HomeMy WebLinkAboutReso 68-06 Dougherty Road Houston Place Project RESOLUTION NO. 68 - 06 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN . ~ * * * * * * * APPROVING AMENDMENT NO.1 TO THE AGREEMENT WITH BKF ENGINEERS FOR ADDmONAL DESIGN SERVICES FOR THE DOUGHERTY ROAD - HOUSTON PLACE TO 1-580 PROJECT WHEREAS, on September 7,2004, the City Council of the City of Dublin approved an agreement for engineering services with BKF Engineers to perform design, surveying and construction consulting work for the Dougherty Road Improvements - Houston Place to 1-580 Project (Project); and WHEREAS, the Site Development ReVIew for the proposed Dublin Honda Dealership, located at 6363 Scarlett Court with frontage on Dublin Boulevard, has been approved with modifications to the City's completed improvement plans for said Project; and WHEREAS, said modifications necessitate additional design to the Project plans; and WHEREAS, the owner/developer of the Dublin Honda Dealership has deposited funds with the City for the modifications to the Project Improvement Plans, as well as required changes to the legal descriptions and plat maps; and WHEREAS, BKF Engineers has submitted an Amended Scope of Services and fee estimate for these modifications and legal descriptions and plats for right-of-way acquisition, and the not-to-exceed amount to perform these tasks is $34,317, NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve Amendment No. 1 to the agreement with BKF Engineers, hereto attached as Exhibit "A," for consulting services. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Amendment. PASSED, APPROVED AND ADOPTED this 16th day of May, 2006, by the following vote: AYES Councilmembers Hildenbrand, McCormick, Oravetz and Zika, and Mayor Lockhart NOES None ABSENT None ABSTAIN None Mayor AT~ aJ\~~ . - C ty Clerk Rcsa No. 68"()6, Adopted 5/16/06, Item 4 8 Page 1 of1 EXHIBIT "A" OF RESOLUTION ~-06 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND BKF ENGINEERS FOR ADDITIONAL DESIGN SERVICES FOR THE DOUGHERTY ROAD IMPROVEMENTS - HOUSTON PLACE TO 1-580 PROJECT WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and BKF Engmeers (hereinaller referred to as "CONSULTANT"), entered into an agreement on September 7, 2004, to prOVide design and construction cngineering services to CITY for the Dougherty Road lmprovements - Houston Place to 1-580 Project (project); and WHEREAS, due to changcs in the Improvements and legal right-of-way descriptions necessary as the result of the future Dublin Honda project; and WHEREAS, these revisions necessitate an amendment to the original Scope of Services in order to complete the design of the City of Dublin' s Project; and WHEREAS, the not-to-exceed contract amount is proposcd to be ll1creased to cover the cost of additional work for the amended Scope of Services; NOW, THEREFORE, the parties hereto agree as follows: Amended Scope of Services The Scope of Services shall be modified as described in Consultant's Amended Scope of Services dated April 27, 2006, for the Dougherty Road Improvements - Houston Place Project, attached