Loading...
HomeMy WebLinkAboutAttmt 8 Focused Prkg Analysis ~R~N~L·s!1)~~~.~ November 9, 2005 Mr. Ray Kuzbari Senior Traffic Engineer City of Dublin 100 Civic Plaza Dublin, CA 94568 Subject: Focused Parking Analysis for the Proposed Metropolitan at Dublin Station Development in the City of Dublin Dear Mr. Kuzbari, This letter report summarizes a focused analysis of the parking conditions for the proposed Metropolitan at Dublin Station development in the City of Dublin. The analysis has focused on shared parking conditions for the residential units' visitors and the ancillary commercial uses within the development. 1. PROJECT DESCRIPTION The focus of this analysis is the parking need associated with residential VISItorS (generated by the project's 300 residential units) and 15,000 sq. ft. of ancillary ground floor commercial space. The commercial space would front on Martinelli Way and Iron Horse Parkway and would consist of 6,000 sq.ft. of smaller high-turnover sit-down and "take-out" restaurants and 9,000 sq.ft. of smaller local serving retail tenants. The commercial space parking needs and a portion of the residential visitor parking needs are proposed to be met by a 95-space shared parking supply, including a 69-space area within the parking garage and 26 on-street curb spaces. All of these spaces would be fully accessible to the public. In addition, 20 visitor spaces would be located within the resident parking area via the resident parking gated access. 2. RESIDENTIAL VISITORS AND COMMERCIAL PARKING NEEDS In order to identifY the overall parking demand throughout the day, a shared parking analysis was conducted. This consisted of establishing the hourly commercial area parking demands and the residential visitor parking demands, then adding them together for a total demand. {ATTACH~~¥T 8 1901 Olympic Boulevard. Suite 120 . Wolnut Creek. CA. 94596' (925) 935-2230 tox: (925) 9352247 ROSEVILLE REDDING VISALlA WALNUT CREEK The commercial parking demand was determined by applying the Dublin Zoning Ordinance requirements of 1 space per 300 sq. ft. of retail area or 30 spaces and 1 space per 100 sq.ft. of restaurant area or 60 spaces.(l) The Dublin requirement for the residential units would be 1.5 spaces per unit. Based on parking research, it is estimated that the residential visitor parking demand would be about 15% of the total residential demand. (2)(3) The visitor demand for the 300 residential units would therefore be 0.225 spaces per unit or 68 spaces. Because there would be 20 visitor spaces located within the residents' parking area, the visitor needs in the shared parking area would be 48 spaces. The Dublin ordinance is formulated to address the peak parking demand that typically occurs during the mid day for the anticipated smaller retail and high turnover restaurant tenants and during the evening hours for the residential units. Recently published data from the Institute of Transportation Engineers (ITE) on hourly parking demand shows that average mid-week parking demand for retail stores and higher turnover restaurants peaks between II :00 a.m. and I :00 p.m.(4) The ITE hourly parking demand factors for residential units applies to the total residential demand, not just the visitor demand. However, there is no research available that establishes the hourly demand for residential visitors, and the overall hourly factors were therefore applied, adjusted to account for the full 48-space visitor demand being realized in the 7:00 p.m. and 8:00 p.m. hours. It is noted that for several reasons, the calculation of the retail and restaurant parking needs overstates the actual parking demand. First, the retail and restaurant tenants would be located within walking distance of residential units and a number of business complex developments. The residents and employees in these complexes would have the opportunity to walk to the restaurants for lunch or to the retail tenants. The restaurants would probably also provide a "take-out" option for local employees who cannot stay for table service. It is conservatively assumed that 