Loading...
HomeMy WebLinkAboutReso 204-01 S&C Amend I580TassaRESOLUTION NO. 204 - 01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AGREEMENT WITH S&C ENGINEERS, INC. FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE I-580/TASSAJARA ROAD INTERCHANGE IMPROVEMENT PROJECT WHEREAS, the 1-580/Tassajara Road Interchange Improvement project is planned to be constructed as part of the development process in Eastern Dublin; and WHEREAS, the City has nearly completed the necessary improvement plans and specifications for the project and Caltrans has approved the appropriate cooperative agreement with Dublin to construct the project; and WHEREAS, Caltrans requires the City to construct the project in accordance with Caltrans standards; and WHEREAS, the City desires to utilize the services of S&C Engineers, Inc. to perform preconstmction tasks including constructibility review and assistance in bidding the project, manage the construction of the project and to provide inspection duties, materials testing and construction staking, all in accordance with Caltrans standards; and WHEREAS, the project documents are at the point of requiring review for constructibility, which is Phase I of the proposed S&C Engineers' services; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves the agreement with S&C Engineers, Inc. for performing Phase 1 of the construction management scope of work. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement. PASSED, APPROVED AND ADOPTED this 16th of January, 2001. AYES: Councilmembers McCormick, Oravetz and Zika and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None g:\engrkresoS&CEngineers EXHIBIT "A" OF RESOLUTION ~0~L -01 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND S&C ENGINEERS, INCORPORATED FOR CONSTRUCTION MANAGEMENT SERVICES -WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and S&C Engineers, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on January 16, 2001 to perform preconstruction tasks, including constructibility review for the Interstate 580/Tassajara Road Interchange Improvement project; and WHEREAS, the Scope of Work to be performed is proposed to be extended to include construction management; and the not-to-exceed contract amount is proposed to be increased to cover the cost of the additional work; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work The Scope of Work shall be modified to include Phase II of the original scope of work as described in S&C Engineers' Scope of Services - Construction Management Services for the I- 580/Tassajara Road Interchange Improvement Project dated January 8,2001 (attached). Extension of Term The total cost for time-and-materials work under this amendment shall not exceed an additional $1,235,568 based on the attached cost breakdown for Phase II. S&C ENGINE~~C O~P OtL~T~F.X~ Date: /tZ" ~'C//