HomeMy WebLinkAboutGenl Pln-E Dubl Specfc Pln Amnd
Fallon Village. October 2005
FALLON VILLAGE
General Plan/Eastern Dublin Specific Plan Amendment
Introduction
The Fallon Village proposal, previously referred to as East Dublin Properties (EDPO),
includes amendments to the General Plan and Eastern Dublin Specific Plan (GPAlSP) for
the approximately 1,134 acres of land located immediately east of Fallon Road which lies
between Fallon Road and the eastern City of Dublin boundary. The Project Area is
bordered by Dublin Ranch on the west, 1-580 to the south and unincorporated Alameda
County territory on the east and north. This is the easternmost sector of Dublin slated to
be urbanized under the City's current General Plan. The Project also includes an
approximate IS-acre lot line adjustment between the Fallon Enterprises parcel and
property owned by the Lin family within the eastern portion of the Dublin Ranch golf
course to allow more sensitive and efficient grading in that area. Please refer to the
General Plan Amendment/Specific Plan Amendment exhibits at the end of this section for
maps showing the previously approved and proposed land uses.
The current General Plan and Eastern Dublin Specific Plan land use designations for the
Project Area call for Rural Residential/Agriculture, Low Density Residential, Medium
Density Residential, Medium High Density Residential, General Commercial, Industrial
Park, Neighborhood Commercial, Elementary School, Junior High School, Neighborhood
Park, Neighborhood Square, Community Park and Open Space land uses. This
amendment to the General and Specific Plans is necessary due to: efforts to preserve
biological resources on site; the expansion of the Specific Plan area to include the Fallon
Enterprises, Braddock & Logan and Croak properties; the projected needs of the Dublin
Unified School District (DUSD); proposed changes in area road alignments; proposed
changes in some land uses; and proposed changes in the size, shape and location of some
land use areas. Amendments to the General Plan and Eastern Dublin Specific Plan
included with this submittal are listed below. Refer to specific text and figures following
for the exact detailed revisions.
Proposed General Plan and Specific Plan Amendments
General Plan: A few text passages, figures and a table are required to be revised to be
consistent with the proposed plan. Please refer to the Dublin General Plan Amendment
section in this submittal.
Eastern Dublin Specific Plan: The proposed amendment to the Eastern Dublin Specific
Plan includes expansion of the Specific Plan area to include approximately 638 acres that
constitutes the Fallon Enterprises, Braddock & Logan and Croak properties. These
P:\19149\ofnceISubl11inaMGP-SPA\GP·SPA DescriplionOclOberdoc
Page 1 . General Plan/Specific Plan Amendment
Fallon Village. October 2005
properties are covered by the Dublin General Plan but are not currently part of the East
Dublin Specific Plan. Because of this expansion, many maps and tables in the latter
document have been modified. Please refer to the East Dublin Specific Plan Amendment
section in this submittal.
Land Use
Three substantive changes are proposed to the Dublin General Plan and the Eastern
Dublin Specific Plan in regard to land use. The first change is necessitated by a
mitigation measure of the 2002 SEIR prepared for the annexation of the Project Area
which required preparation of a Resource Management Plan (RMP) to analyze the
biological resources of the entire project area and proposes measures for protecting and
managing those resources in conjunction with development of the properties. The RMP
has been accepted by the City and calls for a combination of on-site avoidance and
enhancement of biological resources and off-site mitigation for those resources that it
would be impractical to preserve or manage in the Project Area. In order to retain certain
biological resources on-site, the RMP includes a central open space corridor running
from the southwest boundary of the Jordan property to the northwest corner of the
Braddock & Logan parcel, which would preserve an existing drainage and associated
habitat with minimal disturbance. The corridor will be an average of 400 feet wide, with
a minimum width of 150 feet and a maximum width of 600 feet. Because of the RMP's
findings and recommendations, two narrow drainages shown in the current General and
Specific Plans will be removed as part of the proposed project plan because they are of
lesser habitat value and the desire to emphasize the importance of the eastern drainage
(the central corridor in the proposed project plan). An approximately 46-acre area
encompassing a stock pond at the northeast boundary of the Fallon Enterprises parcel is
also proposed by the RMP for avoidance of special status species. Together these
preservation areas total approximately 140 acres and exceed the area designated as
Stream Corridor Open Space in the General Plan by about 115 acres.
