HomeMy WebLinkAboutItem 8.1 5 year CIPSTAFF REPORT
Planning Commission
Page 1 of 4
Agenda Item 8.1
DATE:April 23,2024
TO:Planning Commission
SUBJECT:Five-Year Capital Improvement Program 2024-2029, Finding of General Plan Conformance for Proposed Fiscal Year 2024-25 and Fiscal Year 2025-26Prepared by:Michael Boitnott, Capital Improvement Program Manager
EXECUTIVE SUMMARY:The Planning Commission will consider finding that the Fiscal Year 2024-25 and Fiscal Year 2025-26 projects within the Capital Improvement Program are in conformance with the General Plan.
STAFF RECOMMENDATION:Adopt a Resolution Finding Conformity with the General Plan for the Fiscal Year 2024-25and Fiscal Year 2025-26 Projects in the Five-Year Capital Improvement Program 2024-2029.
DESCRIPTION:BackgroundGovernment Code Sections 65103, 65401 and 65402 require the Planning Commission to review public works projects proposed for the ensuing fiscal year for their conformance with the City’s adopted General Plan (refer to Attachment 1).City Staff prepared a Five-Year Capital Improvement Program (CIP) covering Fiscal Year 2024-25through Fiscal Year 2028-29. The CIP was prepared to identify public infrastructure improvements, public art, park development, facilities development and other capital items for this five-year period.The Planning Commission’s role is to review the CIP and determine whether the CIP is in conformance with the City’s General Plan. The Planning Commission’s review is limited to only those projects that will be undertaken in Fiscal Year 2024-25 and Fiscal Year 2025-26. As noted in the CIP, the precise timing of projects is subject to revision with future updates.AnalysisFive-Year Capital Improvement Program ProjectsBelow is the list of projects that are proposed for Fiscal Year 2024-25 and Fiscal Year 2025-26 in the Five-Year CIP as it relates to the review by the Planning Commission. The projects are detailed
11
Page 2 of 4
in the draftCIP booklet. The list below provides the project number, project name, and an indication of whether the project is new to the CIP. Some projects were contained in the previous CIP (2022-2027) and span several fiscal years. Those projects are included again for Planning Commission review, even though the projects were previously found in conformance with the General Plan by Planning Commission Resolution No. 22-08, dated May 10, 2022.GENERAL IMPROVEMENTSGI0421Audio Visual System UpgradeGI0121Citywide Energy ImprovementsGI0001Civic Center Elevator Modernization GI0002 Civic Center Exterior Glazing, Sealing & Painting GI0122 Civic Center RehabilitationGI0219Electric Vehicle (EV) Charging Stations GI0521 Library Tenant ImprovementsGI0124Marquee SignsGI0221Resiliency and Disaster Preparedness ImprovementsGINEW01Condition Assessment of Water Features NEWGINEW03Facilities Parking Lot Resurfacing NEWGINEW05Waste Enclosure Upgrades NEWPUBLICARTPA0123Downtown Dublin PANEW01 Outdoor Murals NEWPARKSPK0221Downtown Dublin Town Square ParkPK0422Iron Horse Nature Park and Open SpacePK0322Jordan Ranch Neighborhood ParkPK0224Kolb Park RenovationPK0001Sunday School Barn Improvements PKNEW02 Sports Courts Resurfacing NEW STREETSST0117 Annual Street ResurfacingST0517Citywide Bicycle and Pedestrian ImprovementsST0713Citywide Signal Communication UpgradeST0124Citywide Storm Drain ImprovementsST0221Downtown Dublin Street Grid NetworkST0216Dublin Boulevard Extension –Fallon Road to North CanyonsParkwayST0417Dublin Ranch Street Light ImprovementsST0423Golden Gate Drive Intersection Improvements at Dublin Boulevard and St. Patrick Way
12
Page 3 of 4
ST0121 Green Stormwater InfrastructureST0119Tassajara Road Improvements –North Dublin Ranch Drive to Quarry Lane SchoolST0116Tassajara Road Realignment and Widening –Fallon Road to North City Limit ST0001 Traffic Signal Re-LampingST0323Village Parkway Reconstruction Future Projects - Beyond the Five-Year CIPThe following list contains identified public works projects with funding that is anticipated beyond the five-year CIP time frame. The list includes projects derived from several sources, including but not limited to, the Parks and Recreation Master Plan, the Streetscape Master Plan, the Eastern Dublin Specific Plan, the Eastern Dublin Transportation Impact Fee program, and the Western Dublin Transportation Impact Fee program. FUTURE PROJECTSGINEW02Corporation Yard Equipment Wash PadS-01 City Entrance SignsS-02 Eastern Dublin Transportation Impact FeeS-03 Western Dublin Transportation Impact FeeP-01 Dublin Sports Grounds -Phase 5 RenovationP-02 Croak Neighborhood Park WestP-03 Croak Neighborhood Park EastP-04 Emerald Glen Recreation &Aquatic Center Phase 2In summary, the 2024-2029 CIP outlines a five-year program for a variety of public infrastructure projects and associated timing, financing, and related details. The Five-Year CIP is consistent with the overarching goals and policies of the General Plan to meet the needs of the community, including those found in the Land Use Element, Parks and Open Space Element, Public Lands and Utilities Element, Conservation Element, Safety Element, Community Design and Sustainability Element, and Economic Development Element.A draft PlanningCommission Resolution finding conformity with the General Planfor the Fiscal Year 2024-25 and Fiscal Year 2025-26 Projects in the Five-Year Capital Improvement Program 2024-2029 is included as Attachment 2. The draft Capital Improvement Program 2024-2029 is included as Attachment 3.
ENVIRONMENTAL DETERMINATION:The proposed Finding of General Plan Conformance is not a project as defined by the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15378 because it does not commit the City to any of the identified projects in the Capital Improvement Program (CIP). Individual projects identified within the CIP will be reviewed in accordance with CEQA requirements prior to their implementation when specific project details are available for analysis.
13
Page 4 of 4
NOTICING REQUIREMENTS/PUBLIC OUTREACH:A public hearing is not required for a General Plan Conformity Finding and, therefore, no public notice was provided. The Planning Commission Agenda was posted.
ATTACHMENTS:1) Excerpts from the Government Code2) Resolution Finding Conformity with the General Plan for the Fiscal Year 2024-25 and Fiscal Year 2025-26 Projects in the Five-Year Capital Improvement Program 2024-20293) Draft Proposed Five-Year Capital Improvement Program 2024-2029
14
Attachment 1
CALIFORNIA GOVERNMENT CODE - EXCERPT
TITLE 7. PLANNING AND LAND USE [65000 - 66499.58]
( Heading of Title 7 amended by Stats. 1974, Ch. 1536. )
DIVISION 1. PLANNING AND ZONING [65000 - 66210]
( Heading of Division 1 added by Stats. 1974, Ch. 1536. )
CHAPTER 3. Local Planning [65100 - 65763]
( Chapter 3 repealed and added by Stats. 1965, Ch. 1880. )
ARTICLE 1. Local Planning
( Article 1 repealed and added by Stats. 1984, Ch. 690, Sec. 2. )
65103.
Each planning agency shall perform all of the following functions:
(a) Prepare, periodically review, and revise, as necessary, the general plan.
(b) Implement the general plan through actions including, but not limited to, the
administration of specific plans and zoning and subdivision ordinances.
(c) Annually review the capital improvement program of the city or county and the local
public works projects of other local agencies for their consistency with the general plan,
pursuant to Article 7 (commencing with Section 65400).
(d) Endeavor to promote public interest in, comment on, and understanding of the general
plan, and regulations relating to it.
(e) Consult and advise with public officials and agencies, public utility companies, civic,
educational, professional, and other organizations, and citizens generally concerning
implementation of the general plan.
(f) Promote the coordination of local plans and programs with the plans and programs of
other public agencies.
(g) Perform other functions as the legislative body provides, including conducting studies
and preparing plans other than those required or authorized by this title.
(Repealed and added by Stats. 1984, Ch. 690, Sec. 2.)
ARTICLE 7. Administration of General Plan
( Article 7 added by Stats. 1965, Ch. 1880. )
65401.
If a general plan or part thereof has been adopted, within such time as may be fixed by the
legislative body, each county or city officer, department, board, or commission, and each
governmental body, commission, or board, including the governing body of any special
district or school district, whose jurisdiction lies wholly or partially within the county or city,
whose functions include recommending, preparing plans for, or constructing, major public
works, shall submit to the official agency, as designated by the respective county board of
supervisors or city council, a list of the proposed public works recommended for planning,
15
initiation or construction during the ensuing fiscal year. The official agency receiving the list
of proposed public works shall list and classify all such recommendations and shall prepare
a coordinated program of proposed public works for the ensuing fiscal year. Such
coordinated program shall be submitted to the county or city planning agency for review
and report to said official agency as to conformity with the adopted general plan or part
thereof.
(Amended by Stats. 1970, Ch. 1590.)
65402.
(a) If a general plan or part thereof has been adopted, no real property shall be acquired
by dedication or otherwise for street, square, park or other public purposes, and no real
property shall be disposed of, no street shall be vacated or abandoned, and no public
building or structure shall be constructed or authorized, if the adopted general plan or part
thereof applies thereto, until the location, purpose and extent of such acquisition or
disposition, such street vacation or abandonment, or such public building or structure have
been submitted to and reported upon by the planning agency as to conformity with said
adopted general plan or part thereof. The planning agency shall render its report as to
conformity with said adopted general plan or part thereof within forty (40) days after the
matter was submitted to it, or such longer period of time as may be designated by the
legislative body.
If the legislative body so provides, by ordinance or resolution, the provisions of this
subdivision shall not apply to: (1) the disposition of the remainder of a larger parcel which
was acquired and used in part for street purposes; (2) acquisitions, dispositions, or
abandonments for street widening; or (3) alignment projects, provided such dispositions for
street purposes, acquisitions, dispositions, or abandonments for street widening, or
alignment projects are of a minor nature.
(b) A county shall not acquire real property for any of the purposes specified in paragraph
(a), nor dispose of any real property, nor construct or authorize a public building or
structure, in another county or within the corporate limits of a city, if such city or other
county has adopted a general plan or part thereof and such general plan or part thereof is
applicable thereto, and a city shall not acquire real property for any of the purposes
specified in paragraph (a), nor dispose of any real property, nor construct or authorize a
public building or structure, in another city or in unincorporated territory, if such other city
or the county in which such unincorporated territory is situated has adopted a general plan
or part thereof and such general plan or part thereof is applicable thereto, until the
location, purpose and extent of such acquisition, disposition, or such public building or
structure have been submitted to and reported upon by the planning agency having
jurisdiction, as to conformity with said adopted general plan or part thereof. Failure of the
planning agency to report within forty (40) days after the matter has been submitted to it
shall be conclusively deemed a finding that the proposed acquisition, disposition, or public
building or structure is in conformity with said adopted general plan or part thereof. The
provisions of this paragraph (b) shall not apply to acquisition or abandonment for street
widening or alignment projects of a minor nature if the legislative body having the real
property within its boundaries so provides by ordinance or resolution.
(c) A local agency shall not acquire real property for any of the purposes specified in
paragraph (a) nor dispose of any real property, nor construct or authorize a public building
or structure, in any county or city, if such county or city has adopted a general plan or part
16
thereof and such general plan or part thereof is applicable thereto, until the location,
purpose and extent of such acquisition, disposition, or such public building or structure
have been submitted to and reported upon by the planning agency having jurisdiction, as
to conformity with said adopted general plan or part thereof. Failure of the planning agency
to report within forty (40) days after the matter has been submitted to it shall be
conclusively deemed a finding that the proposed acquisition, disposition, or public building
or structure is in conformity with said adopted general plan or part thereof. If the planning
agency disapproves the location, purpose or extent of such acquisition, disposition, or the
public building or structure, the disapproval may be overruled by the local agency.
Local agency as used in this paragraph (c) means an agency of the state for the local
performance of governmental or proprietary functions within limited boundaries. Local
agency does not include the state, or county, or a city.
(Amended by Stats. 1974, Ch. 700.)
17
Attachment 2
RESOLUTION NO. 24 - XX
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
FINDING CONFORMITY WITH THE GENERAL PLAN FOR THE FISCAL YEAR 2024-25 AND
FISCAL YEAR 2025-26 PROJECTS IN THE FIVE-YEAR CAPITAL IMPROVEMENT
PROGRAM 2024-2029
WHEREAS, the City of Dublin has prepared a Five-Year Capital Improvement Program
(CIP) outlining major infrastructure improvements for the years 2024-2029; and
WHEREAS,Sections 65103 of the Government Code requires that the Planning
Commission review the Capital Improvement Program for consistency with the City of Dublin
General Plan; and
WHEREAS, Sections 65401 and 65402(a) of the Government Code require that plans
formajor public works projects for the ensuing fiscal year be submitted to the Planning
Commission for review as to conformance with the adopted City of Dublin General Plan; and
WHEREAS,theproposedfindingofGeneralPlanConformanceisnotaprojectas defined
by the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15378
because it does not commit the City to any of the identified projects in the CIP; and
WHEREAS, the Planning Commission did review and consider the draft document and
heard recommendations at a public meeting on April 23, 2024.
NOW, THEREFORE, BE IT RESOLVED that the City of Dublin Planning Commission
doeshereby find that those major public works projects proposed to occur during Fiscal Year
2024-25 and 2025-26 as presented in the 2024-2029 Capital Improvement Program are
covered by the adopted General Plan and comply with the General Plan as adopted.
BE IT FURTHER RESOLVED that said Resolution shall be submitted to the City Council
in accordance with the Government Code.