hereto as Exhibit "A" to the Amendment. Not-To-Exceed The total cost for work under this amendment shall not exceed an additional $34,317, bringing the total contract amount to $483,763. CITY OF DUBLIN Mayor ATTEST. City Clerk '" BKF E~?N"EERS '%/ b 'J / ' utalina B Date: b)D:l!Dln Ci:\CONS1Jl TANTS\bkMMEND 1 dellign 051fl06.DOC I~ ::.' B k. r April 27, 2006 Lee Thompson ENGINEERS City of Dublin 5 Public Works Department URVEYORS 100 C' C 1 VIC enter PLANNERS Dublin CA 94568 , Subject: Extra Work for Dublin Honda Off -Site lmprovements Dear Mr. Thomp~on, BKF is pleased to. present to you a proposal for the design modifications as required to conform to the Dublin Honda Site Plan along the Dublin Boulevard frontage. The amount of effort for the design modifications is de6cribed in the enclosed "Summary of Pees and Hours by Task" proposal. BKF proposes to provide the extra work task as described in the "Summary of Pees and Hours by task" for an estimated ilmount of $34,317 Should any additional services be requested or required which are not included in our "Summary ofFee~ and Hours by Task," these services will be considered extra work and will require an amendment for approval and processing prior to executing any additlOnal work task. We look fOlward to LOntinue providing services to you on this project. Please contact me if you have any questions or require additional infonnation. 47S0 chabot Or. Suite 104 Plea5anton California Y4588-3323 phone 925.396.7700 fax 925.396.7799 www.bkf:Lvm SUMMARY OF FEES & HOURS BY l"ASJ( BKF ~r'Igil"l'!II!!t!l; 478u Chabot Drivt:, Suite 104 rl~~.;':Ir\Lm\, CA 94588 (925) 396-770u, Fax (925) 39l'i-7799 Engi"eeri"g Servinlifor Off-8ite lfflprove",.ents!or DtJ.blln Hond4-Phase } Wflrk Te~k 1 ptOjeet Coordination Task 2 100% Submittal Task 3 Final PS&E 09 Eng II Eng I Tach ,aft UO< otal Cost Rat~thr $175 S 142 $ 120 $ 106 $ 93 $ 104 $ 64 $ 236 Hours Task 1 2 5 TasK 2 3 ,. 23 34 16 16 2. 0 130 $ 14,045 Task 3 1 7 6 10 6 ,. 12 0 59 $ 6,157 6 36 .9 2. 30 3. 0 209 Sl,Jbtotal $1,050 $3,692 $4.560 $5,06" $2,232 S3.120 $3,024 $0 $ 22 766 Reimbun!iable I:::xpense:s; F'rlntlng/Dellvery Computerll='lotter 4Jl% of professional fees 4.0% of professional fees $ $ 911 911 o a e ursa e )(penlies TI;I!;lk A - Modify Dublin/Dougherty Intersection Improvement projeel $9.730 ro ess ona e ces DB. U gB PIC PM Eng III Eng II Principal in Charge Project Manager Englnfll!lr III E.nglneer II Eng I D",~ Tech SuO< EngIneer I Drafter Techniclsn (Engineering or Survey) Survey Field Crew Notes: 1. It is assumed that thers are no structural elemMfs as part oflhls prOject. 2. existing JmJ)erlal aenal topographic surv~y I~ suffiaii;mt for PS&E work. 3. Restoration of adjacent properties is nat ;nclud9d in th8 SCOp6' with me exces."t1on of driveway conforms. 4. Right of Way work il'lclud&s only modifications to a maxJmum of 4 pl8t 8. legal descriptions. S, The p~par/!fltlon of relocation plans f(lr utilJlies not owned by City are excluded in the project scope. 