The second substantive change to the General Plan and Eastern Dublin Specific Plan
proposed by this project is that specific land uses are now shown for the approximately
58 acres shown as Future Study Area/Agriculture in the existing documents. This area
has been in limbo ever since the adoption of the Eastern Dublin GPAlSP in 1993. It is an
area that was designated as residential before adoption of the Livermore Airport
Protection Area (APA). The APA discourages such uses within 5,000 feet of the
Livermore Airport runways. Because the 58-acre site falls within the APA and no
alternative non-residential uses were proposed for the area in 2002, it was designated
Future Study Area/Agriculture with virtually no development potential. The applicants
of the four properties affected by that designation are now proposing alternative non-
residential uses for the area. This area is now proposed to be designated as General
Commercial (Chen property), General Commercial/Campus Office (Anderson property)
and Industrial Park/Campus Office (Righetti and Sranaugh properties). These
redesignations would add up to 884,268 square feet of local and regional commercial
uses.
P:\19149\omceISubmiualsIGP-SPA\GP-SPA DescriptiollOctobcr.doc
Page 2 . General Plan/Specific Plan Amendment
Fallon Village. October 2005
The last change is the redesignation of approximately 72 acres of Industrial Park adjacent
to 1-580 on the current General and Specific Plans to General Commercial/Campus
Office (on the Chen, EBJ Partners, Pleasanton Ranch Investments, Anderson and Righetti
parcels) and Industrial Park/Campus Office (on the Branaugh and Monte Vista parcels) as
part of this application. The supplemental DSEIR associated with this application is
evaluating an alternative land plan under the Alternatives Analysis chapter that retains the
Industrial Park designation on these properties.
Other less substantial land use changes are proposed as part of the Project. They are as
follows:
· The Dublin Unified School District has determined it does not need a third middle
school for build out of the City, therefore, the approximately 15 acre junior high
school site shown split between the Jordan and Chen properties is now proposed
to be Medium High Density Residential, Neighborhood Square and Mixed Use,
and the 2.3-acre site designated as Elementary School on the Croak property is
not needed and thus has been eliminated. Five acres of Elementary School have
been relocated from Dublin Ranch Area E to the southeast corner of the Fallon
Enterprises property and reconsolidated with 5.0 acres of Fallon Village land
designated as Elementary School to create a 10-acre school site for reasons of
land efficiency and to locate the facility where it can best serve the
neighborhoods. The underlying land use designation of the schools shown on the
Stage I PD Amendment land use map are to be Low Density Residential for the
school site depicted on the Fallon Enterprises property and Medium Density
Residential for the school site on the Jordan property.
· An approximately 15 acre area in Dublin Ranch, including the 5 acre elementary
school and areas immediately north and south of the school site, will undergo a lot
line adjustment and be rezoned to Low Density Residential and Open Space to
allow more sensitive and efficient grading and development to take place between
different properties. This arrangement has been agreed to between the Lin family
and Braddock & Logan. No additional units are attributed to this acreage.
· The Future Study Area-General Commercial on the Chen property has been
redesignated as General Commercial.
· Because this application entails a general plan amendment, City policy requires
the provision of semi-public sites from properties containing residential lands per
the City's Semi-public Facilities Policy document. The approval of 1,078
potential residential units requires that the Project provide a total of 8.6 acres of
Semi-public. To fulfill the requirements of the Semi-public Facilities Policy, 2.1
net acres are designated as Semi-public on the Braddock and Logan-controlled
Fallon Enterprises property, 2.5 net acres on the Chen property within the Village
Center, 2.0 net acres on the Jordan property within the Village Center and 2.0
acres on the Croak property. The final locations of the Semi-public sites will be
determined at the time ofPD-2 approval.
P:I 19149\ûfficeISllbmil1als\GP-SPA\CìP-SPA Dcscrip!ion()clober.doc
Page 3 . General Plan/Specific Plan Amendment
Fallon Village . October 2005
RMP has been accepted by the City and calls for a combination of on-site avoidance and
enhancement of biological resources and off-site mitigation for those resources that it
would be impractical to preserve or manage in the Project Area.
In order to retain certain biological resources on-site, the RMP includes a central open
space corridor running from the southwest boundary of the Jordan property to the
northwest corner of the Braddock & Logan parcel, which would preserve an existing
drainage and associated habitat with minimal disturbance. The corridor will be an
average of 400 feet wide, with a minimum width of 150 feet and a maximum width of
600 feet, with an approximate area of 97 acres. Because of the RMP's findings and
recommendations, two narrow drainages shown in the current General and Specific Plans
will be removed as part of the proposed project plan because they are of lesser habitat
value and the desire to emphasize the importance of the eastern drainage (the central
corridor in the proposed project plan). An approximately 46-acre area encompassing a
stock pond at the northeast boundary of the Fallon Enterprises parcel is also proposed by
the RMP for avoidance of special status species. Together these preservation areas total
approximately 140 acres and exceed the area designated as Stream Corridor Open Space
in the General Plan by about 115 acres. Trails linking residential areas throughout the
site are planned to run along the open space corridor. A conservation easement will be
placed over the rural residential/agriculture and open space designated lands located in
the northern and eastern hillside areas of the Project Area to preserve these undeveloped
lands in perpetuity.
