2006-2011 CAPITAL IMPROVEMENT PROGRAM .
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93135 TV30 Studio Remodel GENERAL
DESCRIPTION - LOCATION
The Tri-Valley Community Television (TV30) Board, in cooperation with the cities of Dublin, Livermore, Pleasanton and
San Ramon, has initiated a project to relocate and expand the current CTV studio and upgrade much of the existing
equipment with new digital technologies. It is estimated that the project will cost approximately $1.8 million, The cost of
the project will be divided equally among the four cities, resulting in a total City contribution of $450,000. To date, the
City has contributed approximately $102,000; ($20,000 of which was previously accounted for in the City's Community
Cable Television Operating Budget), for its share of the design phase of the project, thereby reducing the Fiscal Year
2006-2007 contribution to $348,000.
COMMENTS
~
As part of the City's Cable Television Franchise Agreement, the City received a $200,000 capital grant from AT&T,
which can be used for the purchase of video production equipment and associated facility modifications for the City
and/or Tri-Valley Community Television (TV30). The City used approximately $120,000 of this grant to purchase and
install video production equipment in the Council Chamber. The remaining $80,000 will be used to partially offset the
cost of the TV30 stud io project.
FINAN I EARS SCHEDUL E
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 87.223 $ 348,000 $ 435.223
Other Contract Services $ 435,223
Land I Right of Way
Improvements
Machinery I Equipment
Miscellaneous
TOTAL $ 435,223 $ 87,223 $ 348,000 $ 435,223
PROJECT I STAFF
MANAGEMENT/FTE\ CONTRACT
-1-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93150 Network System Upgrade GENERAL
DESCRIPTION. LOCATION
This project provides for additions and upgrades to the City data processing network, The This includes the basic
infrastructure necessary to access centralized computer servers as well as the accompanying data storage and
support for changes in technology,
COMMENTS
In Fiscal Year 2006-2007 an Information Technology (IT) Strategic Plan will be commissioned. The estimated cost
for a firm to assess the City'S current and future technology needs and to present recommendations on the City's
future technology path is $60,000. One component of this work will also include a security assessment originally
planned for Fiscal Year 2005-2006, and was deferred to Fiscal Year 2006-2007 to be incorporated as part of the IT
Strategic Plan.
The implementation component of the IT Master Plan will result in identifying additional expenditures for this project
in future years. The Plan will also be helpful for establishing priorities and a sequencing of any recommended
improvements.
This Capital Project would accolTlplish the following High Priority City Council Goal:
2006-2007 GOALS
Develop Technology Master Plan for City of Dublin organization
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design {Inspection 001 $ 250,500 $ 60,000 $ 340,500
Other Contract Services $ 127,960 200 17,266 17,266
Land I Right of Way
Improvements 4,815
Machinery I Equipment 221,600
Miscellaneous 3,391
TOTAL $ 357,766 $ 297,766 $ 60,000 $ 357,766
PROJECT I STAFF
MANAGEMENT {FTE\ CONTRACT
-2-
-
-
. 2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93192 I Geographic Information System GENERAL
.
DESCRIPTION - LOCATION
This project provides for the implementation of an integrated Geographic Information System (GIS). This type of
system incorporates various data related to locations and visually displays it on a map, The data necessary includes
foundation layers of engineering and planning mapping, including aerial photographs of the City. The remaining
elements of this project build additional layers of information that are more function specific,
COMMENTS
-
Since 2002, the City has made progress in the development of an Geographic Information System, Initial phases
produced a system that has increased the productivity of City Staff and enhanced customer service, Providing visual
exhibits of information can enhance the ability to communicate information. Some GIS information has also made
available through the City's public website.
The final phase of the project will continue through Fiscal Year 2006-2007. Key elements of this phase involve the
development of additional mapping layers that are function specific (I.e. park infrastructure and storm drains) and the
completion of an updated air photo base map,
In Fiscal Year 2006-2007, consultant services and software purchases are proposed that will improve database
efficiency and complete infrastructure mapping, such as building footprints and street light locations.