PASSED, APPROVED AND ADOPTED this 23rd day of April 2024 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Planning Commission Chair
ATTEST:
18
Assistant Community Development Director
19
DRAFT PROPOSED FIVE-YEAR
CAPITAL IMPROVEMENT PROGRAM
2024-2029
Attachment 3
20
Proposed Five-Year Capital Improvement Program
2024-2029
April 2024
Melissa Hernandez, Mayor
Sherry Hu, Vice Mayor
Jean Josey, Council Member
Michael McCorriston, Council Member
Kashef Qaadri, Council Member
Submitted by: Linda Smith, City Manager
Colleen Tribby, Assistant City Manager
21
Contents City of Dublin Proposed Capital Improvement Program 2024-2029 i
CONTENTS
CONTENTS ........................................................................................................................................................................................................................................................................... i
SUMMARY SCHEDULES .................................................................................................................................................................................................................................................. 1
HIGHLIGHTS ................................................................................................................................................................................................................................................................. 1
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – GENERAL IMPROVEMENTS ............................................................................................................ 3
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – PUBLIC ART ......................................................................................................................................... 5
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – PARKS ..................................................................................................................................................... 6
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – STREETS ................................................................................................................................................. 8
GENERAL IMPROVEMENTS ......................................................................................................................................................................................................................................... 10
LOCATION MAP ....................................................................................................................................................................................................................................................... 11
AUDIO VISUAL SYSTEM UPGRADE ........................................................................................................................................................................................... 12
CITYWIDE ENERGY IMPROVEMENTS ....................................................................................................................................................................................... 13
CIVIC CENTER ELEVATOR MODERNIZATION ............................................................................................................................................................................ 15
CIVIC CENTER EXTERIOR GLAZING, SEALING & PAINTING ....................................................................................................................................................... 16
DUBLIN ARTS CENTER .............................................................................................................................................................................................................. 20
DUBLIN STANDARD PLANS & DETAILS UPDATE ....................................................................................................................................................................... 21
ELECTRIC VEHICLE (EV) CHARGING STATIONS ......................................................................................................................................................................... 22
EXTERIOR PAINTING AT VARIOUS CITY FACILITIES .................................................................................................................................................................. 24
FACILITIES PARKING LOT RESURFACING .................................................................................................................................................................................. 25
FINANCIAL SYSTEM REPLACEMENT ......................................................................................................................................................................................... 26
IRRIGATION SYSTEM UPGRADES ............................................................................................................................................................................................. 27
IT INFRASTRUCTURE IMPROVEMENT ...................................................................................................................................................................................... 28
LIBRARY TENANT IMPROVEMENTS .......................................................................................................................................................................................... 29
MARQUEE SIGNS ...................................................................................................................................................................................................................... 30
22
Contents City of Dublin Proposed Capital Improvement Program 2024-2029 ii
MUNICIPAL FIBER..................................................................................................................................................................................................................... 31
RESILIENCY AND DISASTER PREPAREDNESS IMPROVEMENTS ................................................................................................................................................ 32
ROOF REPLACEMENT AT VARIOUS CITY FACILITIES ................................................................................................................................................................. 33
SHANNON COMMUNITY CENTER PLAY YARD .......................................................................................................................................................................... 34
SITUATIONAL AWARENESS CAMERA PROGRAM ..................................................................................................................................................................... 35
WASTE ENCLOSURES UPGRADES ............................................................................................................................................................................................. 36
THE WAVE POOL REPLASTERING ............................................................................................................................................................................................. 37
PUBLIC ART ...................................................................................................................................................................................................................................................................... 38
LOCATION MAP ....................................................................................................................................................................................................................................................... 39
CAMP PARKS SIGN ................................................................................................................................................................................................................... 40
DOWNTOWN DUBLIN .............................................................................................................................................................................................................. 41
HERITAGE PARK ....................................................................................................................................................................................................................... 42
OUTDOOR MURALS ................................................................................................................................................................................................................. 43
PARKS.................................................................................................................................................................................................................................................................................. 44
LOCATION MAP ....................................................................................................................................................................................................................................................... 45
ALAMO CREEK PARK AND ASSESSMENT DISTRICT – FENCE REPLACEMENT ........................................................................................................................... 46
DON BIDDLE COMMUNITY PARK ............................................................................................................................................................................................. 47
DOWNTOWN DUBLIN TOWN SQUARE PARK........................................................................................................................................................................... 48
DUBLIN SPORTS GROUNDS REHABILITATION .......................................................................................................................................................................... 49
FALLON SPORTS PARK – ARTIFICIAL TURF FIELD REPLACEMENT ............................................................................................................................................ 50
FALLON SPORTS PARK – PHASE 3 ............................................................................................................................................................................................ 51
IRON HORSE NATURE PARK AND OPEN SPACE........................................................................................................................................................................ 52
JORDAN RANCH NEIGHBORHOOD SQUARE ............................................................................................................................................................................ 54
KOLB PARK RENOVATION ........................................................................................................................................................................................................ 55
PARKS PLAYGROUND REPLACEMENT ...................................................................................................................................................................................... 56
PERSIMMON DRIVE PEDESTRIAN PATH REHABILITATION ....................................................................................................................................................... 57
23
Contents City of Dublin Proposed Capital Improvement Program 2024-2029 iii
RESTROOMS REPLACEMENT .................................................................................................................................................................................................... 58
SPORTS COURTS RESURFACING ............................................................................................................................................................................................... 59
SUNDAY SCHOOL BARN IMPROVEMENTS ............................................................................................................................................................................... 60
WALLIS RANCH COMMUNITY PARK ......................................................................................................................................................................................... 61
STREETS .............................................................................................................................................................................................................................................................................. 62
SUMMARY OF PROJECTS PROJECTED TO BE COMPLETED IN FISCAL YEAR 2023-2024 .............................................................................................................. 62
LOCATION MAP ....................................................................................................................................................................................................................................................... 63
AMADOR PLAZA ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS ..................................................................................................................................... 64
ANNUAL STREET RESURFACING ............................................................................................................................................................................................... 65
CITY ENTRANCE MONUMENT SIGNS ....................................................................................................................................................................................... 67
CITYWIDE BICYCLE AND PEDESTRIAN IMPROVEMENTS .......................................................................................................................................................... 68
CITYWIDE SIGNAL COMMUNICATIONS UPGRADE................................................................................................................................................................... 70
CITYWIDE STORM DRAIN IMPROVEMENTS ............................................................................................................................................................................. 72
DOWNTOWN DUBLIN STREET GRID NETWORK....................................................................................................................................................................... 73
DUBLIN BOULEVARD EXTENSION – FALLON ROAD TO NORTH CANYONS PARKWAY ............................................................................................................. 74
DUBLIN RANCH STREETLIGHT IMPROVEMENTS ...................................................................................................................................................................... 76
GOLDEN GATE DRIVE INTERSECTION IMPROVEMENTS - DUBLIN BLVD AND ST. PATRICK WAY ............................................................................................ 77
GREEN STORMWATER INFRASTRUCTURE ............................................................................................................................................................................... 78
IRON HORSE TRAIL BRIDGE AT DUBLIN BOULEVARD .............................................................................................................................................................. 80
SAN RAMON ROAD LANDSCAPE RENOVATION ....................................................................................................................................................................... 82
SAN RAMON ROAD TRAIL LIGHTING ....................................................................................................................................................................................... 83
TASSAJARA ROAD IMPROVEMENTS - NORTH DUBLIN RANCH DRIVE TO QUARRY LANE SCHOOL ......................................................................................... 84
TASSAJARA ROAD REALIGNMENT AND WIDENING - FALLON ROAD TO NORTH CITY LIMIT ................................................................................................... 86
TRAFFIC SIGNAL AND ROADWAY SAFETY IMPROVEMENTS .................................................................................................................................................... 88
TRAFFIC SIGNAL RE-LAMPING ................................................................................................................................................................................................. 89
VILLAGE PARKWAY RECONSTRUCTION ................................................................................................................................................................................... 90
24
Contents City of Dublin Proposed Capital Improvement Program 2024-2029 iv
FUTURE PROJECTS ......................................................................................................................................................................................................................................................... 92
LOCATION MAP ....................................................................................................................................................................................................................................................... 93
CROAK NEIGHBORHOOD PARK EAST ....................................................................................................................................................................................... 94
CROAK NEIGHBORHOOD PARK WEST ...................................................................................................................................................................................... 94
DUBLIN SPORTS GROUNDS – PHASE 5 RENOVATION.............................................................................................................................................................. 95
EMERALD GLEN RECREATION AND AQUATIC COMPLEX - PHASE 2 ......................................................................................................................................... 95
CITY ENTRANCE SIGNS ............................................................................................................................................................................................................. 96
EASTERN DUBLIN TRANSPORTATION IMPACT FEE .................................................................................................................................................................. 96
WESTERN DUBLIN TRANSPORTATION IMPACT FEE ................................................................................................................................................................. 97
25
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 1
SUMMARY SCHEDULES
HIGHLIGHTS
The following schedule provides an overview of the financial information contained in the Proposed Five-Year Capital Improvement Program 2024-
2029.
The first summary schedule highlights expenditures by program area for all projects and identifies the financing category used for the projects. The
following financial schedules provide information by major program area (General Improvements, Public Art, Parks, and Streets) as well as separate
schedules listing unfunded or Future Projects. Additional details about each project are in the corresponding program area.
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – ALL FUNDS
2024-2029 CAPITAL IMPROVEMENT PROGRAM
CATEGORY
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
General Improvements $52,485,029 $10,425,459 $3,952,000 $500,000 $1,500,000 $200,000 $3,775,000 $72,637,488
Public Art $1,745,150 $500,000 $300,000 $250,000 $2,795,150
Parks $58,120,397 $1,943,185 $8,579,595 $150,000 $1,100,000 $5,150,000 $5,500,000 $80,543,177
Streets $101,819,502 $22,150,578 $16,607,000 $14,999,500 $11,292,000 $5,292,000 $105,422,306 $277,582,886
TOTAL COSTS $214,170,078 $35,019,222 $29,438,595 $15,899,500 $13,892,000 $10,642,000 $114,497,306 $433,558,701
26
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 2
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – FINANCING
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – ALL FUNDS
2024-2029 CAPITAL IMPROVEMENT PROGRAM
2024-2029 CAPITAL IMPROVEMENT PROGRAM
FINANCING
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
General Fund $55,192,698 $4,612,698 $15,551,900 $2,357,500 $1,850,000 $1,850,000 $3,575,000 $84,989,532
Special Revenue $29,795,310 $7,042,593 $3,798,100 $4,800,000 $3,400,000 $3,400,000 $52,236,003
Special Revenue
Funds-Assmt. Dist. $1,522,517 $42,000 $42,000 $42,000 $42,000 $42,000 $1,732,517
Public Art Fund $1,745,150 $500,000 $300,000 $250,000 $2,795,150
Traffic Impact Fees $26,998,827 $816,320 $2,500,000 $30,315,147
Public Facility Fees $44,639,675 $1,563,505 $2,490,941 $4,500,000 $53,194,121
Internal Service Funds $5,000,938 $7,621,000 $2,277,000 $650,000 $2,600,000 $5,350,000 $1,000,000 $24,498,938
Energy Improve. Lease
Bond $20,656,074 $20,656,074
Grants (Federal, State,
Local) $10,376,324 $321,106 $10,697,430
Dublin Crossing Fund $1,000,000 $1,000,000
Other $4,385,687 $12,500,000 $16,885,687
Developer Built $12,857,142 $12,857,142
Unidentified $4,978,654 $5,300,000 $6,000,000 $105,422,306 $121,700,960
TOTAL
