HomeMy WebLinkAboutReso 98-06 Adopted 5-Year CIP RESOLUTION NO. 98 - 06 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN . . * * * * * * . ADOPTING THE FIVE YEAR CAPITAL IMPROVEMENT PROGRAM 2006-2011 WHEREAS, each year the City Council adopts or updates the Five-Year Capital Improvement Program, which addresses the City's public infrastructure and facility needs in the following areas: General, Community Improvements, Parks and Streets; and WHEREAS, the City Manager has presented the Proposed Five-Year Capital Improvement Program 2006-2011 to the City Council; and WHEREAS, the Planning Corrunission has reviewed the proposed projects included in the Proposed Five-Year Capital Improvement Program 2006-20Il and has determined that the public works projects to be constructed are in conformance with the City of Dublin General Plan; and WHEREAS, the Parks and Community Services Commission has reviewed the Proposed Five- Year Capital Improvement Program 2006-2011 and provided input regarding the parks and recreation projects included therein; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby take the following actions: 1 The City Council of the City of Dublin does hereby adopt the Proposed Five.Year Capital Improvement Program 2006-2011, which is attached to and made a part hereof; and 2. The items scheduled for implementation in Fiscal Year 2006-2007 shall be included in the Capital Budget ofthe Annual City Budget and Financial Plan for Fiscal Year 2006-2007 PASSED, APPROVED AND ADOPTED this 13th day of June, 2006, by the following vote: AYES Councilmembers Hildenbrand, McCormick, Oravetz and Zika, and Mayor Lockhart NOES' None ABSENT None ABSTAIN None ArrEST Au)~ City Cle k Reso No. 98-06, Adopted 6/13/06, Item 6.1 Pap;e 1 of 1 Proposed Five-Yea~ Capx~al I~provemer~t Pragr~m. ZC~O~-~~~~.~. ~~.lifor~.~a june 2006 J~I1~t ~OC~C~1a.I'ty Ma~Tpx Tony ~ravetz, Vice 1Vlayor Kasie Hildenbrand, ~ounci~.member Claudia McCorn~ick, Councilmem~ber George Zika, Councilmember SUBM~TTED BY Richard ~. Ambrose City Manager ADOPTED CITY OF DUBLIN Proposed Five-Year Capital Improvement Program 2006- 2011 TABLE OF CONTENTS CITY MANAGER'S LETTER OF TRANSMITTAL CAPITAL IMPROVEMENT PROGRAM SUMMARIES All Programs ............ .......... .... __..... ....... ............................... .......... ................. _. .__. __ _... i General....... .... .... ...... ..._. ...... .......... ....... ............. .......... .... ....... ....... ......... ...... ................ .......... ... ....... ......... .... ... ..ii C . I ... ommumty mprovements ............. ............. ............................ .............................. ..................................... 111 Parks......................... ........... ....... ... ....... .......... ... .......... .... ..... ......... ......... ....... ......... ..... ........... .......... ......... .... ..... v Streets .......................................................................... _.................................................................................. vii Overview of 5 Year Capital Improvement Plan Funded Projects............................................................ix GENERAL IMPROVEMENTS TV30 Studio Remodel (93135) .......................................................................................................................1 Network System Upgrade (93150)............................. ............... ..... .................................... ....................... _.... 2 Geographic Information System (93192) ...................._..................................... 3 Building Permit System (93200) .............................................................................................................4 Telecommunications Plan (93320) .................................................................................................................5 Maintenance Facility Study (93402)................................ .......... ............ .... .............. ...... ..... ................... ......... 6 Civic Center Library (93450)............................_.............................................................................................. 7 Building Management Study (93900)...................._ __...... .......... ............................... ....... ............................... 8 Civic Center Modification Design Services & Construction (93910) .....................................9 Civic Center Generator (93933) ....._............................................................................_.................................10 Automated Document Storage & Retrieval System (93970) ..................................................................11 Public Facility Fee Study Update (94500) ...................................................................................................12 Accounting System (New) .....................................................................................................................13 ADA Transition Plan (New) .....................................................................................................................14 Civic Center Window Sealing (New) ..........._.................................................................._....._.....................15 Inspector Trailers (New) .................................._................................... ..............................__.__16 Library Repairs (New) .................................................................................__..................................17 COMMUNITY IMPROVEMENTS Iron Horse Trail - Wildflower Planting (94052) .......................................................18 Sidewalk Safety Repair Program (94250) ...........................................................................................19 Bus Shelters (94252) .......... ................................................................... ........... ..... ....................................... 20 San Ramon Road Concrete Sound Wall Maintenance (Not Yet Assigned)........................................... 21 San Ramon Road Landscape Renovation (Not Yet Assigned) ...........................................................22 San Ramon Road Wooden Sound Wall Maintenance (Not Yet Assigned)............................................ 23 City Entrance Sign Modifications (Not Yet Assigned) ..............................................24 Seasonal Street Banners (New).... .......... ..................................... ........ .......................................................... 25 PARKS Shannon Community Center Reconstruction (95465) .............................................................................26 Dublin Historic Park (95555) ........................................................................................................................27 Emerald Glen Park (95600) ................................................................................................................28 Emerald Glen Park Recreation and Aquatic Complex (95602) ...................................................29 Dougherty Hills Park - Dog Park (95625) .....................................................................................30 Park Furniture Replacement (95631) ......................................................................................................31 Park Play Area Renovations (95635) ......................................................................................................32 Dublin Ranch Neighborhood Parks (95640)............................................................................... 33 Dublin Sports Grounds Renovation (95830) ..............................................................................................34 Fallon Sports Park (95851) ........................................................................................................................35 Cultural Arts Center (95935) ......................................................................36 Eastern Dublin Parks (Not Yet Assigned) ................................................................................................37 Emerald Glen Park Community Center (Not Yet Assigned) ..................................................................38 Schaefer Ranch Neighborhood Park (Not Yet Assigned) ........................................................................39 Stagecoach Park Assessment District Water Meter (Not Yet Assigned) ......................................40 Transit Center Park (Not Yet Assigned) .....................................................................................................41 Community Needs Assessment (New) ......................................................................................................42 Wallis Ranch Neighborhood Parks (New) ..................................................................43 STREETS Tri-Valley Triangle Study (94520) ..........................................................................................................44 Dublin Boulevard Improvements - Silvergate Drive to Hansen Drive (96010) ...45 Underground Utilities - Dublin Boulevard/Dougherty Road Intersection and Vicinity (96082) 46 Eastern Dublin Arterial Street and Freeway Improvements (96400) ............................................... 47 1-580 & Fallon .Road Freeway Interchange Improvements - Phase I (96430) 48 Downtown Traffic Signal Equipment Replacement (96452) ......................................49 Downtown Dublin Roadway Improvements (96480)...............................................................................50 Annual Street Overlay Program (96580).....................................................................................................51 Annual Slurry Seal Program (96585) ......................................................................................................52 Alamo Canal Trail Under I-5HO (%773) ......................................................................................................53 Citywide Bicycle/Pedestrian Plan (96775) .............................. ...............__...................54 Scarlett Drive Iron Horse Trail Extension (96840) .............................................. ....................55 Dougherty Road Improvements - North of Amador Valley Boulevard to North of Houston Plaee (96850) m. __... m.................................................................... ........... .....................56 Dougherty Road Improvements - Houston Place to 1-580 (96852) ........................................ 57 Saint Patrick Way - Regional Street to Golden Gate Drive (96870) .......................................................58 Dublin Boulcvard Improvements - Village Parkway to Sierra Court (96920) .........................59 Dublin Boulevard Improvements - Sierra Court to Dublin Court (96930) ........................................60 Tri-Valley Transportation Development Fee Regional Transportation Projects (Not Assigned) ......61 Bike Lane - Amador Valley Boulevard Stageeoach Road to Dougherty Road (Not Assigned) 62 Dublin Boulevard - Right Turn at Village Parkway (Not Yet Assigned) ......................................63 Dougherty Road Improvements - Amador Valley Blvd North to City Limits (Not Assigned) 64 Dublin Boulevard Bridge Resurfacing at Alamo Canal...........................................................................65 East Dublin BART Station Corridor Enhancement - Dublin Boulevard - Tassajara Road to Clark Avenue (New) ...... ............. .......... ............................................. ........ .......... ........... ................ 66 West Dublin BART Station Corridor Enhancement - Dublin Boulevard - Hansen Drive to Clark Ave ................. ............. ............................ .......................... ................. .......... .......... ........................... 