6. The duratiotl of the design phass of tM prOjeC1/S assumed to oe 4 months, 7 it is assumed that there will be 2 City submltUtls (100% Submltral & FInal Submittal), B. Irrigation, LElndscfJping, Permanent & Temporary Erosion Coritrol. Signing &. Striping aM SragfJ Construction Plans are Bxcludsd from this SC.op8 of work. 9 Project Specfflcafions, Quantities &. Estimate are excluded from this scope of work. 10, Hydraulic Calculatir;m & Analysis arfil excluded from this scops of work. 11. ProJecr scope Includes the frontage Improvements along Dublin Boulevard at the Dublin Honda Site. SCl;irlett Court improvements ars limited to tM curb return at the if1t(frsectlon of Dublin Bou'~vt!Jtd. 1 Z. Projeat scope does flot Include Sl,IfVi;!Y work. T.\Is;1(1 Project Coordination Task 1.1 Attend meetings with City (8!l8Ume 5) T:;lsk 1,2 Coordinate design Vv'!lh City Adjacent O~~i(j:Mr and Developer TASK PIC PM EnQ lit EnQ U i::ng I Tech D"," SU'" rot Hrs Cost Tesk; 1.1 1 3 5 9 $ 1,201 Task 1,2 1 2 4 4 11 5 1,3153 Subtotal < 5 9 . 0 0 0 0 20 . 2,so4 TiI!ilk2 100% Submittal T:;Isk ;2,1 Prepare title sheet 'task 2.2 Prep:;Ire typical cross sections plan ShMI:!i & project cross !;ieCliOns Task 2.3 Prepare layout sheets outlining geometric features Task 2.4 I='reparf!l di!!lmoliliOn plans Task 2.5 Prepare utility ocCUPation $heets Tdsk 2.6 Prepare drainage plan sheets Task 2.7 Prepare construetlon detail plans Task L.B Dl!tlJelOp grading and profile sheets T:;.sk ~,a Modify Plats & Legal!! (As!!ume 4) 'Task 2.10 Conducllndependem QU:;IlIty control review Task 2.11 Prepare PI~ns,del<liIS,C<llculC!lions for Final submittal TASK PIC PM E.n~ III EnQ II EI'lClI >- Teeh Draft Su", Tot HI"$ Cost Task 2.1 1 4 5 . 536 T:;Isk; ,2,2 < 2 2 2 < 10 $ 1,014 Task 2.3 2 2 2 4 11 $ 1 1,6 Task 2.4 2 2 . S $ 904 Task 2.5 2 2 2 6 $ 620 Task 2.f1 1 2 , . 9 $ YU' ia.sk 2.7 1 2 . 4 6 1& $ 1.470 Task 2.8 . 2 4 2 4 2 16 $ 1,718 T.;lsk L.a 1 4 a 22 36 $ 4,035 Task 2.10 1 2 3 $ 459 Task 2.11 1 :/ 4 4 11' .$ 1.247 Subtotal 3 14 23 34 16 ,. 2. a 130 $ 14,04!'i Tnk3 Final PS&E Task 3.1 Revise 100% submittal per City review comments T;;Isk 3,2 Prepare Final PS&E iask 3.3 Conduct independent qua Illy <.;onLrol review Task 3.4 PaCk~!;je aoeuml!l!'1t.s for' Bid TASK PIC PM EnQ III ena II En~ I Tech D",ft Su", 'rot H~.s Cost Task 3,1 1 4 6 . 6 6 26 $ 2,933 Task 3.2 2 2 4 . 6 6 2. $ :/,446 Task 3.3 . 2 $ 284 TliIsk 3.4 2 . 4 $ .92 Subtotal 7 6 10 a 14 12 0 sa $ 0,157 Dublin BlvdlDo!l1;her1y Rd IllterSl!ctit:m Jml'r~l.!l!mefU pf'()jecr h~kA ModIfy Project Plans to Include Phase 1 as EXisting Conditions Task A.1 Modify project plans Task A.2 Update project Quantities ana estimate Task A,~ Incorporate City cOmments Task A.4 Conduct Independent qUilllty control review TASK I PIC PM Eng III Eng II Eng I Tech Orafl survl Total Cosl Rate/hr $175 S 1.4.2 S 120 S 106 $ 93 $ 10. $ 84 S 236 Hours task A.1 2 . 8 10 12 10 8 54 $ 5,766 Task A.2 2 4 . 10 $ 1,072 TaskA.3 1 1 2 2 2 8 $ ""3 TaskAA 1 2 3 $ 4S0 Subtotal . 9 10 10 16 16 10 0 7. $ 8,230 BKF Subconsullants: RGA Utility Consultants, Inc. (lighting) $ 7S0 Gatas & Associates (Landscaping & IrrigatiDn) $ 7S0 SubtotClI 1$ 1,500 Subtot:;!1 B~Jd et $ 9,700 .