FINANCING $214,170,078 $35,019,222 $29,438,595 $15,899,500 $13,892,000 $10,642,000 $114,497,306 $433,558,701
27
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 3
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – GENERAL IMPROVEMENTS
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
GI0421 Audio Visual System Upgrade $473,040 $771,000 $177,000 $1,421,040
GI0121 Citywide Energy Improvements $23,014,270 $1,500,000 $1,000,000 $25,514,270
GI0001 Civic Center Elevator Modernization $900,000 $900,000
GI0002
Civic Center Exterior Glazing, Sealing &
Painting $4,250,000 $4,250,000
GI0122 Civic Center Rehabilitation $2,031,730 $205,000 $2,236,730
GINEW01 Condition Assessment of Water Features $50,000 $50,000
GINEW02 Corporation Yard Equipment Wash Pad $475,000 $475,000
GI0120 Dublin Arts Center $14,397,035 $14,397,035
GI0123 Dublin Standard Plans & Details Update $142,500 $142,500
GI0219 Electric Vehicle (EV) Charging Stations $230,000 $197,459 $300,000 $727,459
GI0223 Exterior Painting at Various City Facilities $785,000 $785,000
GINEW03 Facilities Parking Lot Resurfacing $500,000 $500,000 $1,000,000
GI0319 Financial System Replacement $2,515,000 $2,515,000
GI0224 Irrigation System Upgrades $1,840,000 $1,840,000
GI0117 IT Infrastructure Improvement $1,243,600 $1,243,600
GI0521 Library Tenant Improvements $2,835,665 $2,000,000 $4,835,665
GI0124 Marquee Signs $495,000 $350,000 $845,000
GI0323 Municipal Fiber $140,000 $140,000
GI0221 Resiliency and Disaster Preparedness Imp. $1,102,189 $277,000 $1,375,000 $2,754,189
GI0423 Roof Replacement at Various City Facilities $655,000 $655,000
GINEW04 Shannon Community Center Play Yard $200,000 $200,000
GI0523 Situational Awareness Camera Program $585,000 $585,000
GINEW05 Waste Enclosure Upgrades $325,000 $2,800,000 $3,125,000
GINEW06 The Wave Pool Replastering $500,000 $1,500,000 $2,000,000
TOTAL COSTS $52,485,029 $10,425,459 $3,952,000 $500,000 $1,500,000 $200,000 $3,575,000 $72,637,488
PROJECT NUMBER & DESCRIPTION
2024-2029 CAPITAL IMPROVEMENT PROGRAM
28
Contents City of Dublin Proposed Capital Improvement Program 2024-2029 4
FINANCING
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
1001 General Fund $7,755,149 $1,908,124 $2,275,000 $3,575,000 $15,513,273
1101 General Fund Designated Reserves $9,301,527 $275,229 $9,576,756
2207 Transportation for Clean Air $18,000 $18,000
2705 Street Light District East Dublin 1999-1 $860,776 $860,776
2811 Cable TV Facilities $300,000 $300,000
2921 State Grant General $1,380,000 $193,876 $1,573,876
4100 Public Facility Fees $7,634,865 $7,634,865
6205 Internal Service Fund - Facilities Replacement $3,073,638 $7,150,000 $1,500,000 $500,000 $1,500,000 $200,000 $13,923,638
6305 Internal Service Fund - Equipment $655,000 $655,000
6605 IT Fund $1,150,000 $471,000 $177,000 $1,798,000
7102 Energy Improve. Lease Bond $20,656,074 $20,656,074
9902 Federal Grants $127,230 $127,230
TOTAL FINANCING $52,485,029 $10,425,459 $3,952,000 $500,000 $1,500,000 $200,000 $3,575,000 $72,637,488
2024-2029 CAPITAL IMPROVEMENT PROGRAM
29
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 5
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – PUBLIC ART
PRIOR
YEAR
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
PA0121 Camp Parks Sign $500,450 $500,450
PA0123 Downtown Dublin $650,000 $300,000 $300,000 $250,000 $1,500,000
PA0222 Heritage Park $594,700 $594,700
PANEW01 Outdoor Murals $200,000 $200,000
TOTAL COSTS $1,745,150 $500,000 $300,000 $250,000 $2,795,150
FINANCING
2801 Public Art Fund $1,745,150 $500,000 $300,000 $250,000 $2,795,150
TOTAL FINANCING $1,745,150 $500,000 $300,000 $250,000 $2,795,150
PROJECT NUMBER & DESCRIPTION
2024-2029 CAPITAL IMPROVEMENT PROGRAM
30
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 6
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – PARKS
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
PK0122
Alamo Creek Park and Assessment District - Fence
Replacement $850,000 $850,000
PK0115 Don Biddle Community Park $24,824,005 $24,824,005
PK0221 Downtown Dublin Town Square Park $106,885 $4,680 $4,500,000 $4,611,565
PK0002 Dublin Sports Grounds Rehabilitation $150,000 $600,000 $2,900,000 $3,650,000
PKNEW01 Fallon Sports Park - Artificial Turf Field Replacement $2,250,000 $2,250,000
PK0119 Fallon Sports Park - Phase 3 $9,623,000 $9,623,000
PK0422 Iron Horse Nature Park and Open Space $5,403,000 $1,463,505 $5,269,595 $12,136,100
PK0322 Jordan Ranch Neighborhood Square $2,798,947 $350,000 $3,148,947
PK0224 Kolb Park Renovation $450,000 $2,450,000 $2,900,000
PK0124 Parks Playground Replacement $1,109,560 $1,109,560
PK0123 Persimmon Drive Pedestrian Path Rehabilitation $195,000 $195,000
PK0321 Restrooms Replacement $1,000,000 $1,000,000
PKNEW02 Sports Courts Resurfacing $600,000 $500,000 $1,000,000 $2,100,000
PK0001 Sunday School Barn Improvements $125,000 $260,000 $385,000
PK0421 Wallis Ranch Community Park $11,760,000 $11,760,000
TOTAL COSTS $58,120,397 $1,943,185 $8,579,595 $150,000 $1,100,000 $5,150,000 $5,500,000 $80,543,177
PROJECT NUMBER & DESCRIPTION
2024-2029 CAPITAL IMPROVEMENT PROGRAM
31
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 7
FINANCING
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
1001 General Fund $3,169,445 $129,680 $2,710,000 $6,009,125
1101 General Fund Designated Reserves $2,200,000 $2,200,000
2215 Measure BB Sales Tax – Bike & Ped. Fund (ACTC) $250,000 $250,000
2403 State Park Grant $2,294,000 $2,294,000
2703 Landscape District Dougherty 1986-1 $400,000 $400,000
2704 Landscape District Santa Rita 1997-1 $195,000 $195,000
4100 Public Facility Fees $37,004,810 $1,563,505 $2,490,941 $4,500,000 $45,559,256
6205 Internal Service Fund - Facilities Replacement $600,000 $150,000 $1,100,000 $5,150,000 $1,000,000 $8,000,000
9998 Unidentified $2,778,654 $2,778,654
9999 Developer Built $12,857,142 $12,857,142
TOTAL FINANCING $58,120,397 $1,943,185 $8,579,595 $150,000 $1,100,000 $5,150,000 $5,500,000 $80,543,177
2024-2029 CAPITAL IMPROVEMENT PROGRAM
32
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 8
SUMMARY 2024-2029 CAPITAL IMPROVEMENT PROGRAM – STREETS
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
ST0815 Amador Plaza Road Bicycle and Pedestrian Imp. $1,413,649 $1,413,649
ST0117 Annual Street Resurfacing $15,530,538 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $38,030,538
ST0319 City Entrance Monument Signs $485,000 $485,000
ST0517 Citywide Bicycle and Pedestrian Improvements $4,655,372 $1,788,228 $750,000 $750,000 $750,000 $750,000 $9,443,600
ST0713 Citywide Signal Communications Upgrade $4,326,616 $825,040 $5,151,656
ST0124 Citywide Storm Drain Improvements $30,000 $30,000 $157,500 $217,500
ST0221 Downtown Dublin Street Grid Network $219,030 $8,990 $21,200,000 $21,428,020
ST0216
Dublin Boulevard Extension - Fallon Road to North
Canyons Parkway $30,741,712 $11,200,000 $84,222,306 $126,164,018
ST0417 Dublin Ranch Street Light Improvements $66,741 $42,000 $42,000 $42,000 $42,000 $42,000 $276,741
ST0423
Golden Gate Drive Intersection Improvements at
Dublin Boulevard and St. Patrick Way $135,320 $816,320 $3,500,000 $4,451,640
ST0121 Green Stormwater Infrastructure $3,289,063 $420,000 $450,000 $4,159,063
ST0118 Iron Horse Trail Bridge at Dublin Boulevard $14,004,439 $14,004,439
ST0218 San Ramon Road Landscape Renovation $239,065 $239,065
ST0514 San Ramon Road Trail Lighting $173,461 $173,461
ST0119
Tassajara Road Improvements - North Dublin Ranch
Drive to Quarry Lane School $13,500,000 $500,000 $14,000,000
ST0116
Tassajara Road Realignment and Widening - Fallon
Road to North City Limit $11,777,416 $1,000,000 $12,777,416
ST0123 Traffic Signal and Roadway Safety Improvements $170,000 $170,000
ST0223 Traffic Signal Re-Lamping $512,080 $135,000 $647,080
ST0323 Village Parkway Reconstruction $550,000 $1,050,000 $11,150,000 $5,600,000 $6,000,000 $24,350,000
TOTAL COSTS $101,819,502 $22,150,578 $16,607,000 $14,999,500 $11,292,000 $5,292,000 $105,422,306 $277,582,886
PROJECT NUMBER & DESCRIPTION
2024-2029 CAPITAL IMPROVEMENT PROGRAM
33
Summary Schedules City of Dublin Proposed Capital Improvement Program 2024-2029 Page 9
FINANCING
PRIOR
YEARS
2024-2025
BUDGET 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTAL
1001 General Fund $9,642,788 $879,665 $2,116,900 $1,907,500 $1,850,000 $1,850,000 $18,246,853
1101 General Fund Designated Reserves $23,123,525 $1,420,000 $8,450,000 $450,000 $33,443,525
2201 State Gas Tax $7,818,041 $462,300 $723,100 $850,000 $650,000 $650,000 $11,153,441
2202 Federal Transportation Grant
2203 Transportation Development Act $210,000 $210,000
2204 Measure B Sales Tax - Local Streets Fund (ACTC) $3,131,619 $1,322,025 $4,453,644
2205
Measure B Sales Tax - Bike & Pedestrian Fund
(ACTC)$842,900 $842,900
2206 State Transportation Improvement
2207 Transportation for Clean Air $1,002,419 $1,002,419
2212 Vehicle Registration Fee (ACTC) $1,738,356 $35,040 $1,773,396
2214 Measure BB Sales Tax - Local Streets Fund (ACTC) $5,187,620 $1,780,000 $550,000 $1,050,000 $250,000 $250,000 $9,067,620
2215
Measure BB Sales Tax - Bike & Pedestrian Fund
(ACTC) $1,366,372 $798,228 $275,000 $650,000 $250,000 $250,000 $3,589,600
2216 Measure B Grants $82,500 $82,500
2217 Measure BB Grants $6,619,824 $6,619,824
2218 Measure RR $1,500,000 $1,500,000
2220 Road Maint. & Rehab Account (RMRA) $6,819,983 $2,395,000 $2,250,000 $2,250,000 $2,250,000 $2,250,000 $18,214,983
2304 Local Recycling Programs $160,000 $160,000
2705 Street Light District East Dublin 1999-1 $66,741 $42,000 $42,000 $42,000 $42,000 $42,000 $276,741
4300 Eastern Dublin Transportation Impact Fee $13,328,260 $13,328,260
4303 Traffic Impact Fee - Category 3 $409,263 $409,263
4304 Western Dublin Transportation Impact Fee $1,747,969 $816,320 $2,500,000 $5,064,289
4305 Traffic Impact Fee - Dougherty Valley $5,464,338 $5,464,338
4306 Tri-Valley Transportation Development Fee $6,003,017 $6,003,017
4309 Mitigation Contributions $45,980 $45,980
4401 Dublin Crossing Development Fee $1,000,000 $1,000,000
6305 Internal Service Fund - Equipment $122,300 $122,300
9901 Other County Reimbursement $2,335,687 $2,335,687
9997 Other $2,050,000 $12,200,000 $14,250,000
9998 Unidentified $2,200,000 $5,300,000 $6,000,000 $105,422,306 $118,922,306
9999 Developer Built
TOTAL FINANCING $101,819,502 $22,150,578 $16,607,000 $14,999,500 $11,292,000 $5,292,000 $105,422,306 $277,582,886
2024-2029 CAPITAL IMPROVEMENT PROGRAM
34
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 10
GENERAL IMPROVEMENTS
35
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 11
LOCATION MAP
36
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 12
Number – GI0421 AUDIO VISUAL SYSTEM UPGRADE Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of the audio visual-system upgrades in the Ambrose Hall and adjoining conference room at the Shannon
Community Center, the Alamilla Springs Ballroom at the Senior Center, the Program Room at the Dublin Library, the Emergency Operations Center, and the Bray
Community Room. These upgrades will include replacement of equipment to improve the service quality for rentals, meetings, corporate events, and staff use. In addition
to those major staff/public AV facilities, smaller, citywide staff conference room hardware will be modernized, replaced, and/or updated. All these upgrades will bring the
City’s audio-visual systems up to current industry standards and ADA compliance. A request for proposals was completed in summer 2022 for the design and construction
is anticipated for summer 2024.
ANNUAL OPERATING IMPACT: To be determined.
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $23,224 $23,224
9200 – Contract Services $107,026 $330,000 $67,000 $504,026
9500 – Miscellaneous $128,000 $30,000 $158,000
9600 – Equipment $342,790 $313,000 $80,000 $735,790
TOTAL $473,040 $771,000 $177,000 $1,421,040
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $473,040 $473,040
2811 – Cable TV Facilities $300,000 $300,000
6605 – IT Fund $471,000 $177,000 $648,000
TOTAL $473,040 $771,000 $177,000 $1,421,040
ANNUAL OPERATING IMPACT
37
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 13
Number – GI0121 CITYWIDE ENERGY IMPROVEMENTS Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the planning (Investment Grade Audit), design, and construction of various energy upgrades, efficiency improvements, lighting upgrades,
energy generation, solar photovoltaic (PV) systems, and energy storage projects at facilities, parks, street rights-of-way, and other City-owned property. The project
includes lighting and controls upgrades at Mape Memorial Park, Alamo Creek Park, Ted Fairfield Park, Bray Commons Park, Dolan Park, Emerald Glen Park, Fallon
Sports Park, Heritage Park, and Shannon Park, as well as interior and exterior building lighting and controls upgrades at the Library, Corp Yard, Heritage Park and
Museums facilities, Shannon Community Center, Fire Stations 16, 17, and 18, and at The Wave. The conversion of approximately 1,626 streetlights in the East Ranch
Street Light Assessment District (1999-1) to LED is also included. There will be various mechanical, HVAC and controls upgrades at the following facilities: Library,
Senior Center, Heritage Park and Museums, The Wave, Fire Stations 16, 17, and 18.
Renewable, resiliency, and disaster preparedness improvements to prepare for future PG&E Public Safety Power Shutoff events and other emergency events will be
provided with back-up generators at the Library, Shannon Community Center, Civic Center, Fire Stations 16, 17, and 18, while battery back-up or hydrogen fuel cell
resiliency will be provided at 22 major street intersections throughout the city. Solar PV and EV charging will be provided at Dublin Sports Grounds and Public
Safety Complex. Solar PV with battery energy storage systems will be provided at the Civic Center, The Wave, Corp Yard, and Senior Center. Solar PV will be
provided at the Library, Fallon Sports Park, Fire Stations 17 and 18. The new solar PV and replacement HVAC systems on the Library roof require a portion of the
roof to be replaced, and to support the additional solar PV canopies at the Civic Center, portions of the parking lot will be reconfigured.
ANNUAL OPERATING IMPACT: Savings in energy costs
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $34,406 $30,000 $20,000 $84,406
9200 – Contract Services $212,514 $150,000 $50,000 $412,514
9400 – Improvements $22,766,850 1,320,000 $930,000 $25,016,850
9500 – Miscellaneous $500 $500
TOTAL $23,014,270 $1,500,000 $1,000,000 $25,514,270
38
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 14
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $1,497,420 $600,000 $400,000 $2,497,420
2705 – Street Light Dist East Dublin 1999-1 $860,776 $860,776
7102 – Energy Improv. Lease Bond $20,656,074 $20,656,074
6205 – Internal Service Funds – Facilities $900,000 $600,000 $1,500,000
TOTAL $23,014,270 $1,500,000 $1,000,000 $25,514,270
ANNUAL OPERATING IMPACT
39
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 15
Number – GI0001 CIVIC CENTER ELEVATOR MODERNIZATION Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide for the design and construction to upgrade the three existing elevators located within Civic Center. Most elevators are built to provide about
30 to 40 years of service. The modernization process will include upgrading the critical parts of the elevators in order for them to accommodate new technology, have
better performance, less energy consumption, and improved safety. This upgrade will also include the replacement of the interior panels and controls within the
elevator cars.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $24,960 $24,960
9200 – Contract Services $100,040 $100,040
9400 – Improvements $750,000 $750,000
9600 – Equipment $25,000 $25,000
TOTAL $900,000 $900,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Funds –
Facilities $900,000 $900,000
TOTAL $900,000 $900,000
ANNUAL OPERATING IMPACT
40
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 16
Number – GI0002 CIVIC CENTER EXTERIOR GLAZING, SEALING &
PAINTING Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide for design and construction for the sealing of the exterior natural stone veneer, concrete masonry block, reinstallation and replacement of
the glazing in the window systems, and replacement of the caulked joints in the architectural metal panels and stonework at Civic Center. The work on the Dublin Art
Center “DAC” side of Civic Center will be done in conjunction with the DAC improvements. The project will also paint the accent trim colors inside City Hall and
the exterior surfaces of the building that are not stone or architectural panels. Buildings should be sealed approximately every 10 years and caulking replaced every 30
years to maintain the exterior's appearance and to prevent damage caused by moisture infiltration.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $150,000 $150,000
9200 – Contract Services $450,000 $450,000
9400 – Improvements $3,650,000 $6,650,000
TOTAL $4,250,000 $4,250,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Fund –
Facilities $4,250,000 $4,250,000
TOTAL $4,250,000 $4,250,000
ANNUAL OPERATING IMPACT
41
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 17
Number – GI0122 CIVIC CENTER REHABILITATION Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of various rehabilitation and renovation projects at the Civic Center. Projects may include: renovation
of all restrooms, showers, kitchenettes, and the employee break room; modifications to conference rooms; lighting and ceiling replacement; site improvements to the
parking lot area and surrounding walkways of the Civic Center; plaza and landscaping improvements; building security evaluation and upgrades; repainting; and
Americans with Disabilities Act (ADA) and Code upgrades. Interior repainting in select areas was completed during construction of the Civic Center HVAC and Roof
Replacement project, and minor parking lot and walkway improvements are anticipated to be designed and constructed in conjunction with the Dublin Arts Center
project. This project also includes the partitioning of three spaces into six on the second floor of Civic Center. Planning for other projects began in Fiscal Year 2023-
24.
This project is funded by General Fund Reserves. Other potential funding sources for the building security upgrades may include Federal and State public safety grants.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $80,140 $80,140
9200 – Contract Services $511,590 $100,000 $611,590
9400 – Improvements $1,425,000 $100,000 $1,525,000
9500 – Miscellaneous $15,000 $5,000 $20,000
TOTAL $2,031,730 $205,000 $2,236,730
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $2,031,730 $205,000 $2,236,730
TOTAL $2,031,730 $205,000 $2,236,730
ANNUAL OPERATING IMPACT
42
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 18
Number – GINEW01 CONDITION ASSESSMENT OF WATER FEATURES Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project is a comprehensive condition assessment for outdoor water features including fountains and splash pads at Civic Center, Shannon Center, Emerald Glen
Park, Senior Center, and Devaney Square. Examine the structural integrity, plumbing systems, water quality, and overall functionality. Through detailed inspections
and evaluations, potential issues such as wear and tear, corrosion, or outdated technology can be identified. Following this assessment, a strategic project can be
developed to address the findings. This may include developing plans for either replacing the existing water features with modern and sustainable designs, incorporating
advanced water circulation systems, or transitioning the spaces into landscaped areas or alternative features that align with the evolving needs and preferences of the
community.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $5,000 $5,000
9200 – Contract Services $45,000 $45,000
TOTAL $50,000 $50,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $50,000 $50,000
TOTAL $50,000 $50,000
ANNUAL OPERATING IMPACT
43
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 19
Number – GINEW02 CORPORATION YARD EQUIPMENT WASH PAD Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide for design and construction of a vehicle and equipment wash pad at the Corporation Yard. The wash pad would capture wash water and solid
wastes separate the fluids from solids filter the and filter the fluids prior to discharge or storage for reuse. The wash pad will reduce water usage and ensure equipment
is maintained using best management practices required by the Municipal Regional Stormwater Permit and EPA.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $35,000 $35,000
9200 – Contract Services $125,000 $125,000
9400 – Improvements $315,000 $315,000
TOTAL $475,000 $475,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $475,000 $475,000
TOTAL $475,000 $475,000
ANNUAL OPERATING IMPACT
44
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 20
Number – GI0120 DUBLIN ARTS CENTER Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and improvements of an approximately 13,000-square-foot Cultural Arts Center on the first floor of the Civic Center, which was
formerly occupied by Dublin Police Services. The Parks & Recreation Master Plan identifies a Cultural Arts Center that would serve as a multi-use facility that affords
cultural, educational, and social opportunities for the community. The Cultural Arts Center will include: an Art gallery, Black Box theater space; multi-purpose art and
music classrooms; a dance studio; and restrooms. The project also provides for the replacement of the heating, ventilation, and air conditioning (HVAC) systems,
HVAC controls, roof replacement, major upgrades to the main telecommunication room, and the relocation of the Parks and Community Services Department offices
to the second floor of the Cultural Arts Center. Construction began in November 2022 and is anticipated to be completed in fall 2024.