67 I I I I I I I I I I I I I I I I I I I CITY OF DURLIN 100 Civic Plaza, Dublin, r":alifornia 91J5flR Website: http://www.r.i.riuhlin.cC).IJS June 2, 2006 Honorable Mayor and City Councilmembers: Presented herein IS the Proposed Five-Year Capital Tmprovement Program (eIP) for the period covering fiscal Year 2006-2007 through Fiscal Year 2010-2011. Tills CIP includes sIxty-one (61) projccts costing a total .of approximately $213,241,353 Of this amount, approximately $64,291,790 was spent In prior years, leaving a total of $148,949,563 allocated during the fivc- year CIP lime frame. The CIP also identifies sixteen (16) projects that are wholly or partlally unfunded dunng the five-year time frame in the anlOunt of $156,793,345 Of this unfunded/future amount, $41,065,506 in restricted funds has been collected or obligatcd to date by the City or othcr agencies, leaving a current net shortfall of $115,727,839 For the most parI, lhe projects that are identified as unfunded will be funded beyond the scope of this CIP through development Impact fees or constructed directly by the development community Many of these proJects are Included in the CLP to ensure that the City meets the necessary requirements of State Law related to the collection of development impact fccs and to position the City to actively compete for available grant funding. Funding for thc projects idcntified during thc fivc-ycar timc framc of the CIP comes from a vanety of sources. The largest slllgle source of funding for the remaining projects is development impact fees ($123.3 million or 82.8%). The next largest funding source IS the General Fund ($10.5 million or 70%). The balance of the funding ($15.2 million or 10.20/0) comes from othcr agcncics in thc Iurm of grants or spccial taxes. Projects Completed During Fiscal Year 2005-2006 Dunng Fiscal Year 2005-2006, the City has completed or expects to complete twenty One (21) elF projects valued at an estimated cost of $5 7 million. These completed projects are hsted in the slUnmary table that follows; Are~ Cnde (9:-'5) . City Mam:lger 833-66fiO . Cily CClurlciI8::\::l-fi6f1{) . PAr~()nnAI B:~:~-6605 Economic Development 833-6650 Finance 833-664u . Public Works/Engineering 83::3..6630 Parks & Community Services 833-6645 . Police 833-6670 Planning/Code Enforcement 833-6610 . Building Inspectiun 83::1-fi1120 . Fire Prevention Bureau 8:::l3-660fl Printed on Recvded Paper I I I I I I I I I I I I I I I I I I I General 93161 93172 93174 93175 93181 93220 93465 93521 93913 93922 Capital Improvement Projects Completed During Fiscal Year 2005-2006 Council Chambcr Voting System Civic Center Fuel Tank Removal Emergency Portable Radios Public Safety Memorial Habitat Monitoring Camera CommuillcatlOns System Upgrade Short Term Office Space/Civic Center Modifications Fire Station 16 Repairs Civic Center Furniture Replacement Regional Meeting Room Painting Civic Center Trellises Subtotal Community Improvements 94060 Downtown Improvement Implementation 94193 Dougherty Assessment Distnct Fence Pamtmg 94226 Freeway Underpass Art at Dublin Boulevard & Amador Valley Boulevard 94135 Arroyo Vista Projcct Improvements EVA Road Repair Subtotal Parks 95566 95600 95930 Streets 90061 96453 96567 90940 Murray Schoolhouse Exhibit RestoratlOn Emerald Glen Park (Phase III) Senior Center Subtotal Street Light Pole Replacement COlmtdown Pedestrian Signals Traffic Signal at Amador Valley Boulevard and Starward Drive Summer Concert Senes Banners Subtotal GRAND TOT AI- Page Two FV 2005-2006 Cost $8,000 17,977 21,089 4,103 67,750 6,500 93,652 308,941 31,378 11,128 $570,518.00 $608,880 18,107 36,584 29,791 $693,362.00 $210,885 3,404,662 461,149 $4,076,696.00 $204,341 43,145 81,608 !J ,360 $340,454.110 $5,681,030 I I I I I I I I I I I I I I I I I I I In addition to thc completed projects shown above, the City made significant progress on several long-term projects. Work on several parks projects is currently underway, design of the rcplacement of the Shannon Community Center began in Fiscal Year 2005-2006, and construction will commence m Fiscal Year 2006-2007. A full financIal analysis of the operational costs and funding options for the RecreatIon and Aquatic Complex was completed. ReVIew of options to pursue a public / private partnership on this facility will bc cvaluated further in Fiscal Year 2006-2007. Mass grading of Fallon Sports Park IS complete and construction of Phase 1 is proposed to begin in Fiscal Year 2007-2008. In the area of transportation, design work is currently underway for thc 1-580 & Fallon Road Interchange project and construction is proposed to start III Fiscal Year 2006-2007 Design has been completed and nght~of-way acquisition is nearly complete for thc Dougherty Road hnprovements project from 1-580 to Houston Place. Construction on tlus project IS proposed to commence in Fiscal Ycar 2006-2007 Projects Recommended for Fiscal Year 2006-2007 The proposed CIP includes recommended appropriations for Fiscal Year 2006-2007 in the amount of $43,652,11 I Of this amount, approximately $5,344,031 (l2.2%.) is proposed to be funded by the General Fund. Included in this amount is $2.6 million in General Fund Capital Project Reserves and project carryovers from appropriations from prior years. The haIaa:e of $38,308,180 (87.8%) is proposed to be fundcd from restncted funds. The restrictcd fund amount includes $37,004,573 ill development Impact fees. It is possible that the development community may choose to build SOme of the nccded projects directly rather than paymg the fees. In that event, the cost for developer built projccts would not be reflected In tbe City's future financial reports. The prOjects proposed for Fiscal Y car 2006-2007 utilize all available capacity of existing StaffprOJect managers. Highlights and Changes by CIP Category The proposed CIP projects are presented In four categoncs: Gcncral, Community Improvements, Parks and Streets. Of the total estimated five-year CIP cost of $148.9 million, approximately $5.6 million (3.R%) is allocated to General projects, $0.9 million (0.6%) is allocated to Community Improvements, $47.7 million (32.0%) is allocated to Park projects, and $94.7 million (G3.G'Yo) is allocated to Street projects. Highlights and changes in each of these lIIajor catcgorics arc discussed in detail in the followmg sectHlns of this transmittal letter. General Proiects The General Project category Includes a broad rangc of projects to enhance, lmprove ;tIdlor construct general City faciblJes. It also )Deludes computcr/tcchnology, telecommulllcatlOllS and general administrative projects. Several projects lllvolve expansIOn of City facilitics to serve the future needs of the City. rhese projects mclude: Page Three I I I I I I I I I I I I I I I I I I I Civic Center Librarv It is anticIpated that the completion of the Library expansion space will be needed in Fiscal Year 20IO~2011 Mamtenance Facihtv Studv It is anticipated that the City will acquire property and acquire or construct a maintenllllce facility in the future. In Fiscal Year 2006-2007, a study is proposed to be undertaken whIch will identify the scope and potential cost of such a facility Civic Ccntcr Modification The cxisting Civic Center was planned to accommodate the City's staffing needs to serve a population of 40,000 In Fiscal Year 2006-2007 the City will complete a study which will identify the City's CiVIC Center space needs to serve the City's buildout populatIOn. The space options and future costs implications will need to be addressed in a future CIP The largest projects in the General Category m Fiscal Year 2006-2007 are the TV30 Studio Remodel, Building Permit System, and Buildmg Managemcnt Study TV30 Studio Remodel The Tn-Valley Community Television (CTV) Board, in cooperation with the cities of Dublin, Livermore, Pleasanton lIlld SlIll R<lIl1on, ImtIated a project to relocate lIlld explllld the current CTV studio and upgrade much of the existing equipment with new digital technologies. It is estimated that the project will cost approximately $1.8 million. The cost of the project will be divided equally among the four cities, resulting m a total City contribution of $450,000 A capital grant from AT&T was used to partially offset thc City's contribution by $80,000 The liming of the project is dependent upon the Community Television Board of Directors identifymg that the project scope can be completed wlth available funds. At this time the project is anticipated to be completed in Fiscal Year 2006-2007 Building Permit Svstcm A new Buildmg Permit System 1S needed to handle building pennit issuance, building inspechon rcquests, field inspection tracking and necessary State and Local required building reports. An important feature of the new software will allow the mspeetion staff to have acccss to data in the field via remote computers. The new system would improve productivity, minimize lost time, enhllllCC customer service and create a more reliable and efficicnt way of trllllsferring information among City Departments. Building Management Study Thc Building Managcment Study project will proVIde the City with information to ensure that City buildings and the building systems are adequately maintained. In addition to thosc projects mentioned above, the General Project category also includes a number of computer related projects to improve internal operabons and customer service. These projects inelude the Network System Upgrade, Geographic Information System, Automated Document Storage & RetJieval System, and the replacement of the City's Accounting System. Page Four I I I I I I I I I I I I I I I I I I I In some cases baseline studles are proposed to assess proceeding in a manner that will be cost effective while meeting the needs of a growing City. Other projects include the Telecommunications Plan, CiVIC Center Generator, and Public Facility Fee Study Update. New PrOjects In addition to the Accounting System project, other ncw projects include tbe ADA Transition Plan; Civic Ccntcr window sealing; rclocation of the Inspector Trailers from the Area G NeIghborhood Square site to Fallon Sports Park" and the repamng of accident damage to the library building. Community Improvements The Community Improvements category includes a range of projects to enhance communlty facilities and beautify the public infrastructure through landscaping, public art, signage and pedestrian improvements. Several projects are included to enhance the community, including, Iron Horse Trail - Wildflower Plantmg, the Sidewalk Safety Repair program, replacement Bus Shelters in the Downtown area, San Ramon Road Sound Wall Maintenance on both the concrete and wooden sections, San Ramon Road Landscape Renovation, and City Entrance Sign Modifications. For Fiscal Year 2006-2007 a new project IS proposed to replace the seasonal winter holiday banners, and the additwn of new banners for the summer season, Red Ribbon week, and Dublin Pride Week. Parks The Parks category reflects the City's pnorities with respect to creating and enhancing park, recreal10n and cultural facilities for existmg Dublin rcsidents and for future resIdents as the City grows. Two community building pnlJecta have been included in the CIP. The Shannon Community Center will be rebuilt in the same locallon as the eurrcnt Center but will be enlarged to 19,760 square feet m order to accommodate a larger SOCIal hall. Design of the replacement facility began 111 Fi,cal Year 2005-2006, and construcl1on will commence in Fiscal Year 2006-2007. It is anhclpated that the Shannon Community Center will reopen in July 2008. The estimated cost is $10,478,568 (includll1g the use of $366,328 from the Building Replacement Internal Servlce Fund). Approximately $6 million is from General Fund and $4 million IS from Public Facilities Fees. Dunng Fiscal Year 2004-2005, a FeasibilIty Study !llr thc Emerald Glen Park Recreation and Aquatic Complex was conducted to assess commumty needs, demographic analysis, space components, constl1lction and project costs. The City Council directed Staif to move forward WIth a rull financial analysis of the operatlOnaI costs and funding optJ(lllS for a larger, state-of- Page Fivc I I I ,I I I I I I I I I I I I I I I I the-art, Recreation and Aquatic Complex. The financial analysis was completed 1D Fiscal Year 2005-2006. The