HomeMy WebLinkAboutPC Reso05-66 04-060 Appv SDR for Carports at Iron Horse Trail Apts RESOLUTION NO. 05 - 66 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A SITE DEVELOPMENT REVIEW (SDR) TO CONSTRUCT CARPORTS FOR 88 EXISTING PARKING STALLS AT THE EXISTING IRON HORSE TRAIL APARTMENTS LOCATED AT 6253 DOUGHERTY ROAD (APN 941-0550-069) P A 04-060 WHEREAS, Bill Rogers, on behalf of Ameriton Properties, has requested approval of a Site Development Review application to construct additional carports for 88 existing parking spaces for the Iron Horse Trail Apartments located at 6253 Dougherty Road; and WHEREAS, a completed application for Site Development Review is available and on file in the Dublin Planning Department; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15303(e), accessory structures such as carports are exempt from further environmental review; and WHEREAS, Ameriton Properties submitted a related Tentative Condominium Map (Tract 7589) application, to subdivide the 6.385::!: acre site into a condominium creating 177 units and common areas; and WHEREAS, the project as proposed is consistent with the General Provisions and Development Standards for the Planned Development Zoning District for the property in which the site is located; and WHEREAS, the project application has been reviewed by the applicable City departments and agencies, and their comments have been incorporated into the Conditions of Approval for the project; and WHEREAS, the Staff Report was submitted recommending that the application be approved; and WHEREAS, the Planning Commission did hold a public hearing on said application on December 13,2005; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a staff report was submitted recommending that the Planning Commission approve the Site Development Review subject to conditions prepared by Staff; and WHEREAS, the Planning Commission did hear and use its independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Planning Commission ofthe City of Dublin does hereby find that: A. Approval of this Site Development Review (SDR) application (PA 04-060) is consistent with the intent/purpose of the Site Development Review (Section 8.104) of the Zoning Ordinance. B. The approval of this application, as conditioned, complies with the policies of the General Plan, and with Planned Development Regulations for this project site, and with all other requirements of the Zoning Ordinance. C. The approval of this application, as conditioned, will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and general welfare because the development is consistent with all laws and ordinances and implements the Dublin General Plan. D. The project site has existing improvements associated with the apartment complex and the approved carports are designed to be consistent with the existing carports and together are designed to provide a desirable environment for the development. E. The subject site is physically suitable for the type and intensity of the proposed use because it is a level site with existing parking spaces that will accommodate carports and allow sufficient vehicular access. F. Impacts to existing views are addressed because the project site is flat and the proposed carports are setback from adjacent buildings and screened from adjacent uses by an existing masonry wall. G. Impacts to existing slopes and topographic features are addressed because the property is flat and there are no significant topographic features and the Applicant does not propose any additional grading of the site. H. Architectural considerations, including the character, scale and quality of the design; the architectural relationship with the site and other buildings, signs, building materials and colors; and the screening of exterior appurtenances, exterior lighting and similar elements have been incorporated into the project and as Conditions of Approval in order to insure compatibility of this development with the development's design concept or theme and the character of adjacent buildings and uses because the proposed carports are designed to match the existing carports. I. Landscape considerations, including the locations, type, size, color, texture and coverage of plant materials, provisions and similar elements have been considered to insure visual relief and an attractive environment for the public. BE IT FURTHER RESOLVED THA T THE Planning Commission of the City of Dublin does hereby conditionally approve P A 04-060 Site Development Review (SDR) to construct additional carports for 88 existing parking spaces as generally depicted by the Staff Report and the Project Plans dated September 13, 2005, and labeled Exhibit A consisting of two (2) sheets, stamped approved and on file with the City of Dublin Planning Department, subject to compliance with the following conditions: CONDITIONS OF APPROVAL Unless otherwise stated, all Conditions of Approval shall be complied with prior filing the Final Map and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance with the Conditions of Approval: fPLl Planning, fBl Building, fPOl Police, fPWl Public Works, fADMl Administration, fFINl Finance, fPCSl Parks and Community Services. rFl Alameda County Fire Department, fDSRl Dublin San Ramon Services District, fCOl Alameda Countv Flood Control and Water Conservation District Zone 7. 