HomeMy WebLinkAbout5.10 Citywide Bicycle and Pedestrian Improvements – Safe Routes to School Project, CIP No. ST0517 - Approval of Plans and Specifications and Award of Contract to FBD Vanguard Construction, Inc.r
DUBLIN
CALIFORNIA
STAFF REPORT
CITY COUNCIL
DATE: .Lily 16, 2024
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
Agenda Item 5.10
SU B.ECT: Citywide Bicycle and Pedestrian Improvements - Safe Routes to School
Project, CIP No. ST0517 - Approval of Plans and Specifications and Award of
Contract to FBD Vanguard Construction, Inc.
Prepared by: Oliver Castillo, Assistant Civil Engineer
EXECUTIVE SUMMARY:
The City Council will consider approving the plans and specifications and awarding a construction
contract to FBD Vanguard Construction, Inc. for the Citywide Bicycle and Pedestrian
Improvements - Safe Routes to School Project. The project will install Rectangular Rapid Flashing
Beacons and upgrades to existing curb ramps at the following locations: Amador Valley
Boulevard/Burton Street, Central Parkway/Aspen Street, and Grafton Street/Antone Way. The
project will also modify the traffic signal at Central Parkway/Hibernia Drive.
STAFF RECOMMENDATION:
Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to FBD
Vanguard Construction, Inc. for the Citywide Bicycle and Pedestrian Improvements - Safe Routes
to School Project, CIP No. ST0517.
FINANCIAL IMPACT:
The bid submitted by FBD Vanguard Construction, Inc. is $1,511,600. Staff recommends a
construction contingency of $150,000 (approximately 10%) to facilitate change orders for
unforeseen construction issues, bringing the total potential construction cost to $1,661,600.
Sufficient funds are available in the approved budget for CIP No. ST0517.
Page 1 of 4
1
DESCRIPTION:
The 2024-2029 Capital Improvement Program (CIP) includes the Citywide Bicycle and Pedestrian
Improvements Project, CIP No. ST0517 (Attachment 2). The project provides for the planning,
design, and construction of improvements to various pedestrian and bicycle facilities throughout
the City, including pedestrian/bicycle bridges, annual sidewalk repair, and the Safe Routes to
School improvements at various intersections.
The Safe Routes to School portion of the Project will include the installation of Rectangular Rapid
Flashing Beacons at the intersections of Amador Valley Boulevard/Burton Street, Central
Parkway/Aspen Street, and Grafton Street/Antone Way, existing pedestrian curb ramp upgrades
in accordance with the Americans with Disabilities Act (ADA) requirements, and other minor
appurtenant improvements. This project will also include a traffic signal modification and curb
ramp modifications at the intersection of Central Parkway/Hibernia Drive.
On July 19, 2022, the City Council approved a project funding agreement with Alameda County
Transportation Commission (Alameda CTC) (Agreement No. A22-0026) for the construction
phase of the Safe Routes to School Project. The agreement allocated $390,000 in Vehicle
Registration Fee funds for the construction of the improvements.
Bid Process and Results
The City of Dublin issued a bid package for the Safe Routes to School Project on April 22, 2024. The
bid package consisted of 43 base bid items. Three sealed bids were received on May 16, 2024, with
the base bids ranging from $1,379,756.50 to $1,578,859.25. The lowest base bid of $1,379,756.50
was submitted by Sposeto Engineering, Inc. A summary of the bids is provided as Attachment 3.
Staff conducted an initial review of the bid results, references, and necessary licenses of the
submitted bidders. However, since this project is partially funded by Vehicle Registration Fee funds,
Alameda CTC requires all bidders to comply with the Local Business Contract Equity (LBCE)
Program. The LBCE Program has the following contract goals:
• For Local Business Enterprise (LBE): 60% for construction contracts
• For Small Local Business Enterprise (SLBE): 20% for construction contracts
The apparent lowest bidder, Sposeto Engineering, Inc., did not meet the construction contract goal
for 60% LBE participation under the LBCE Program. Therefore, a Good Faith Efforts (GFE) review
was required pursuant to the LBCE Program. Staff provided Alameda CTC with the GFE
documentation from all three bidders. The GFE documentation was reviewed and analyzed by
Alameda CTC's Contract Equity Consultant, who prepared an initial report that was subsequently
reviewed by the Interdisciplinary Review Team (IRT). The three -member IRT included one City
staff member and two Alameda CTC staff members, who were nominated by the Alameda CTC
Executive Director.