estimated cost for the prefcrred option selected by the City Council exceeds the available Public Facility Fee revenue. The City Council directed Staff to evaluate the feasibility of a public-private partnershIp for a state-of-the-art facility Oncc complete, a determination will be made on how the City will move forward to provide a facility to meet the recreation and aquatic needs ofthe community Community Park projects included m the eIP include Emerald Glen Park, Fallon Sports Park and Dougherty Hills Dog Park. Phase 1lI of Emerald Glen Park was completed m Fiscal Y car 2005-2006 and one adchtJonal phase of the park remains which is beyond the time frame of this eIP Ibis includes the landscape improvements assocIated with the futurc Community Center, including a lakc and an outdoor amphitheater. The Fallon Sports Park Master Plan was completed in Fiscal Year 2004-2ll05 and the grading operation was completed in Fiscal Year 2005-2006. Phase I is scheduled to begin in Fiscal Year 2007-2008 and be complete in Fiscal Year 200"1-2010 Phase I will add thc following amenities to the City developed park invcntory- 2 little league fields; 2 lighted softball fields; 4 lighted tenrns courts; 4 lighted basketball courts; 2 lighted soccer fields; parking; trails; and restrooms. Subsequent phascs arc outsidc the time frame of this CIP The Dougherty Hills Dog Park provides for construction of a dog park for both large and small dogs at the base of Dougherty Hills Open Space. In Fiscal Year 2005-2006, the CIty Council approved the conceptual deSIgn of the project and authorized production of construction documents for the project. Construction IS scheduled for Fiscal Year 2006-2007 Neighborhood Park projects ineluded in the CIP include projects related to the Dubhn Ranch Development. DeSIgn of the Neighborhood Squarc in Area F bcgan in Fiscal Year 2005-2006 and constructIon will be complete m Fiscal Year 2006-2007 Design of the Neighborhood Park in Area F and Ne]ghhurhood Square in Area G will begin in Fiscal Year 2llll6-2llll7 and construct1On will be complete m Fiscal Ycar 2008-2009 Park renovation projects included in the CIP mc1ude Park Play Area Renovations (Alamo Creek Park), Dublin Sports GrOlmds Renovation and Park Furniture Replacement (Alamo Creek Park and Stagecoach Park). Park Furniture RepIacemcnt project provides for the replacement of aging wooden park picnic tables and benches made of recycled matenals. The City intends to use annual b'1'ant funds Irom the Alameda. County Waste Management Authonty and the State of California to fund rcplacemcnt. Park play areas in Shannon Park and Dolan Park were completed in Fiscal Year 2005-2006, Alamo Creek will be completed m Fiscal Year 2006-2007, and Stagecoach Park will be completed in Fiscal Year 2007-2008. Thc Dublin Sports Ground Parking Lot Renovation project was completed in Fiscal Year 2005- 2006. The Fiscal Year 2005-2006 project of remodeling the restroom fixtures at the Sports Grounds has been carried over to Fiscal Year 2006-2007 A new project for Fiscal Year 2006- 2007 ]s the remodeling or the snack bar to comply with Alameda County Health Code Requirements. The field turf renovatJOn projects that were previously included in this ell' have Page Slx I I I I I I I I I I I I I I I I I I I been deferred pending further cvaluation, as a number of the problem areas ongmally identified have been addressed through the park maintenance budget. Other projects include the completion of the Master Plan for thc Dublin Historic Park; installatIOn of an addItIOnal water meter at Stagecoach Park to separate the water usage of the park from the assessment distnct; and conducting an in-depth commumty needs assessment for recreation programs and services to aSSIst In the data collection relating to the development of a community WIde diverSIty program. Unfunded projects not discussed above include the Cultural Arts Center, Eastern Dublin Parks, WaIIis Ranch Neighborhood Park, TransIt Center Park, and the Neighborhood Square in Dublin Ranch Area B. All except the Schaefer RllllCh Park are expected to he developed beyond the time frame of thIS CIP One project not included in the Five Year CIP IS the replacement of the Civic Ccnter irrigation system with a recycled water system. The Council recently Identified this project as a priority goal. Staff has been unahle to determine the cost of the project as of this date. Once this evaluation is completed, Staff will bnng thJS project forward for City Council's consideration in Fiscal Ycar 2006-2007 Streets The Streets category comprises over sixty percent of the total CIP funding. This emphasIS on street projects reflects the current nccd to focus on the creation of the 1IIfrastTUctUTe necessary to support development as well as Improving the ability of residents to travel on City Streets. Many of the Street CIP's are largely or entirely funded by new development through Traffic Impact Fees. Traffic Impact Fees compnse approximately 83,}" of the total funding for the Street eIP's. General Fund conlIibutions represent appnlXlmately 10;(, of the total Street CIP funding. The largest project in eastem Dublin is the Eastern Dublm Arterial Street Improvem,,-nts. This project includes all of thc specific projects identified in the Eastem Dubhn Traffic Impact Fee Study that have not yet been constmctcd or bonded by the development commumty, or have not progressed to tlle point of being Identified as a separatc CIP project. It is likely that many of the projects will ultimately be constructed by pnvate developers in lieu of paying traffic impact fees. Phase I of the 1-580 and Fallon Road Freeway Interchange would Improve the interchange to accornmou<1te fulure tmffic 111 the ncxt 10 to 15 years. ConstructlOD IS proposed to begm III Fiscal Year 2006-2007, WIth completJOn 111 Fiscal Ycar 2007-2008. This year's CIP includcs a number of proj ects deSIgned to Improve traffic circulation m the Downtown area, mc1uding thc replacement of Traffic Signal EqUIpment to beUer integrate and coordinate traffic signals Wlthll1 Downtown Dublin and intcgmte these signals into the City's Traffic Opcrations Communication network. The Downtown Roadway Improvements Project will fund desib'11atcd roadway projects identified in the Downtown TIF study. Most of the improvements IdentIfied III thIS prnJect are scheduled beyond thc time framc of this CIP Saint Page Seven I I I I I I I I I I I I I I I I I I I Patrick Way will also be extended between Regional Street and Golden Gate Dnve m anticipation of future development m the area, including the ncw West Dublin BART Station. Two improvement projects related to Dougherty Road are mcludcd in the CIP. The first project provides for the acquisition of right-of-way and widening of Dougherty Road between 1-580 and Houston Place, and related Improvements at the intersection of Dublin Boulevard and Dougherty Road. Design and right-of-way acquisition will be completed and rmprovements will be under construction in Fiscal Year 2006-2007. The second proJ ect provides for Widening Dougherty Road from Amador Vallcy Boulevard to north of Houstou Place from four to six lanes and will melude landscaped medians. Construcbon of the project IS scheduled to hegin in Fiscal Year 2010-2011 Dougherty Road widening from Amador Valley Boulevard North to City Limits is scheduled beyond the time frame of this CIP Another major Street project is the Scarlett Drive Iron Horse Trail Extension. This project would provide an extensIon of Scarlett Dnve and relocate and enhance a portion of the Iron Horse Trail. The roadway element IS a connection between Dougherty Road and Dublin Boulevard (withm the Southern PacIfic RaiIroad Right-of-Way). PrOject development, including prelimmary engineering and environmental work, was performed in Fiscal Year 2005-2006. Design work is proposed for Fiscal Year 2007-2008, right-of-way acquisition in Fiscal Year 2008-2009, and constructIOn in Fiscal Year 2009-2010 The project will be funded by developcr dedicationslcontributions, County-Widc half-cent transportation sales tax (Mcasure B), Eastern Dublin Traffic Tmpaet Fces (Category 2), Contra Costa County contributions and/or outSIde grants. Two aunual projccts are proposed which address the City's safety and maintenance needs: the Allllual Street Overlay program and Annual Slurry Seal program. Scveral projects have been included to improvc access fOT pedestrians and bIcycles mcluding: the addition of a Bike Lan~ on Amador VaHcy Boulevard from Stagecoach Road to Dougherty Road, a prelimmaTY engineering study of the connectIOn of the Alamo Canal Trail to the Pleasanton trail system under 1-580 to transIorm it to a reglUnal trail and the development of a Citywidc Bicycle I Pedestrian Plan. The CIP also mcludes two projects to facilitate regional transportation planning and improvements. The Tri-Valley Triangle Study will allow the City to develop a sequencing strategy fOT improvcments Identificd in the Alameda Countywide Transportation Plan for the 1- 580, T-680, and Route 84 comdors. The TriNal1ey Transportation Development Fee RegIOnal Transportation Projccts identIfy regional transportation projects to be funded by Tri-VaHey Transportation Development Fees from developers as a mitigation for new developments m the Tri-Valleyarea. The project will use TVTD Fees in Fiscal Year 2006-2007 and 2007-2008 to support a multi agency funding agreement which will assure the construction of a western Dnblin I Pleasanton BART station. The balance of the project is scheduled beyond thc time frame of thIS CIP There are two proposed major comdor enhancement projects along Dublin Boulevard 1ll the vicinity of both BART stations. These projccts will Improve Dublin Boulevard, in accordance Page Eight I I I I I I I I I I I I I I I I I I I WIth the City's Streetscape Master Plan, in those areas which interface with the East Dublin and West Dublin BART Stations. MTC has granted $3 million for both projects. The CIF includes more than $64 0 million III Streets projects that are unfunded or partially lUlfunded during the five year hme frame. Most of these projects will be funded by development Impact fees or constructed dIrectly by the private development community Some of these projects may require addihunal grants or City funding as well. Outstandim! Capital Issues As indicated above, there are several major capital projects that are not ineluded in this Capital Tmprovcment Program that have significant cost Implications for the City in the future. These prOjects include: 1. City Maintenance Facility 2. CiVIC Center Expansion 3. Emerald Glen park Recreation and AquatIcs Complex. In addition to these pmjects, the City has a park defiCIt whICh will require additional funds i r thc defiCIt IS to bc eliminated. During Fiscal Year 2006-2007 studies will be completed that will provide thc City Council with information related to what finanCIal resources will be needed in the future to address these capital needs. Summary and Conclusion The 2006-201 I Capital lmprovement Program establishes the framework for addressing the City's infrastructure necds and impruvmg services to the entire Dublin community It maintains a balanced approach to growth hy providing for neW park and street facilities, while continually Improving eXlstmg infrastruchIre throughout the CIty, with a speCIfic emphasis on improving and enhancing the Downtown. The City has planned effectively to ensure that It IS m a strong financial position to meet the needs of the corrununity and accomphsh the priorities estabhshed by the City Council. I would like to expres'; my appreciation to those mcmbers of the City Staff who worked so diligently in the preparahun of this document, as well as tboseStaff members who plan, design and maintam these facililJes. Respectfully submitted, ~&l(. RIchard C Ambrose City Manager Page Nine SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - ALL PROGRAMS PRIOR PROJECT TOTALS YEARS 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 General $ 25,882,164 $ 20,234,570 $ 1,194,030 $ 728,198 $ 2,314,721 $ 50,000 $ 1,360,645 Community