ANNUAL OPERATING IMPACT: $800,000
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $199,945 $199,945
9200 – Contract Services $3,678,519 $3,678,519
9400 – Improvements $9,700,317 $9,700,317
9500 – Miscellaneous $18,254 $18,254
9600 – Equipment $800,000 $800,000
TOTAL $14,397,035 $14,397,035
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves
$6,964,197
$6,964,197
4100 – Public Facility Fees $5,889,200 $5,889,200
6205 – Internal Service Fund –
Facilities $1,543,638 $1,543,638
TOTAL $14,397,035 $14,397,035
ANNUAL OPERATING IMPACT $600,000 $800,000 $840,000 $880,000 $925,000
45
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 21
Number – GI0123 DUBLIN STANDARD PLANS & DETAILS UPDATE Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will update the City’s Standard Plans, Details and Specifications (Standards) utilized by the Public Works Department for design and construction of
public improvements within the City’s right-of-way and properties. These Standards are necessary for consistency to provide guidance to designers, and to specify the
current requirements for public infrastructure to be constructed and maintained by the City. The Standards require periodic update and revision to be aligned with
current industry practice, changes in materials and construction methods, as well as to be compliant with local, State, and federal goals and requirements, such as the
Storm Water Municipal Regional Permit and accessibility requirements of the ADA. Planning began in early 2023 and the update is anticipated to take 18 to 24 months
to complete.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $15,392 $15,392
9200 – Contract Services $124,608 124,608
9500 – Miscellaneous $2,500 $2,500
TOTAL $142,500 $142,500
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $142,500 $142,500
TOTAL $142,500 $142,500
ANNUAL OPERATING IMPACT
46
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 22
Number – GI0219 ELECTRIC VEHICLE (EV) CHARGING STATIONS Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and construction of at least two electric vehicle (EV) charging spaces at The Wave at Emerald Glen Park and the underground
infrastructure for future expansion. Additionally, two direct-current (DC) EV fast chargers will be installed at the Dublin Sports Grounds. In future years, the project
could provide for design and construction of EV charging spaces at other City facilities. Staff will apply for grant funding for the charging units; agencies typically
fund conduits, wiring, and electrical panel upgrades as local/match contribution to grant funding.
Installation of the EV charges at The Wave were completed in summer 2023.
The City received an Energy Efficiency Conservation Block Grant from the U.S. Department of Energy, which partially funded the installation of the two DC EV
fast chargers at the Dublin Sports Grounds.
ANNUAL OPERATING IMPACT: $1,500
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $12,620 $15,000 $27,620
9200 – Contract Services $30,211 $75,000 $105,211
9400 – Improvements $92,181 $197,459 $110,000 $399,640
9200 – Miscellaneous $881 $881
9600 – Equipment $94,107 $100,000 $194,107
TOTAL $230,000 $197,459 $300,000 $727,459
47
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 23
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $212,000 $70,229 $282,0
1001 – General Fund $300,000 $300,000
2207 – Transportation for Clean Air $18,000 $18,000
9902 – Federal Grants $127,230 $127,230
TOTAL $230,000 $197,459 $300,000 $727,459
ANNUAL OPERATING IMPACT $1,500 $1,500 $1,500 $1,500
48
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 24
Number – GI0223 EXTERIOR PAINTING AT VARIOUS CITY FACILITIES Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and construction to paint the exterior and make minor repairs at various City facilities. Buildings should be painted approximately
every 10 years to maintain the structures' appearance and to prevent damage caused by moisture infiltration. This project will include work at the following locations:
Heritage Museum, Saint Raymond's Church, Kolb House, Senior Center, Fire Stations 16, 17, and 18, The Wave, and the Library.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $29,952 $29,952
9200 – Contract Services $150,048 $150,048
9400 – Improvements $605,000 $605,000
TOTAL $785,000 $785,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Funds -
Facilities $785,000 $785,000
TOTAL $785,000 $785,000
ANNUAL OPERATING IMPACT
49
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 25
Number – GINEW03 FACILITIES PARKING LOT RESURFACING Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and construction to resurface parking lots at various City facilities and make renovations to accommodate the newest ADA and
parking lot standards. This project will include work at the following locations: Shannon Community Center, Emerald Glen Park, Senior Center, and Alamo Creek
Park.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $20,000 $20,000 $40,000
9200 – Contract Services $140,000 $140,000 $280,000
9400 – Improvements $340,000 $340,000 $680,000
TOTAL $500,000 $500,000 $1,000,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $500,000 $500,000 $1,000,000
TOTAL $500,000 $500,000 $1,000,000
ANNUAL OPERATING IMPACT
50
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 26
Number – GI0319 FINANCIAL SYSTEM REPLACEMENT Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the replacement of the City's Enterprise Resource Planning (ERP) system and other related technological projects that support the City
Council’s initiative to “Become a 24/7 City Hall to Enhance Resident and Business Engagement.” These include the OpenGov financial transparency software and
upgrades to the City’s Laserfiche document management software.
The City's ERP system serves as the primary software platform for Finance, Human Resources, Public Works, Community Development, and all other core
transactions. The outgoing system was implemented in Fiscal Year 2008-09 and has reached the end of its 10-year lifespan. The selection of the software vendor
was approved in December 2020, the implementation started in Spring 2021, the Finance Module went live in July 2022, the Human Resources and Payroll modules
went live in April 2023, Permitting and Licensing modules are projected to go live in July 2024. The complete transition to the new ERP system is expected for
Fiscal Year 2024-25; with post-live configuration and training continuing throughout the year.
ANNUAL OPERATING IMPACT: $240,000 at complete transition.
MANAGING DEPARTMENT: Administrative Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9200 – Contract Services $1,002,679 $1,002,679
9500 – Miscellaneous $500 $500
9600 – Equipment $1,511,821 $1,511,821
TOTAL $2,515,000 $2,515,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $1,860,000 $1,860,000
6305 – Internal Service Fund -
Equipment $655,000 $655,000
TOTAL $2,515,000 $2,515,000
ANNUAL OPERATING IMPACT $240,000 $245,000 $245,000 $245,000 $245,000
51
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 27
Number – GI0224 IRRIGATION SYSTEM UPGRADES Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will include the planning, design and installation of approximately sixty new irrigation controllers along streets, parks and facilities. System-wide
communication upgrades with the Central Irrigation System will improve water conservation in response to daily weather conditions. Additionally, consultant
services will be utilized to improve system optimization including site specific scheduling for up to twenty-five of the City's large landscapes. A series of training
sessions will be held with the City's Maintenance Division to ensure the ongoing operation of the system.
The $1.38 million identified as "State Grant" is from the State of California - Department of Water Resources Urban Community Drought Relief Grant, which was
awarded to Alameda County Flood Control and Water Conservation District, Zone 7, as part of a grant application that included several projects from local sponsors
in the Livermore-Amador Valley. All activities to implement the project must be completed by December 31, 2026, to be eligible for State Grant funding.
ANNUAL OPERATING IMPACT: Savings in water utility costs.
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $104,000 $104,000
9200 – Contract Services $350,000 $350,000
9400 – Improvements $721,000 $721,000
9500 – Miscellaneous $15,000 $15,000
9600 – Equipment $650,000 $650,000
TOTAL $1,840,000 $1,840,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $460,000 $460,000
2921 – State Grant - General $1,380,000 $1,380,000
TOTAL $1,840,000 $1,840,000
ANNUAL OPERATING IMPACT
52
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 28
Number – GI0117 IT INFRASTRUCTURE IMPROVEMENT Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project allows for the replacement and upgrade of aging network hardware as well as the implementation of centralized Information Technology management
tools that will increase efficiency in City operations.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Information Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9200 – Contract Services $302,886 $302,886
9400 – Improvements $273,644 $273,644
9500 – Miscellaneous $678 $678
9600 – Equipment $666,391 $666,391
TOTAL $1,243,600 $1,243,600
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $93,600 $93,600
6605 – IT Fund $1,150,000 $1,150,000
TOTAL $1,243,600 $1,243,600
ANNUAL OPERATING IMPACT
53
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 29
Number – GI0521 LIBRARY TENANT IMPROVEMENTS Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and construction of tenant improvements to the Dublin Library, including completion of 5,150 square feet of currently unoccupied
space within the library building. The 37,000 square-foot library building was completed in Fiscal Year 2002-03, however only 30,000 square feet was occupied. In
Fiscal Year 2016-17, a tenant improvement project was completed which opened an additional 1,850 square feet of space adjacent to the children's area. This project
will open the remaining 5,150 square feet of building area for library and community use. Improvements will include: a large flex space; new small group study rooms;
expansion of the children’s area; modification of shelving and fixtures; carpet replacement; repainting; and refurbish select systems and interior surfaces. Planning and
preliminary design begin in Fiscal Year 2023-24 and schematic design started in 2024.
ANNUAL OPERATING IMPACT: $8,000
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $62,510 140,000 $202,510
9200 – Contract Services $492,885 $560,000 $1,052,885
9400 – Improvements $2,260,270 $1,300,000 $3,560,270
9500 – Miscellaneous $20,000 $20,000
TOTAL $2,835,665 $2,000,000 $4,835,665
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
4100 – Public Facility Fees $1,745,665 $1,745,665
6205 – Internal Service Fund –
Facilities $90,000 $2,000,000 $2,090,000
1001 – General Fund $1,000,000 $1,000,000
TOTAL $2,835,665 $2,000,000 $4,835,665
ANNUAL OPERATING IMPACT $8,000 $8,000 $8,000
54
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 30
Number – GI0124 MARQUEE SIGNS Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide for the design and construction to replace the digital signage display components at the Shannon Community Center and the Senior Center,
as well as the addition of a double-sided marquee sign at Civic Center and along Tassajara Road at Emerald Glen Park or at the future Event Center at the DC. Digital
signage typically has a service life of approximately 10 years. The project will also standardize the digital signage operating system to allow the signage to be controlled
from multiple facilities.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Information Services & Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $20,072 $10,000 $30,072
9200 – Contract Services $74,928 $40,000 $114,928
9400 – Improvements $375,000 $300,000 $675,000
9500 – Equipment $25,000 $25,000
TOTAL $495,000 $350,000 $845,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $495,000 $350,000 $845,000
TOTAL $495,000 $350,000 $845,000
ANNUAL OPERATING IMPACT
55
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 31
Number – GI0323 MUNICIPAL FIBER Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction to improve and extend the existing City Information Technology fiber optic network cabling and
infrastructure by laying the foundation for future high speed networking capability and improve existing City facilities' networking speed and reliability by
interconnecting City facilities from Civic Center to Heritage Park and Museums, Shannon Community Center, Senior Center, and the Corp Yard. An approximate 13-
mile loop is anticipated to connect these facilities. This project will also assist in improving Traffic Operations with faster fiber optic networks that support smart and
adaptive traffic software. Additionally, Dublin Police Services' ability and effectiveness in crime prevention will be enhanced with faster connections to the situational
awareness cameras, license plate readers, and major intersection video streaming. Lastly, this project will improve Citywide Wi-Fi access, performance, and security.
The first phase will be to solicit consultant services to develop a five-year fiber optic master plan and feasibility study, which will include an assessment of the existing
City network infrastructure and the required build out. The preliminary planning began in 2022 with identifying the locations citywide of existing infrastructure.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Information Services & Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $20,800 $20,800
9200 – Contract Services $119,200 $119,200
TOTAL $140,000 $140,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $140,000 $140,000
TOTAL $140,000 $140,000
ANNUAL OPERATING IMPACT
56
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 32
Number – GI0221 RESILIENCY AND DISASTER PREPAREDNESS
IMPROVEMENTS Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
Beginning in the end of December 2022 through the first few weeks of 2023, Dublin and most of California experienced damage due to a series of rain fall events that
were declared a major disaster in Alameda County by the President on January 17, 2023. The City experienced damage at various sites, including street rights-of-way,
parks and open space, and facilities and buildings. This project will be utilized to provide for the planning, design, environmental permitting, if necessary, and
construction to make the repairs at various sites impacted. The following locations and types of repairs have been identified:
Dougherty Hills Open Space, Crossridge Road Trailhead – slide repair
Dublin Boulevard, west of Silvergate Road – slide repair
Mape Memorial Park – Pathway Realignment
Shannon Community Center/San Ramon Road – ditch and culvert improvements
Various citywide storm drainage facilities repairs, such as trash racks, culverts, ditches, bank stabilization, etc.
The City will apply for grant funding through FEMA and CalOES. The clean-up effort has been on-going since the storm events and the planning for the
permanent repair began in Fiscal Year 2023-24.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $54,189 $75,000 $129,189
9200 – Contract Services $223,000 $277,000 $300,000 $800,000
9400 – Improvements $825,000 $1,000,000 $1,825,000
TOTAL $1,102,189 $277,000 $1,375,000 $2,754,189
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $1,102,189 $277,000 $1,375,000 $2,754,189
TOTAL $1,102,189 $277,000 $1,375,000 $2,754,189
ANNUAL OPERATING IMPACT
57
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 33
Number – GI0423 ROOF REPLACEMENT AT VARIOUS CITY FACILITIES Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and construction of roof replacement or partial roof replacement at various City facilities. Typically, a roof has a 20-30-year service
life depending on the roof type. This project will include work at the following locations: Heritage Museum, St. Raymond's Church, Senior Center, and Fire Station
16. The project design began in 2023 with construction anticipated to begin in 2024.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $29,952 $29,952
9200 – Contract Services $75,048 $75,048
9400 – Improvements $550,000 $550,000
TOTAL $655,000 $655,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Funds –
Facilities $655,000 $655,000
TOTAL $655,000 $655,000
ANNUAL OPERATING IMPACT
58
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 34
Number – GINEW04 SHANNON COMMUNITY CENTER PLAY YARD Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide for design and construction of the replacement of the poured-in-place safety surfacing at the preschool playground at the Shannon Community
Center Preschool. The surfacing will create a modern, safe, and stimulating environment that aligns with the evolving needs of our community's preschool-aged
children.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $15,000 $15,000
9200 – Contract Services $55,000 $55,000
9400 – Improvements $130,000 $130,000
TOTAL $200,000 $200,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Funds –
Facilities $200,000 $200,000
TOTAL $200,000 $200,000
ANNUAL OPERATING IMPACT
59
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 35
Number – GI0523 SITUATIONAL AWARENESS CAMERA PROGRAM Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide 40 situational awareness cameras at 10 locations to cover known gaps within the City. These cameras will strategically be located along major
corridors and arteries to maximize observation of Dublin’s many entrances and exit points into and out of town. These cameras will be valuable technological resources
that assist in criminal investigations and the apprehension of law violators within the City.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Police Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $7,072 $7,072
9200 – Contract Services $44,928 $44,928
9400 – Improvements $533,000 $533,000
TOTAL $585,000 $585,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $585,000 $585,000
TOTAL $585,000 $585,000
ANNUAL OPERATING IMPACT
60
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 36
Number – GINEW05 WASTE ENCLOSURES UPGRADES Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project provides for the design and construction to replace or upgrade waste enclosures at various City facilities. The priority locations are at the Senior Center
and at the Shannon Community Center. Other locations for future upgrades include the Civic Center, Library, Dublin Sports Grounds, Emerald Glen Park, and Fire
Stations 16, 17, and 18.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $23,000 $200,000 $223,000
9200 – Contract Services $89,000 $760,000 $849,000
9400 – Improvements $213,000 $1,840,000 $2,053,000
TOTAL $325,000 $2,800,000 $3,125,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $131,124 $2,800,000 $2,931,124
2921 – State Grant – SB 1383 $193,876 $193,876
TOTAL $325,000 $2,800,000 $3,125,000
ANNUAL OPERATING IMPACT
61
General Improvements City of Dublin Proposed Capital Improvement Program 2024-2029 Page 37
Number – GINEW06 THE WAVE POOL REPLASTERING Program – GENERAL IMPROVEMENTS
PROJECT DESCRIPTION
This project will provide for the design and construction to replace the pool plaster at The Wave Indoor Pool, Outdoor Sport Pool, and Aquatic Play Structure.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $70,000 $70,000 $140,000
9200 – Contract Services $430,000 $120,000 550,000
9400 – Improvements $1,310,000 $1,310,000
TOTAL $500,000 $1,500,000 $2,000,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Funds –
Facilities $500,000 $1,500,000 $2,000,000
TOTAL $500,000 $1,500,000 $2,000,000
ANNUAL OPERATING IMPACT
62
Public Art City of Dublin Proposed Capital Improvement Program 2024-2029 Page 38
PUBLIC ART
63
Public Art City of Dublin Proposed Capital Improvement Program 2024-2029 Page 39
LOCATION MAP
64
Public Art City of Dublin Proposed Capital Improvement Program 2024-2029 Page 40
Number – PA0121 CAMP PARKS SIGN Program – PUBLIC ART
PROJECT DESCRIPTION
This project includes the restoration and relocation of the historic Camp Parks entrance sign from its current location at approximately 201 Dougherty Road to the
new entrance at Camp Parks Boulevard and Dougherty Road.