The IRT conducted a GFE review in accordance with the LBCE criteria and determined that
Sposeto Engineering, Inc. did not meet the requirements of the LBCE Program for GFE. Therefore,
Page 2 of 4
2
Sposeto Engineering, Inc.'s bid was deemed non -responsive and resulted in its rejection. The IRT
concluded that the second lowest bidder, FBD Vanguard Construction, Inc., met the requirements
for the LBCE Program for GFE. Staff recommends that the City Council award the construction
contract to FBD Vanguard Construction, Inc. as the lowest responsive and responsible bidder.
To facilitate the approval of contract change orders and avoid construction delays, it is requested
that the City Manager or designee be authorized to approve change orders up to the contingency
amount of $150,000. The resolution will authorize this change as it relates to the project. Staff
expects work to begin in late August 2024 and be completed in early 2025.
Community Workforce Agreement
On January 11, 2022, the City Council approved a Community Workforce Agreement (CWA) with
the Building and Construction Trades Council of Alameda County and its Affiliated Local Unions.
The CWA is applicable to public works projects valued at over $1,000,000, ensures that there are
no labor issues related to said projects, and bolsters local efforts to connect residents with careers
in the building and construction trades. The CWA includes a Local Hire Goal where 20% of all
hours on a project are worked by Local Residents, which are defined as individuals that reside
within Alameda County or within a 15-mile radius of City limits. The CWA also requires
contractors to hire one new apprentice for the first $1,000,000 of construction costs, and an
additional new apprentice for every $5,000,000 construction costs, based on the engineer's
estimate. Apprentices must work a minimum of 10% of the total craft's work hours, but the CWA
allows that apprentices may be deployed to another project to ensure the minimum number of
hours are met.
Staff worked with its consultant, Workforce Integrity and Training Solutions, to prepare bid
documents and solicit bids for the Safe Routes to School Project that comply with the provisions of
the CWA. The provisions include the requirement that responsive bidders include an executed
Agreement to be Bound to and by the CWA, and that all subcontractors of the successful bidder
also execute the Agreement to be Bound within 14 days after Notice of Award.
California Environmental Oualitv Act (CEOA)
This project is exempt under Section 15301 (Existing Facilities) of the CEQA Guidelines.
STRATEGIC PLAN INITIATIVE:
None.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
A courtesy copy of this report was sent to FBD Vanguard Construction, Inc. and Alameda County
Transportation Commission's Independent Watchdog Committee. The City Council Agenda was
posted.
Page 3 of 4
3
ATTACHMENTS:
1) Resolution Approving the Plans and Specifications and Awarding a Contract to FBD Vanguard
Construction, Inc. for the Citywide Bicycle and Pedestrian Improvements - Safe Routes to
School Project, CIP No. ST0517
2) CIP No. ST0517
3) Location Map
4) Bid Results
Page 4 of 4
4
Attachment I
RESOLUTION NO. XX - 24
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO FBD
VANGUARD CONSTRUCTION, INC. FOR THE CITYWIDE BICYCLE AND PEDESTRIAN
IMPROVEMENTS — SAFE ROUTES TO SCHOOL PROJECT, CIP NO. ST0517
WHEREAS, the design team has completed the plans and specifications for the Citywide
Bicycle and Pedestrian Improvements — Safe Routes to School, CIP No. ST0517, (Project) which
includes installation of Rectangular Rapid Flashing Beacons at Amador Valley Boulevard/Burton
Street, Central Parkway/Aspen Street, and Grafton Street/Antone Way, existing pedestrian curb
ramp upgrades, and other minor appurtenant improvements, as well as. traffic signal modification
and curb ramp upgrades at the intersection of Central Parkway/Hibernia Drive; and
WHEREAS, the City of Dublin did, on May 16, 2024, publicly open, examine, and declare
all sealed bids for doing the work described in the approved plans and specifications for the
Project, which plans and specifications are hereby expressly referred to for a description of said
work and for all particulars relative to the proceedings under the request for bids; and
WHEREAS, the low bid from Sposeto Engineering, Inc. was deemed non -responsive due
to not meeting the Alameda County Transportation Commission's Local Business Contract Equity
Program requirements for Good Faith Efforts; and
WHEREAS, the bid submitted by FBD Vanguard Construction, Inc. met the requirements
for the Alameda County Transportation Commission's Local Business Contract Equity Program
and was determined to be the lowest, responsive, and responsible bidder for doing said work.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby
approves the Plans and Specifications for the Project.
BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby award
the Contract for the Project to the lowest, responsive, and responsible bidder, FBD Vanguard
Construction, Inc. at a base bid of $1,511,600, the particulars of which bids are on file in the Office
of the Public Works Director.
BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby
authorize the City Manager or designee to approve the Project contract change orders based on
the appropriated funds designated for the Project up to the contingency amount of $150,000.
BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute
the Construction Agreement for the Project with FBD Vanguard Construction, Inc. and make any
necessary non -substantive changes to carry out the intent of this Resolution.
Reso. No. XX-24, Item XX, Adopted 07/16/24 Page 1 of 2
5
PASSED, APPROVED AND ADOPTED this 16th day of July 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
ATTEST:
City Clerk
Reso. No. XX-24, Item XX, Adopted 07/16/2024 Page 2 of 2
6
Attachment 2
Number — ST 0517
CITYW IDE BICYCLEAND PEDESTRIAN IMPROVEMENTS Program —STREETS
PRO.ECT DESCRIPTION
This project includes planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the City, including pedestrian/bicycle
bridges and annual sidewalk repair. This project includes design and construction of improvements recommended in the updated Bicycle and Pedestrian Plan, which
was adopted by the City Council on January 10, 2023, as well as the Safe Routes to School improvements.
The project also includes an update to the American with Disabilities Act (ADA) Transition Plan and implementation of Public Right-of-way Accessibility Guidelines
(PROWAG). The plan update will include a review of City buildings, parks, and rights -of -way.
PRO.ECT TIMELINE: The Downtown pedestrian crossing improvements on Regional Street is the first project to be constructed. The design is 95% complete,
and construction will begin in summer/fall 2024. The Safe Routes to School improvements at the intersections of Central Parkway at Aspen Street and Hibernia
Drive, Grafton Street at Antone Way, and Amador Valley Boulevard at Burton Street are anticipated to begin construction in 2024. The ADA Transition Plan update,
funded by the General Fund, is anticipated to be completed in 2025.
ANNUAL OPERATING IMPACT: $12,000
2024-2029 CAPITAL IMPROVEMENT PROGRAM
ESTIMATED COSTS
PRIOR
YEARS 2024-2025
FUTURE
2025-2026 2026-2027 2027-2028 2028-2029 YEARS TOTALS
9100 — Salaries & Benefits
9200 — Contract Services
9400 — Improvements
9500 — Miscellaneous
$127,372 $50,728
$1,314,668 $555,000
$3,173,298 $1,175,000
$40,034 $7,500
$20,000
$200,000
$525,000
$5,000
$20,000
$200,000
$525,000
$5,000
$20,000
$200,000
$525,000
$5,000
$20,000
$200,000
$525,000
$5,000
$258,100
$2,669,668
$6,448,298
$67,534
TOTAL
$4,655,372 $1,788,228 $750,000
$750,000 $750,000 $750,000
$9,443,600
7
PRIOR
YEARS
2024-2025
2027-2028 2028-2029
