WHEREAS, on September 7,2004, the City Council of the City of Dublin approved an agreement
for engineering services with BKF Engineers to perform design, surveying and construction consulting
work for the Dougherty Road Improvements - Houston Place to 1-580 Project (Project); and
WHEREAS, the Site Development ReVIew for the proposed Dublin Honda Dealership, located at
6363 Scarlett Court with frontage on Dublin Boulevard, has been approved with modifications to the
City's completed improvement plans for said Project; and
WHEREAS, said modifications necessitate additional design to the Project plans; and
WHEREAS, the owner/developer of the Dublin Honda Dealership has deposited funds with the
City for the modifications to the Project Improvement Plans, as well as required changes to the legal
descriptions and plat maps; and
WHEREAS, BKF Engineers has submitted an Amended Scope of Services and fee estimate for
these modifications and legal descriptions and plats for right-of-way acquisition, and the not-to-exceed
amount to perform these tasks is $34,317,
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby approve Amendment No. 1 to the agreement with BKF Engineers, hereto attached as Exhibit "A,"
for consulting services.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Amendment.
PASSED, APPROVED AND ADOPTED this 16th day of May, 2006, by the following vote:
AYES Councilmembers Hildenbrand, McCormick, Oravetz and Zika, and Mayor Lockhart
NOES None
ABSENT None
ABSTAIN None
Mayor
AT~
aJ\~~
. - C ty Clerk
Rcsa No. 68"()6, Adopted 5/16/06, Item 4 8
Page 1 of1
EXHIBIT "A" OF RESOLUTION ~-06
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND BKF ENGINEERS
FOR ADDITIONAL DESIGN SERVICES FOR THE DOUGHERTY ROAD
IMPROVEMENTS - HOUSTON PLACE TO 1-580 PROJECT
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and BKF Engmeers
(hereinaller referred to as "CONSULTANT"), entered into an agreement on September 7, 2004, to prOVide
design and construction cngineering services to CITY for the Dougherty Road lmprovements - Houston
Place to 1-580 Project (project); and
WHEREAS, due to changcs in the Improvements and legal right-of-way descriptions
necessary as the result of the future Dublin Honda project; and
WHEREAS, these revisions necessitate an amendment to the original Scope of Services in
order to complete the design of the City of Dublin' s Project; and
WHEREAS, the not-to-exceed contract amount is proposcd to be ll1creased to cover the
cost of additional work for the amended Scope of Services;
NOW, THEREFORE, the parties hereto agree as follows:
Amended Scope of Services
The Scope of Services shall be modified as described in Consultant's Amended Scope of
Services dated April 27, 2006, for the Dougherty Road Improvements - Houston Place Project, attached
hereto as Exhibit "A" to the Amendment.
Not-To-Exceed
The total cost for work under this amendment shall not exceed an additional $34,317,
bringing the total contract amount to $483,763.
CITY OF DUBLIN
Mayor
ATTEST.
City Clerk
'"
BKF E~?N"EERS
'%/
b
'J
/ '
utalina B
Date: b)D:l!Dln
Ci:\CONS1Jl TANTS\bkMMEND 1 dellign 051fl06.DOC
I~
::.'
B k. r April 27, 2006
Lee Thompson
ENGINEERS City of Dublin
5 Public Works Department
URVEYORS 100 C' C
1 VIC enter
PLANNERS Dublin CA 94568
,
Subject:
Extra Work for Dublin Honda Off -Site lmprovements
Dear Mr. Thomp~on,
BKF is pleased to. present to you a proposal for the design modifications as required to
conform to the Dublin Honda Site Plan along the Dublin Boulevard frontage.
The amount of effort for the design modifications is de6cribed in the enclosed "Summary
of Pees and Hours by Task" proposal. BKF proposes to provide the extra work task as
described in the "Summary of Pees and Hours by task" for an estimated ilmount of
$34,317
Should any additional services be requested or required which are not included in our
"Summary ofFee~ and Hours by Task," these services will be considered extra work and
will require an amendment for approval and processing prior to executing any additlOnal
work task.
We look fOlward to LOntinue providing services to you on this project. Please contact me
if you have any questions or require additional infonnation.
47S0 chabot Or.
Suite 104
Plea5anton
California Y4588-3323
phone 925.396.7700
fax 925.396.7799
www.bkf:Lvm
SUMMARY OF FEES & HOURS BY l"ASJ(
BKF ~r'Igil"l'!II!!t!l;
478u Chabot Drivt:, Suite 104
rl~~.;':Ir\Lm\, CA 94588
(925) 396-770u, Fax (925) 39l'i-7799
Engi"eeri"g Servinlifor Off-8ite lfflprove",.ents!or DtJ.blln Hond4-Phase } Wflrk
Te~k 1 ptOjeet Coordination
Task 2 100% Submittal
Task 3 Final PS&E
09 Eng II Eng I Tach ,aft UO< otal Cost
Rat~thr $175 S 142 $ 120 $ 106 $ 93 $ 104 $ 64 $ 236 Hours
Task 1 2 5
TasK 2 3 ,. 23 34 16 16 2. 0 130 $ 14,045
Task 3 1 7 6 10 6 ,. 12 0 59 $ 6,157
6 36 .9 2. 30 3. 0 209
Sl,Jbtotal $1,050 $3,692 $4.560 $5,06" $2,232 S3.120 $3,024 $0 $ 22 766
Reimbun!iable I:::xpense:s;
F'rlntlng/Dellvery
Computerll='lotter
4Jl% of professional fees
4.0% of professional fees
$
$
911
911
o a e ursa e )(penlies
TI;I!;lk A - Modify Dublin/Dougherty Intersection Improvement projeel
$9.730
ro ess ona e ces
DB. U gB
PIC
PM
Eng III
Eng II
Principal in Charge
Project Manager
Englnfll!lr III
E.nglneer II
Eng I
D",~
Tech
SuO<
EngIneer I
Drafter
Techniclsn (Engineering or Survey)
Survey Field Crew
Notes:
1. It is assumed that thers are no structural elemMfs as part oflhls prOject.
2. existing JmJ)erlal aenal topographic surv~y I~ suffiaii;mt for PS&E work.