Improvements 1,046,429 143,250 218,125 309,127 222,920 87,807 65,200 Parks 75,159,453 27,503,114 4,660,458 10,952,511 10,188,713 13,306,007 8,548,650 Streets 111,153,307 16,410,856 37,579,598 23,213,952 19,789,955 8,804,135 5,354,811 TOTAL cosT''' S 213,241 ,353 S 64,291,790 $ 43,652,211 $ 35,203,788 $ 32,516,309 S 22,247,949 $ 15,329,306 FINANCING Ge neral Fund (001) $ 20,677, 06 5 $ 10,226,549 $ 5,344,031 $ 4,033,738 $ 568,205 $ 137,807 $ 366,735 Cri m i nal Activity Fund (200) 17,266 17,266 State Gas Tax (206) 3,871,790 560,821 192,529 855,190 668,250 785,000 810,GOO Community Development Block Grant (209) 74,294 74,294 ISTEA (210) 3,285,044 285,044 339,500 902,800 1,757,700 Transp. Development Act (211) 45,144 39,000 6,144 State Park Bond Act (213) 701,037 701,037 Measure B Sales Tax (217) 7,559,482 62,269 407,148 115,400 3,883,400 2,705,865 385,400 State T ransportatio n Imp roveme nts (219) 3,080,268 3,080,268 S B 300 Grant (220) 69,340 69,340 Measure D Fund (224) 318,189 129,715 79,874 55,800 52,800 M easu re B - B i keJPedestrian (227) 291 ,283 30,000 37,245 224,038 CMA TIP funds (228) 906,000 400,000 289,000 217,000 Traffic Congestion Relief Fund (240) 338,873 166,873 172,000 Traffic Impact Fee Fund (300) 89,682,154 10,742,920 35,672,424 20,530,524 13,263,605 5,313,270 4,159,411 Public Facility Impact Fee (310) 75,262,760 30,886,197 1,332,149 8,025,298 12,105,349 13,306,007 9,607,760 Park Dedicatio n In-Lieu Fund (315) 7,061,364 7,061,364 TOTAL S 213,241 ,353 S 64,291,790 $ 43,652,211 $ 35,203,788 $ 32,516,309 S 22,247,949 $ 15,329,306 (.) Does not include $156,793,34 5 j n u nfu nded Comm unity Improvements, Parks and Street Projects for which $41,06 5,506 in restricted fu nds has been coil ected or 0 b I igated by the City or othe r agencies, I eavi ng a net shortfall of $115,727,839 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - GENERAL PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 200&-2007 2007.2008 2008.2009 2009-2010 2010-2011 93135 TV30 Stud io Remodel $ 435,2:23 $ 87,223 $ 348,000 93150 Network System Upg rade 3-57,766 297,766 60,000 93192 Geographic I nformation System 330,117 234,917 35,200 $ 30,000 $ 30,000 93200 Bu ilding Perm it System 252,000 252,000 93320 Telecommunications Plan 163,581 13,581 $ 150,000 934()2 Ma intenance Facility Study 35,000 35,000 93450 Civic Center Library 18,559,497 17,218,852 $ 1,34(),645 93900 Bu ilding Management Study 175,000 175,000 93910 Civic Center Modifrcation Desig n Services & 4,373,022 2,204,988 5,500 193,098 1,969,436 Construction 93933 Civic Center GeneratOf 334,055 38,770 295,285 93970 Automaled Documenl Storage & Retri"",,1 System 119,237 104,237 15,000 94500 Public Facility Fee Study Update 41,446 34,236 7,210 New Accounting System 355,000 80,000 275,000 New ADA Transition Plan 110,000 30,000 20,000 20,000 20,000 20,000 New Civic Center Window Seali ng 54,100 54,100 New Inspector Trailers 153,820 63,720 90,100 New Li bra ry Repei rs 33,300 33,300 TOTAL COST $ 25,882,164 $ 20,234,570 $ 1,194,030 $ 728,198 $ 2,314,721 $ 50,000 $ 1,360,645 FINANCING Genera I Fund (001) $ 9,703,449 $ 7,290,209 $1,181,320 $ 535,100 $ 345,285 $ 50,000 $ 301,535 Cri minal ActivITy Fund (200) 17,266 17,266 Public Faciirty I mpact Fee (31 0) 16,161449 12,927,095 12,710 193,098 1,969,436 1,059,110 TOTAL FINANCING $ 25,882,164 $ 20,234,570 $ 1,194,030 $ 728,198 $ 2,314,721 $ 50,000 $ 1,360,645 SUMMARY 2006.2011 CAPITAL IMPROVEMENT PROGRAM - COMMUNITY IMPROVEMENTS PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007-2008 2008-2009 2009-2010 201 0.2011 94052 Iron Horse Trail- Wildflower Planting S 72,364 $ 27,150 $ 22,607 $ 22,607 94250 Si dewalk Safety Repai r Program 374,167 $ 113,367 65,200 S 65,200 65,200 $ 65,200 94252 Bus Shelters 206,800 116,100 30,500 60,200 NIA San Ramon Road Concrete Sound Wall Ma i n lenance 70,135 70,135 NIA San Ramon Road Landscape Ren ovati on 143,745 143,745 NIA San Ramon Road Wooden Sound Wall Maintenance 47,075 47,075 NIA City Entrance Sig n Modifications 97,520 97,520 New Season al Street Sa n ners 34,623 34,623 TOTAL COST $ 1 ,046,429 $ 143,250 $ 218,125 $ 309,127 $ 222,920 $ 87,807 $ 65,200 FINANCING General Fund (001) $ 1,028,848 $ 143,250 $ 200,544 $ 309,127 $ 222,920 $ 87,807 $ 65,200 Community Development Block Grant (209) 17,581 17,581 TOTAL FINANCING $ 1 ,046,429 $ 143,250 $ 218,125 $ 309,127 $ 222,920 $ 87,807 $ 65,200 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - COMMUNITY IMPROVEMENTS PROJECTS UNFUNDED DURING THE FIVE YEAR TIME FRAME PROJECT NUMBER AND NAME ESTIMATED COST TOTALS $ 120,300 $ 120,300 94252 Bus Shelters SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - PARKS PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007-20-08 2008-2009 2009-201 0 2010-2011 95465 Shannon Community Center Reronslru ction $10,112,240 $ 566,900 $ 2,484,222 $ 7,061,118 95555 Du b lin Historic Park 161131 141,336 19,795 95600 Emerald Glen Park 17 ,454,298 17,454 ,298 95602 Emerald Glen Park Recreation and Aquatic Complex 16,154,935 67,954 102,500 604,368 $ 818,389 $ 6,799,534 $ 7,772,190 95625 Do u9 herty H ills Park - Dog Pa rk 596,639 53 ,099 543,540 95631 Park F u rn iture Replacement 246,469 57,995 79,874 55,800 52,800 95635 Park Play Area Renovations 576,742 383,732 134,550 78,460 95640 D u bl in Ranch Neig h I>orhood Pa rks 4,856,996 1,525,636 924,872 1,519,538 886,750 95830 D u bl in Sports Gro u nds Renovation 1,728,012 1,670,762 57,250 95851 Fallon Sports Park 19,322,096 5,801,202 214,230 1,620,827 7,196,304 4,669,533 N/A Schaefer Ra nch N eig h I>orhood Park 3,827,670 1,234,470 1,816,940 776,460 N/A Slag ecoach Park Assessment District Waler Meter 50,025 50,025 New Commu n ity N eecfs Assessment 62,000 49,600 12,400 TOTAL COST $ 75,159,4S3 $ 27,503,114 $ 4,660,456 $ 10,952,511 $ 10,188,713 $ 13,306,007 $ 8,548,650 FINANCING General Fund (001 ) $ 7,629,939 $ 1,360,996 $ 3,204,432 $ 3.064,511 Community Development Block Grant (209) 56,713 56,713 Slate Park Bond Act (213) 701,037 701,037 Measure 0 Fund (224) 318,189 129,715 79,674 55,800 $ 52,800 Traffic Impact Fee Fund (300) 290,900 290,900 Publi c Faci lity Impact Fee (310) 59,101,311 17,959,102 1,319,439 7,632,200 10,135,913 $ 13,306,007 $ 8,548,650 Park DedicaUon In-Lieu Fund (315) 7,061,364 7,061,364 TOTAL FINANCING $ 75,159,453 $ 27,503,114 $ 4,660,458 $ 10,952 ,511 $ 10,188,713 $ 13,306,007 $ 8,548,650 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - PARKS PROJECTS UNFUNDED DURING THE FIVE YEAR TIME FRAME PROJECT NUMBER AND NAME 95600 Emerald Glen Park 95602 Emerald Glen Park Recreation and Aquatic Complex 95640 Du bl in Ranch Ne ig h borhood Parks 95830 Du blin Sports Ground s Renovati 0 n 95851 Fallon Sports Park 95935 Cu ltura I Arts Cente r NIA Eastern Dublin Parks NIA Emerald Glen Park Community Center NIA Transit Center Park New Wallis Ranch Neighborhood Parks TOTALS LESS AVAILABLE PARK DEDICATION AND PUBLIC FACILITY FEES FUNDING SHORTFALL UNFUNDED PORTION OF ESTIMATED COST $ 875,300 1,028,653 750,710 850,685 15,077,062 8,401,470 37,745,505 8,418,465 10,192,921 9,353,970 $ 92,694,741 $ 40,100.719 $ 52,594.022 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM. STREETS PRIOR PROJECT N UMBE R AN D NAM E TOTALS YEARS 2006-2007 2007 -20OS 2008-2009 2009-2010 2010-2011 94520 Tri-Valley Triangle Sludy S 60,500 $ 60,500 96010 Dublin Boulevard I mprovemenls . Silvergate Drive to Hansen Drive 3,597,557 $ 719,976 $ 2,877 ,581 96082 Ur>derground Util ities - Dublin Boulevard! Dougherty Road 759,840 786.840 3,000 I nlersectioo and Vicinity 96400 Easlam D\J blin Arterial Street and Freeway Improvemanls 38.718,860 2,581,362 12,193,679 12,201,923 $ 8,479.786 $ 2,886,892 $ 375,218 96430 t-580 & Fallon Road Free.....-ay Interchange Improvements. Phase J 15.413,689 2,854,653 9,195,937 3,363,099 96452 Downtown Tr.rffic Signal Equipment Replacement 130,843 106,766 24,057 96480 Downtowll Dublin Roadway Improvements 1,632,685 30,411 1,992 345,761 1 ,254 ,521 96580 An nual Street Overiay Program 2,998.621 574,021 576,400 600,400 622,400 625,400 96585 Annual Slurry Seal Program 2,411,590 78,020 698,570 520,000 545,000 570,000 96773 Alamo Canal Trail Under 1-580 31,490 16,500 14,990 96775 Citywide Bicycle! Pedestrian Plan 80,899 52,500 28,399 96840 Sea rtelt Drive I ron Horse Trail Exl.ension 10,786,437 234,632 495,817 5,306,145 4,749,843 96650 Dougherty Road Improvements - North of Amador Valley Bou levard 4,234,967 570,269 3,664,698 to North of Houston Plaoe 96852 Dougherty Road I mprovemenls - Houston Plaoe 10 1-580 15,753,984 2,830,570 12,923,394 96870 Sainl Pa~ick Way - Regional Street 10 Golden Gale Drive 1,707,032 6,942 592,490 1,107,600 96920 Dublin Boulevard I mprovemanls - Village Parkway 10 Sierra Court 5,834,525 5,649,415 185,110 96930 Dublin Boulevard I mprovemanls - Sierra Coo rt to Dublin Court 119,495 119,495 IWA Tri-Valley Transportation Dev.elopment Fee Regional TrallSportation 2,500,000 1,250,000 1 ,2S0,000 Projects IWA Bike Lane - Amador Valley Boulevard Slageooach Road 10 287,000 287,000 Dougherty Road IWA Dublin Boulevard. Righi Tum at Village Parkway 673,934 200,781 473,153 New Dublin Booleovard Bridge Resu rfac:ing at Alamo Canal 29,0(t9 29,O(t9 New East Dublin 8.A.RT Statioo Corridor Enhancement - Dublin 1,970,000 249,750 605,700 1,114,S50 Boulevard. T assajara Road to Clark Avenue New West Dublin BART Station Corridor En hancement - Dublin 1 ,420,370 175,250 453.720 791,400 Boulevard - Hansen Drive to Clark Avenue TOTAL COST $111,153,307 $ 16,410,856 $ 37,579,5l1B $ 23,213,962 $ 19,789,955 $ 8,804,135 $ 5,354,811 FINANCING General Fund (001] $ 2,314,829 S 1,432,094 $ 757,735 $ 125,000 Slale Gas Tax (206) 3.671,790 560,821 192,529 S55,190 S 668,250 S 785,000 $ 810,000 ISTEA (210) 3,285,044 285,044 339,500 902,800 1,757,700 Transp. Development Act (211) 45,144 39,000 6,144 Measure B Sales Tax (217) 7,559,462 62,289 407,148 115,400 3,883,400 2,705,665 385,400 Slale Transportation Improvemanls (219) 3,OSO,268 3,080,268 SB300 Granl (220) 69,340 69,340 Measure B - Bike/Pedestrian (227) 291,283 30,000 37.245 224,038 CMA TI P Funds (228) 906,000 400,000 289,000 217,000 Traffic Congestion Relief Fund (240) 33S,873 166,873 172,000 T raffie Impact Fee Fund (300) 89,391 ,254 10,452,020 35,672,424 20,530,524 13.263,605 5.313,270 4,159,411 $ 111,153,307 $16,410,856 $ 37,579,598 $ 23,213,952 $ 19,789,955 $ 8,804,135 $ 5,354,811 * It is estimated that approxima~y $11 4 million of the Fiscal Year 2006-2007 budgeted expendittlres for this project will be built by tile development community SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - STREETS PROJECTS UNFUNDED DURING THE FIVE YEAR TIME FRAME UNFUNDED PORTION OF ESTIMATED FEES NET PROJECT NUMBER AND NAME COST AVAILABLE SHORTFALL 96400 Eastern Dublin Arteria I Street and Freeway Imp rove ments $ 38.012,334 $ 38,012,334 96480 Downtown Dublin Roadway Improvements 4.933,587 $ 104,281 4.829,306 96930 Dublin Boulevard Improvements - Sierra Court to Dublin Court 2,628.425 482,963 2.145.462 NIA Dougherty Road Improvements - Amador Valley Boulevard North to 4.084,558 377,543 3.707,015 City Um Ks NIA Tn-Valley Transportation Development Fee Regional Transportation 14,319,400 14.319,400 Projects TOTALS $ 63,978,304 $ 964.787 $ 63,013,517 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93135 PROJECT DESCRIPTION TV30 Studio Remodel ACTIVITY GENERAL DESCRIPTION. LOCATION The Tri-Valley Community Television (TV30) Board, in cooperation with the cities of Dublin, Livermore, Pleasanton and San Ramon, has initiated a project to relocate and expand the current CTV studio and upgrade much of the existing equipment with new digital technologies. It is estimated that the project will cost approximately $1.8 million. The cost of the project will be divided equally among the four cities. resulting in a total City contribution of $450,000 To date, the City has contributed approximately $102.000; ($20,000 of which was previously accounted for in the City's Community Cable Television Operating Budget), for its share of the design phase of the project, thereby reducing the Fiscal Year 2006-2007 contribution to $348,000 COMMENTS As part of the City's