Loading...
HomeMy WebLinkAboutReso 94-24 Item 5.15 Accepting the Civic Center Rehabilitation Project, CIP No. GI0122.pdf Reso. No. 94-24, Item 5.15, Adopted 08/20/2024 Page 1 of 1 RESOLUTION NO. 94 - 24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ACCEPTING THE CIVIC CENTER REHABILITATION PROJECT, CIP NO. GI0122 WHEREAS, on November 7, 2023, the City of Dublin entered into a Construction Contract with C. Overaa & Co. for the Civic Center Rehabilitation Project, with improvements that converted three existing spaces on the second floor of City Hall into six spaces; and WHEREAS, said improvements have been completed in accordance with plans and specifications, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin; and WHEREAS, as a condition of the contract, C. Overaa & Co. is required to warranty the improvements for a period of one year following the completion of the work and maintain a maintenance bond in the amount of 10% of the final contract value. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the Civic Center Rehabilitation Project, CIP No. GI0122 and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to release the maintenance bond at the end of the one- year warranty period. PASSED, APPROVED AND ADOPTED this 20th day of August 2024, by the following vote: AYES: Councilmembers Hu, Josey, Qaadri, Thalblum and Mayor McCorriston NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk Docusign Envelope ID: 2640FC10-F9D7-414D-A491-3A73EC197331