2 NO. CONDITION TEXT L.C 1. Approval. This Site Development Review approval for the Iron Horse Trail Apartments establishes the detailed design concepts and regulations for the project. Development pursuant to this Site Development Review generally shall conform the project elevations/renderings submitted by Kier & Wright dated received September 13, 2005, stamped approved, and on file in the Planning Department (hereinafter referred to as the "Project Plans"), unless modified by the Conditions of Approval contained herein. The Project Plans shall be modified only as directed by the following conditions of approval. No other modifications shall be made to the Project Plans without subse uent review and a roval. 2. Term. Approval of the Site Development Review shall be valid for one year from approval by the Planning Commission. If construction has not commenced by that time, this approval shall be null and void. The approval period for Site Development Review may be extended six (6) additional months by the Director of Community Development upon determination that the Conditions of Approval remain adequate to assure that the above stated findings of approval will continue to be met. (Applicant/Developer must submit a written request for the extension prior to the expiration date of the Site Develo ment Review. 3. All project construction shall conform to all building codes and ordinances in effect at the time of building ermit. 4. To apply for building permits, Applicant/Developer shall submit eight (8) sets of construction plans to the Building Division for plan check. Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participation non-City agencies prior to the issuance of buildin ermits. 5. Construction plans shall be fully dimensioned (including building elevations) accurately drawn (depicting all existing and proposed conditions of site), and prepared and signed by a California licensed Architect or Engineer. AI structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape plan and details shall be consistent with each other. 6. Temporary construction fencing shall be installed along perimeter of all work under construction. 7. Geotechnical Engineer for the soils report shall review and a rove the foundation desi n. A letter shall be 3 RESPON. AGENCY! DEPART. PL B B B B B WHEN REQUIRED Prior to: Ongoing Standard Ongoing Standard Prior to Standard Occupancy Issuance of Standard Building Permi ts Permit Standard Issuance Through Standard Project Com letion Permit Standard Issuance NO. CONDITION TEXT RESPON. WHEN SOURCl: AGENCYI REQUIRED DEPART. Prior to: submitted to the Building Division on the approval. 8. Emergency Vehicle Access. Fire apparatus roadways F On-going Standard shall have a minimum unobstructed width of 20' and an unobstructed vertical clearance of not less than 13'6". Roadways under 36' wide shall be posted with signs or shall have red curbs painted with labels on one side; roadways under 28' wide shall be posted with signs or shall have red curbs painted with labels on both sides of the street as follows: "NO STOPPING FIRE LANE - CVC 22500.1". 9. The project shall comply with Uniform Building and F On-going Standard Fire Codes as adopted by the City of Dublin. 10. The Applicant shall comply with all applicable City of PO Ongoing Standard Dublin Residential Security Ordinance requirements. 11. A site plan shall be provided showing a point by point PO Issuance of Standard photometric calculation of the required light levels. Building Permits 12. Open parking lots and carports shall be illuminated to PO On-going Standard a minimum level of 1.0 foot-candle of light at ground level between sunset and sunrise. 13. The numbering of assigned parking spaces/stalls shall PO On-going Standard not coincide with the actual address number of individual units 14. The applicant shall work with the Dublin Police on an PO On-going Standard ongomg basis to establish and effective theft prevention and security program. 15. Prior to issuance of any building permit, complete DSRSD Issuance of Standard improvement plans shall be submitted to DSRSD that Building conform to the requirements of the Dublin San Ramon Permits Services District Code, the DSRSD "Standard Procedures, Specifications and Drawings for Design and Installation of Water and Wastewater Facilities", all applicable DSRSD Master Plans and all DSRSD policies 16. Prior to issuance by the City of any Building Permit or DSRSD Issuance of Standard Construction Permit by the Dublin San Ramon Services Building District, whichever comes first, all utility connection Permits fees including DSRSD and Zone 7, plan checking fees, inspection fees, connection fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules established in the DSRSD Code. 17. The Applicant shall hold DSRSD, its Board of DSRSD On-going Standard Directors, commissions, employees, and agents of DSRSD harmless and indemnify and defend the same from any litigation, claims, or fines resulting from the construction and completion of the proiect. 4 PASSED, APPROVED AND ADOPTED this 13th day of December 2005. AYES: Chair Schaub and Commissioners Biddle, King, Fasulkey, Wehrenberg NOES: ABSENT: ABSTAIN: ~~"-~ Planning Commission Chairperson G:IPA#\2004\04-060 Iron Horse Condo MapIPC Reso SDR.doc 5