Current Visually Sensitive Ridgelands (VSR)- Limited Development lands as identified
in the East Dublin Specific Plan obscure a portion of the primary ridgeline located along
the northern and eastern areas of Fallon Village when viewed from 1-580. Any
development in these Visually Sensitive Ridgelines- Limited Development areas will
continue to obscure the primary ridgeline. While some topographical features do not
currently obscure the ridgeline some development anticipated by the East Dublin Specific
Plan, may obscure views. Additionally, proposed foreground development along the
freeway will further obstruct some views of the primary ridgeline, as was originally
anticipated with the 1993 General Plan and East Dublin Specific Plan.
Development and grading of these Visually Sensitive Ridgeland areas is permitted as
long as the proposed project adheres to and reflects the City's interpretation of the
policies and criteria ofthe East Dublin Specific Plan, including Policies 6-29 and 6-30, as
it has been applied to other development projects within the Specific Plan area. As
recommended by the EDSP Action Program 6S, density transfers of units may be
implemented to relocate units from the VSR area to other portions of the Project area to
aid in preserving the landforms of the VSR area.
In some cases, Visually Sensitive Ridgeland- Limited Development areas cross property
lines. Where possible, such adjoining properties should work together on a grading plan.
If this is not possible, initial developerslbuilders should contemplate grading continuity
offsite and later developerslbuilders shall match and continue the shape of the land form
in a smooth transition.
P:\!9!49\ortice\Submittals\Stage 1 PD\PDI-ProjDescrrevisedOCTOBER2005.doc Page 4 . Stage 1 Development Plan Amendment
Fallon Village. October 2005
rural residential/agriculture and open space designated lands located m the
northern and eastern hillside areas of the Project Area.
Following is a comparison
Dublin Specific Plan
of land uses between
and the proposed
the approved General PlanlEastern
amendments to those plans.
P:\ 19149\officcISubmiualsIGP·SI' A\GP-SPA DescriptionOctober.doc
Page 5 . General Plan/Specific Plan Amendment
October 2005
Fallon Village.
TOTAL.'
G~ u~
403.6 1739
Pleasanton Rancta-Invmte
Gros~M.. Mr!/tSISf
Fil"lon Enterprleea
ß~ u~
184.7 867
MonteVIst8
Gm!I.'IAc. Unlts/sf
ESJ Pertne"', LP
~-ª-Ac Unlts/sf
Br'IInaugh
GroIIsk. Unltslsf
Righetti P.rtn....
G!!mSAc (Lnltslsf
äeC"Oñ-cn-.mlly Ltd P....p
Unlt;/Sr
Anderson
GrossAc
then
Unltslsf
Fi,..t AmerlClln Title
~c un~
.¡M 92
Creek
G~c. u~
115.04 -469
LAND USE SUMMARY· FALLDN VILLAGE
REVISED October 20015
Bnlddock & Logan
GrD~C_ Ul1..ltsIsf
55.5 2
,
PROPOSED PLAN·
~-4ç,
601
'"
83,6351
___-+~1-----1---~ ~8~~~~1
48791 72.1 886.708
".
721 785
"
747.664
61.3
"
---.
13,416
"
225,641
----
".
--..--
411,131
34.2
225,641
Medium Denl/ty R"kI,nti,1
6.1·14dullc
Medium High Den~ty Rnldentllll
14.1·2I1dYlac
MlxeclU....
111dullc
MIMldUN"
0.3-1.0 FAR (0.30 FAR I'I'g.")
RuraIR..ldentklL'Ag,lc:ultul1l
1duf100J.CI1I.or~rul
General CommefCl.1
0.2.(1.8 FAR (0.25 FAR -"AlgI')
Oenlrlll Commen;laIfClm-pul óirila
O.2.o.IIFAR(o.28FAR.verage}
IndUlIn.! PlrklC-PIII Offlee
0.ZH.8 FAR (US 'AR lvel'llge)
s.ml.pllbll~'"
LamlUISf/;
Low Denlity Rnideñiiãi
..-6dwI~
"
o
1
23,8
(8.4,
142,9
60
"
0.0
53.9
97
'.7
"
-
-
..
70
7.0
130
'.0
234
83.635
542
"
23,4
{ISA}
,..
19,9
'04
0.0
10.4
19.4
0.0
69,1S
'.3
21.1
163
23.0
'.0
211.2
113«
2.'