Cable Television Franchise Agreement, the City received a $200,000 capital grant from AT&T, which can be used for the purchase of video production equipment and associated facility modifications for the City and/or Tri-Valley Community Television (TV30). The City used apprOXimately $120,000 of this grant to purchase and install video production equipment in the Council Chamber The remaining $80,000 will be used to partially offset the cost of the TV30 studio project. ESTIMATED COSTS FINANCING/yEAR:; Fund Prior Ye." 2006-2007 2007.2006 2006.2009 2009.2010 2010.2011 Totills Design fln,peotion 001 $ 87.223 $ 348.000 Other Contract Services $ 435,223 Land / Right of Way Improvements Machinery I Equipment Miscellaneous $ 435.223 TOTAL PROJECT MANAGEMENT FTE $ 435,223 STAFF CONTRACT $ 87 223 $ 348,000 $ 435.223 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93150 Network System Upgrade GENERAL , DESCRIPTION - LOCATION This project provides for additions and upgrades to the City data processing network. The This includes the basic infrastructure necessary to access centralized computer servers as well as the accompanying data storage and support for changes in technology COMMENTS In Fiscal Year 2006-2007 an Information Technology (IT) Strategic Plan will be commissioned. The estimated cost for a firm to assess the City's current and future technology needs and to present recommendations on the City's future technology path is $60,000 One component of this work will also include a security assessment originally planned for Fiscal Year 2005-2006, and was deferred to Fiscal Year 2006-2007 to be incorporated as part of the IT Strategic Plan. The implementation component of the IT Master Plan will result in identifying additional expenditures for this project in future years. The Plan will also be helpful for establishing priorities and a sequencing of any recommended improvements. This Capital Project would accomplish the following High Priority City Council Goal: 2006-2007 GOALS Develop Technology Master Plan for City of Dublin organization FINANCINGfYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 200&-2007 2007-2008 2008-2009 2009-2010 2010-2011 Total. Design I Inspection 001 $ 280.500 $ 60,000 $ 340,500 Other Contract Services $ 127.960 200 17.266 17,266 Land I Right of Way Improvements 4.S15 Machinery / Equipment 221.600 Miscellaneous 3,391 TOTAL $ 357,788 $ 297 788 $ 60 000 $ 357,788 PROJECT I STAFF MANAGEMENTIFTEI CONTRACT 2006-2011 CAPITAL IMPR PROJECT NUMBER PROJECT DES 93192 Geographic Infonn DESCRIPTION. LOCATION This project provides for the implementation of an integrate system incorporates various data related to locations and visu foundation layers of engineering and planning mapping, incl elements of this project build additional layers of information th COMMENTS Since 2002, the City has made progress in the developmen produced a system that has increased the productivity of City exhibits of information can enhance the ability to communica available through the City's public website. The final phase of the project will continue through Fiscal Y development of additional mapping layers that are function s completion of an updated air photo base map In Fiscal Year 2006-2007, consultant services and soflwar efficiency and complete infrastructure mapping, such as buildi In 2006/2007 Staff is working to update aerial imagery in a County may provide the information at no cost. Staff propose to the aerial photography, starting in Fiscal Year 2008-2009. past efforts by several local agencies to jointly pursue a regio ESTIMATED COSTS Fund Prior Years 2006-2007 Dasign { Inspection 001 $ 234,917 $ 35.200 Other Contract Services $ 245.568 Land I Right of Way Improvements Machinery I Equipment 84,440 Miscellaneous 109 TOTAL $ 330,117 $ 234 917 $ 35,200 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT OVEMENT PROGRAM CRIPTlON atlon System ACTIVITY GENERAL d Geographic Information System (GIS). This type of ally displays it on a map. The data necessary includes uding aerial photographs of the City The remaining at are more function specific. t of an Geographic Information System. Initial phases Staff and enhanced customer service. Providing visual te information. Some GIS information has aiso made ear 2006-2007 Key elements of this phase involve the pecific (Le. park infrastructure and storm drains) and the e purchases are proposed that will improve database ng footprints and street light iocations. cooperative manner with Alameda County, which the S a two year approach to imagery collection for updates The cost shown is the projected Dublin share based on nal project to update current information. FINANCINGIYEARS SCHEDULE 2007-2008 2008-2009 2009-2010 2010-2011 Totals $ 30,000 $ 30.000 $ '30.117 S 30 000 $ 30 000 $ 330117 ! , 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY , 93200 Building Permit System GENERAL , I , DESCRIPTION. LOCATION This project would install a new Building Permit System to handle building permit issuance, building inspection requests, field inspections and necessary state and local required building reports. An important feature of the new software would allow customers to request and track inspections on-line. Additional software for future tracking systems (code enforcement, grading and encroachment permits) would also be purchased as part of this project. COMMENTS The present system, initiated in Fiscal Year 1999-2000, is unable to handle the City's increased permit workload. Severe limitations of the present system have resulted in data loss requiring re-entry causing frequent software breakdowns, and resulting in the inability to complete building inspection requests. Additionally, field records must be entered manually, resulting in lost productivity and additional work for Building Division Staff. The new system would improve productivity, minimize lost time, enhance customer service and create a more reliable and efficient way of transferring information among City Departments. The system would be implemented over two fiscal years, 2005-2007 The Department has made progress in Fiscal Year 2005-2006 with the preparation and dissemination of a Request for Proposal. Consultants have been interviewed and it is anticipated that the contract will be before the City Council by July 2006. Data will be transferred and the system implemented in Fiscal Year 2006-2007 This CIP would accomplish the following High Priority City Council Goal: 2006.2007 GOAL 1 Implement real-time electronic field inspection system FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Total. Design !Inspection 001 $ 252.000 $ 252.000 Other Contract Services $ 70,000 Land I Right of Way Improvements Machinery { Equipment 182.000 Miscellaneous TOTAL $ 252.000 $ 252.000 $ 252 000 PROJECT I STAFF MANAGEMENTlFTEl CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93320 Telecommunications Plan GENERAL DESCRIPTION - LOCATION This project would define the role the City should take in the provision of telecommunication facilities to the community I COMMENTS The Plan is composed of two parts: Phase I - Develop Zoning Regulations for wireless communications (completed in 2000) Phase II - Feasibility study, community outreach, financial analysis This project has been ranked as a medium priority by the City Council. Phase II is proposed to be completed in Fiscal Year 2007-2008, utilizing consultant services. FINANCINGNE:ARS SCHE:DULE ESTIMA TE:O COSTS Fund Prior Years 2006-2007 2007-2008 2008.2009 2009-2010 2010-2011 Totals Design I Inspection $ 724 001 $ 13.581 $ 150,000 $ 163.581 Other Contract Services 162,857 Land I Right of Way Improvements Machinery I Equipment Miscellaneous TOTAL $ 163581 $ 13561 $ 150.000 $ 183.581 PROJECT I ~TAFF MANAGEMENT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93402 Maintenance Facility Study GENERAL DESCRIPTION. LOCATION This project would perform a programming study to examine personnel needs, functions. and infrastructure demands for a maintenance yard and office/storage facility, including an Emergency Operations Center (EOC), in keeping with the City's growth and long"range infrastructure plans. COMMENTS The existing City Corporation Yard, located at the east end of Scarlett Court, contains minimal outdoor space and a two-room metal building which was erected in 1985 when the City's maintenance needs were based on a four-square mile area and a population of less than 15,000 The facility is now undersized for the existing infrastructure. and it is important to begin planning for its replacement. This CIP will allow substantial progress towards the following City Council High Priority Goal: 2006-2007 Goal Examine potential funding sources for design and construction of a maintenance yard and secure a site if funding becomes available. FINANCINGIYEARS ScHEDULE ESTIMATED cOSTS Fund Prior Years. 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals D@sign I Inspection 001 $ 35.000 $ 35,000 Other Contract Sarvlces $ 35.000 Land I Right of Way lmp1'Ovaments Machinery I Equipment Miscellaneous TOTAL $ 35,000 $ 35,000 $ 35,000 PROJEcT I ~TAFF MANAGEMENT 'FTEt CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93450 PROJECT DESCRIPTION Civic Center Library ACTIVITY GENERAL DESCRIPTION - LOCATION 9 COMMENTS w.. \ "'( .............- \.. \ ........ -,:'<..~...-.... ~.~.P.~~P_P.~.P._~~~~.PII ~~I~"'i . '-,- I, ...---~ ~ I r" - I _.p.~. '," ,I T. '~) ,I" r;'_ ,,_ " , \. ,if. ,.oJ 1 1[--' ,,-' ~ - - . %1 I I I I 1Jil1 ,- , "b'v.-"::" I "I I ,- "",. ' ",,/" '-, ,,$'; 't 1 '-", l ' " " \'l", ,'j' "j '""fF '<> -- I ,-.-'', t-,-" r .LI, \~" }~~<i1t/ G: I'. ,,3 I', 1:- \,~,',' ",', ',il," 'i I P R F T, A, " - ~lrCf I '0'''\.\~' ", "~\ ,. __ ~ 'r ,I w __ /] , ,1""1\ <," '%\ ,.~~l{", ,__ g DU..~INI'-";;D-' I'-'~'l} '1 \ r \ _ .~' 1-. '11..' '. , 1 'I -::'1 ~J.-- ~ r-, + f ""1 -- ,....A -"("..J1;.. _~.. ~~ .;.~_~-...J...__ 41 ..1I.....'t.&.:t I 1-81!10 ~.._~~- :. - . CIVIC Gental' --1-' - ;c ""'T'- , 1- I -f -,\ , , .'M I The project provided for the design and construction of a 37,000 square foot library The new library is located adjacent to the Civic Center In September, 1998, the City Council approved the Library Plannin9 Task Force Report. In the Report, the Task Force recommended that a 37,000 square foot library be built at the Civic Center The City's plan was to construct the entire 37,000 square feet building initially, and phase the furnishing of the library to occupy 30,000 square feet in Fiscal Year 2002-2003. The remainder of the library would be furnished in the year 2010, at which time the City will be able to afford the annual operating expense of a larger library The Friends of the Library and meeting room spaces would be furnished and occupied during the initial stage. A breakdown of the project costs are shown as follows: Library Task Force Report Phase I Design & Construction Phase II Design & Construction TOTAL $ 20,860 17,197,992 1,340,645 $ 18,559,497 The new library was funded by Public Facility Fees ($12,150,111) and Private Development ($2,000,000); the balance of $4,409,386 was funded from the General Fund. Phase I construction was completed in spring 2003, and the Dublin Public Library opened to the public on April 12. 