Loading...
HomeMy WebLinkAboutReso 44-24 Item 5.5 Adopting a List of Projects Funded in Fiscal Year 2024-25 by Senate Bill 1, theDocuSign Envelope ID: 18F374E7-BB2F-42F5-82C6-28ABC1B2890E RESOLUTION NO. 44 — 24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ADOPTING A LIST OF PROJECTS FUNDED IN FISCAL YEAR 2024-25 BY SENATE BILL 1, THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $1,899,234 in RMRA funding in Fiscal Year 2024-25 from SB 1; and WHEREAS, this is the eighth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; and WHEREAS, the City used the Capital Improvement Program and a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets and help add active transportation infrastructure through the City this year and into the future; and WHEREAS, the 2022 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in "very good" condition and this revenue will help us increase and maintain the overall quality of our road system and enhance pedestrian and bicycle safety and mobility within the City; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive benefits to the lifespan of our local streets and enhance pedestrian and bicycle mobility and safety with co -benefits statewide. Reso. No. 44-24, Item 5.5, Adopted 06/04/2024 Page 1 of 3 DocuSign Envelope ID: 18F374E7-BB2F-42F5-82C6-28ABC1B2890E NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the following project to be funded in Fiscal Year 2024-25 with Road Maintenance and Rehabilitation Account revenues: Proiect Title: Annual Street Resurfacing (CIP No. ST0117) for Fiscal Year 2024-25 Proiect Description: This project provides a variety of pavement resurfacing treatments and repairs to existing City streets. The project is budgeted annually to help maintain the substantial investment the City has in the public street system. This Fiscal Year's resurfacing treatments include slurry seal, pavement overlays, and base repairs at the locations described below. Proiect Location: This project provides slurry seal maintenance of collector and residential streets in Dublin Ranch including: Antone Way, Applegate Court, Applegate Way, Blackstone Road, Castleton Court, Castleton Lane, Cedar Crest Terrace, Colebrook Court, Colebrook Lane, Cranbrook Place, Crestridge Terrace, Ferncroft Court, Ferncroft Way, Groveland Lane, Hartland Court, Hartland Lane, Longmeadow Place, N Bridgepoint Lane, N Dublin Ranch Road, N Forestdale Circle, Oakbluff Lane, Oakhurst Court, Oakhurst Way, Rams Gate Court, S Bridgepoint Lane, S Dublin Ranch Road, S Forestdale Circle, Saddlebrook Place, Sugarloaf Court, Woodshire Lane, Hobstone Place, Milbridge Court, Penwood Lane, Penwood Place, Woodvale Terrace, Ledgewood Terrace, Round Hill Drive, Positano Parkway, Newfields Lane, Calcagno Court, Campanille Court, Croak Road, N Terracina Drive, Porcellano Way, S Terracina Drive, Tramont Drive, Travertino Street, Vasari Street, Viento Court, Volterra Court, and Volterra Drive. Additional projects in the Annual Street Resurfacing project (CIP No. ST0117) include a cape seal project on Dublin Boulevard, west of Silvergate Drive, and an overlay project on John Monego Court and Dublin Boulevard between Myrtle Drive and John Monego Court. Estimated Proiect Schedule: Construction starts summer 2024 — completion fall/winter 2024. Estimated Proiect Useful Life: Surface treatments that will be completed as part of this project will have a useful life of between seven and 20 years. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby approve the following project to be funded in Fiscal Year 2024-25 with Road Maintenance and Rehabilitation Account revenues: Proiect Title: Citywide Bicycle and Pedestrian Improvements (CIP No. ST0517) for Fiscal Year 2024-25 Proiect Description: This project includes planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the City. This Fiscal Year's project includes the construction of Rectangular Rapid Flashing Beacons, curb ramp improvements, minor civil improvements, and traffic signal modifications. Proiect Location: The Rectangular Rapid Flashing Beacons will be installed at Amador Valley Boulevard/Burton Street, Central Parkway/Aspen Street, and Grafton Street/Antone Way. The traffic signal modification is located at Central Parkway/Hibernia Drive. Reso. No. 44-24, Item 5.5, Adopted 06/04/2024 Page 2 of 3 DocuSign Envelope ID: 18F374E7-BB2F-42F5-82C6-28ABC1B2890E Estimated Proiect Schedule: Construction starts summer 2024 — completion fall/winter 2024. Estimated Proiect Useful Life: Rectangular Rapid Flashing Beacons and the traffic signal modification will have a useful life of approximately 20 years. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby approve the following project to be funded in Fiscal Year 2024-25 with Road Maintenance and Rehabilitation Account revenues: Proiect Title: Citywide Signal Communications Upgrade (CIP No. ST0713) Proiect Description: This project provides for the continued upgrade of the citywide traffic signal communications system, including expansion of the traffic communication network, which will improve traffic signal operations and safety. In Fiscal Year 2024-25, the project will provide for installation of new 144-strand fiber optic cables along Dublin Boulevard between Sierra Court and San Ramon Road and between Hacienda Drive and Tassajara Road. The fiber optic cable will provide higher bandwidth and connect 13 signalized intersections to the traffic management center. The project will also include updating the vehicle detection at the intersections to make ready for adaptive signal control. Proiect Location: On Dublin Boulevard between San Ramon Road and Sierra Court and between Hacienda Drive and Tassajara Road. Estimated Proiect Schedule: Preconstruction starts winter 2024 — completion spring 2025; construction starts summer 2025 — fall/winter 2025. Estimated Proiect Useful Life: The useful life of improvements varies based on the upgrades needed and the expansion components, which are expected to have a minimum useful life of approximately 10 years. PASSED, APPROVED AND ADOPTED this 4th day of June 2024, by the following vote: AYES: Councilmembers Josey, McCorriston, Qaadri and Mayor Pro Tempore Hu NOES: ABSENT: ABSTAIN: ATTEST: FiliruSigned by: v•�vv. City�Uerf�rµU" . DocuSigned by: Mayor LULASHV40 I... Reso. No. 44-24, Item 5.5, Adopted 06/04/2024 Page 3 of 3