The original sign was constructed by artist/architect Bruce Goff in the 1940s and is eligible for the National Register. Rehabilitation will be in accordance with
standards and guidelines per the U.S. Department of the Interior National Park Service. The design process began in winter 2022 and the rehabilitation work is
anticipated to begin in Summer 2024.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Parks & Community Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $24,450 $25,450
9200 – Contract Services $165,00 $165,000
9400 – Improvements $300,000 $300,000
9500 – Miscellaneous $10,000 $10,000
TOTAL $500,450 $500,450
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2801 – Public Art Fund $500,450 $500,450
TOTAL $500,450 $500,450
ANNUAL OPERATING IMPACT
65
Public Art City of Dublin Proposed Capital Improvement Program 2024-2029 Page 41
Number – PA0123 DOWNTOWN DUBLIN Program – PUBLIC ART
PROJECT DESCRIPTION
This project will include painting of Public Art Murals at sites to include, but not limited to: Generator enclosures, utility enclosures, and others. All potential mural
sites, including any current or future, are subject to City Council approval.
Current potential sites include the generator enclosure in the Civic Center parking lot, utility enclosure at Don Biddle Community Park, and future Dublin Art Center.
Each project, and project goals, would be reviewed by the Heritage & Cultural Arts Commission and City Council prior to commencement.
This project will be funded by the Public Art Fund.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Parks & Community Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $24,960 $24,960
9200 – Contract Services $75,040 $75,040
9400 – Improvements $300,000 $300,000 $300,000 $250,000 $1,150,000
9500 – Miscellaneous $250,000 $250,000
TOTAL $650,000 $300,000 $300,000 $250,000 $1,500,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2801 – Public Art Fund $650,000 $300,000 $300,000 $250,000 $1,500,000
TOTAL $650,000 $300,000 $300,000 $250,000 $1,500,000
ANNUAL OPERATING IMPACT
66
Public Art City of Dublin Proposed Capital Improvement Program 2024-2029 Page 42
Number – PA0222 HERITAGE PARK Program – PUBLIC ART
PROJECT DESCRIPTION
This project will be located at Dublin Heritage Park and Museums. The project budget is based on the Public Art in-lieu contribution required by the Schaefer Ranch
Development Agreement. This project includes a monument piece at the corner of Donlon Way and Dublin Blvd as well as a series of six mini-sculptures located
throughout the park. These artworks, approved by the City Council in February 2022, will represent Dublin's rich heritage, culture, and diversity. Project planning
began in Fiscal Year 2021-22 with project completion anticipated in Summer 2024.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Parks & Community Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $9,700 $9,700
9200 – Contract Services $100,000 $100,000
9400 – Improvements $450,000 $450,000
9500 – Miscellaneous $35,000 $35,000
TOTAL $594,700 $594,700
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2801 – Public Art Fund $594,700 $594,700
TOTAL $594,700 $594,700
ANNUAL OPERATING IMPACT
67
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 43
Number – PANEW01 OUTDOOR MURALS Program – PUBLIC ART
PROJECT DESCRIPTION
This project will include painting of Public Art Murals at sites including, but not limited to generator enclosures at Civic Center, Library, Don Biddle Community Park
and the Dublin Arts Center, as well as, utility enclosures, and others. The exact locations are not yet determined, and any project sites would be subject to review by
the Heritage and Cultural Arts Commission and approval by the City Council.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Parks & Community Services
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $15,000 $15,000
9200 – Contract Services
9400 – Improvements $150,000 $150,000
9500 – Miscellaneous $35,000 $35,000
TOTAL $200,000 $200,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2801 – Public Art Fund $200,000 $200,000
TOTAL $200,000 $200,000
ANNUAL OPERATING IMPACT
68
Public Art City of Dublin Proposed Capital Improvement Program 2024-2029 Page 44
PARKS
69
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 45
LOCATION MAP
70
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 46
Number – PK0122 ALAMO CREEK PARK AND ASSESSMENT DISTRICT – FENCE
REPLACEMENT Program – PARKS
PROJECT DESCRIPTION
This project provides for the design and construction of replacement fencing at Alamo Creek Park and for replacement and repair of fencing within the Dougherty
Road Landscape and Lighting District No. 1986-1. Most of the existing tubular steel fencing has reached the end of its service life and needs to be replaced or repaired.
The project will include replacement of the tubular steel fencing within Alamo Creek Park. In addition to the park fencing, the existing decorative concrete masonry
walls within the park, which include integrated tubular steel fence elements, will be evaluated, repaired as needed, and repainted.
The project will also include evaluation and selecting replacement or repair of the tubular steel fencing that is maintained by the Dougherty Road Landscape and
Lighting District No. 1986-1. The subject fencing is located along Fall Creek Road, Wildwood Road, and Willow Creek Drive. Funding for this portion of the project
is provided from funding reserves that were collected from District No. 1986-1. Design is nearly complete, and construction is anticipated to start in 2024.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $41,600 $41,600
9200 – Contract Services $53,751 $53,751
9400 – Improvements $747,500 $747,500
9500 – Miscellaneous $7,149 $7,149
TOTAL $850,000 $850,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $450,000 $450,000
2703 – Landscape District – Dougherty
1986-1 $400,000 $400,000
TOTAL $850,000 $850,000
ANNUAL OPERATING IMPACT
71
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 47
Number – PK0115 DON BIDDLE COMMUNITY PARK Program – PARKS
PROJECT DESCRIPTION
This project provides for the design and construction of a 30-acre community park in the Boulevard Development within the Dublin Crossing Specific Plan. The park
is located between Dublin Boulevard, Scarlett Drive, Horizon Parkway, and Columbus Street and will be built by the Boulevard Developer. The conceptual plan was
approved by the City Council on January 9, 2018. The plan includes tennis courts, basketball courts, a picnic and barbeque area, a great lawn (multi-use lawn area),
playgrounds, parent paddock, community garden, and other amenities. On October 2, 2018, the City Council provided direction to use $600,000 of Community Benefit
Funds for the inclusion of a specimen tree and upgraded playground equipment in the park design. Construction was substantially completed in late summer 2022 and
a park opening ceremony was held on September 24, 2022. The project was substantially completed in late 2023 and remaining work at the southwest corner will be
completed in conjunction with the Iron Horse Trail Bridge and the Scarlett Drive extension work.
In accordance with the Dublin Crossing Development Agreement, the Developer is responsible for project costs up to $12,857,142. The City is responsible for
reimbursing the Developer for project costs that exceed that amount. City funding will come from Public Facility Fee Funds.
ANNUAL OPERATING IMPACT: $660,000 (at completion)
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $519,903 $519,903
9200 – Contract Services $2,932,161 $2,932,161
9400 – Improvements $19,328,720 $19,328,720
9500 – Miscellaneous $2,043,221 $2,043,221
TOTAL $24,824,005 $24,824,005
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $2,100,000 $2,100,000
4100 – Public Facilities Fees $9,866,863 $9,866,863
9999 – Developer Built $12,857,142 $12,857,142
TOTAL $24,824,005 $24,824,005
ANNUAL OPERATING IMPACT $660,000 $660,000 $660,000 $660,000 $660,000
72
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 48
Number – PK0221 DOWNTOWN DUBLIN TOWN SQUARE PARK Program – PARKS
PROJECT DESCRIPTION
This project provides for the planning of a new Town Square, in accordance with the main principles of the Downtown Dublin Preferred Vision, which was approved
by the City Council on November 5, 2019. The Town Square is a one-acre park and plaza that will serve as Downtown Dublin's gathering place, which may include a
market promenade, outdoor dining, and event space, and will be located one block north of Dublin Boulevard in the Dublin Place shopping center along the proposed
extension of Golden Gate Drive. The planning phase began in 2023.
Possible funding sources are development impact fees, community facilities district or other assessment district.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $31,885 $4,680 $110,000 $146,565
9200 – Contract Services $75,000 $550,000 $625,000
9300 – Land/Right of Way $2,400,000 $2,400,000
9400 – Improvements $1,440,000 $1,440,000
TOTAL $106,885 $4,680 $4,500,000 $4,611,565
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $106,885 $4,680 $111,565
4100 – Public Facility Fees
$4,500,000 $4,500,000
TOTAL $106,885 $4,680 $4,500,000 $4,611,565
ANNUAL OPERATING IMPACT
73
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 49
Number – PK0002 DUBLIN SPORTS GROUNDS REHABILITATION Program – PARKS
PROJECT DESCRIPTION
This project will provide for the design and construction to renovate the easterly ball fields at the Dublin Sports Grounds. The improvements may include dugout
covers/shelter, fence repairs, backstop replacement, replacement of the core booths and storage at the fields. Additionally, the dugouts and bullpen openings will be
reconfigured. The project will also include the replacement of the westerly restroom and the addition of concrete walkways.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $24,960 $24,960 $210,000 $259,920
9200 – Contract Services $125,040 $790,000 $915,040
9400 – Improvements $575,040 $1,900,000 $2,475,040
TOTAL $150,000 $600,000 $2,900,000 $3,650,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Fund –
Facilities $150,000 $600,000 $2,900,000 $3,650,000
TOTAL $150,000 $600,000 $2,900,000 $3,650,000
ANNUAL OPERATING IMPACT
74
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 50
Number – PKNEW01 FALLON SPORTS PARK – ARTIFICIAL TURF FIELD REPLACEMENT Program – PARKS
PROJECT DESCRIPTION
This project will provide for the design and construction to replace the four artificial turf sports fields at Fallon Sports Park. The lifespan of artificial turf sports fields
can vary depending on factors such as the quality of the turf, the level of usage, maintenance practices, and environmental conditions. Depending upon continued use
and maintenance, the artificial turf is anticipated to need replacement in Fiscal Year 2028-29.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $100,000 $100,000
9200 – Contract Services $600,000 $600,000
9400 – Improvements $1,550,000 $1,550,000
TOTAL $2,250,000 $2,250,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Fund –
Facilities $2,250,000 $2,250,000
TOTAL $2,250,000 $2,250,000
ANNUAL OPERATING IMPACT
75
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 51
Number – PK0119 FALLON SPORTS PARK – PHASE 3 Program – PARKS
PROJECT DESCRIPTION
Fallon Sports Park is a 60-acre community park bordered by Fallon Road, Central Parkway, Lockhart Street and Gleason Drive. Phases 1 and 2 of the park have been
completed and Phase 3 represents the final phase of park development.
The Phase 3 project provides for the design and construction of the remaining 14 acres of Fallon Sports Park, referred to as the Upper Terrace. On December 17,
2019, City Council approved the concept design that includes a cricket field, two ballfields, sand volleyball courts and multi-sport batting cages. On September 2022
the City Council authorized the use of construction contingency to install perimeter fencing/netting at the cricket field. Construction was substantially completed in
late summer 2022 and a park opening ceremony was on October 22, 2022. The project is anticipated to be completed in spring/summer 2024.
ANNUAL OPERATING IMPACT: $500,000
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $225,000 $225,000
9200 – Contract Services $1,268,000 $1,268,000
9400 – Improvements $8,100,000 $8,100,000
9500 – Miscellaneous $30,000 $30,000
TOTAL $9,623,000 $9,623,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $100,000 $100,000
4100 – Public Facility Fees $9,523,000 $9,523,000
TOTAL $9,623,000 $9,623,000
ANNUAL OPERATING IMPACT $500,000 $500,000 $500,000 $500,000 $500,000
76
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 52
Number – PK0422 IRON HORSE NATURE PARK AND OPEN SPACE Program – PARKS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of 12.13 acres of a nature park and open space adjacent to the Iron Horse Regional Trail, from the
Dublin/San Ramon city limit to the confluence of Alamo and South San Ramon Creeks, that may be developed in partnership with Zone 7 Water Agency. The park
size could increase to over 20 acres of usable parkland when combined with adjacent Zone 7 Water Agency property. The park will be designed in accordance with
the Iron Horse Nature Park and Open Space Master Plan, which was approved by the City Council on October 1, 2013. The City has already acquired 12.13 acres and
the balance of the parkland would be accessible through an easement and operational agreement with Zone 7 Water Agency. The City will continue to pursue the
acquisition of the Alameda County portion of the Iron Horse Regional Trail corridor to add to the City's portion of the parkland. Planning and design for Phase 1
began in Fiscal Year 2021-22 and construction was awarded and work began in spring 2024. The Phase I improvements will provide a trail connection to Stagecoach
Park and the installation of a shade structure over a picnic area.
In addition to Public Facilities Fee, possible funding sources are additional statewide grants or federal grants for projects that provide non-motorized infrastructure
and enhancements that promote new or alternate access to parks, waterways, outdoor recreational pursuits, and forested or other natural environments to encourage
health-related active transportation and opportunities for residents and trail users to reconnect with nature, such as Active Transportation Program grants or
Proposition 68.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $210,247 $52,000 $262,247
9200 – Contract Services $2,381,226 $196,505 $2,577,731
9400 – Improvements $2,446,027 $1,215,000 $5,014,595 $8,675,622
9500 – Miscellaneous $365,000 $255,000 $620,500
TOTAL $5,403,000 $1,463,505 $5,269,595 $12,136,100
77
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 53
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
4100 – Public Facilities Fee $3,056,000 $1,463,505 $2,490,941 $7,010,446
2403 – State Park Grant $2,294,000 $2,294,000
9998 – Unidentified $2,778,654 $2,778,654
1001 – General Fund $53,000 $53,000
TOTAL $5,403,000 $1,463,505 $5,269,595 $12,136,100
ANNUAL OPERATING IMPACT
78
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 54
Number – PK0322 JORDAN RANCH NEIGHBORHOOD SQUARE Program – PARKS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of a 2.0-acre neighborhood square in the Jordan Ranch Development. The neighborhood square
will be designed in accordance with the Neighborhood Square Standards contained in the Parks and Recreation Master Plan. The planning phase began in Fiscal
Year 2021-22 and the conceptual plan was approved by the City Council on December 6, 2022. The detailed design of the park will continue through Fiscal Year
2023-24 with construction anticipated to begin in summer 2024.