In 2006/2007 Staff is working to update aerial Imagery in a cooperative manner with Alameda County, which the
County may provide the information at no cost. Staff proposes a two year approach to imagery collection for updates
to the aerial photography, starting in Fiscal Year 2008-2009. The cost shown Is the projected Dublin share based on
past efforts by several local agencies to jointly pursue a regional project to update current Information.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 234,917 $ 35,200 $ 30,000 $ 30.000 $ 330,117
Other Contract Services $ 245,568
Land I Right of Way
Improvements
Machinery I Equipment 84,440
Miscellaneous 109
TOTAL $ 330,117 $ 234,917 $ 35,200 $ 30,000 $ 30,000 $ 330,117
PROJECT I STAFF
MANAGEMENT (FTEI CONTRACT
-3-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93200 Building Permit System GENERAL
DESCRIPTION - LOCATION
. This project would install a new Building Permit System to handle building permit issuance, building inspection
requests, field inspections and necessary state and local required building reports. An important feature of the
new software would allow customers to request and track inspections on-line. Additional software for future
tracking systems (code enforcement, grading and encroachment permits) would also be purchased as part of this
project.
COMMENTS
The present system, initiated in Fiscal Year 1999-2000, is unable to handle the City's increased permit workload.
Severe limitations of the present system have resulted in data loss requiring re-entry, causing frequent software
breakdowns, and resulting in the inability to complete building inspection requests. Additionally, field records must
be entered manually, resulting in lost productivity and additional work for Building Division Staff, The new system
would improve productivity, minimize lost time, enhance customer service and create a more reliable and efficient
way of transferring information among City Departments.
The system wouid be implemented over two fiscal years, 2005-2007. The Department has made progress in Fiscal
Year 2005-2006 with the preparation and dissemination of a Request for Proposal. Consultants have been
interviewed and it is anticipated that the contract will be before the City Council by July 2006. Data will be transferred
and the system implemented in Fiscal Year 2006-2007.
This CIP would accomplish the following High Priority City Council Goal:
2006-2007 GOAL
1, Implement real-time electronic field inspection system
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design / Inspection 001 $ 252,000 $ 252,000
Other Contract Services $ 70,000
Land I Right of Way
Improvements
Machinery I Equipment 182,000
Miscellaneous
TOTAL $ 252,000 $ 252,000 $ 252,000
PROJECT I STAFF
MANAGEMENT tFTEl CONTRACT
-4-
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93320 Telecommunications Plan GENERAL
DESCRIPTION - LOCATION
This project would define the role the City should take in the provision of telecommunication facilities to the
community.
~
COMMENTS
The Plan Is composed of two parts:
Phase I - Develop Zoning Regulations for wireless communications (completed in 2000)
Phase II - Feasibility study, community outreach, financial analysis
This project has been ranked as a medium priority by the City Council. Phase II is proposed to be completed in
Fiscal Year 2007-2008, utilizing consultant services.
~
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design !Inspection $ 724 001 $ 13,581 $ 150,000 $ 163,581
Other Contract Services 162,857
Land I Right of Way
Improvements
Machinery I Equipment
Miscellaneous
TOTAL $ 163,581 $ 13,581 $ 150,000 $ 163,581
PROJECT I STAFF
MANAGEMENT/FTE\ CONTRACT
-
-5-
. 2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93402 Maintenance Facility Study GENERAL
DESCRIPTION - LOCATION
This project would perform a programming study to examine personnel needs, functions, and infrastructure demands
for a maintenance yard and office/storage facility, including an Emergency Operations Center (EOC), in keeping with
the City's growth and long-range infrastructure plans.
~
COMMENTS
The existing City Corporation Yard, located at the east end of Scarlett Court, contains minimal outdoor space and a
two-room metal building which was erected In 1985 when the City's maintenance needs were based on a four-square
mile area and a population of less than 15,000, The facility is now undersized for the existing infrastructure, and it is
important to begin planning for its replacement.
This CIP will allow substantial progress towards the following City Council High Priority Goal:
- 2006-2007 Goal
Examine potential funding sources for design and construction of a maintenance yard and secure a site if funding
becomes available.
-
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 35,000 $ 35,000
Other Contract Services $ 35,000
Land I Right of Way
Improvements
Machinery I Equipment
Miscellaneous
TOTAL $ 35,000 $ 35,000 $ 35,000
PROJECT I STAFF
MANAGEMENT /FTEI CONTRACT
-6-
-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93450 Civic Center Library GENERAL
.
