HomeMy WebLinkAboutCommunity Improvements
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94052 Iron Horse Trail - Wildflower Planting COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
9
This project provides for planting a 30 foot strip of
wildflowers along the Iron Horse Trail, from the northerly
City limit south to the East Dublin BART Station.
-
,
, ,.
\ \II \ ....-...--
-( \.-..-.........
C \"{ _..~
COMMENTS
The Dublin City Council designated this project as a High Priority Goal for Fiscal Year 2002-2003, and has indicated
that the planting should take place in alternating years. In Fiscal Year 2005-2006, a wildflower seed mix was
hydroseeded along the Iron Horse Trail in bands up to 30 feet in width. It is anticipated that these annual flowers will
die in early summer and reseed themselves for the next growing season. The next hydroseeding is proposed to be
performed in Fiscal Year 2007-2008.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection 001 $ 27,150 $ 22,607 $ 22,607 $ 72,364
Other Contract Services $ 5,600
land I Right of Way
Improvements 66,364
Machinery I Equipment
Miscellaneous 400
.
TOTAL $ 72,364 $ 27,150 $ 22,607 $ 22,607 '$ 72,364
PROJECT I STAFF
MANAGEMENT (FTE) CONTRACT
-18-
-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94250 Sidewalk Safety Repair Program COMMUNITY IMPROVEMENTS
.
DESCRIPTION. LOCATION
This program provides for the replacement of damaged curbs, gutters and sidewalks at various locations. The
sidewalk repairs are made by either removing and replacing concrete or by grinding the high side of the offset
sidewalk. The method is determined by the severity of the damage,
COMMENTS
State Law provides that sidewalk repair is the responsibility of the property owner, yet cities are also held liable for
hazards associated with sidewalks in need of repair. This program reduces liability exposure for property owners, as
well as for the City. Dublin's program has been funded by the City on a year-to-year basis.
This program is funded through General Fund (001). In Fiscal Year 2006-2007, $17,581 has been allocated from
Community Development Block Grant (CDBG) funds for the construction of approximately 9 pedestrian curb ramps.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection $ 80.086 001 Annual $ 95,786 $ 65,200 $ 65,200 $ 65,200 $ 65,200 $ 356,586
Other Contract Services 209 Annual 17,581 17,581
Land I Right of Way
Improvements 292,581
Machinery I Equipment
Miscellaneous 1,500
TOTAL $ 374,167 $ 113367 $ 65,200 $ 65,200 $ 65,200 $ 65,200 $ 374,167
PROJECT I ~TAFF 0,19 0,12 0,12 0.12 0.12
MANAGEMENT IFTE\ CONTRACT
-19 -
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM
. PROJECT NUMBER PROJECT DESCRIPTION 'ACTIVITY
94252 Bus Shelters COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
e
This project provides for the replacement of existing
LAVTA standard bus shelters in the downtown area with
artist inspired bus shelters.
""-
,
",. \ "'{ -.-..,.
\. \ ----..--
1""'f _.
C \ .._..-
~
!
i!
ili
~
COMMENTS
During Fiscal Year 2001-2002, five artists were selected to develop models of bus shelter designs. In Fiscal Year
2002-2003, the preferred design was selected and the artist prepared plans and specifications for the bus shelters.
During Fiscal Year 2002-2003, three of the bus shelters were fabricated and installed, LAVTA contributed $6,000
towards the cost of each shelter, for a total of $18,000.
Six additional bus shelters are recommended for replacement. It is recommended that a new artist or artists be
selected to commission additional bus shelters. In Fiscal Year 2007-2008, the artist selection process will be
undertaken and a design(s) selected. In Fiscal Year 2008-2009, the shelters at Dublin Boulevard at Village Parkway
and Amador Valley Boulevard at Donohue Drive are recommended for replacement. The shelters at Dublin
Boulevard at Civic Plaza, Dublin Boulevard at Sierra Court and the shelters at Dublin Court north and south are
recommended for replacement after the Dublin Boulevard Improvement Project (Sierra Court to Dublin Court) occurs
which is outside the time frame of the CIP.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design !Inspection $ 648 001 $ 116,100 $ 30,500 $ 60,200 $ 206,800
Other Contract Services 100,723
Land I Right of Way
Improvements 225,000
Machinery J Equipment
Miscellaneous 729 Insufficient Funding within CIP Time Frame 120.300
TOTAL $ 327,100 $ 116,100 $ 30,500 $ 60,200 $ 327,100
PROJECT I STAFF
MANAGEMENT (FTE) CONTRACT
-20-
-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
N/A San Ramon Road Concrete Sound Wall COMMUNITY IMPROVEMENTS
Maintenance
DESCRIPTION. LOCATION
e
This project would provide maintenance for the
westerly face of a concrete soundwall that was built in
1990 as' part of the San Ramon Road Widening
project. This soundwall is the short wall adjacent to the
northbound lanes on San Ramon Road between
Shannon Avenue and Silvergate Drive and a. short
section of wall along the median on the southbound
lanes.
....
,
\'" ---.-
~ \.. \ ",,-..-..-..
-r"'i _..-..
c \ _..-..
-~
COMMENTS
The lower portion of the soundwall is cast-in-place concrete and serves as a barrier for off-the-road accidents. The
top portion of the wall is split-face concrete block and is in good condition. The lower portion of the wall has
weathered, and cracks have formed where the vertical reinforcing bars are located inside the wall.