10,6
'3
'.3
!:l
=7
113.430
'.3
m002
30.'
262.23
f
21.5
'.1
60.3
2.'
35,9
140.'
72
2.0
10,0
111
~
".7
...
2.7
2.0
11.5
..
18!.5
o.
~
159.5
Ellmøt.lry School
CommunltyPllrle
NIlghbol'hoodP.rk
IMlghbol'hood SqUire
.2!:::8p.c.
Toto'
31<'"
2.5D3,178
'>T'
o
...
..,
,
113,430
'.3
o
13,418
Dublin Specific Plan/General Plan.
1
"
372,Q02
".2
PO and existing East
..
487,872
*Acreages include area to the Center Line of all major streets and approximately 15 acre lot line adjustment, accounting for acreage difference with approved 2002 Stage
Notes: 1. Mixed Use acres are separated into residential and commercial components for the table calculations (duplicate acres sho'M1 in parentheses).
2. uResidential and Commercial uses are subject to the FAR.
3. Underlying use of elementary school on Fallon Enterprises is Low Density Residential. Underlying use of elementary school on Jordan Trust is Medium Density Residential.
4. *H2.0 net acres of Semi.public are designated on Jordan, 2.0 net acres on Croak and 2.5 net acres on Chen. 2.1 net acres are required on Fallon Enterprises: 2.8 gross acres
.u
<417,13
70
,"
1,010,810
'014
83,835
'"
2
reflects Stege 2 PO Plan.
Braddock & Logan Cro.k First American Tla. Ch.n And....on Second Family Ltd P1np RiSlhttti Partners Brsnaugh ESJ Partners, LP Monte Vista Filion Ent.rpri..1 Pleaslnton Rlnch Invrnts TOTAL
LsndUses G/'Of¡sAc. Unitslsf GrossAc Unltslsf GrossAc. Unitslsf G"",'" u,,,., G/'Of¡sAc, Unitslsf GrossAc Unitslsf GrossAc Unitslsf GrossAc Units/sf GrossAc. Unitslsf G""'''' Uni/s/sf GrossAc Unitslsf Gro.>,'" """'"
Low Den.ityR..ld.ntial 51.6 '" 111.6 '" 11.2 353 .. " .. " .0 " 157,11 53' ~33.5 1734
.O..duf.c
FutureStuclyAf'N 7.' 16.0 · 17.3 40,1 0
(RuI1IIReilld.nU.VA"rlcultl.mlJ
tMd!lIm Density RMldlnthll ... 94 ... 94
1,1·14dw.~ ,
FutureStudyAI'I. 1512 ,.7 ., I '.0 37.0 0
RUI'IIIR.ldeflu..IfAClrlcultuNl) ,
MIKIlllm High o.n.1Iy Rnldentlal 28.2 .... ,. 132 34. ."
14.1-:illdw.c
Rill'll Rnl$ntlall AgriCulture 100,3 , 31,5 0 I 137.3 1 269.1 2
1 dUf100 .e.... Of p~u·es ,
Gln.,.1 Comm.rcl.1 41,0 446,490 , 41.0 446,.0190
0.25 FAR
Fllture Study Aru 10.-1 , 10,<1
(Glns,.1 Commercl.l)
Nllghbomood Commercial 10.3 134,600 10,3 134,600
O.:SOFAR
Ind....trt.IP.rIe 180 219.542 19.6 231,838 15.7 · 1131,490 ,.. 90,256 0.' 13,767 7.3 89,037 0.2 2,4313 .... 840360
O.2BFAR
Futul'l Study AI'I. 0.' 21 · 01 ,. ... 0
(Indu.trl.IP~;.ki-·
JllnlorHIg¡hSchool ... ... 14,6 0
e:lenMnCarya~hool 23 10.0 '.0 17,3 0
CommunIty P.rIe 14.1 14,1 0
NelghborhoodP.rk 10.6 5. I '.0 240 0
No bomoodSqu.re 27 27 0
Op.nBpece 7.' .0 ".0 35,6 '.1 ... 76.S 0
Toto' 159.5 207 16<U ... 189.1 1011 135.6 132 .... " ".7 · " 3'" " ,.. , ... , 313.8 ." '.2 0 1109.2 2526
134,800 6'1,032 237,138 191.490 90"" 9,757 89,037 2,430 1,421,450
EXISTING EASTERN DUBLIN SPECIFIC PLAN/GENERAl PLAN
General Plan/Specific ptan Amendment
Page 6 .
......-I)'-P'01~eND-p<e-(henre'IIĆOCTOBER2006,...