-
DESCRIPTION - LOCATION
Q
The project provided for the design and
construction of a 37,000 square foot library, The
new library Is located adjacent to the Civic
Center,
-
,
\ 't .,.,..
\'" ....-
'" \...............-..
C \ "t.."...~
COMMENTS
~ In September, 1998, the City Council approved the Library Planning Task Force Report. In the Report. the Task Force
recommended that a 37,000 square foot library be buill at the Civic Center. The City's plan was to construct the entire
37,000 square feet building initially, and phase the furnishing of the library to occupy 30,000 square feet in Fiscal Year
. 2002-2003. The remainder of the library would be furnished in the year 2010, at which time the City will be able to
afford the annual operating expense of a larger library. The Friends of the Library and meeting room spaces would be
furnished and occupied during the initial stage.
A breakdown of the project costs are shown as follows:
Library Task Force Report
Phase I Design & Construction
Phase II Design & Construction
TOTAL
$ 20,860
17,197,992
1.340.645
$ 18,559,497
The new library was funded by Public Facility Fees ($12,150,111) and Private Development ($2,000,000); the balance
of $4,409,386 was funded from the General Fund.
Phase I construction was completed in spring 2003, and the Dublin Public Library opened to the public on April 12,
2003. Phase II is scheduled for Fiscal Year 2010-2011.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 . 2010-2011 Totals
.
Design I Inspection $ 223.532 001 $ 6,127.851 $ 281,535 $ 6,409,386
Other Contract-Services 1,759,161 310 11,091,001 1.059,110 12,150,111
Land I Right of Way
Improvements 13,763,590
Machinery I Equipment 648,415
Books 2,061.245
Miscellaneous 103,554
TOTAL $ 18,559,497 $ 17,218852 $ 1,340,645 $ 18,559,497
PROJECT I STAFF 0,50
MANAGEMENT/FTB CONTRACT
-7-
. 2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93900 Building Management Study GENERAL
DESCRIPTION - LOCATION
The City of Dublin operates and maintains three fire stations, the Library, the Civic Center, the new Senior Center,
the Corporation Yard, the Swim Center, the Heritage Center, and many public restrooms in its parks, Future
building projects Include a replacement for the Shannon Center, and future Community Center and Aquatic Center
in Emerald Glen Park. This project would conduct a building management study to ensure that City buildings and
their building systems were adequately assessed for condition, and a group of Capital Improvement Projects to
bring all buildings up to performance standards would be developed. In addition, as part of the study, the
maintenance and inspection schedule would be revised to ensure the sustainability of the City's facilities in the
future,
-
COMMENTS
This study would establish building standards, measure the City's facilities by those standards, and recommend
needed improvements, revise maintenance and inspection schedules to ensure sustainability, revise maintenance
documentation to track trends and Issues, and revise the Internal Service Fund'to ensure necessary funding for
replacement of building systems,
-
This CIP will allow completion of the following City Council High Priority Goal:
2006-2007 GOAL
Complete Building Management Study
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 175,000 $ 175,000
Other Contract Services $ 175,000
Land I Ri9hl of Way
Improvements
Machinery I Equipment
Miscellaneous
TOTAL $ 175,000 $ 175,000 $ 175000
PROJECT I STAFF
MANAGEMENT IFTEl CONTRACT
-8-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93910 Civic Center Modification GENERAL
Desian Services & Construction
DESCRIPTION - LOCATION
e
This project provides for the completion of the Dublin
Civic Center renovation, in order to accommodate the
additional City Staff and police personnel required to
serve the City in the next three-five years (Phase I),
and at build-out of the City (Phase II). Design,
engineering and all consulting services needed for the
modifications at the Civic Center are included in the
CIP. Phase II includes a 5,000 square foot addition to
the police wing to accommodate the anticipated growth
in the Poilce Department to serve the City at build-out.
....
1
\ "t ...--.-
\. \ "'.....--_..
,. '{ -..-..
C \ _..-'"
.'
COMMENTS
As the City grows, it has become necessary to increase personnel to adequately serve the community. During Fiscal
Year 1997-1998, the City conducted a Civic Center Space Planning Study, which identified the number of personnel in
each City Department that would occupy space in the Civic Center in the Year 2002, and at build-out of the City's
General Plan.