ANNUAL OPERATING IMPACT: $57,000
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $117,578 $117,578
9200 – Contract Services $493,940 $25,000 $518,940
9400 – Improvements $1,904,749 $325,000 $2,229,749
9500 – Miscellaneous $282,680 $282,680
TOTAL $2,798,947 $350,000 $3,148,947
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
4100 – Public Facility Fees $2,798,947 $100,000 $2,898,974
2215 – Measure BB Sales Tax – Bike &
Pedestrian Fund (ACTC) $250,000 $250,000
TOTAL $2,798,947 $350,000 $3,148,947
ANNUAL OPERATING IMPACT $57,000 $57,000 $57,000 $57,000
79
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 55
Number – PK0224 KOLB PARK RENOVATION Program – PARKS
PROJECT DESCRIPTION
This project will provide for the planning, design, and construction to renovate the 4.86-acre Kolb Park. The improvements will be consistent with the Parks and
Recreation Master Plan and may include the replacement of the restroom building, play equipment, site furnishings, picnic areas, drinking fountains, tot lot fencing,
parcourse equipment stations, signage, refresh the shade structure, relevel the existing paver and decomposed granite pathways, and refresh the landscaping. Staff will
look for opportunities to incorporate Green Stormwater Infrastructure within the park as a part of the renovation.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $24,960 $24,960 $49,920
9200 – Contract Services $425,040 $75,040 $500,080
9400 – Improvements $2,300,000 $2,300,000
9500 – Miscellaneous $50,000 $50,000
TOTAL $450,000 $2,450,000 $2,900,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $450,000 $2,450,000 $2,900,000
TOTAL $450,000 $2,450,000 $2,900,000
ANNUAL OPERATING IMPACT
80
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 56
Number – PK0124 PARKS PLAYGROUND REPLACEMENT Program – PARKS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of the replacement of playground equipment at various parks. Based on the results of annual
inspections and regular maintenance records, all City parks will be evaluated for the need to replace play equipment at the end of their useful life. The first phase
will be at Emerald Glen Park (Near Splash Pad Ages 5-12) and Ted Fairfield Park (Ages 2-5 and 5-12).
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $118,560 $118,560
9200 – Contract Services $120,000 $120,000
9400 – Improvements $850,000 $850,000
9500 – Miscellaneous $21,000 $21,000
TOTAL $1,109,560 $1,109,560
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $1,109,560 $1,109,560
TOTAL $1,109,560 $1,109,560
ANNUAL OPERATING IMPACT
81
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 57
Number – PK0123 PERSIMMON DRIVE PEDESTRIAN PATH REHABILITATION Program – PARKS
PROJECT DESCRIPTION
This project will provide for removal and replacement of approximately 1,250 linear feet of asphalt pathway along Persimmon Drive between Gleason Drive and
Central Parkway. The asphalt concrete surface has experienced distress due to soil expansion, the encroachment of tree roots, and some slope creep along the adjacent
Tassajara Creek bank. Design began in spring 2023 in conjunction with the Annual Street Resurfacing Project. Construction is anticipated for summer 2024.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $15,080 $15,080
9200 – Contract Services $29,920 $29,920
9400 – Improvements $150,000 $150,000
TOTAL $195,000 $195,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2704 – Landscape District Santa Rita
1997-1 $195,000 $195,000
TOTAL $195,000 $195,000
ANNUAL OPERATING IMPACT
82
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 58
Number – PK0321 RESTROOMS REPLACEMENT Program – PARKS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction to replace the existing restrooms at Alamo Creek Park and Mape Memorial Park. To bring the
restrooms up to current accessibility standards and codes, the existing restroom buildings will be demolished and replaced with pre-engineered restroom buildings.
The planning and design phases began in 2023. The restroom replacement at Kolb Park will be completed with the Kolb Park Renovation Project, PK0224.
ANNUAL OPERATING IMPACT: No increase
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $33,380 $33,380
9200 – Contract Services $152,000 $152,000
9400 – Improvements $807,000 $807,000
9500 – Miscellaneous $7,620 $7,620
TOTAL $1,000,000 $1,000,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $1,000,000 $1,000,000
TOTAL $1,000,000 $1,000,000
ANNUAL OPERATING IMPACT
83
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 59
Number – PKNEW02 SPORTS COURTS RESURFACING Program – PARKS
PROJECT DESCRIPTION
This project will provide for the design and construction to resurface tennis and basketball courts. Courts generally have a seven-to-ten-year useful life prior to needing
to be resurfaced. The sports courts at Emerald Glen Park would be the first site to be resurfaced followed by those at Fallon Sports Park.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $40,000 $35,000 $70,000 $145,000
9200 – Contract Services $160,000 $135,000 $275,000 $570,000
9400 – Improvements $400,000 $330,000 $655,000 $1,385,000
TOTAL $600,000 $500,000 $1,000,000 $2,100,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
6205 – Internal Service Fund –
Facilities $600,000 $500,000 $1,000,000 $2,100,000
TOTAL $600,000 $500,000 $1,000,000 $2,100,000
ANNUAL OPERATING IMPACT
84
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 60
Number – PK0001 SUNDAY SCHOOL BARN IMPROVEMENTS Program – PARKS
PROJECT DESCRIPTION
This project provides for the design and construction to renovate the existing wood floor inside the Sunday School Barn at Heritage Park. The original wood floors
are not adequate for the types and frequency of use that the building is experiencing. The project is intended to preserve the look and historic fabric of the original
wood that is believed to be from the late 1800’s while ensuring the structural integrity and finish of the floor are adequate for the current and planned uses of the barn.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $24,960 $24,960 $49,920
9200 – Contract Services $100,040 $25,040 $125,080
9400 – Improvements $200,000 $200,000
9500 – Miscellaneous $10,000 $10,000
TOTAL $125,000 $260,000 $385,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $125,000 $260,000 $385,000
TOTAL $125,000 $260,000 $385,000
ANNUAL OPERATING IMPACT
85
Parks City of Dublin Proposed Capital Improvement Program 2024-2029 Page 61
Number – PK0421 WALLIS RANCH COMMUNITY PARK Program – PARKS
PROJECT DESCRIPTION
The Wallis Ranch Community Park consists of three separate parcels totaling 8.85 acres in the Wallis Ranch Development. The project will provide for the design
and construction of a community park and will be designed to the Community Park Standards contained in the Parks and Recreation Master Plan. Park amenities
include play areas, picnic facilities, turf area, lighted tennis, pickle ball, and basketball facilities, natural area, restrooms, pathways, lighting, dog park, and irrigation
and landscaping. Design started in spring 2021 and construction began in October 2023 and is anticipated to be completed in 2025.
ANNUAL OPERATING IMPACT: $215,000
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $192,202 $192,202
9200 – Contract Services $1,356,421 $1,356,421
9400 – Improvements $9,224,172 $9,224,172
9500 – Miscellaneous $987,205 $987,205
TOTAL $11,760,000 $11,760,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
4100 – Public Facilities Fee $11,760,000 $11,760,000
TOTAL $11,760,000 $11,760,000
ANNUAL OPERATING IMPACT $215,000 $215,000 $215,000 $215,000
86
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 62
STREETS
SUMMARY OF PROJECTS PROJECTED TO BE COMPLETED IN FISCAL YEAR 2023-2024
Project Number Project Description
Estimated Total
Project Cost
ST0120 Dublin Boulevard Pavement Rehabilitation $737,000
ST0519
Intelligent Transportation System Upgrade –
Connected/Autonomous Vehicle and Safety
Improvements $166,973
ST0222 St. Patrick Way Extension $3,742,556
87
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 63
LOCATION MAP
88
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 64
Number – ST0815 AMADOR PLAZA ROAD BICYCLE AND PEDESTRIAN
IMPROVEMENTS Program – STREETS
PROJECT DESCRIPTION
This project provides for the design and construction of pedestrian, bicycle, and vehicular improvements along Amador Plaza Road between Dublin Boulevard
and Amador Valley Boulevard.
The project has two phases. On December 6, 2016, the City Council accepted the first phase of improvements, which included the installation of two mid-block
crosswalks with pedestrian warning lights and construction of a raised concrete median at the southern Safeway/Dublin Place driveway. The second phase will
include construction of an exclusive southbound right turn lane on Amador Plaza Road at Dublin Boulevard. Phase 2 design began in mid-2018 and construction
will occur following acquisition of the right-of-way for these improvements, which are dependent upon the timing of an adjacent development project at the former
Coco’s site.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $19,416 $19,416
9200 – Contract Services $228,371 $228,371
9300 – Land/Right of Way $126,000 $126,000
9400 – Improvements $1,035,862 $1,035,862
9500 – Miscellaneous $4,000 $4,000
TOTAL $1,413,649 $1,413,649
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
4304 – Western Dublin Transportation
Impact Fee $1,413,649 $1,413,649
TOTAL $1,413,649 $1,413,649
ANNUAL OPERATING IMPACT
89
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 65
Number – ST0117 ANNUAL STREET RESURFACING Program – STREETS
PROJECT DESCRIPTION
This project provides for the design and construction of a variety of pavement resurfacing treatments, from slurry seal to major rehabilitation and reconstruction
of streets and resurfacing of bridge decks. The project also includes installation of new or upgrades of existing ADA curb ramps on roads that are reconstructed
or receive an asphalt concrete overlay. Streets are selected for improvements based on the City’s Pavement Management System to optimize the pavement condition
in relation to the available budget. The City owns and maintains approximately 148 centerline miles of streets.
The Metropolitan Transportation Commission groups Pavement Condition Index (PCI) ratings into the following categories: 80-100 Very Good-Excellent; 70-79
Good, 60-69 Fair, 50-59 At Risk, 25-49 Poor, and 0-24 Failed. The City of Dublin is rated very good with a three-year moving average PCI of 80.
This annual Resurfacing Program is primarily funded by Alameda County Transportation Commission Measure B/BB funds, SB-1, and Gas Tax. This program
protects the substantial investment the City has in the public street system.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $227,235 $167,500 $167,500 $167,500 $167,500 $167,500 $1,064,735
9200 – Contract Services $2,509,344 $775,000 $775,000 $775,000 $775,000 $775,000 $6,384,344
9400 – Improvements $12,737,648 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $30,487,648
9500 – Miscellaneous $56,311 $7,500 $7,500 $7,500 $7,500 $7,500 $93,811
TOTAL $15,530,538 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $38,030,538
90
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 66
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $467,999 $765,675 $2,086,900 $1,750,000 $1,850,000 $1,850,000 $8,770,574
2201 – State Gas Tax $5,289,941 $412,300 $413,100 $750,000 $650,000 $650,000 $8,165,341
2204 – Measure B Sales Tax – Local
Streets Fund (ACTC) $1,784,999 $1,322,025 $3,107,024
2205 – Measure B Sales Tax – Bike &
Pedestrian Fund (ACTC) $300,000 $300,000
2214 – Measure BB Sales Tax – Local
Streets Fund (ACTC) $2,831,020 $2,831,020
2215 – Measure BB Sales Tax – Bike &
Pedestrian Fund (ACTC) $304,500 $304,500
2216 – Measure B Grants $82,500 $82,500
2220 – Road Maint. & Rehab. Account
(RMRA) $4,263,599 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $14,263,599
2304 – Local Recycling Programs $160,000 $160,000
4309 – Mitigation Contributions $45,980 $45,980
TOTAL $15,530,538 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $38,030,538
ANNUAL OPERATING IMPACT
91
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 67
Number – ST0319 CITY ENTRANCE MONUMENT SIGNS Program – STREETS
PROJECT DESCRIPTION
This project provides for the design and construction to install City entrance monument signs and a Downtown gateway sign at the following locations: Village
Parkway median at Kimball Avenue (monument), San Ramon Road median at Alcosta Boulevard (monument), Schaefer Ranch Road at Dublin Boulevard (monument),
and Tassajara Road north of Fallon Road (monument); and the southeast corner of Dublin Boulevard and San Ramon Road (Downtown gateway). The new signs will
conform to the City of Dublin Streetscape Master Plan and the monument signs will match the existing granite monument signs currently installed within the City.
Installation of the Downtown gateway signage was completed in spring 2022 and the monument signage is anticipated to start in 2024. Funding for the Downtown
gateway sign comes from the General Fund Downtown Public Improvements Reserve.
The Streetscape Master Plan also calls for entrance monument signs at Fallon Road at Dublin Boulevard and at Dublin Boulevard at the eastern city limits. Currently
there are no medians at these locations on which to install the signs. These two entrance monument signs may be installed on the Dublin Boulevard Extension –
Fallon Road to North Canyons Parkway project (ST0216) or when adjacent property develops and installs associated street improvements. The monument sign on
Village Parkway median at Kimball Avenue will be installed with the Village Parkway Reconstruction project (CIP No. ST0323).
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $45,175 $45,175
9200 – Contract Services $80,000 $80,000
9400 – Improvements $350,000 $350,000
9500 – Miscellaneous $9,825 $9,825
TOTAL $485,000 $485,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $285,000 $285,000
1101 – General Fund Designated
Reserves $200,000 200,000
TOTAL $485,000 $485,000
92
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 68
ANNUAL OPERATING IMPACT
Number – ST0517 CITYWIDE BICYCLE AND PEDESTRIAN IMPROVEMENTS Program – STREETS
PROJECT DESCRIPTION
This project includes planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the City, including pedestrian/bicycle
bridges and annual sidewalk repair. This project includes design and construction of improvements recommended in the updated Bicycle and Pedestrian Plan, which
was adopted by the City Council on January 10, 2023, as well as the Safe Routes to School improvements. The Downtown pedestrian crossing improvements on
Regional Street is the first project to be constructed which is anticipated to begin summer 2024. The Safe Routes to School improvements at the intersections of
Central Parkway at Aspen Street and Hibernia Drive; Grafton at Antone Way; and Amador Valley Boulevard at Burton Street are anticipated to begin summer 2024.
The project includes an update to the American with Disabilities Act (ADA) Transition Plan and implementation of Public Right-of-way Accessibility Guidelines
(PROWAG). The plan update will include a review of City buildings, parks, and rights-of-way. The ADA Transition Plan update will be funded by General Fund. It
is anticipated that the ADA Transition Plan update will be completed in 2025.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $127,372 $50,788 $20,000 $20,000 $20,000 $20,000 $258,160
9200 – Contract Services $1,314,668 $555,000 $200,000 $200,000 $200,000 $200,000 $2,669,668
9400 – Improvements $3,173,298 $1,175,000 $525,000 $525,000 $525,000 $525,000 $6,448,298
9500 – Miscellaneous $40,034 $7,500 $5,000 $5,000 $5,000 $5,000 $67,534
TOTAL $4,655,372 $1,788,228 $750,000 $750,000 $750,000 $750,000 $9,443,600
93
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 69
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $858,000 $105,000 $963,000
2203 – Transportation Development Act $210,000 $210,000
2204 – Measure B Sales Tax - Local
Streets Fund (ACTC) $510,000 $510,000
2205 – Measure B Sales Tax - Bike &
Pedestrian Fund (ACTC) $142,900 $142,900
2214 – Measure BB Sales Tax - Local
Streets Fund (ACTC) $1,471,600 $530,000 $250,000 $250,000 $250,000 $250,000 $3,001,600
2215 – Measure BB Sales Tax - Bike &
Pedestrian Fund (ACTC) $601,872 $798,228 $250,000 $250,000 $250,000 $250,000 $2,400,100
2212 – Vehicle Registration Fee $726,000 $726,000
2217 – Measure BB Grants $135,000 $135,000
2220 – Road Maint. & Rehab. Account
(RMRA) $355,000 $250,000 $250,000 $250,000 $250,000 $1,355,000
TOTAL $4,655,372 $1,788,228 $750,000 $750,000 $750,000 $750,000 $9,443,600
ANNUAL OPERATING IMPACT
94
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 70
Number – ST0713 CITYWIDE SIGNAL COMMUNICATIONS UPGRADE Program – STREETS
PROJECT DESCRIPTION
This project provides for the continued upgrades of the traffic signal communications system and includes the replacement of signal controllers, conflict monitors,
and battery backup units, as well as managing ongoing signal operations of coordinated corridors. In Fiscal Years 2019-20 and 2020-21, the project further expanded
the traffic communications network, connecting traffic signals on Dublin Boulevard, San Ramon Road, Fallon Road and Tassajara Road. The project will provide
for the installation of new conduits, removing the existing copper communication cables and installing new fiber optic cables on Dublin Boulevard. The project
will also expand the adaptive traffic signal system along key corridors and will connect existing and new public safety infrastructure, such as situational awareness
cameras and automated license plate recognition cameras, to the high-speed fiber optic communications system. The first phase of one of the projects to install a
conduit pathway between Civic Center and San Ramon Road to accommodate the future fiber optic upgrade to city infrastructure is complete.
