Loading...
HomeMy WebLinkAbout7.1 FireStation17&18Design CITY CLERK File #540-70 AGENDA STATEMENT CITY COUNCIL MEETING DATE: February 19, 2002 SUBJECT: Review of Schematic Design for Fire Stations 17 and 18 Report prepared by: Herma Lichtenstein, parks & Facilities Development Manager ATTACHMENTS: A Schematic Alternative will be presented at the meeting RECOMMENDATIO~~ 1) 2) Receive presentation from Staff and Consultants Provide direction and authorize Design Development FINANCIAL STATEMENT: None DESCRIPTION At the December 18, 2001 meeting of the Dublin City Council, the Council reviewed concept alternatives by BSA Architects for the design of two new Fire Stations for the City. The Consultant had prepared building plans for the two stations. Station 17 is the larger of the two buildings at 11,000 square feet with a three-engine company. Station 18 has a two-engine company and is approximately 8,000 square feet. Each of the alternatives was presented with a variety of color possibilities. The design intent was to pick one style of fagade for both buildings to minimize future maintenance requirements and to help create an identifiable architecture for the City. At that meeting Council provided the architect with design direction and chose a preferred alternative 'to be developed into a schematic design. The Architect has prepared revised drawings reflecting the Council's comments and has further defined the building materials and colors. The Architect will review the revised drawings and color selections with Council. The goal for the presentation is to provide further direction and design input and to authorize the Architect to begin Design Development. RECOMMENDATION: It is the recommendation of Staffthat the City Council take the following action: I Receive presentation from Staff and the Consultant 2 Provide direction and authorize Design Development COPIES TO: BSA Architects ITEM NO.~j~