FUTURE
YEARS TOTALS
1001 - General Fund
$858,000 $105,000
2203 - Transportation Development Act $210,000
2204 - Measure B Sales Tax - Local
Streets Fund (ACTC) $510,000
2205 - Measure B Sales Tax - Bike &
Pedestrian Fund (ACTC) $142,900
2214 - Measure BB Sales Tax - Local
Streets Fund (ACTC) $1,471,600 $630,000 $250,000 $250,000 $250,000 $250,000
2215 - Measure BB Sales Tax - Bike &
Pedestrian Fund (ACTC) $601,872 $698,228 $250,000 $250,000 $250,000 $250,000
2212 - Vehicle Registration Fee
2217 - Measure BB Grants
2220 - Road Maint. & Rehab. Account
(RMRA)
$726,000
$135,000
$355,000
$250,000
$250,000 $250,000
$250,000
$963,000
$210,000
$510,000
$142,900
$3,001,600
$2,400,100
$726,000
$135,000
$1,355,000
TOTAL $4,655,372
$1,788,228 $750,000 $750,000 $750,000 $750,000 $9,443,600
8
Attachment 3
SD
2
-13
r
m
D
D
z
0
z
NOLLVl1V1SNl 8J d •
OAI8 Nnena
ante Nnena
DOUGHERTY RD
HACIENDA DR
HIBERNIA DR
•SPEN ST
TASSAJARA RD
NO NOSY31O
v
c
co
r_
z
GRAFTON ST•
2
z
rA
Oa NO11YJ
0
0
9
Attachment 4
G,�q OF DpB�
w
Project Name:
Project No. :
Bid Date:
CITY OF DUBLIN
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
BID SUMMARY
Citywide Bicycle and Pedestrian Improvements - "Safe Routes to School: Crosswalk and Curb Ramp Improvement Projects and Traffic Signal Modification Project
ST0517
5/16/2024, 2:30pm
BASE BID Sposeto Engineering Inc. Rays Electric FBD Vanguard Construction Inc.
ITEM DESCRIPTION Qty. UNIT Unit Cost Extension Unit Cost Extension Unit Cost Extension
1 Mobilization (Max 10% of total base bid) 1 LS $100,000.00 $100,000.00 $127,000.00 $127,000.00 $140,000.00 $140,000.00
2 Traffic Control and Public Convenience (Max 10% of total base bid) 1 LS $60,000.00 $60,000.00 $110,500.00 $110,500.00 $70,000.00 $70,000.00
3 Water Pollution Control Work 1 LS $25,000.00 $25,000.00 $25,035.00 $25,035.00 $10,000.00 $10,000.00
4 Potholing 1 LS $10,000.00 $10,000.00 $44,750.00 $44,750.00 $4,000.00 $4,000.00
5 Clear and Grub 1 LS $56,000.00 $56,000.00 $30,000.00 $30,000.00 $3,800.00 $3,800.00
6 Roadway Excavation 147 CY $375.00 $55,125.00 $310.00 $45,570.00 $170.00 $24,990.00
7 0.17' Cold Plan Asphalt Concrete 6 SY $600.00 $3,600.00 $1,094.00 $6,564.00 $400.00 $2,400.00
8 Remove Concrete (Sidewalk) 4,886 SF $5.00 $24,430.00 $10.00 $48,860.00 $22.00 $107,492.00
9 Remove Concrete (Curb and Guttter) 633 LF $22.00 $13,926.00 $23.00 $14,559.00 $18.00 $11,394.00
10 Remove Brick Pavers 490 SF $5.00 $2,450.00 $12.00 $5,880.00 $10.00 $4,900.00
11 Remove Existing Tree 3 EA $2,500.00 $7,500.00 $1,000.00 $3,000.00 $2,300.00 $6,900.00
12 Adjust Utility to Grade 4 EA $275.00 $1,100.00 $1,425.00 $5,700.00 $6,400.00 $25,600.00
13 Reconstruct Type III Sidewalk Underdrain 42 LF $90.00 $3,780.00 $90.00 $3,780.00 $130.00 $5,460.00
14 Reconstruct Existing Storm Drain Inlet 1 EA $6,000.00 $6,000.00 $5,850.00 $5,850.00 $9,700.00 $9,700.00
15 Install Storm Drain Inlet 1 EA $13,000.00 $13,000.00 $7,250.00 $7,250.00 $27,000.00 $27,000.00