2003. Phase II is scheduled for Fiscal Year 2010-2011 ESTIMATED COSTS Fund Prior Years FINANCINGIYEARS SCHEDULE ~006-2007 2007-2006 2006-2009 2009-2010 2010-2011 Totals Design !Inspection Other Contract Services Land I Right Df Way Improvements Machinery I Equipment Books Miscellaneous $ 223.532 1,759.161 001 310 $ 6,127.851 11,091.001 $ 261,535 $ 6.409.386 1.059,110 12.100.111 13.763.590 648.415 2,061,245 103M4 TOTAL PROJECT MANAGEMENT FTE $ 18,SS9,497 STAFF CONTRACT $ 17216852 $ 1 340645 $16,SS9,497 0.50 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93900 Building Management Study GENERAL DESCRIPTION - LOCATION The City of Dublin operates and maintains three fire stations, the Library, the Civic Center, the new Senior Center, the Corporation Yard, the Swim Center, the Heritage Center, and many public restrooms in its parks. Future building projects include a repiacement for the Shannon Center, and future Community Center and Aquatic Center in Emerald Glen Park. This project would conduct a building management study to ensure that City buildings and their building systems were adequately assessed for condition, and a group of Capitai Improvement Projects to bring all buildings up to performance standards would be developed. In addition, as part of the study, the maintenance and inspection schedule would be revised to ensure the sustainability of the City's facilities in the future. COMMENTS This study would establish building standards. measure the City's facilities by those standards, and recommend needed improvements, revise maintenance and inspection sChedules to ensure sustainability, revise maintenance documentation to track trends and issues, and revise the Internal Service Fund to ensure necessary funding for replacement of building systems. This CIP will allow completion of the following City Council High Priority Goal: 2006-2007 GOAL Complete Building Management Study FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Year5 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design J Inspection 001 $ 175,000 $ 175,000 Other Contract Services $ 175.000 Land I Right of Way Improvements MachInery I Equipment Miscellaneous TOTAL $ 175 000 $ 175.000 $ 175 000 PROJECT I ~T AFF MANAGEMENT (FTEI CONTRACT 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93910 Civic Center Modification GENERAL Desl'ln Services & Construction DESCRIPTION - LOCATION e \1: _......... .. ..' \... \ ........- C \ 1" .:......."...... _....., -'~ ..- -' ..' _....- - ,pI:.~"l"'o:' ,0" _ _I -,.~.....~~..~', " -i ~I\ J- .... .. .- ' ~, ,--'"!l:I' ..... " .. ~ "I I -- I"., '\ \:' I' /1 ,~I , - ~ ~..:i>l I' ,\"'....'llr,, ".:"!~~ ~..., I I -I "lif" I r - ",I, " ~,-, ,- !;I, PRFTA ~O~ "j, ' '.. ~.. \ .,~..w- - ~ '1--" 11 <le1 ; \ I -[I' ,. , I ~- " - - ..::',' "' _ \ ~ I 1_ _ _ ffi". ,\ '.1', :Ii\'~' -t., '" 'c. jj o~ '~,._'~, ~;'I '\. \ "i$~.,_OtJlltj#illt.'_ '~DU8L,.INIiiILVD...' -'--r-. ~,_. 1-- , ). .,. "" ~ I I 1- .. " \. .... .,~ I, ' ..-- __..;.I;i "'--.-.._.__ "... __'__i=._______/........-......~ 1-81!11;1 ... , This project provides for the completion of the DUblin Civic Center renovation. in order to accommodate the additional City Staff and police personnel required to serve the City in the next three-five years (Phase I). and at build-out of the City (Phase Ill. Design, engineering and all consulting services needed for the modifications at the Civic Center are included in the CIP Phase II includes a 5.000 square foot addition to the police wing to accommodate the anticipated growth in the Police Department to serve the City at build-out. ,,1 COMMENTS As the City grows, it has become necessary to increase personnel to adequately serve the community During Fiscal Year 1997-1998, the City conducted a Civic Center Space Planning Study, which identified the number of personnel in each City Department that would occupy space in the Civic Center in the Year 2002. and at build-out of the City's General Plan. The proposed modifications as a result of the Study were divided into two phases. The first phase was completed in Fiscal Year 2000.2001 at an approximate cost of $2,1 million. Improvements included the completion of 4,500 square feet of unimproved space, expansion of the police parking lot, and construction of a 494 square foot evidence garage, a 470 square foot bike storage building and a 1,026 square foot maintenance building. Prior to moving forward with the second phase which provided for construction of a 5.000 square foot addition, a Programming Study was commissioned during Fiscal Year 2005-2006 to re-evaluate the space needs for build-out of the City The Study will be complete in summer of 2006 at which time the revised costs associated with the second phase will be known. For the purpose of this CIP project. the costs have been estimated based on the improvements originally planned for the second phase. An update to the CIP will need to be done at a later date. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Pr'ior' Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 385.351 001 $ 403.130 $ 403,130 Other Contrsct Serviess 321.562 310 1,801.858 $ MOO $ 193,098 $ 1.969.436 3.969,892 Land I Right of Way Improvements 3.322,560 Machinery I Equipment 293,020 Miscellaneous 50,529 TOTAL $ 4 373,022 $ 2,204,988 $ 5500 $ 193098 $ 1.969.436 $ 4,373 022 PROJECT I ~TAFF 0.36 0.70 MANAGEM~NT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93933 PROJECT DESCRIPTION Civic Center Generator ACTIVITY GENERAL DESCRIPTION - LOCATION e This project would replace the existing Civic Center emergency generator with a larger unit capable of powering the entire building. The project includes modification of the existing enclosure to accept the larger generator and construction of a new trash enclosure. ,i" _....- \,. \ WI. .,.......... ,. '{ -.... Co \ ........~ ..__.1"!'<:":. _I ~~..... ~.~: I .....~~... . , I ....,.~,'., L 1,:.,::-*\ ~f'-::~\f/!f'~' -_'~ II(T ':"'1 -_.--:,,'~ '\,,~\ -::[' ,11 1'1 ''-R~ [=it. ,.- -.-- I - ,I....!..I i'I.1 lut -., ~- I '_ I I- . 'I '\'ai ~II~~~~" ~ -~;*1fAl1.}L ,,'" I I, /T~I'~~' ,1~:~(" ,,"' ~I fTrriI~lfi~~: ; ,{!c:... ,\" ~~~.' ". ...i-D"".uNL'ol I l!.",1 '.r I ", \ .'\ .'-....'" I 1 ,. r . '>"..,,.- ~'-. . ""'~ ',,,-L I I,. '..' I" .~~.~ !t"'_'!~~':~ ,r- ',c.o=-~~'~_.__'!--~._ - ~ ;;-.~-=____~~~.,...;r-'-- ._:' ,. Civic Center ,.'~,:~ .~I_,..._r ,,-, ~.~:i . ,,_. II" .... , COMMENTS The existing generator is sized to power only certain elements of the Civic Center which were determined to be critical functions at the time the building was originally constructed; however, it may be of benefit to both Staff and the public that the entire facility remain operational during a power failure or emergency situation. The City is currently exempt from blackouts, but the exemption status could change. This project is proposed to be deferred until Fiscal Year 2008-2009 in order to coincide with the proposed Phase 2 Civic Center modifications, The future design and use of the police facility, as well as a pending decision on the location of the Emergency Operations Center, would directly affect the size and configuration of the emergency power system. An additional $125,425 from the Internal Service Fund would be required to fund this project. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006.2007 2007.2008 2008.2009 2009-2010 2010.2011 TDI<oI. Design I Inspection $ 10,600 001 $ 38.770 $ 295.285 $ 334.000 Other Contract Services 47.618 Land I Right of Way Improvementij 270.873 Machinery I Equipment Miscellaneous 4,909 TOTAL $ 334 055 $ 38,770 $ 295,280 334,055 PROJECT STAFF MANAGEMENT FTE CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93970 Automated Document Storage GENERAL & Retrieval Svstem DESCRIPTION - LOCATION This project has provided for the purchase and phased implementation of an electronic automated documen storage system for all City Departments. The intent of the system is to reduce physical storage deman providing an efficient method to index, store, and retrieve records in the City COMMENTS The current system was purchased in 1999 and has allowed the City to establish electronic copies of do that can be easily retrieved, In Fiscal Year 2006-2007. system assessment and planning activities are pro order to ensure that the version of the technology employed represents best practices and is capable of s continued growth. It is expected that additional data storage will be needed in the future as the City broa use of electronic data storage between the various Departments. The assessment will also allow Staff to whether there would be benefits from implementing additional modules such as an agenda management The cost associated with this phase is expected to be $15.000 Recommendations from the system assessment may lead to expenditures for this project in future years. FltlANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2006 2006-2009 2009-2010 2010-2011 Design II nspeetlon 001 $ 104,237 $ 15,000 $ Other Contract Services $ 37,396 Land! RI9ht of Way Improvements Machinery I Equipment 81,841 Miscellaneous TOTAL S 119237 $ 104.237 $ 15,000 $ PROJECT I ~TAFF MANAGEMENT IFTEl CONTRACT t imaging ds, while cumentsj posed in up porting dens the ascertain system. Totals 119.237 119.237 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 94500 Public Facility Fee Study Update GENERAL DESCRIPTION. LOCATION This project finances the Fiscal Year 2005-2006 update to the City's Public Facility Fee. COMMENTS The City Council adopted Resolution No. 32-96 on March 26, 1996, establishing a Public Facilities Fee for development within Dublin and eastern Dublin. The Public Facilities Fee was based on the Public Facilities Fee Justification Study prepared by a private consultant. The purpose of the fee is to finance municipal public facilities to reduce the impacts caused by future development in the City of Dublin. These facilities include: community and neighborhood parks; community buildings; library; civic center office space completion; and aquatic center The City Council directed Staff to update the Public Facilities Fee periodically Two subsequent updates have been done in 1999 and 2002. The proposed update is needed to revise population projections based on recently approved development proposals and to conduct an appraisal of land values for parkland acquisition. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior YBarli 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Total. Design { InspectIon 310 $ 34,236 $ 7,210 $ 41.446 Other Contract Services $ 40,576 Land I Right of Way Improvements Machinery J Equipment Miscellaneous 870 TOTAL $ 41,446 $ 34 236 $ 7210 $ 41,446 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT .-..- 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New Accounting System GENERAL DESCRIPTION - LOCATION The City currently operates several centralized accounting functions on an IBM AS/400 The initial hardware and software were purchased in 1988, with some additional software enhancements and replacement of the hardware server taking place subsequent to that purchase. However, the software has an outdated user interface, making it difficult to use for other departments, and the vendor has made few significant enhancements to the accounting package during the last few years other than those purchased directly by the City Meanwhile, Significant advancements have been made in technology and financial software offerings since the original purchase. This item would provide for replacement of the IBM AS/400 and all associated software. COMMENTS It is expected that a selection of a new or upgraded financial system will be made during Fiscal Year 2006-2007, with full implementation planned for Fiscal Year 2007-2008. Staff is proposing to have a third party consultant who specializes in the purchase of new accounting systems assist with the development of a Request for Proposal (RFP), evaluation of accounting systems of vendors who specialize in providing solutions specifically for cities and the completion of a contract for a new system. The total cost of the accounting system. including contractor assistance with the RFP. evaluation and contract for the system as well as with the training and implementation of the system, is projected to be $480,000, with $125,000 funded from reserves previously established for replacement of the system in the City's Equipment Replacement Internal Service Fund. The Financial Software will include: General Ledger, Accounts Payable. Accounts Receivable, Budget Preparation, Purchasing, Fixed Assets, Cash Receipts, Bank Reconciliation, Project Cost Accounting and Payroll. Replacement of the City's accounting system is anticipated to provide the follOWing benefits. a, A windows based system that provides a more user friendly interface and ease of use to Staff b. Regular updates to the software provided by the vendor, which allows the City to establish strong financial internal controls and safeguards over the financial data and maintain compliance with the latest Governmental Accounting Standards Board (GASB) pronouncements c. Beller tracking of fixed assets and infrastructure d Beller integration and monitoring capabilities regarding the issuance of purchase orders and contracts e. Beller tracking and integration with the City's financial system for the billing of City services and miscellaneous Items f Easier methods for downloading financial reports into Excel sheets, which can be used by Staff for additional financial analysis g. Beller integration with the outside software packages used by the City for recreation programs, business licenses and building permits This CIP would accomplish the following High Priority City Council Goal: 2006-2007 GOAL 1 Evaluate the need to replace the City's accounting system. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Total. Design J Inspection 001 $ 80,000 $ 275.000 $ 355,000 Other Contract Services $ 80,000 Land I Right of Way Improvements Machinery I Equip",.n! 275.000 Miscellaneous TOTAL $ 355 000 $ 80,000 $ 275 000 $ 355.000 PROJECT I ~TAFF MANAGEMENT (FTEI CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New ADA Transition Plan GENERAL DESCRIPTION - LOCATION This project will examine conformance of City streets and civic buildings for conformance with the Americans with Disabilities Act (ADA) requirements. The project will conduct an updated assessment of City facilities and establish priorities for capital improvements to increase accessibility for our citizens. COMMENTS In 1993, in response to the enactment of the Americans with Disabilities Act, the City of Dublin adopted a Title I Compliance Plan, a Title II Transition Plan, and a complaint procedure. This project is an update of the Title II Transition Plan, While the City has conducted prior studies of both buildin9S and parks, this Capital Improvement Project will conduct a comprehensive inventory of City facilities, their reiative compliance with ADA, a capital improvement estimale for improvements to improve accessibility and a prioritization of improvements based on public outreach, and assessment of use and demand. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design Ilnspec:tion $ 10,000 001 $ 30.000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 110.000 Other Contract Services 20,000 Land I Right of Way Improvements 80,000 Machinery I Equipment Miscellaneous TOTAL $ 110000 $ 30,000 $ 20,000 $ 20 000 $ 20 000 $ 20,000 $ 110000 PROJECT I STAFF MANAGEMENTIFTEl CONTRACT -- PROJECT NUMBER New PROJECT DESCRIPTION Civic Center Window Sealing A GE CTIVITY NERAL ~ \ ""i.....'*........ \.......~_......- ..~~ I -- I - , '0"" --- 'f' ..I~II',1c ...;...- ~" ',I P R F T AlL':=i!i'11 . '~~LH air I UOLIN b.,-1- Ijc 1-- ! ! I ,<-~, _"" ""):6;-" i,.~ r , . 'f' I. -I ir project that was curred minor leaks seals is a normal ement Project will es such as this. 10-2011 Totals $ 54,100 $ 54,100 2006.2011 CAPITAL IMPROVEMENT PROGRAM DESCRIPTION - LOCATION 6) This project would replace the caulking and gaskets for the hallway atrium windows at the Civic Center c. \ 1.:- .-~....-....~~- ...~.. .- I ,*,.! """,.,-~,. II'.~' ~_~" ~ ' .-1 ......~~~,::/ '. '", --\- \,li,".,:'Cl .~--"""'I, -~'l] I _~_ 1,,'- I ,n , .. '., ., I'" ';>".. ..,,,- : ~. . :.". Q' r ....1..1 " i i I "J-'- ~.........', I '\'i, ?i~.jl'_U.I.-~#,(I' 1 'k'~ ""J-i/.'.'....,' Ii! I _1_""1, K~"" ,I , I I' -11_.- \\ I' II \~ , ~ , r I "OCJ, " ~ ' \ '1-lln.\~..-<~, I - ~' '" -,;, IRe.. il'l I':. ~-, ~~\ _ ~~~-~&.i." ,~I,,:.o -, . -!,; ...,.-""g.... ,,~ 'I -' ,.- /I. ~- .:J~ ! \. ~ l _'" r--:-~" ---:OS". _~"----';'_._./!'b:~':~f . '-1 -~I,I j \ _ fl .... , COMMENTS Re-sealing of the upper atrium windows was not included as part of the water intrusion repa accomplished in Fiscal Year 2003-2004 Since that time, some of the atrium windows have in where the existing seals have contracted or hardened due to weather Replacement of window and expected part of building maintenance. The Building Management Study Capital Improv include development of a maintenance program and assignment of frequencies for periodic activiti ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Y..". 2006-2007 2007-2006 2008-2009 2009-2010 20 Design {Inspection Other Contract Services $ Land f Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 54.100 2.700 51,000 400 TOTAL PROJECT MANAGEMENT FTE $ 54100 STAFF CONTRACT $ 54,100 0.01 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Inspector Trailers ACTIVITY GENERAL DESCRIPTION - LOCATION e I, This project provides for the relocation of the temporary inspector trailers from the site of the future Area G Neighborhood Square to the site of the future Fallon Sports Park, Phase III. ..- , I,qi ~: u-I ill ~ I I , '" '1' ': -I']' -, r I r ,1'-- ., COMMENTS Temporary Trailers to house Building Inspectors were placed on the site of the Area G Neighborhood Square in Fiscal Year 2004-2005 In order to proceed with construction of the Area G Neighborhood Square, the trailers need to be relocated to the future Fallon Sports Park in the proposed location of Phase III. This project includes the cost to relocate the trailers. excluding electrical transformer and water connections. These services will be oversized to accomodate the third phase of Fallon Sports Park and therefore have been shown as Fiscal Year 2006-2007 expenditures in the Fallon Sports Park Project # 95851 ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007.2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 1,920 001 Other Conuact Services 10,000 Land I Right of Way Improvements 132.700 Machinary I Equlpmont 9,200 Miscellaneou5 $ 63.720 $ 90.100 $ 153,620 TOTAL PROJECT MANAGEMENT FTE $ 153820 STAFF CONTRACT $ 63.720 $ 90 100 0.02 $ 153,820 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New Library Repairs GENERAL DESCRIPTION - LOCATION 9 "'" \ "'i .............. ..11110:1 '( \... \_....,.... This project wouid repair accident damage to the rear , :l~ of the library building. The work includes framing, ............ I," I 1 .....,... I ~ '-. I - ...... - I <\ stucco, and drywall repair ..~.,~ '. I ~ 111.:..1:";' "'f!"'~"\o!!" '\ _ ~-., r ,pII"~ \ T ,iI,U ~.-'.:"', '-'. ,"\ -,I"-;jl '1,1, ~ i . ~ ' ,\ , f-i J ..~<>) . I I ,\~r , " c-" ., 1 I' ,'\\, ;~II[-".#" ,~,I ,0+-"'.t _ " I, .J, \\, iJ~.'",." ~I~IL~, II {-' "_,, ,. __. ._ _ <'i I I I '-:-Tl~\tt.:.-"" &j_ 1 ~ .::~ II ~L -,ct,. ' ,\, .Oust", 8 CU....'N LIlt>' I :l!1.. . -=\ .,', " ~"\ / .\~."._~~-" \ I I I~- , ' ".' Ii ~d"..., fl".L ' I -!>( \ ~--;j -~:.,},;. -~-_._- - -'- _..,.-.+ 'i" ~ 'I I.&eO - --:-=.---c4~-~-'- ~~ , -rcMee.nm,!, ~._. I '-,_1 "~\,1 : "" I 1'1 I _ ' COMMENTS It is anticipated that the entire cost of the work will be reimbursed through insurance claims. FINANCINGIYIOARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006.2007 2007-2008 2008.2009 2009.2010 2010.2011 Totals Design I Inspection $ 6.000 001 $ 33.300 $ 33,3QO Other Contract Services 1,300 Land I Right of Way Improvements 25,300 Machln@ry { Equipment Miscellaneous 700 TOTAL $ 33 300 $ 33.300 $ 33 300 PROJECT I ~TAFF MANAGEMENT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94052 PROJECT DESCRIPTION Iron Horse Trail - Wildflower Planting ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION Q ~ \ \ ..........- .~- This project provides for planting a 30 foot strip of wildflowers along the Iron Horse Trail, from the northerly City limit south to the East Dublin BART Station. "......~~. __....~ri-.. _.......,,--1'. ,~ _.~~~,.( 1\' I ~ -, '-"I ,\' M~.. , !.: f , , r:'~' COMMENTS The Dublin City Council designated this project as a High Priority Goal for Fiscal Year 2002-2003, and has indicated that the planting should take place in alternating years. In Fiscal Year 2005-2006, a Wildflower seed mix was hydroseeded along the Iron Horse Trail in bands up to 30 feet in width. It is anticipated that these annual flowers will die in early summer and reseed themselves for the next growing season. The next hydroseeding is proposed to be performed in Fiscal Year 2007-2008. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Ptior YQars 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totlll!;l. Design Iln:!;ipec::tion 001 $ 27,150 $ 22,807 $ 22,607 $ 72.364 Other Contract Services $ MOO L.and J Right of Way Improvements 66,364 Machinery I Equipment MiscsllaMous 400 TOTAL $ 72.364 $ 27150 $ 22.607 $ 22 607 $ 72364 PROJECT STAFF MANAGEMENT FTE CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTI 94250 Sidewalk Safety Repair Program COMMUNITY 1M DESCRIPTION - LOCATION This program provides for the replacement of damaged curbs, gutters and sidewalks at various sidewalk repairs are made by either removing and replacing concrete or by grinding the high sid sidewalk. The method is determined by the severity of the damage. COMMENTS State Law provides that sidewalk repair is the responsibility of the property owner, yet cities are als hazards associated with sidewalks in need of repair This program reduces liability exposure for prop well as for the City Dublin's program has been funded by the City on a year-to-year basis, This program is funded through General Fund (001). In Fiscal Year 2006-2007, $17,581 has been Community Development Block Grant (CDBG) funds for the construction of approximately 9 pedestria FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Year5 2006.2007 2007.2008 2008.2009 2009.2010 2010.2 Design II nspectior'l $ 80,086 001 Annual $ 95.786 $ 65,200 $ 65,200 $ S5.20D $ 65. Other Contract Services 209 Annual 17.581 Land I Right of Way Improvements 292,581 Machinery I Equipment Miscellaneou5 1,500 TOTAL $ 374167 $ 113.367 $ 65,200 $ 65 200 $ 68.200 $ 65 PROJECT I STAFF 0.19 0.12 0.12 0.12 MANAGEMENT (FTE) CONTRACT VITY PROVEMENTS locations. The e of the offset o held liable for erty owners, as allocated from n curb ramps. 011 Tot.lo 200 $ 386.586 17,581 200 $ 374.167 0.12 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94252 PROJECT DESCRIPTION Bus Shelters ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION. LOCATION e This project provides for the replacement of existing LAVTA standard bus shelters in the downtown area with artist inspired bus shelters. , ~. \ ~ \ .......-'* C ~. \ "\ -of ~........... c .....- ....-~"7~" ,,*~....~O!'- II ,'(<'1\ -'""'III'...~\ ~ '"!"~- \., .\ ~~~',. \, ,,, \ \1(17T,)-IL,I, ! ......~.~':' 'I i I ,,~:,. 7"...1.... ~f - ni -:"j '\' "", ,I, ~I ,.' .I r;'-l c- I I\~"' I I ;il~l!l' .-#'t~'; J~I _, ., L~ .[ I I II ~J"~' - t:T ~ J~:i! III P R F T A -I L. I ~:.' \ I ~ j I _, I r 0\ \ ~ I ' "_? I, I 1 - I T~-tir"l']\ . '\ }.: ,r\ . '_Ov"<,,, -1-' ({ tl .......,,\.. 1- r I: I, ,<,," .l"~'""" ",' ,>.. ~ :LS.~ _.~~*t-,.'7,;~".' -~~., .I~~-.-..'_" '--_"":"':~-:..'; ,,("{;,,~ ,~~ "Civic Center~' ~ ,r, "'11 ',__ '1__' '\ I - , 3_ aii'. " ~ '" ,] COMMENTS During Fiscal Year 2001-2002, five artists were selected to develop models of bus shelter designs. In Fiscal Year 2002-2003, the preferred design was selected and the artist prepared plans and specifications for the bus shelters. During Fiscal Year 2002-2003. three of the bus sheilers were fabricated and installed. LAVTA contributed $6,000 towards the cost of each shelter, for a total of $18.000. Six additional bus shelters are recommended for replacement. It is recommended that a new artist or artists be selected to commission additional bus shelters. In Fiscal Year 2007-2008. the artist seiection process will be undertaken and a design(s) selected. In Fiscal Year 2008-2009, the shelters at Dublin Boulevard at Village Parkway and Amador Valley Boulevard at Donohue Drive are recommended for replacement. The shelters at Dublin Boulevard at Civic Plaza, Dublin Boulevard at Sierra Court and the shelters at Dublin Court north and south are recommended for replacement after the Dublin Bouievard Improvement Project (Sierra Court to Dublin Court) occurs which is outside the time frame of the CiP ESTIMATED COsTS FINANCING/YEARS sCHEDULE Fund PriorY.... 