The proposed modifications as a result of the Study were divided into two phases, The first phase was completed in
Fiscal Year 2000-2001 at an approximate cost of $2.1 million, Improvements included the completion of 4,500 square
feet of unimproved space, expansion of the police parking lot, and construction of a 494 square foot evidence garage, a
470 square foot bike storage building and a 1,026 square foot maintenance building.
Prior to moving forward with the second phase which provided for construction of a 5,000 square foot addition, a
Programming Study was commissioned during Fiscal Year 2005-2006 to re-evaluate the space needs for build-out of
the City, The StUdy will be complete in summer of 2006 at which time the revised costs associated with the second
phase will be known. For the purpose of this CIP project, the costs have been estimated based on the improvements
originally planned for the second phase. An update to the CIP will need to be done at a later date.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection $ 385,351 001 $ 403,130 $ 403,130
Other Contract Services 321.562 310 1,801,858 $ 5,500 $ 193.098 $ 1,969,436 3,969,892
Land I Right of Way
Improvements 3,322,560
Machinery I Equipment 293,020
Miscellaneous 50,529
TOTAL $ 4,373,022 $ 2,204,988 $ 5,500 $ 193,098 $ 1,969,436 $ 4,373,022
PROJECT I STAFF 0,36 0,70
MANAGEMENT IFTE\ CONTRACT
-9-
-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93933 Civic Center Generator GENERAL
~
DESCRIPTION - LOCATION
e
This project would replace the existing Civic Center
emergency generator with a larger unit capable of
powering the entire building, The project includes
modification of the existing enclosure to accept the
larger generator and construction of a new trash
enclosure.
-
,
",\"~"".,,,,"
\.._~....."''''-
-
COMMENTS
The existing generator is sized to power only certain elements of the Civic Center which were determined to be critical
functions at the time the building was originally constructed; however, it may be of benefit to both Staff and the public
that the entire facility remain operational during a power failure or emergency situation. The City is currently exempt
from blackouts, but the exemption slatuscould change.
This project is proposed to be deferred until Fiscal Year 2008-2009 in order to coincide with the proposed Phase 2
Civic Center modifications. The future design and use of the police facility, as well as a pending decision on the
location of the Emergency Operations Center, would directly affect the size and configuration of the emergency power
system.
An additional $125,425 from the Internal Service Fund would be required to fund this project.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection $ 10,655 001 $ 38,770 $ 295,285 $ 334,055
Other Contract Services 47,618
Land I Right of Way
Improvements 270,873
Machinery I Equipment
Miscellaneous 4.909
TOTAL $ 334,055 $ 38,770 $ 295,285 $ 334 055
PROJECT I STAFF
MANAGEMENTIFTBCONTRACT .
-10-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
93970 Automated Document Storage GENERAL
& Retrieval.System
~
DESCRIPTION - LOCATION
This project has provided for the purchase and phased implementation of an electronic automated document imaging
storage system for all City Departments, The intent of the system is to reduce physical storage demands, while
providing an efficient method to index, store, and retrieve records in the City,
~
COMMENTS
The current system was purchased in 1999 and has allowed the City to establish electronic copies of documents,
that can be easily retrieved. In Fiscal Year 2006-2007, system assessment and planning activities are proposed in
order to ensure that the version of the technology employed represents best practices and is capable of supporting
continued growth. It is expected that additional data storage will be needed in the future as the City broadens the
use of electronic data storage between the various Departments. The assessment will also allow Staff to ascertain
whether there would be benefits from implementing additional modules such as an agenda management system.
The cost associated with this phase is expected to be $15,000,
Recommendations from the system assessment may lead to expenditures for this project in future years.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007.2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 104,237 $ 15,000 $ 119,237
Other Contract Services $ 37,396
Land I Right of Way
Improvements
Machinery I Equipment 81,841
Miscellaneous
TOTAL $ 119,237 $ 104,237 $ 15,000 $ 119,237
PROJECT I STAFF
MANAGEMENT IFTEI CONTRACT
-11-
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94500 Public Facility Fee Study Update GENERAL
~
DESCRIPTION - LOCATION
This project finances the Fiscal Year 2005-2006 update to the City's Public Facility Fee.
