Loading...
HomeMy WebLinkAbout5.5 Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117 – Contract Change Order Authorization for Hacienda Driver DUBLIN CALIFORNIA STAFF REPORT CITY COUNCIL Agenda Item 5.5 DATE: TO: FROM: SU B,ECT: October 15, 2024 Honorable Mayor and City Councilmembers Colleen Tribby, City Manager Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117 - Contract Change Order Authorization for Hacienda Drive Prepared by: Michael Boitnott, Capital Improvement Program Manager EXECUTIVE SUMMARY: The City Council will consider increasing the contract change order authority of the City Manager for the Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117, to enable a change to the contract with American Asphalt Repair & Resurfacing Co. to resurface and restripe Hacienda Drive from Dublin Boulevard to the I-580 on- and off -ramps. STAFF RECOMMENDATION: Adopt the Resolution Authorizing the City Manager to Approve Contract Change Orders with American Asphalt Repair & Resurfacing Co., Inc. for Hacienda Drive for the Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117. FINANCIAL IMPACT: The cost to resurface and restripe Hacienda Drive from Dublin Boulevard to the I-580 on- and off - ramps is estimated at $175,000. There are sufficient funds in the Annual Street Resurfacing Project (CIP No. ST0117) budget to fund this work. DESCRIPTION: On April 16, 2024, the City Council awarded a construction contract of $809,029 to American Asphalt Repair & Resurfacing Co., Inc. for the Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117, and authorized the City Manager to approve change orders up to a contingency amount of $100,000 (Resolution No. 28-24). The total potential construction contract amount, including the $100,000 construction contingency, is $909,029. Page 1 of 2 1 The 2024 Slurry Seal Project is currently under construction and has repaired localized failed asphalt concrete pavement, slurry sealed approximately 1.5 million square feet of roadway, and installed pavement delineation on 51 street segments. Proposed Change Order The segment of Hacienda Drive pavement between Dublin Boulevard and the I-580 on -and off - ramps is significantly oxidized, and the top road surface is unevenly worn over the entire segment. The uneven wear of the asphalt surface decreases visibility of lane lines, pavement markings, and crosswalks. Staff solicited a quote from American Asphalt Repair & Resurfacing Co., Inc. to resurface Hacienda Drive between Dublin Boulevard and the I-580 on- and off -ramps. This resurfacing would include cleaning and preparing the existing asphalt surface, crack filling and patching surface gaps, applying a sand/oil slurry seal on all asphalt pavement surfaces, and installing new striping, pavement markings, and crosswalks. The Hacienda Drive pavement resurfacing and restriping is estimated to cost no more than $175,000. Existing project change orders have encumbered $10,000 of the initial $100,000 contingency, leaving $90,000 available. To complete the Hacienda Drive work at $175,000, Staff requests that City Council authorize an additional $85,000 of change order authority for the City Manager. This will bring the total authorized change order authority to $185,000 and increases the total potential construction cost to $994,029. A budget change is not needed as there are sufficient available funds in the project budget. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. A courtesy copy of this report was sent to American Asphalt Repair & Resurfacing Co., Inc. ATTACHMENTS: 1) Resolution Authorizing the City Manager to Approve Contract Change Orders with American Asphalt Repair & Resurfacing Co., Inc. for Hacienda Drive for the Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117 2) Resolution No. 28-24 - Approving the Plans and Specifications and Awarding a Contract to American Asphalt Repair & Resurfacing co., Inc. for Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117 3) CIP No. ST0117 Page 2 of 2 2 Attachment I RESOLUTION NO. XX - 24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AUTHORIZING THE CITY MANAGER TO APPROVE CONTRACT CHANGE ORDERS WITH AMERICAN ASPHALT REPAIR & RESURFACING CO., INC. FOR HACIENDA DRIVE FOR THE ANNUAL STREET RESURFACING (2024 SLURRY SEAL) PROJECT, CIP NO. ST0117 WHEREAS, on April 16, 2024, the City of Dublin adopted Resolution No. 28-24, Approving the Plans and Specifications and Awarding a Contract to American Asphalt Repair & Resurfacing co., Inc. for the Annual Street Resurfacing (2024 Slurry Seal) Project, CIP No. ST0117; and WHEREAS, the City Council authorized the City Manager or designee to approve contract change orders based on appropriated funds designated for the Project up to the contingency amount of $100,000; and WHEREAS, additional resurfacing need has been identified for Hacienda Drive between Dublin Boulevard and the 1-580 on- and off -ramps; and WHEREAS, sufficient budget is available in the Annual Street Resurfacing Project, CIP No. ST0117, to increase the project contingency by $85,000, thereby facilitating completion of the additional scope of work, estimated at $175,000. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to approve contract change orders with American Asphalt Repair & Resurfacing co., Inc. up to the revised contingency amount of $185,000 and increase the construction contract total to $994,029. PASSED, APPROVED AND ADOPTED this 15th day of October 2024, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk Reso. No. XX-24, Item X.X, Adopted 10/15/2024 Page 1 of 1 3 DocuSign Envelope ID: 7823305E-34D4-413D-AAE9-4A320D786947 Attachment 2 RESOLUTION NO. 28 - 24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO AMERICAN ASPHALT REPAIR & RESURFACING CO., INC. FOR THE ANNUAL STREET RESURFACING (2024 SLURRY SEAL) PROJECT, CIP NO. ST0117 WHEREAS, the design team has completed the plans and specifications for the Annual Street Resurfacing Project (2024 Slurry Seal), CIP No. ST0117, (Project) which includes the roadway resurfacing on 51 street segments by means of crack filling, seal coating the pavement, and installation of pavement delineation; and WHEREAS, the City of Dublin did, on March 26, 2024, publicly open, examine, and declare all sealed bids for doing the work described in the approved plans and specifications for the Project, which plans and specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to Staff and American Asphalt Repair & Resurfacing Co., Inc. was determined to be the lowest responsive and responsible bidder for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves the Plans and Specifications for the Project. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby award the Contract for the Project to the lowest responsive and responsible bidder, American Asphalt Repair & Resurfacing Co., Inc. at a base bid of $809,029, the particulars of which bids are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to approve the Project contract change orders based on the appropriated funds designated for the Project up to the contingency amount of $100,000. BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute the Construction Agreement for the Project with American Asphalt Repair & Resurfacing Co., Inc. {Signatures on the following page} Reso. No. 28-24, Item 5.5, Adopted 04/16/2024 Page 1 of 2 4 DocuSign Envelope ID: 7823305E-34D4-413D-AAE9-4A320D786947 PASSED, APPROVED AND ADOPTED this 16th day of April 2024, by the following vote: AYES: Councilmembers Hu, Josey, McCorriston, Qaadri and Mayor Hernandez NOES: ABSENT: ABSTAIN: DocuSigned by: (A4bAS4b1... Mayor ATTEST: ,-DocuSigned by: Motl1n9(- ityBuue°r F40A... Reso. No. 28-24, Item 5.5, Adopted 04/16/2024 Page 2 of 2 5 Attachment 3 Number — STO 117 i ANNUAL STREET RESURFACING Program — STREETS PROJECT DESCRIPTION This project provides for the design and construction of a variety of pavement resurfacing treatments, from slurry seal to major rehabilitation and reconstruction of streets and resurfacing of bridge decks. The project also includes installation of new or upgrades of existing ADA curb ramps on roads that are reconstructed or receive an asphalt concrete overlay. Streets are selected for improvements based on the City's Pavement Management System to optimize the pavement condition in relation to the available budget. The City owns and maintains approximately 148 centerline miles of streets. The Metropolitan Transportation Commission groups Pavement Condition Index (PCI) ratings into the following categories: 80-100 Very Good -Excellent; 70-79 Good, 60-69 Fair, 50-59 At Risk, 25-49 Poor, and 0-24 Failed. The City of Dublin is rated very good with a three-year moving average PCI of 80. PROJECT TIMELINE: The project is currently in various stages of design or construction. Improvements are typically constructed each year between spring and fall. ANNUAL OPERATING IMPACT: None. 2024-2029 CAPITAL IMPROVEMENT PROGRAM PRIOR FUTURE ESTIMATED COSTS YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 YEARS TOTALS 9100 — Salaries & Benefits $227,235 $167,500 $167,500 $167,500 $167,500 $167,500 $1,064,735 9200 — Contract Services $2,509,344 $775,000 $775,000 $775,000 $775,000 $775,000 $6,384,344 9400 — Improvements $12,737,648 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $30,487,648 9500 — Miscellaneous $56,311 $7,500 $7,500 $7,500 $7,500 $7,500 $93,811 TOTAL $15,530,538 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $38,030,538 Streets Five -Year Capital Improvement Program 2024-2029 66 6 FUNDING SOURCE PRIOR YEARS 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 FUTURE YEARS TOTALS 1001 — General Fund $467,999 $1,250,000 $2,086,900 $1,750,000 $1,850,000 $1,850,000 $9,254,899 2201 — State Gas Tax $5,289,941 $700,000 $413,100 $750,000 $650,000 $650,000 $8,453,041 2204 — Measure B Sales Tax — Local Streets Fund (ACTC) $1,784,999 $1,784,999 2205 — Measure B Sales Tax — Bike & Pedestrian Fund (ACTC) $300,000 $300,000 2214 — Measure BB Sales Tax — Local Streets Fund (ACTC) $2,831,020 $200,000 $3,031,020 2215 — Measure BB Sales Tax — Bike & Pedestrian Fund (ACTC) $304,500 $304,500 2216 — Measure B Grants $82,500 $82,500 2220 — Road Maint. & Rehab. Account (RMRA) $4,263,599 $2,350,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $14,263,599 2304 — Local Recycling Programs $160,000 $160,000 4309 — Miti! ation Contributions TOTAL $45,980 $15,530,538 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $45,980 $38,030,538 Streets Five -Year Capital Improvement Program 2024-2029 67 7