25% of the retail and restaurant parking demand would be offset by local pedestrian access to these tenants. Applying the various hourly percentages to the peak retail, restaurant and residential visitor demands (with a 25% commercial parking reduction due to internal trips) results in parking demands as listed in Table I. Based on the calculations, the parking supply would accommodate the expected demand. However, as noted in the table, the 95 space supply would essentially be fully occupied in the 6:00-8:00 p.m. period, which represents the peak parking demand period. It is noted that if one of the restaurant tenants is a Starbuck's, the parking supply would still accommodate the shared demand. Based on an extensive analysis of parking demand at Starbucks stores, a Starbucks store would add a I 0-12 . space parking demand during the 8:00-10:00 'a.m. period.(5) As outlined in Table 1, an increased morning demand of 10-l2 spaces could be accommodated within the planned supply. It is also noted that a Starbucks parking demand is substantially lower during the 6:00-8:00 p.m. peak period ,demand for the other uses. Parking Analysis for Metropolitan at Dublin Station Page 2 3. SUMMARY AND CONCLUSIONS The parking supply of 95 shared spaces would accommodate the expected combined commercial/residential visitor parking demand. Even if one of the commercial tenants was a Starbucks store, the parking supply would be adequate. It is noted that this fmding is predicated upon two assumptions: . First; it is assumed that a portion of the residential visitor parking demand would, in fact, be met by the 20 spaces located within the gated resident parking area. If these spaces are not used, there would likely be a parking deficit in the 6:00-8:00 p.m. period (see Table I). The applicant must be able to demonstrate how these 20 parking spaces will be conveniently available to residential visitors. . The calculations also assume that the 26 curb spaces on Campus Drive and Iron Horse Parkway would be available for the short term parking needs of commercial customers and residential visitors. It is recommended that the curb spaces be signed for short-term use (no more than 1-2 hours). I trust that this analysis responds to your needs. Please contact me with any questions or comments. µ;7~ George W. Nickelson, P.E. Branch Manager REFERENCES: (1) City of Dublin, City of Dublin Zoning Ordinance, Amended July 15, 2003. (2) The Eno Foundation (Robert A. Weant and Herbert S. Levinson), Parking, 1990. (3) Walker Parking Consultants, California Parking Standards for Selected Cities and Counties, June 1995. (4) Institute of Transportation Engineers, Parking Generation - 3rd Edition, 2004. (5) Omni-Means, Ltd., Focused Traffic/Parking Analysis for a proposed Retail/Starbucks Development on Village Parkway in the City of Dublin, April 19, 2005. Parking Analysis for Metropolitan at Dublin Station Page 3 TABLE 1 ~EKDAYSHAREDP~GDEMANDFOR RESIDENTIAL VISITORS AND COMMERCIAL SPACE Time Retail Restaurant Visitor Total Surplus / Demand(1) Demand(2) Demand(3) Demand Deficit 8:00 a.m. 4 24 31 59 +36 9:00 a.m. 8 33 17 58 + 37 10:00 a.m. 12 37 16 65 +30 11 :00 a.m. 20 45 15 80 + 15 12:00 PM 23 45 15 83 + 12 I :00 p.m. 22 45 15 82 +13 2:00 p.m. 20 23 16 59 + 36 3:00 p.m. 20 18 18 56 +39 4:00 p.m. 18 18 22 58 +37 5:00 p.m. 13 35 29 77 +18 6:00 p.m. 16 37 34 87 +8 7:00 p.m. 19 28 48 95 0 8:00 p.m. 16 29 48 93 +2 (1) Dublin City Code rate is I space/300 sq. ft., reduce by 25% to account for internal trips, resulting in a peak calculated demand of 23 spaces. (2) Dublin City Code rate is I spacellOO sq.ft., reduce by 25% to account for internal trips, resulting in a peak calculated demand of 45 spaces. (3) Based on residential visitor demand being 15% of the overall demand or 0.225 space/unit. The peak visitor demand for 68 spaces (300 units @ 0.225 per unit) was reduced by 20 spaces (to account for 20 visitor spaces being located at another location in the development), resulting in a peak calculated demand of 48 spaces. Parking Analysis for Metropolitan at Dublin Station Page 4