This project would repair the cracks and paint the surface of the wall with a waterproof treatment to protect the
reinforcing steel from rust damage. The concrete surface would also be restored to a more uniform color.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design I Inspection $ 9,485 001 $ 70,135 $ 70.135
Other Contract Services
Land I Right of Way
Improvements 60,000
Machinery I Equipment
Miscellaneous 650
TOTAL $ 70,135 $ 70,135 $ 70,135
PROJECT I STAFF 0,09
MANAGEMENT IFTE\ CONTRACT
-21-
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM
~-c~
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
N/A San Ramon Road Landscape Renovation COMMUNITY IMPROVEMENTS
.
DESCRIPTION - LOCATION
This project would renovate the landscaping along
the San Ramon Road bike path, from West Vomac
Road to Alcosta Boulevard. removing the existing
Baccharis and soil and installing new topsoil and
plant material.
Q
....
,
tA \ \' -~-~...-
\.._~---_"'-
COMMENTS
Most of the landscaping in this area was installed 13 to 15 years ago, and has reached the end of its life expectancy.
This project will be funded through General Fund.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design !Inspection $ 15,435 001 $ 143,745 $ 143,745
Other Contract Services
Land I Right of Way
Improvements 128,100
Machinery I Equipment
Miscellaneous 210
TOTAL $ 143,745 $ 143,745 $ 143,745
PROJECT I STAFF 0,08
MANAGEMENT (FTEI CONTRACT
-22-
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
N/A San Ramon Road Wooden Sound Wall COMMUNITY IMPROVEMENTS
Maintenance
DESCRIPTION - LOCATION
e
This project provides maintenance for the wooden
soundwall along the residential backyards on the
western side of San Ramon Road between Alcosta
Boulevard and Silvergate Drive, The project would
repaint the fence facing San Ramon Road.
-
,
)~ ,.
",..-..."~
-..---.-...---"
COMMENTS
This soundwall was constructed in 1988 as a noise mitigation for the widening of San Ramon Road from two lanes to
four. When the City built the fence, easements were obtained to construct the fence, and the City retained the right,
but not the responsibility, to maintain the road side of the fence.
At the time of construction, the fence was painted with two shades of brown wood stain. Over the years, the color
has faded and the wood has weathered. This project would repaint the fence to bring back the original color and
extend the life of the wood,
. FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
Design !Inspection $ 7,620 001 $ 47,075 $ 47.075
Other Contract Services
Land I Right of Way
Improvements 38,805
Machinery I Equipment
Miscellaneous 650
TOTAL $ 47,075 $ 47,075 $ 47,075
PROJECT I STAFF 0,06
MANAGEMENT IFTE\ CONTRACT
-23-
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM -
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
N/A City Entrance Sign Modifications COMMUNITY IMPROVEMENTS
~
DESCRIPTION - LOCATION
e
-
..
tA ' "t_.
\.. \ -.--
\ ,. '( -.--,..
This project would construct three City entrance
signs located at the following entry points to the
City:
L
I
1) San Ramon Road at Alcosta Boulevard
2) Village Parkway at Kimball Avenue
3) Dougherty Road at Fall Creek Road
.....
COMMENTS
It is anticipated that the first new granite-faced City entrance sign will be located on Hacienda Drive near 1-580 in
Fiscal Year 2006-2007, as part of the adjacent deveiopment improvements. The City currently has five existing
entrance signs located on San Ramon Road, Village Parkway and Dougherty Road with the concrete facades. In
order to be consistent with the new granite finish sign proposed at Hacienda Drive (IKEA to construct entrance sign),
this project would replace three existing signs with the new granite-faced signs. The two other existing signs along
Dublin Boulevard (at San Ramon Road and at Dougherty Road) will be replaced as part of the West Dublin BART
Station Corridor Enhancements and East Dublin BART Station Corridor Enhancements capital projects.
For the purpose of this capital project, it Is assumed City entrance signs at the remaining City entry points will be
constructed as part of the adjacent development improvements.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals
.
Design I Inspection $ 30,720 001 $ 97,520 $ 97,520
Other Contract Services
Land I Right of Way
Improvements 66,300
Machinery I Equipment
Miscellaneous 500
TOTAL $ 97,520 $ 97 520 $ 97,520
PROJECT I STAFF 0.09
MANAGEMENT (FTE) CONTRACT
-24-
~
2006-2011 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New Seasonal Street Banners COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
This project provides for the replacement of the seasonal winter holiday banners and Dublin Pride Week banners, and
the addition of new banners for the summer season and Red Ribbon week. The project will provide extra banners for
future expansion of the program when Dublin Boulevard is extended east.
COMMENTS
Currently during the Summer the City hangs patriotic banners from Memorial Day until Labor Day, A new set of
seasonal summer banners would help provide more visual appeal and variety throughout the summer months, The
new Red Ribbon Week banners would allow the Police Department to continue to increase public awareness, while
reducing the number of ribbons that need to be hung by volunteers. Staff also recommends replacing the winter
holiday seasonal banners and Dublin Pride Week banners as they are showing signs of age and deterioration,
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2006-2007 2007.2008 2008-2009 2009-2010 201 0-2011 Totals
Design I Inspection 001 $ 34,623 $ 34,623
Other Contract Services $ 1,760
Land I Right of Way
Improvements
Machinery I EqUipment 32,863
Miscellaneous
TOTAL $ 34,623 $ 34,623 $ 34 623
PROJECT I STAFF
MANAGEMENT (FTE) CONTRACT
-25-