3. Restoration of adjacent properties is nat ;nclud9d in th8 SCOp6' with me exces."t1on of driveway conforms.
4. Right of Way work il'lclud&s only modifications to a maxJmum of 4 pl8t 8. legal descriptions.
S, The p~par/!fltlon of relocation plans f(lr utilJlies not owned by City are excluded in the project scope.
6. The duratiotl of the design phass of tM prOjeC1/S assumed to oe 4 months,
7 it is assumed that there will be 2 City submltUtls (100% Submltral & FInal Submittal),
B. Irrigation, LElndscfJping, Permanent & Temporary Erosion Coritrol. Signing &. Striping aM SragfJ Construction Plans are Bxcludsd from this SC.op8 of work.
9 Project Specfflcafions, Quantities &. Estimate are excluded from this scope of work.
10, Hydraulic Calculatir;m & Analysis arfil excluded from this scops of work.
11. ProJecr scope Includes the frontage Improvements along Dublin Boulevard at the Dublin Honda Site.
SCl;irlett Court improvements ars limited to tM curb return at the if1t(frsectlon of Dublin Bou'~vt!Jtd.
1 Z. Projeat scope does flot Include Sl,IfVi;!Y work.
T.\Is;1(1 Project Coordination
Task 1.1 Attend meetings with City (8!l8Ume 5)
T:;lsk 1,2 Coordinate design Vv'!lh City Adjacent O~~i(j:Mr and Developer
TASK PIC PM EnQ lit EnQ U i::ng I Tech D"," SU'" rot Hrs Cost
Tesk; 1.1 1 3 5 9 $ 1,201
Task 1,2 1 2 4 4 11 5 1,3153
Subtotal < 5 9 . 0 0 0 0 20 . 2,so4
TiI!ilk2 100% Submittal
T:;Isk ;2,1 Prepare title sheet
'task 2.2 Prep:;Ire typical cross sections plan ShMI:!i & project cross !;ieCliOns
Task 2.3 Prepare layout sheets outlining geometric features
Task 2.4 I='reparf!l di!!lmoliliOn plans
Task 2.5 Prepare utility ocCUPation $heets
Tdsk 2.6 Prepare drainage plan sheets
Task 2.7 Prepare construetlon detail plans
Task L.B Dl!tlJelOp grading and profile sheets
T:;.sk ~,a Modify Plats & Legal!! (As!!ume 4)
'Task 2.10 Conducllndependem QU:;IlIty control review
Task 2.11 Prepare PI~ns,del<liIS,C<llculC!lions for Final submittal
TASK PIC PM E.n~ III EnQ II EI'lClI >- Teeh Draft Su", Tot HI"$ Cost
Task 2.1 1 4 5 . 536
T:;Isk; ,2,2 < 2 2 2 < 10 $ 1,014
Task 2.3 2 2 2 4 11 $ 1 1,6
Task 2.4 2 2 . S $ 904
Task 2.5 2 2 2 6 $ 620
Task 2.f1 1 2 , . 9 $ YU'
ia.sk 2.7 1 2 . 4 6 1& $ 1.470
Task 2.8 . 2 4 2 4 2 16 $ 1,718
T.;lsk L.a 1 4 a 22 36 $ 4,035
Task 2.10 1 2 3 $ 459
Task 2.11 1 :/ 4 4 11' .$ 1.247
Subtotal 3 14 23 34 16 ,. 2. a 130 $ 14,04!'i
Tnk3 Final PS&E
Task 3.1 Revise 100% submittal per City review comments
T;;Isk 3,2 Prepare Final PS&E
iask 3.3 Conduct independent qua Illy <.;onLrol review
Task 3.4 PaCk~!;je aoeuml!l!'1t.s for' Bid
TASK PIC PM EnQ III ena II En~ I Tech D",ft Su", 'rot H~.s Cost
Task 3,1 1 4 6 . 6 6 26 $ 2,933
Task 3.2 2 2 4 . 6 6 2. $ :/,446
Task 3.3 . 2 $ 284
TliIsk 3.4 2 . 4 $ .92
Subtotal 7 6 10 a 14 12 0 sa $ 0,157
Dublin BlvdlDo!l1;her1y Rd IllterSl!ctit:m Jml'r~l.!l!mefU pf'()jecr
h~kA ModIfy Project Plans to Include Phase 1 as EXisting Conditions
Task A.1 Modify project plans
Task A.2 Update project Quantities ana estimate
Task A,~ Incorporate City cOmments
Task A.4 Conduct Independent qUilllty control review
TASK I PIC PM Eng III Eng II Eng I Tech Orafl survl Total Cosl
Rate/hr $175 S 1.4.2 S 120 S 106 $ 93 $ 10. $ 84 S 236 Hours
task A.1 2 . 8 10 12 10 8 54 $ 5,766
Task A.2 2 4 . 10 $ 1,072
TaskA.3 1 1 2 2 2 8 $ ""3
TaskAA 1 2 3 $ 4S0
Subtotal . 9 10 10 16 16 10 0 7. $ 8,230
BKF Subconsullants:
RGA Utility Consultants, Inc. (lighting) $ 7S0
Gatas & Associates (Landscaping & IrrigatiDn) $ 7S0
SubtotClI 1$ 1,500
Subtot:;!1 B~Jd et $ 9,700
.