The project also updated the City of Dublin Travel Demand Forecasting Model to provide traffic flow projections on the arterial and collector roadways as well as
analyzed future land use development proposals and transportation network changes in the City. In April 2021, the project resulted in the City Council adopting a
resolution establishing the California Environmental Quality Act (CEQA) transportation thresholds of significance for Vehicle Miles Traveled (VMT).
This project is partially funded with General Fund reserve designation for One Time Initiative - Capital. Potential other funding for this project may include Federal
and State grants.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $132,827 $55,040 $187,867
9200 – Contract Services $1,220,200 $225,000 $1,445,20
9400 – Improvements $2,963,954 $540,000 $3,596,638
9500 – Miscellaneous $4,900 $5,000 $9,900
9600 – Equipment $5,120 $5,120
TOTAL $4,326,616 $825,040 $5,151,656
95
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 71
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $79,851 $79,851
1101 – General Fund Designated
Reserves $1,420,149 $1,420,149
2201 – State Gas Tax $104,000 $104,000
2204 – Measure B Sales Tax - Local
Streets Fund (ACTC) $248,640 $248,640
2207 – TFCA/Transportation for Clean
Air $146,000 $146,000
2212 – Vehicle Registration Fee (ACTC) $752,356 $35,040 $386,477
2214 – Measure BB Sales Tax – Local
Streets Fund (ACTC) $400,000 $750,000 $1,150,000
2220 – Road Maint. & Rehab. Account
(RMRA) $654,320 $40,000 $694,320
4301 – Eastern Dublin Transportation
Impact Fee $200,000 $200,000
4304 – Western Dublin Transportation
Impact Fee $199,000 $199,000
6305 – Internal Service Fund -
Equipment $122,300 $85,426
TOTAL $4,326,616 $825,040 $5,151,656
ANNUAL OPERATING IMPACT
96
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 72
Number – ST0124 CITYWIDE STORM DRAIN IMPROVEMENTS Program – STREETS
PROJECT DESCRIPTION
This project will provide for the planning, design, maintenance, and construction of various improvements to citywide storm drainage facilities that may be located
outside the public street rights-of-way, such as v-ditches and culverts on City-owned properties or public easements, such as the large G-3 box culvert running parallel
to I-580. The first phase of the project will include a storm drainage master plan and/or condition assessment report with recommendations for maintenance or
improvements. Future phases will include design and maintenance and/or construction implementing the recommendations from the Master Plan.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $4,992 $4,992 $4,992 $14,976
9200 – Contract Services $25,008 $25,008 $150,000 $200,016
9500 – Miscellaneous $2,508 $2,508
TOTAL $30,000 $30,000 $157,500 $217,500
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $30,000 $30,000 $157,500 $217,500
TOTAL $30,000 $30,000 $157,500 $217,500
ANNUAL OPERATING IMPACT
97
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 73
Number – ST0221 DOWNTOWN DUBLIN STREET GRID NETWORK Program – STREETS
PROJECT DESCRIPTION
This project provides for the planning of a new Street Grid Network, in accordance with the main principles of the Downtown Dublin Preferred Vision, which
was approved by the City Council on November 5, 2019. The Street Grid Network will introduce new streets that will break down the large block format into
smaller, walkable-sized blocks between 350 to 450 feet per side. The proposed extension of Golden Gate Drive north from Dublin Boulevard up to Amador Valley
Boulevard will become a new main street with the classic Downtown street grid network within street rights-of-way varying between 60 and 90 feet wide. Street
infrastructure may include storm drainage, sewer, water, recycled water, communications, gas, and electric utilities, as well as landscaping and irrigation.
The planning phase began in 2020 with the update of the existing City Travel Demand Forecasting Model to provide traffic flow projections on the new roadways,
analyze future land use development proposals, and transportation network changes in the Downtown. Staff is currently working on the Retail District Parking
Study.
Street rights-of-way are anticipated to be dedicated by developers. Possible funding sources are development impact fees, community facilities district, or other
assessment district.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $69,030 $8,990 $200,000 $278,020
9200 – Contract Services $150,000 $1,000,000 $1,150,000
9400 – Improvements $20,000,000 $20,000,000
TOTAL $219,030 $8,990 $21,200,000 $21,428,020
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $219,030 $8,990 $228,020
9998 – Unidentified $21,200,000 $21,200,000
TOTAL $219,030 $8,990 $21,200,000 $21,428,020
ANNUAL OPERATING IMPACT
98
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 74
Number – ST0216 DUBLIN BOULEVARD EXTENSION – FALLON ROAD TO
NORTH CANYONS PARKWAY Program – STREETS
PROJECT DESCRIPTION
This project provides for the environmental review, preliminary engineering, design and construction of the 1.5-mile extension of Dublin Boulevard from Fallon
Road to North Canyons Parkway in Livermore. The extension is planned to have four to six travel lanes, bike lanes, a Class 1 bike/multi-use path, sidewalk, curb
and gutter, traffic signals, street lighting, landscaped medians, bus stops, and utilities. The preliminary engineering and Environmental Impact Report (EIR) cost
allocation between the City of Dublin and City of Livermore is governed by a Memorandum of Understanding approved by the City Council on April 19, 2016.
The project EIR and precise roadway alignment were completed in 2020. The NEPA Environmental Assessment was completed in early 2021 with a Finding of
No Significant Impact. Alameda CTC has assumed the role of implementing agency for the final design phase of the project working in cooperation with the cities
of Dublin and Livermore.
The preliminary engineering level cost estimate for this project is currently at $153.6 million, which includes all project mitigation costs and indirect impacts
mitigation and is anticipated to be divided among the City of Dublin and the City of Livermore based on street length in each jurisdiction. It is expected that the
City of Dublin share will be approximately $126.1 million, and the City of Livermore share will be $27.5 million. The unincorporated Alameda County's costs will
be shared between the City of Dublin and City of Livermore with the final cost allocation to each jurisdiction to be defined by a Cooperative Agreement.
The $11.2 million identified as "Other" is from Tri-Valley Transportation Development Fee.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $361,262 $200,000 $561,262
9200 – Contract Services $17,051,105 $9,549,891 $26,600,996
9300 – Land/Right of Way $13,324,879 $11,200,000 $24,524,879
9400 – Improvements $74,472,415 $74,472,415
9500 – Miscellaneous $4,466 $4,466
TOTAL $30,741,712 $11,200,000 $84,222,306 $126,164,018
99
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 75
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $7,290,382 $7,290,382
1101 – General Fund Designated Reserves $20,000,000 $20,000,000
2217 – Measure BB Grants $439,824 $439,824
2220 - Road Maint. & Rehab. Account
(RMRA) $240,005 $240,005
4301 – Eastern Dublin Transportation
Impact Fee $1,033,916 $1,033,916
4302 – Eastern Dublin Transportation
Impact Fee $1,737,585 $1,737,585
9997 – Other $11,200,000 $11,200,000
9998 – Unidentified $84,222,306 $84,222,306
TOTAL $30,741,712 $11,200,000 $84,222,306 $126,164,018
ANNUAL OPERATING IMPACT
100
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 76
Number – ST0417 DUBLIN RANCH STREETLIGHT IMPROVEMENTS Program – STREETS
PROJECT DESCRIPTION
This project provides for the design and repainting of decorative streetlight poles. Repainting of the streetlight poles protects its integrity and improves aesthetics in
the surrounding neighborhood. This project is funded by revenue collected through District assessments.
The conversion of approximately 1,626 existing streetlights into energy efficient LED in the Dublin Ranch Street Light Assessment District (1999-1) is now included
within the Citywide Energy Improvements Project, CIP No. GI0121.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $20,295 $6,760 $6,760 $6,760 $6,760 $6,760 $54,095
9200 – Contract Services $42,386 $34,820 $34,820 $34,820 $34,820 $34,820 $216,486
9500 – Miscellaneous $4,060 $420 $420 $420 $420 $420 $6,160
TOTAL $66,741 $42,000 $42,000 $42,000 $42,000 $42,000 $276,741
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2705 – Streetlight District East Dublin
1991-1 $66,741 $42,000 $42,000 $42,000 $42,000 $42,000 $276,741
TOTAL $66,741 $42,000 $42,000 $42,000 $42,000 $42,000 $276,741
ANNUAL OPERATING IMPACT
101
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 77
Number – ST0423 GOLDEN GATE DRIVE INTERSECTION IMPROVEMENTS - DUBLIN BLVD
AND ST. PATRICK WAY Program – STREETS
PROJECT DESCRIPTION
This project provides for the design and construction of improvements at the intersections of Dublin Boulevard at Golden Gate Drive and St. Patrick Way at Golden
Gate Drive. This is a Western Dublin Transportation Impact Fee Program project designed to relieve congestion, reduce greenhouse gases, and is an Active
Transportation Solution. The project is identified in the Downtown Dublin Specific Plan and the Bicycle and Pedestrian Plan. The improvements may include a new
traffic signal at the intersection of St. Patrick Way and Golden Gate Drive; traffic signal modifications at the intersection of Dublin Boulevard at Golden Gate Drive;
conversion of signal interconnection from copper to fiber optic; signage, striping and markings; necessary green stormwater infrastructure, utility, pavement, curb,
gutter, ADA curb ramps, and sidewalk modifications or adjustments. The preliminary design and planning phase began in 2023 in preparation for applying for grant
funding. Staff will continue to seek funding opportunities.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $34,320 $8,320 $150,000 $192,640
9200 – Contract Services $101,000 $199,000 $750,000 $1,050,000
9400 – Improvements $609,000 $2,600,000 $3,209,000
TOTAL $135,320 $816,320 $3,500,000 $4,451,640
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
4304 – Western Dublin Transportation
Impact Fee $135,320 $816,320 $2,500,000 $3,451,640
2214 – Measure BB Sales Tax – Local
Streets Fund (ACTC) $600,000 $600,000
2215 – Measure BB Sales Tax – Bike &
Pedestrian Fund (ACTC) $400,000 $400,000
TOTAL $135,320 $816,320 $3,500,000 $4,451,640
ANNUAL OPERATING IMPACT
102
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 78
Number – ST0121 GREEN STORMWATER INFRASTRUCTURE Program – STREETS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of various citywide projects that will improve water quality and provide other environmental benefits
in accordance with the Green Stormwater Infrastructure (GSI) Plan, which was approved by the City Council on June 18, 2019. The GSI Plan and associated
implementing projects, as well as trash load reduction requirements, are mandated by the Municipal Regional Stormwater Permit (MRP). Projects include: stormwater
full trash capture device installation throughout the City, and construction of GSI along the Iron Horse Regional Trail corridor, south of Amador Valley Boulevard.
GSI planning and planning for the installation of trash capture devices began in Fiscal Year 2021-22. The installation of the trash capture devices is anticipated to
begin in Fiscal Year 2023-24. Construction of GSI along the Iron Horse Regional Trail corridor, south of Amador Valley Boulevard, is anticipated in 2024.
This project is funded by a General Fund Reserve set aside for this purpose. The City and Alameda CTC entered into Cooperative Agreements on February 7, 2023
and April 16, 2024 to partner on the design, environmental permitting, and construction phases for a bio-retention and hydromodification management facility along
the Iron Horse Regional Trail corridor, south of Amador Valley Boulevard, that satisfies a portion of the City's GSI requirement and Alameda CTC's project, SR84
Expressway Widening and SR84/I-680 Interchange Improvements. Alameda CTC's share of the costs is 75% of the total, which will be reimbursed to the City after
expenditure. Both agencies will enter into a subsequent agreement for the maintenance phase.
The "Other County Reimbursement" funding is from Alameda County Transportation Commission.
ANNUAL OPERATING IMPACT: To be determined. Alameda CTC will enter into a long-term maintenance agreement with the City for the GSI along the
Iron Horse Regional Trail corridor, south of Amador Valley Boulevard, to account for the on-going maintenance costs of the portion of the facility that satisfies their
project.
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $96,340 $30,000 $30,000 $156,340
9200 – Contract Services $847,053 $115,000 $120,000 $1,082,365
9400 – Improvements $2,333,670 $275,000 $300,000 $2,908,670
9500 – Miscellaneous $12,000 $12,000
TOTAL $3,289,063 $420,000 $450,000 $4,159,063
103
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 79
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $953,376 $420,000 $450,000 $1,823,376
9901 – Other County Reimbursement $2,335,687 $2,335,687
TOTAL $3,289,063 $420,000 $450,000 $4,159,063
ANNUAL OPERATING IMPACT
104
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 80
Number – ST0118 IRON HORSE TRAIL BRIDGE AT DUBLIN BOULEVARD Program – STREETS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of the Iron Horse Trail bridge for bicycles and pedestrians over Dublin Boulevard. The project will
construct a 230-foot clear span truss arch bridge consistent with the Iron Horse Trail Feasibility Study and preliminary bridge design, approved by the City Council
on November 7, 2017. The bridge will provide safer and easier trail access, including access to and from the Dublin-Pleasanton BART station.
The Alameda County Transportation Commission (Alameda CTC) approved an allocation of $1,294,000 of Measure BB discretionary funds in Fiscal Year 2017-18
for the bridge design and environmental clearance. On June 17, 2019, Alameda CTC approved additional funding in the amount of $4,751,000 of Measure BB and
$856,419 of Transportation for Clean Air funds for the construction phase of the project. The project will also receive funding of $1,000,000 for construction from a
Developer contribution from the Boulevard Project. In fall of 2020, BART approved $1,500,000 of Measure RR Safe Routes to BART Grant for the construction
phase of the project. Construction of the project was awarded by the City Council on March 1, 2022, and is anticipated to be completed in summer 2024.
The $600,000 identified as "Other" is from the Tri-Valley Transportation Development Fee.
ANNUAL OPERATING IMPACT: $100,000
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $155,460 $155,460
9200 – Contract Services $2,419,540 $2,419,540
9400 – Improvements $11,416,979 $11,416,979
9500 – Miscellaneous $12,460 $12,460
TOTAL $14,004,439 $14,004,439
105
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 81
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2201 – State Gas Tax $845,040 $845,040
2204 – Measure B Sales Tax – Local
Streets Fund (ACTC) $587,980 $587,980
2205 – Measure B Sales Tax – Bike &
Pedestrian Fund (ACTC) $400,000 $400,000
2207 – TFCA/Transportation for Clean
Air $856,419 $856,419
2214 – Measure BB Sales Tax – Local
Streets Fund (ACTC) $400,000 $400,000
2215 – Measure BB Sales Tax – Bike &
Pedestrian Fund (ACTC) $300,000 $300,000
2217 – Measure BB Grants $6,045,000 $6,045,000
2218 – Measure RR Safe Routes to
BART $1,500,000 $1,500,000
2220 – Road Maint. & Rehab. Account
(RMRA) $970,000 $970,000
4301 – Eastern Dublin Transportation
Impact Fee $500,000 $500,000
4401 – Dublin Crossing Fund $1,000,000 $1,000,000
9997 – Other $600,000 $600,000
TOTAL $14,004,439 $14,004,439
ANNUAL OPERATING IMPACT $100,000 $100,000 $100,000 $100,000 $100,000
106
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 82
Number – ST0218 SAN RAMON ROAD LANDSCAPE RENOVATION Program – STREETS
PROJECT DESCRIPTION
This project provides for design and construction to renovate the landscaping along San Ramon Road between Silvergate Drive and Alcosta Boulevard. Proposed
renovation includes the removal of failing plants, soil amendment, and installation of new plants, with an emphasis on Bay Friendly and water conserving plant species.