"
MocIIfled1012B12005
P:\19149\off'¡¡;e\SubmittaJs\GP-SPA\GP·SPA DescrlptionOctober.doc
Fallon Village. October 2005
Circulation
Three changes to the backbone circulation pattern in the Fallon Village project occur as
part of this application. The City Council has recently approved the realignment of
Fallon Road and Dublin Boulevard from those alignments illustrated in the general plan
and EDSP. These realignments, plus the resulting land use changes, have been integrated
into this application.
A second circulation change between the current plans and the proposed project is that
the project realigns Central Parkway to curve southeasterly to connect with Dublin
Boulevard along the current path of Croak Road, not near the eastern boundary of the
site, as presently shown in the General Plan and Eastern Dublin Specific Plan. Hence,
Croak Road is proposed to now terminate at Central Parkway. This realignment provides
greater efficiency and access through the project while limiting impacts to the project's
neighborhoods.
The third difference is that the northernmost collector street and the intermediate road
which connects it to the Upper Loop Road which runs from the southwest corner of the
Fallon Enterprises property to Central Parkway have been removed in the Proposed
Project. Due to the recommendations of the RMP and the land plan and circulation
system, these street segments are no longer desired.
Hazardous Waste Site Potential
A series of Phase I Environmental Site Assessments have been conducted on the
properties within the Project Area. Based on these Assessments, no registered hazardous
waste or substance sites are known to exist on the Project Area. Seven registered leaking
underground storage tanks (LUSTs) were identified within a one-half mile of the Project
Area. Based on the Phase I evaluations, the consultant's opinions are that these off-site
LUST facilities do not represent an environmental concern to the Project Area. Copies of
these reports have been submitted to the City.
The Phase I investigations indicated some possible contaminants in limited locations on
some of the properties. Limited Phase II analyses were recommended for certain
locations to determine the extent of the potential contamination and to identify the
contaminants. Results received to date indicate that contaminated areas are minor and
contaminants are typical of residential uses, working ranches, and landscaping, trucking,
and excavating uses present on the site (such as paints, pesticides, organicides, etc.).
Other recommendations include surveying for asbestos and lead based paint, and
performing a limited subsurface investigation to better assess whether impacts to soil and
shallow ground water have resulted from the former gas station in the vicinity of the EBJ
Partners and Pleasanton Ranch Investment properties.
The conclusion of the Phase II studies that have been conducted was that there is no
evidence of subsurface impacts. The studies also recommend that the various
contaminants and any underground storage tanks be removed prior to demolition and pre-
Pel) 9149\oITíce\Submìll~b\GP-SPA KiP-SPA DescriplÎonOcluberdoc
Page 7 . General Plan/Specific Plan Amendment
Fallon Village. October 2005
grading activities, that on-site wells be capped, and existing septic systems and associated
leach fields be pumped out and removed.
Benefits of the Project
This proposed amendment to the General Plan and Eastern Dublin Specific Plan will
benefit the City of Dublin by allowing development essentially as called for in those two
documents but doing so with fewer environmental impacts than would occur with the
build out of those Plans as they are now constituted through better planning practices.
The Project complements Dublin Ranch (immediately to the west) by proposing adjacent
land uses and a street system that are compatible with that development, as well as
providing a more sensitive grading situation at the property interface. To the north and
along much of its eastern boundary the Project retains rural residential/agricultural land
uses that are harmonious with the rural nature of the Doolan Canyon area that borders the
Project in those directions.
This project would allow the construction of approximately 3,100 dwelling units and
approximately 2,500,000 square feet of commercial uses for the City of Dublin. In
addition, a mixed-use village center, four neighborhood parks, a community park, a
neighborhood square and multi-use trails would be constructed for the use of residents,
visitors and employees. Open space would be preserved in areas of high biotic value to
native species.
The new residents of the project will strengthen adjacent commercial areas projected to
occur in accordance with the Eastern Dublin Specific Plan and Dublin General Plan and
create new commercial areas, which could draw customers and revenue from the greater
Tri-Valley area and create employment opportunities for Dublin residents. This, in turn,
will substantially increase sales and property taxes for the City of Dublin.
In summary, the Project carries out the goals and policies of the City of Dublin by
building out this easternmost sector of the City essentially as reflected in its General Plan
and the Eastern Dublin Specific Plan.
P:\ 19149\oflìceISuhmÎualsIGP-SPA\GP·SPA DcscriptionOctober_doc
Page 8 . General Plan/Specific Plan Amendment
Dcto¡;;er 20'05
*
N R T H
300' 600' 1200'
9,49-
"'era; f
...........?l
~,503,
/I\rea
""""
2:5$:00