-
COMMENTS
The City Council adopted Resolution No, 32-96 on March 26, 1996, establishing a Public Facilities Fee for
development within Dublin and eastern Dublin. The Public Facilities Fee was based on the Public Facilities Fee
Justification Study prepared by a private consultant. The purpose of the fee is to finance municipal public facilities to
reduce the impacts caused by future development in the City of Dublin. These facilities include: community and
neighborhood parks; community buildings; library; civic center office space completion; and aquatic center.
The City Council directed Staff to update the Public Facilities Fee periodically. Two subsequent updates have been
done in 1999 and 2002.
The proposed update is needed to revise population projections based on recently approved development proposals
and to conduct an appraisal of land values for parkland acquisition.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design !Inspection 310 $ 34,236 $ 7,210 $ 41,446
Other Contract Services $ 40,576
Land I Right of Way
Improvements
Machinery I Equipment
Miscellaneous 870
TOTAL $ 41,446 $ 34,236 $ 7,210 $ 41,446
PROJECT 1 STAFF
MANAGEMENTCFTEl CONTRACT
-12-
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New Accounting System GENERAL
-
DESCRIPTION - LOCATION
The City currently operates several centralized accounting functions on an ISM AS/400, The initial hardware and
software were purchased in 1988, with some additional software enhancements and replacement of the hardware
server taking place subsequent to that purchase. However, the software has an outdated user interface, making it
difficult to use for other departments, and the vendor has made few significant enhancements to the accounting
package during the last few years other than those purchased directly by the City. Meanwhile, significant
advancements have been made in technology and financial software offerings since the original purchase. This item
would provide for replacement of the IBM AS/400 and all associated software.
COMMENTS
It is expected that a selection of a new or upgraded financial system will be made during Fiscal Year 2006-2007, with
full implementation planned for Fiscal Year 2007-2008. Staff is proposing to have a third party consultant who
specializes in the purchase of new accounting systems assist with the development of a Request for Proposal (RFP),
evaluation of accounting systems of vendors who specialize in providing solutions specifically for cities and the
completion of a contract for a new system, The total cost of the accounting system, including contractor assistance
with the RFP, evaluation and contract for the system as well as with the training and implementation of the system, is
projected to be $480,000, with $125,000 funded from reserves previously established for replacement of the system
in the City's Equipment Replacement Internal Service Fund.
The Financial Software will include: General Ledger, Accounts Payable, Accounts Receivable, Budget Preparation,
Purchasing, Fixed Assets, Cash Receipts, Bank Reconciliation, Project Cost Accounting and Payroll. Replacement
of the City's accounting system is anticipated to provide the following benefits:
a. A windows based system that provides a more user friendly interface and ease of use to Staff
b. Regular updates to the software provided by the vendor, which allows the City to establish strong
financial internal controls and safeguards over the financial data and maintain compliance with the latest
Governmental Accounting Standards Board (GASB) pronouncements
c. Better tracking of fixed assets and infrastructure
d. Better integration and monitoring capabilities regarding the issuance of purchase orders and contracts
e. Setter tracking and integration with the City's financial system for the billing of City services and
miscellaneous Items
f. Easier methods for downloading financial reports into Excel sheets, which can be used by Staff for
additional financial analysis
g. Better integration with the outside software packages used by the City for recreation programs, business
licenses and building permits
This CIP would accomplish the following High Priority City Council Goal:
2006-2007 GOAL
1. Evaluate the need to replace the City's accounting system,
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 80,000 $ 275,000 $ 355,000
Other Contract Services $ 80,000
Land I Right of Way
Improvements
Machinery I Equipment 275,000
Miscellaneous
TOTAL $ 355,000 $ 80,000 $ 275,000 $ 355,000
PROJECT I STAFF
MANAGEMENT IFTEl CONTRACT
-13-
-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New ADA Transition Plan GENERAL
DESCRIPTION - LOCATION
This project will examine conformance of City streets and civic buildings for conformance with the Americans with
Disabilities Act (ADA) requirements. The project will conduct an updated assessment of City facilities and establish
~ priorities for capital improvements to increase accessibility for our citizens,
-
COMMENTS
In 1993, in response to the enactment of the Americans with Disabilities Act, the City of Dublin adopted a Title I
Compliance Plan, a Titie II Transition Plan, and a complaint procedure. This project is an update of the Title II
Transition Plan. While the City has conducted prior studies of both buildings and parks, this Capital Improvement
Project will conduct a comprehensive inventory of City facilities, their relative compliance with ADA, a capital
improvement estimate for improvements to improve accessibility and a prioritization of improvements based on
public outreach, and assessment of use and demand.