16 Hot Mix Asphalt (Type A) 264 TON $320.00 $84,480.00 $380.00 $100,320.00 $623.00 $164,472.00
17 Minor Concrete (Stamped Concrete) 406 SF $36.50 $14,819.00 $65.00 $26,390.00 $63.00 $25,578.00
18 Minor Concrete (Sidewalk) 6,086 SF $24.00 $146,064.00 $31.00 $188,666.00 $28.00 $170,408.00
19 Minor Concrete (Curb and Gutter) 599 LF $96.00 $57,504.00 $115.00 $68,885.00 $50.00 $29,950.00
20 Minor Concrete (Caltrans Type A1-8 Curb) 134 LF $68.00 $9,112.00 $80.00 $10,720.00 $148.00 $19,832.00
21 Minor Concrete (4" Retaining Curb) 52 LF $33.00 $1,716.00 $117.00 $6,084.00 $35.00 $1,820.00
22 Minor Concrete (6" Retaining Curb) 79 LF $33.00 $2,607.00 $127.00 $10,033.00 $45.00 $3,555.00
23 Minor Concrete (8" Retaining Curb) 22 LF $33.00 $726.00 $140.00 $3,080.00 $55.00 $1,210.00
24 Install Concrete Pavers 190 SF $52.00 $9,880.00 $77.00 $14,630.00 $105.00 $19,950.00
25 Detectable Warning Surface 366 SF $60.00 $21,960.00 $82.00 $30,012.00 $35.00 $12,810.00
26 Native Backfil Compacted 8 CY $118.00 $944.00 $500.00 $4,000.00 $230.00 $1,840.00
27 Remove Roadside Sign 37 EA $158.00 $5,846.00 $250.00 $9,250.00 $450.00 $16,650.00
28 Install Roadside Sign 14 EA $282.00 $3,948.00 $225.00 $3,150.00 $290.00 $4,060.00
29 Remove Post and Foundation for Roadside Sign 9 EA $158.00 $1,422.00 $550.00 $4,950.00 $540.00 $4,860.00
30 Instal Post and Foundation for Roadside Sign 5 EA $376.00 $1,880.00 $300.00 $1,500.00 $390.00 $1,950.00
31 Remove Traffic Stripes and Lane Markers 4,160 LF $8.20 $34,112.00 $6.50 $27,040.00 $8.40 $34,944.00
32 Remove Thermoplastic Pavement Markings 88 SF $12.50 $1,100.00 $10.00 $880.00 $13.00 $1,144.00
33 Thermoplastic Stripe (12") (White and Yellow) 448 LF $19.00 $8,512.00 $15.00 $6,720.00 $20.00 $8,960.00
34 Thermoplastic Stripe (24") Yellow 500 LF $37.60 $18,800.00 $30.00 $15,000.00 $39.00 $19,500.00
35 Thermoplastic Traffic Stripe (Detail 22) 400 LF $18.80 $7,520.00 $15.00 $6,000.00 $20.00 $8,000.00
36 Thermoplastic Traffic Stripe (Detail 38) 160 LF $13.20 $2,112.00 $10.50 $1,680.00 $14.00 $2,240.00
37 Thermoplastic Traffic Stripe (Detail 41) 155 LF $9.80 $1,519.00 $7.75 $1,201.25 $10.00 $1,550.00
38 Thermoplastic Pavement Marking 256 SF $25.00 $6,400.00 $20.00 $5,120.00 $26.00 $6,656.00
39 Yellow Curb Stripe 75 LF $7.50 $562.50 $6.00 $450.00 $7.00 $525.00
40 Traffic Signal Modification at Centrail & Hibernia 1 LS $380,000.00 $380,000.00 $353,000.00 $353,000.00 $339,650.00 $339,650.00
1
41 IRRFB Installation at Central & Aspen
42 RRFB Installation at Grafton & Antone
43 RRFB Installation at Amador Valley & Burton
TOTAL
1 LS $53,600.00
1 LS $40,200.00
1 LS $80,500.00
$53,600.00
$40,200.00
$80,500.00
$1,379,756.50
APPARENT LOW BIDDER
$62,500.00
$42,800.00
$90,500.00
$62,500.00
$42,800.00
$90,500.00
$1,578,859.25
$47,950.00
$36,000.00
$71, 900.00
$47,950.00
$36,000.00
$71, 900.00
$1,511,600.00
LOWEST RESPONSIVE &
RESPONSIBLE BIDDER