Loading...
HomeMy WebLinkAboutReso 28-24 Approving the Plans and Specifications and Awarding a Contract to American Asphalt Repair & Resurfacing Co., Inc. for the Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117 Reso. No. 28-24, Item 5.5, Adopted 04/16/2024 Page 1 of 2 RESOLUTION NO. 28 - 24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO AMERICAN ASPHALT REPAIR & RESURFACING CO., INC. FOR THE ANNUAL STREET RESURFACING (2024 SLURRY SEAL) PROJECT, CIP NO. ST0117 WHEREAS, the design team has completed the plans and specifications for the Annual Street Resurfacing Project (2024 Slurry Seal), CIP No. ST0117, (Project) which includes the roadway resurfacing on 51 street segments by means of crack filling, seal coating the pavement, and installation of pavement delineation; and WHEREAS, the City of Dublin did, on March 26, 2024, publicly open, examine, and declare all sealed bids for doing the work described in the approved plans and specifications for the Project, which plans and specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to Staff and American Asphalt Repair & Resurfacing Co., Inc. was determined to be the lowest responsive and responsible bidder for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves the Plans and Specifications for the Project. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby award the Contract for the Project to the lowest responsive and responsible bidder, American Asphalt Repair & Resurfacing Co., Inc. at a base bid of $809,029, the particulars of which bids are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to approve the Project contract change orders based on the appropriated funds designated for the Project up to the contingency amount of $100,000. BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute the Construction Agreement for the Project with American Asphalt Repair & Resurfacing Co., Inc. {Signatures on the following page} DocuSign Envelope ID: 7823305E-34D4-413D-AAE9-4A320D786947 Reso. No. 28-24, Item 5.5, Adopted 04/16/2024 Page 2 of 2 PASSED, APPROVED AND ADOPTED this 16th day of April 2024, by the following vote: AYES: Councilmembers Hu, Josey, McCorriston, Qaadri and Mayor Hernandez NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk DocuSign Envelope ID: 7823305E-34D4-413D-AAE9-4A320D786947