-
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection $ 10,000 001 $ 30,000 $ 20.000 $ 20,000 $ 20,000 $ 20,000 $ 110,000
Other Contract Services 20,000
Land I Right of Way
Improvements 80,000
Machinery I Equipment
Miscellaneous
TOTAL $ 110,000 $ 30,000 $ 20,000 $ 20,000 $ 20,000 $ 20 000 $ 110,000
PROJECT 1 STAFF
MANAGEMENTIFT~ CONTRACT
-14-
....
. 2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New Civic Center Window Sealing GENERAL
DESCRIPTION - LOCATION
fa
This project would replace the caulking and gaskets for
the hallway atrium windows at the Civic Center.
...
,
'" \ 1 ..-_,.....-
\.. \ ....-
"t "l ...'-
C \ ..._..-
~
!
Cl
z
w
11
;!
COMMENTS
Re-sealing of the upper atrium windows was not included as part of the water intrusion repair project that was
accomplished in Fiscal Year 2003-2004. Since that time, some of the atrium windows have incurred minor leaks
where the existing seals have contracted or hardened due to weather. Replacement of window seals is a normal
and expected part of building maintenance, The Building Management Study Capital Improvement Project will
include development of a maintenance program and assignment of frequencies for periodic activities such as this.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years . 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 54,100 $ 54,100
Other Contract Services $ 2,700
Land I Right of Way
Improvements 51.000
Machinery I Equipment
Miscellaneous 400
TOTAL $ 54,100 $ 54,100 $ 54,100
PROJECT I STAFF
MANAGEMENT (FTEI CONTRACT 0.01
-15-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New Inspector Trailers GENERAL
DESCRIPTION - LOCATION
e
~
-.-
"",.."",.
.--"",,,
.-
This project provides for the relocation of the
temporary inspector trailers from the site of the future
Area G Neighborhood Square to the site of the future
Fallon Sports Park, Phase III,
_.-
Mm _~_.
1 _..,..-
'" \ 1:...._..-..
... \. ~........-..
"t :~..
COMMENTS
Temporary Trailers to house Building Inspectors were placed on the site of the Area G Neighborhood Square In Fiscal
Year 2004-2005. In order to proceed with construction of the Area G Neighborhood Square, the trailers need to be
relocated to the future Fallon Sports Park in the proposed location of Phase III. This project includes the cost to
relocate the trailers, excluding electrical transformer and water connections, These services will be oversized to
accomodate the third phase of Fallon Sports Park and therefore have been shown as Fiscal Year 2006-2007
expenditures in the Fallon Sports Park Project # 95851.
FINANCINGlYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection $ 1,920 001 $ 63,720 $ 90,100 $ 153,820
Other Contract Services 10,000
Land I Right of Way
Improvements 132,700
Machinery I Equipment 9,200
Miscellaneous
TOTAL $ 153,820 $ 63,720 $ 90,100 $ 153.820
PROJECT I STAFF 0.02
MANAGEMENT IFTE\ CONTRACT
-16-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New Library Repairs GENERAL
DESCRIPTION - LOCATION
9
This project would repair accident damage to the rear
of the library building. The work includes framing,
stucco, and drywall repair.
-
,
\.,. ......-
\ tA ......'
"t \....................
C \ .,...........-
COMMENTS
It is anticipated that the entire cost of the work will be reimbursed through Insurance claims.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design !Inspection $ 6,000 001 $ 33,300 $ 33,300
Other Contract Services 1,300
Land I Right of Way
Improvements 25,300
Machinery J Equipment
Miscellaneous 700
TOTAL $ 33.300 $ 33,300 $ 33,300
PROJECT I~TAFF