Much of the existing landscaping in this area was installed between 1993 and 1995, and some of the planting has reached the end of its life expectancy. The project
has been delayed due to prior years’ droughts and due to other adjacent projects, such as installation of a recycled water irrigation main by Dublin San Ramon Services
District, as well as the potential impacts imposed by AB 1572 to achieve water conservation limits. Potential funding for Bay Friendly landscaping may be available
from Measure D.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $12,864 $12,864
9200 – Contract Services $19,000 $19,000
9400 – Improvements $206,201 $206,201
9500 – Miscellaneous $1,000 $1,000
TOTAL $239,065 $239,065
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $239,065 $239,065
TOTAL $239,065 $239,065
ANNUAL OPERATING IMPACT
107
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 83
Number – ST0514 SAN RAMON ROAD TRAIL LIGHTING Program – STREETS
PROJECT DESCRIPTION
This project provides for the design and construction of improvements to the trail light fixtures between Silvergate Drive and Alcosta Boulevard. In prior years, the
project included installation of tree root barriers and repair of portions of the asphalt concrete trail. Other CIP Projects (ST0514 - Storm Drain Bypass San Ramon
Road, ST0117 - Annual Street Resurfacing, and ST0517 - Citywide Bicycle and Pedestrian Improvements) replaced the existing asphalt trail surface. The trail lighting
improvement portion of the project was completed in 2022. The remaining pole painting portion of the project will be completed in conjunction with the Dublin
Ranch Street Light Improvements, CIP No. ST0417.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $21,378 $21,378
9200 – Contract Services $31,142 $31,142
9400 – Improvements $119,891 $119,891
9500 – Miscellaneous $1,050 $1,050
TOTAL $173,461 $173,461
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 – General Fund $173,461 $173,461
TOTAL $173,461 $173,461
ANNUAL OPERATING IMPACT
108
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 84
Number – ST0119
TASSAJARA ROAD IMPROVEMENTS - NORTH
DUBLIN RANCH DRIVE TO QUARRY LANE
SCHOOL Program – STREETS
PROJECT DESCRIPTION
This project provides for design and construction to complete the street improvements on Tassajara Road, from North Dublin Ranch Drive to Quarry Lane School.
The scope of this project was previously included as part of Fiscal Years 2016-19 Capital Improvement Program project, ST0116 - Tassajara Road Realignment &
Widening, which included the design and construction of Tassajara Road from North Dublin Ranch Drive to Dublin's northern limit. In Fiscal Year 2018-19, the
scope of ST0116 was revised to only include the segment of Tassajara Road north of Fallon Road.
The project will improve Tassajara Road to a four-lane arterial standard, with bike lanes, sidewalks, landscaped median, stormwater treatment areas, and other associated
street improvements. Portions of the existing roadway have been improved by adjacent development projects and this project will complete the street improvements
implementing the General Plan and the Complete Streets Policy. This roadway segment is a project within the Eastern Dublin Transportation Impact Fee program.
Preliminary engineering and environmental documentation were completed as part of ST0116.
Design of the project began in early 2020. Construction is anticipated to start early 2025; however, it is dependent upon utility relocation, right-of-way acquisition, and
permitting by regulatory agencies.
The $1,450,000 identified as "Other" is from Tri-Valley Transportation Development Fee.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $136,040 $136,040
9200 – Contract Services $2,169,660 $2,169,660
9300 – Land/Right of Way $436,300 $436,300
9400 – Improvements $10,340,000 $500,000 $10,840,000
9500 – Miscellaneous $418,000 $418,000
TOTAL $13,500,000 $500,000 $14,000,000
109
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 85
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2201 – State Gas Tax $1,201,980 $1,201,980
4301 – Eastern Dublin Transportation
Impact Fee $3,848,020 $3,848,020
4305 – Traffic Impact Fee – Dougherty
Valley $1,500,000 $1,500,000
4306 – Tri-Valley Transportation
Development Fee $5,500,000 $5,500,000
2214 – Measure BB Sales Tax – Local
Streets Fund (ACTC) $500,000 $500,000
9997 – Other $1,450,000 $1,450,000
TOTAL $13,500,000 $500,000 $14,000,000
ANNUAL OPERATING IMPACT
110
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 86
Number – ST0116 TASSAJARA ROAD REALIGNMENT AND WIDENING -
FALLON ROAD TO NORTH CITY LIMIT Program – STREETS
PROJECT DESCRIPTION
The project provides for the planning and preliminary engineering to define a new roadway alignment, design cross-section, right-of-way, and environmental clearance
for Tassajara Road between North Dublin Ranch Drive and the City and Contra Costa County limits. The project also provides for the design and construction of a
realigned Tassajara Road from Fallon Road to the northern city limit, which will be coordinated with Contra Costa County. Planning and preliminary engineering cost
will be split in accordance with the Memorandum of Understanding, which was approved on September 16, 2014. Costs for the design and construction will be agreed
upon and split proportionally with the work within each jurisdiction. The City and Contra Costa County executed a JEPA on September 23, 2020 for Contra Costa
County to lead the project design, which started in January 2021. The design and construction of the southerly Tassajara Road segment is included in another Capital
Improvement Program project, Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School (ST0119).
This project will widen Tassajara Road to a four-lane arterial standard with bike lanes, sidewalks, landscaped median, stormwater treatment areas, and other associated
street improvements. Segments of the existing roadway have been improved by adjacent development projects. This project will complete the street improvements
and realign the remaining segments of the existing roadway to improve safety and achieve better circulation while adhering to the Complete Streets Policy. The roadway
segment is a project within both the Tri-Valley Transportation Council Strategic Expenditure Plan (Project B-8) and the Eastern Dublin Transportation Impact Fee
Program.
The $1,000,000 in "Other" funding is from Tri-Valley Transportation Development Fee.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $352,478 $352,478
9200 – Contract Services $1,924,149 $1,924,149
9300 – Land/Right of Way $1,980,000 $1,980,000
9400 – Improvements $7,072,476 $1,000,000 $8,072,476
9500 – Miscellaneous $495,313 $495,313
TOTAL $11,777,416 $1,000,000 $12,777,416
111
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 87
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2201 – State Gas Tax $200,000 $200,000
2220 – Road Maint. & Rehab. Account
(RMRA) $692,059 $692,059
4301 – Eastern Dublin Transportation
Impact Fee $6,008,739 $6,008,739
4303 – Traffic Impact Fee – Category 3 $409,263 $409,263
4305 – Traffic Impact Fee – Dougherty
Valley $3,964,338 $3,964,338
4306 – Tri-Valley Transportation
Development Fee $503,017 $503,017
9997 – Other $1,000,000 $1,000,000
TOTAL $11,777,416 $1,000,000 $12,777,416
ANNUAL OPERATING IMPACT
112
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 88
Number – ST0123 TRAFFIC SIGNAL AND ROADWAY SAFETY IMPROVEMENTS Program – STREETS
PROJECT DESCRIPTION
This project will provide for feasibility, design, and construction and modification of traffic signals and roadway safety improvements at locations prioritized and
recommended by Local Roadway Safety Plan (LRSP), which was approved in January 2023. Improvements include upgrading the signal equipment such as traffic
signal poles/mast arms, vehicle and pedestrian signal heads, signal controllers, cabinet upgrades, streetlighting/safety lighting improvements, signal phasing and
timing changes, signing and striping improvements, and other alternatives identified in the LRSP toolbox and under systemic and site recommendations. The project
will also provide for evaluating the design and installation of protected intersection elements. The planning phase began in Fiscal Year 2023-24.
ANNUAL OPERATING IMPACT: To be determined
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $20,800 $20,800
9200 – Contract Services $149,200 $149,200
TOTAL $170,000 $170,000
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2214 – Measure B Sales Tax – Local
Streets Fund (ACTC) $85,000 $85,000
2215 – Measure BB Sales Tax – Bike &
Pedestrian (ACTC) $85,000 $85,000
TOTAL $170,000 $170,000
ANNUAL OPERATING IMPACT
113
Streets City of Dublin Proposed Capital Improvement Program 2024-2029 Page 89
Number – ST0223 TRAFFIC SIGNAL RE-LAMPING Program – STREETS
PROJECT DESCRIPTION
This project provides for the replacement of the traffic signal and pedestrian signal LED lamps at approximately 78 signalized intersections. The City currently has 98
traffic signals, many of which were installed in 2008, and the LED lamps are reaching the end of their useful life, which is typically eight to ten years. The City has
replaced 20 signalized intersection lamps through on-going maintenance efforts. New LED lamps will ensure proper visibility of vehicle and pedestrian signal heads,
which is critical for maintaining safe traffic flow. Design is anticipated to begin in 2024.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $8,320 $4,160 $12,480
9200 – Contract Services $70,000 $70,000
9400 – Improvements $433,760 $130,840 $564,600
TOTAL $512,080 $135,000 $647,080
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
2201 – State Gas Tax $177,080 $60,000 $237,080
2212 – Vehicle Registration Fee (ACTC) $260,000 $260,000
2214 – Measure BB Sales Tax – Local
Streets Fund (ACTC) $50,000 $50,000
2215 – Measure BB Sales Tax – Bike &
Ped Fund (ACTC) $75,000 $25,000 $100,000
TOTAL $512,080 $135,000 $647,080
ANNUAL OPERATING IMPACT
114
Number – ST0323 VILLAGE PARKWAY RECONSTRUCTION Program – STREETS
PROJECT DESCRIPTION
This project provides for the planning, design, and construction of the replacement of the existing streetscape elements on Village Parkway between Amador Valley
Boulevard and the northern city limit (approximately 6,000 linear feet). The project will transform the segment of Village Parkway between Amador Valley Boulevard
and Kimball Avenue to a pedestrian and bicycle friendly roadway, which will incorporate complete streets elements such as median islands, bulbouts, decorative or
high visibility crosswalks, and street lighting. The work may include the reconstruction of the median island; reconstruction of the roadway base immediately adjacent
to the median island; reconstruction necessary for sidewalks improvements, ADA upgrades to curb ramps, curb, and gutter; necessary utility work; landscaping;
stormwater improvements; and new pavement for the roadway. The City Council approved the Concept Plan on February 20, 2024 and approved the recommendation
to add replacement of the neighborhood concrete walls to the project. Staff will continue to seek grant funding opportunities to close the current funding shortfall.
The project will receive grants funds in the amount of $9,150,000 from the State Transportation Improvement Program, which will be allocated in FY 2027-28.
ANNUAL OPERATING IMPACT: To be determined.
MANAGING DEPARTMENT: Public Works
2020-2027 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
9100 – Salaries & Benefits $45,032 $49,920 $64,480 $89,440 $100,000 $348,872
9200 – Contract Services $504,968 $1,000,080 $1,000,000 $510,560 $1,000,000 $4,015,608
9400 – Improvements $10,000,000 $5,000,000 $4,900,000 $19,900,000
9500 – Miscellaneous $85,520 $85,520
TOTAL $550,000 $1,050,000 $11,150,000 $5,600,000 $6,000,000 $24,350,000
115
FUNDING SOURCE
PRIOR
YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
FUTURE
YEARS TOTALS
1101 – General Fund Designated
Reserves $550,000 $1,000,000 $8,450,000 $10,000,000
2201 – State Gas Tax $50,000 $250,000 $100,000 $400,000
2214 – Measure BB Sales Tax – Local
Streets Fund $250,000 $200,000 $450,000
9998 – Unidentified $2,200,000 $5,300,000 $6,000,000 $13,500,000
TOTAL $550,000 $1,050,000 $11,150,000 $5,600,000 $6,000,000 $24,350,000
ANNUAL OPERATING IMPACT
116
Future Projects City of Dublin Proposed Capital Improvement Program 2024-2029 Page 92
FUTURE PROJECTS
117
Future Projects City of Dublin Proposed Capital Improvement Program 2024-2029 Page 93
LOCATION MAP
118
Future Projects City of Dublin Proposed Capital Improvement Program 2024-2029 Page 94
Number – P-03 CROAK NEIGHBORHOOD PARK EAST Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction of a 5.5-acre neighborhood park to serve new development. The park will be designed in
accordance with the Neighborhood Park Standards contained in the Parks and Recreation Master Plan. Based on development projections, it is
anticipated that design and construction will occur beyond the CIP time frame and will occur at or after development of the project area.
ESTIMATED COSTS: $4,890,000
MANAGING DEPARTMENT: Public Works
Number – P-02 CROAK NEIGHBORHOOD PARK WEST Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction of a 5.5-acre neighborhood park to serve new development. The park will be designed in
accordance with the Neighborhood Park Standards contained in the Parks and Recreation Master Plan. Based on development projections, it is
anticipated that design and construction will occur beyond the current CIP time frame and will occur at or after development of the project area.
ESTIMATED COSTS: $4,890,000
MANAGING DEPARTMENT: Public Works
119
Future Projects City of Dublin Proposed Capital Improvement Program 2024-2029 Page 95
Number – P-01 DUBLIN SPORTS GROUNDS – PHASE 5 RENOVATION Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction to renovate a portion of the Dublin Sports Grounds. The Phase 5 project encompasses
approximately 180,000 square feet, west of Soccer Field #3, and includes installation of a sand channel drainage system, irrigation upgrades and new
turf.
ESTIMATED COSTS: $2,750,000
MANAGING DEPARTMENT: Public Works
Number – P-04 EMERALD GLEN RECREATION AND AQUATIC
COMPLEX - PHASE 2 Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction of the final phase of the Emerald Glen Recreation and Aquatic Complex (known as The Wave).
Amenities may include a community room and gymnasium space. This project may be modified as the City has entered into an agreement for a joint
use gymnasium at the Dublin Crossing school site. Until such time, it will remain as a future project.
ESTIMATED COSTS: $17,600,000
MANAGING DEPARTMENT: Public Works
120
Future Projects City of Dublin Proposed Capital Improvement Program 2024-2029 Page 96
Number – S-01 CITY ENTRANCE SIGNS Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction to install City entrance signs at the following two locations: Fallon Road at Dublin Boulevard and
at Dublin Boulevard at the eastern city limit. Currently there are no medians at these locations on which to install the signs. The new signs will conform
to the City of Dublin Streetscape Master Plan and will match the existing granite monument signs currently installed within the City.
ESTIMATED COSTS: $225,000
MANAGING DEPARTMENT: Public Works
Number – S-02 EASTERN DUBLIN TRANSPORTATION IMPACT FEE Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction of 15 projects being partially funded by the Eastern Dublin Transportation Impact Fee (EDTIF)
program. The City Council established the EDTIF program on January 9, 1995 and adopted the most recent update on December 21, 2021. This project
does not include completed EDTIF projects, current projects that are individual CIP projects, or current projects to be constructed by developers.
EDTIF projects within the five-year capital improvement program are: ST0116 Tassajara Road Realignment & Widening; ST0119 Tassajara Road
Improvements - North Dublin Ranch Drive to Quarry Lane School; and ST0216 Dublin Boulevard Extension.
ESTIMATED COSTS: $61,750,000
MANAGING DEPARTMENT: Public Works
121
Future Projects City of Dublin Proposed Capital Improvement Program 2024-2029 Page 97
Number – S-03 WESTERN DUBLIN TRANSPORTATION IMPACT FEE Program – FUTURE
PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction of eight projects being partially funded by the Western Dublin Transportation Impact Fee (WDTIF)
program. The City Council adopted an update to the WDTIF on September 6, 2016. The WDTIF program includes a total of nine projects, however
the following three projects are within the five-year capital improvement program: ST0815 - Amador Plaza Road Bicycle and Pedestrian Improvements,
and ST0423 - Golden Gate Drive Intersection Improvements - Dublin Blvd and St. Patrick Way.
ESTIMATED COSTS: $8,750,000
MANAGING DEPARTMENT: Public Works
122