HomeMy WebLinkAboutReso 213-01 CCS I580FallonAmend RESOLUTION NO. 213 - 01
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT #2 TO AGREEMENT WITH
CCS PLANNING AND ENGINEERING, INC. FOR CONSULTING SERVICES
I-580/FALLON ROAD INTERCHANGE IMPROVEMENTS DESIGN
WHEREAS, future freeway and inter-agency infrastructure is planned to be constructed as part of
the development process in Eastern Dublin, and improvements are required at the Interstate 580/Fallon
Road interchange; and
WHEREAS, on May 16, 2000, the City Council of the City of Dublin approved an agreement for
design services with CCS Planning & Engineering, Inc. (CCS), for the design of said improvements; and
WHEREAS, on May 1, 2001, the City Council of the City of Dublin approved Amendment #1 to
the agreement with CCS planning and Engineering, Inc., to include additional services, and
WHEREAS, Pleasanton desires to have the draf~ Project Report/Environmental Documentation
(PR/ED) amended to include additional improvements to the interchange as required mitigation associated
with the proposed developments in Pleasanton, and
WHEREAS, in order to proceed with this additional PR/ED work, it is necessary to amend CCS's
contract, and
WHEREAS, Pleasanton agreed to reimburse Dublin the cost of performing this work.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve Amendment No. 2 to the agreement with CCS Planning and Engineering, Inc., which is attached
hereto as "Exhibit A".
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment.
PASSED, APPROVED AND ADOPTED this 18th day of December, 2001.
AYES: Councilmembers McCormick, Oravetz and Zika and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
g:\engr~ccs~reso_fallon Amendment #2
EXHIBIT "A" OF RESOLUTION -01
AMENDMENT #2 TO AGREEMENT
BETWEEN CITY OF DUBLIN AND CCS PLANNING AND ENGINEERING, INC.
FOR ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and CCS Planning and.
Engineering, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on May 16,
2000 to design the 1-580/Fallon Road Interchange Improvements; .and
WHEREAS, the City Council of the City of Dublin approved Amendment #1 to the Consultant
agreement to include additional services, and
WHEREAS~ the city desires to amend the consultant contract to include additional services, and
the not-to-exceed contract amount is proposed to be increased to cover the cost of the additional work;
NOW, THEREFORE, the parties hereto agree as follows:
Scope of Work
The Scope of Work shall be extended 'to include additional scope, of work as described in
Consultant's letter dated November 27, 2001 for the 1-580/Fallon Road Interchange Improvements Project
(attached).
Extension of Fees
The total cost for time-and-materials work under this amendment shall not exceed an additional
$94,700.