2006-2007 ~007-200B 200B.2009 2009.2010 2010-2011 Totals Design / Inspection $ Other Contract Services Land I Right of Way Improvements MaChinery I !;qulpment Miscellaneous 648 100.723 001 $ 116,100 $ 30.500 $ 60.200 $ 206.800 225.000 729 Insufficient Funding within CIP Time Frame 120.300 TOTAL PROJECT MANAGEMENT $ 327.100 sTAFF CONTRACT $ 116,100 $ 30.500 $ 60.200 $ 327.100 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER NIA PROJECT DESCRIPTION San Ramon Road Concrete Sound Wall Maintenance ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION. LOCATION e This project would provide maintenance for the westerly face of a concrete soundwall that was built in 1990 as part of the San Ramon Road Widening project. This soundwall is the short wall adjacent to the northbound lanes on San Ramon Road between Shannon Avenue and Silvergate Drive and a short section of wall along the median on the southbound lanes. \JI. ' ~...-...-.... \.. \ .....- "'" --< -...... c ~....._..... ..........":" I ......._..~":~ ILl \, """I',..~....-:,~~" I.~.' 1- ~,~-"r=.'''' ~'-~' --',I '"I'.Jn ' 10".".- ,,' -"'1:,, ;Ii,ln __ l' ~~'~~,. -- I i-I';. , '9',,"-' ,;?fv-, " - -" . _' ,~:, '1 :ij)~",,,,,~",, Ii' ~ p R FT A 'jl_.i!i'- \ " I" Ii:l,,~ I> ',~"'" , ~d--I --I ~III - j'i, ,'~ :1i. - g' - .~ - 1I~, _'f "tl\ ~fJSJ.:nv$i. _ &; DUBLlNBL.\!P-1 _ =- ." ' ,: '~~"'- I - ,---- ,I I, \ ;'".....-- :~._-~~.______.._.A"'.. _ /.......-....... I HI80 -----..------ CiviC Canter "," , COMMENTS The lower portion of the soundwall is cast-in-place concrete and serves as a barrier for off-the-road accidents. The top portion of the wall is split-face concrete block and is in good condition. The lower portion of the wall has weathered, and cracks have formed where the vertical reinforcing bars are located inside the wall. This project would repair the cracks and paint the surface of the wall with a waterproof treatment to protect the reinforcing steel from rust damage. The concrete surface would also be restored to a more uniform color ESTIMATED COSTS FINANCINGIYEARS SCHEDU~E Fund Prior Y.ars 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I ~quipment Miscellaneou5 9.485 001 $ 70,135 $ 70,135 60.000 650 TOTA~ $ 70,135 PROJECT I STAFF MANAG~M~NTIFT~1 CONTRACT $ 70135 0.09 $ 70135 PROJECT NUMBER N/A DESCRIPTION - LOCATION 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION San Ramon Road Landscape Renovation ACTIVITY COMMUNITY IMPROVEMENTS This project would renovate the landscaping along the San Ramon Road bike path, from West Vomac Road to Alcosta Boulevard, removing the existing Baccharis and soil and installing new topsoil and plant material. COMMENTS e .0.. 1 FG'l - -? ~- Most of the landscaping in this area was installed 13 to 15 years ago, and has reached the end of its life expectancy This project will be funded through General Fund. ESTIMATED COSTS Design I Inspection $ 15,435 001 Other Contract Services land I Right of Way Improvements 128,100 Machinery I Equipment Miscellaneous 210 TOTAL PROJECT MANAGEMENT FTE $ 143745 STAFF CONTRACT FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007.2006 2008.2009 2009.2010 2010.2011 Toti!lls $ 143.745 $ 143.745 $ 143.745 0.08 $ 143 745 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER N/A PROJECT DESCRIPTION San Ramon Road Wooden Sound Wall Maintenance ACTIVITY COMMUNITY IMPROVE DESCRIPTION - LOCATION 6) This project provides maintenance for the wooden soundwall along the residential backyards on the western side of San Ramon Road between Alcosta Boulevard and Silvergate Drive. The project would repaint the fence facing San Ramon Road. \ ' \- \ ~_...- 'f' "< .".--*' Co' ...- ...~...r _....- I _~...-.o:=-~ \ I I ~..~.. , ~~:,,'I"":.~ '..'. _, ._.," T I.'~!,::-.: ~"~""'""., ., "~I -~ I" ,~'-=-- ,"' i., 'i'iill; _I ,,...,.~~:I ~I" r-- i\ . J :/1'1-: ~:;:p-'~:' I II~" -;1 ,~_ J.k ~ ~T,t\f1l'~,": '" ',PRFT-:L" I 11 I - - "tp" . I ,~"., "j' , _ \ '.. WI.I '\ i-, Illl-'~.1 \ 'r T ~i' .C-- - .-. 1__~\ ,,- _'l ~~al,lN.et..- at DUB~NBLVD . ,. I . .. '''''- ........1.. I I---J 'I " , ,-- .--.. ------ . I" ,;..... _....... 1-680 ----_._.--_.~ .. "OK , COMMENTS This soundwali was constructed in 1988 as a noise mitigation for the widening of San Ramon Road from two I four When the City built the fence, easements were obtained to construct the fence, and the City retained th but not the responsibility, to maintain the road side of the fence. At the time of construction, the fence was painted with two shades of brown wood stain. Over the years, th has faded and the wood has weathered, This project would repaint the fence to bring back the original co extend the life of the wood, ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PrlorY.ars 2006-2007 2007-2006 2006.2009 2009.2010 2010-2011 Design I Inspection $ Other Contract Service. Land { Right of Way Improvements Machinery / Equipment Mlscellan@ous $ 47.075 7.620 001 38.S05 S50 TOTAL PROJECT MANAGEMENT FTE $ 47.075 STAFF CONTRACT $ 47 07S 0.06 $ .---- MENTS -......... ~. , , I rt ., ._.;.,.~ anes to e right, e coior lor and Totals 47,075 47.075 $ 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER N/A PROJECT DESCRIPTION City Entrance Sign Modifications ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION 9 - o. \.. \ ~....~...:....... 1" '( ..-.... \ ..~_.- This project would construct three City entrance signs located at the following entry points to the City' , \ 1) San Ramon Road at Alcosta Boulevard 2) Village Parkway at Kimball Avenue 3) Dougherty Road at Fall Creek Road COMMENTS It is anticipated that the first new granite-faced City entrance sign will be located on Hacienda Drive near 1-580 in Fiscal Year 2006-2007, as part of the adjacent development improvements. The City currently has five existing entrance signs located on San Ramon Road, Village Parkway and Dougherty Road with the concrete facades, In order to be consistent with the new granite finish sign proposed at Hacienda Drive (IKEA to construct entrance sign), this project would replace three existing signs with the new granite-faced signs. The two other existing signs along Dublin Boulevard (at San Ramon Road and at Dougherty Road) will be replaced as part of the West Dublin BART Station Corridor Enhancements and East Dublin BART Station Corridor Enhancements capital projects. For the purpose of this capital project, it is assumed City entrance signs at the remaining City entry points will be constructed as part of the adjacent development improvements. FINANCINGNEARs sCHEDULE EsTIMATED COsTs Fund Prior Y8i1rS 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Dflslgn IlnspflCllon $ 30,720 001 $ 97,520 $ 97,,20 Other Contrlilct Services Land I Right of Way Improvements 66,300 Machine!)' I Equipment Miscellaneous. ,00 TOTAL $ 97.520 $ 97 ,20 $ 97.520 PROJECT STAFF 0.09 MANAGEMENT FTE CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROJECT NUMBER PROJECT DESCRIPTION New Seasonal Street Banners DESCRIPTION - LOCATION This project provides for the replacement of the seasonal winter holiday b the addition of new banners for the summer season and Red Ribbon we future expansion of the program when Dublin Boulevard is extended east. COMMENTS Currently during the Summer the City hangs patriotic banners from M seasonal summer banners would help provide more visual appeal and v new Red Ribbon Week banners would allow the Police Department to c reducing the number of ribbons that need to be hung by volunteers holiday seasonal banners and Dublin Pride Week banners as they are sh FINANCING ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 Design I Inspection 001 $ 34.623 Other Contract Services $ 1,760 l..aod I Right of Way Improvements Machinery I Equipment 32.863 Miscellaneous TOTAL $ 34,623 $ 34 623 PROJECT I ~TAFF MANAGEMENTIFTEl CONTRACT PROGRAM ACTIVITY COMMUNITY IMPROVEMENTS annerS and Dublin Pride Week banners, and ek. The project will provide extra banners for emorial Day until Labor Day A new set of ariety throughout the summer months, The ontinue to increase public awareness, while Staff also recommends replacing the winter owing signs of age and deterioration. /YEARS SCHEDUI..E 2006-2009 2009-2010 2010-2011 Total. $ 34.623 $ 34,623 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95465 PROJECT DESCRIPTION Shannon Community Center Reconstruction ACTIVITY PARKS DESCRIPTION. LOCATION e This project provides lor the reconstruction of the Shannon Community Center, 11600 Shannon Avenue. \ 1: _-.... \., \ ,J. .........-. , i .~....-. C \ .- ......'I"!',. .....':'........ I,I;/t"" I ~..~~:":... -. ,\ -- ~.~ .". \" c l ~~it" .. -'- \"1;'"1""11_ ...._....~~P! '"4\\", '>) ".1 ,'jl .1,' ,'_' ~ . j" \' :.' ;~ :..1 - _<tlJ,,~'-11 1;- -. - '1' I"':i JO!I/IJ- AA''' 1- I -I ",1 ,., ~'I ".,,#~. ~ I P R F TAl =-1'<_ i_'I"\~,,,~, ,.J" ."\>"':','- I jJ4' _ ~~ Sll" , 1 I "%--1 ~, " I. ~l ~ _ :r,. " 'h \ ""~!1<"" 8\ DOB..1'. lLW'i - I JL \1 l. -+:' i~ -.~ I ,~' l\ ~ l1.;~~_ -.,. ~~____~ ! _ Al-,,!Io. ,,!,,~~$'~": .:' ." I ,_ I~t' 'r, .. ~--_".~1:,,:;,,-_ " . CMcCenle, \- T, 7 , ,:1, \ '. .\,' I, I 'nJ -1-+_ .... , I ' COMMENTS During Fiscal Year 2003-2004, the Shannon Community Center was closed due to extensive damage caused by water intrusion. In July 2004, the City Council determined that the Shannon Community Center should be demolished and rebuilt. In April 2005, the City Council determined that the Shannon Community Center should be enlarged to 19,760 sJ in order to accommodate a larger social hall, and in March 2006, the City Council approved the Schematic Design for the new Center Design of the replacement facility began in Fiscal Year 2005-2006, and construction will commence in Fiscal Year 2006-2007 It is anticipated that the Shannon Community Center will reopen in July 2008. The General Fund will fund the construction of 12,200 s.1 (based on the original square lootage of the Shannon Community Center) and the Public Facilities Fund will fund the balance 01 7,560 s,l. An additional $366,328 01 the reconstruction is proposed to be funded through the Internal Service Fund. For the General Fund portion of this project, $1,804,301 will be lunded out of a Capital Project General Fund reserve previously established by Council and $679,921 will be lunded by a Workforce Housing Grant received as part of the Transit Center project. FINANCINGNEARS SCHEDULE ESTIMATI;D COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 1,069,650 001 $ 566.900 $ 2,484.222 $ 3,052,111 $ 6,103.233 Other ConVact Services 462,588 310 4.009,007 4,009,007 Land I Right of Way Improvements 7,976,672 Machinery I Equipment 500,180 Miscellaneou5 83,150 TOTAL $ 10,112240 $ 568,900 $ 2 484 222 $ 7061118 $10,112240 PROJI;CT STAFF 0.72 0.83 MANAGI;MENT FTE CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95555 PROJECT DESCRIPTION Dublin Historic Park ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for a master plan and programming study to determine the ultimate boundaries and uses of the Dublin Historic Park on Donlon Way and the potential expansion of the Pioneer Cemetery \11\1..........-. 'i \.....~-_....- C. \ 1._...~ ......-.....~.":) -I ....."1' I II~' ~ ....~.~"'~~~~:..:' :' I :'c;"J . \- ...~~,',\).\ : -.. \II.,/j '~""""'\"',,"'f I" - .-, -",.." " \',,' ",'" . ,I',. ,~I , '>I") q . --I r, ,\i,"" j':i,l,r",'" '~, ',",'f',( , I" II ',I _,I '\'1:.' ~I. I . ~..'_" 6- .. 1'- ,.,'" \~' "1r,i,,,>,,,, P R F T A ~L.,~ . "1 "-', \ ~ " I ,,~(t;J;:.-' \...1 .t; I" ll~:- \, '" , ',,~ ' 1511 + I, ~:I j I .-'"/'1"\;' .,1, , '. "'-I L~ 11 ',/'.I:"""'\~ """,\','",," , , ", -',r- I '-'~.r " ,1 J: II. ... ,~'i,."c'!0<~SI::.O"'-T~: : 'r,-, : ,. ,-, \ " 1;5:, ...l\~-: :,?" ....".~:i~~.:---+. l---F--~~_-=,~}:f':"!'!"'.~ _,,"I~ . Civic Center :.:.' i ",~ "; ).~' "\ ,\(1 11-- ,- ~- , COMMENTS One of the City Council Strategic Goals is to expand and enhance the Dublin Historic Park. To accomplish this goal. a site master plan and programming study to determine the ultimate boundaries and uses of the DUblin Historic Park, as well as a financial feasibility study to determine development and operational costs, is underway In Fiscal Year 2004-2005, a consultant was contracted to prepare a master plan for the Dublin Historic Park. In addition, the consultant will study the potential cemetery expansion, which was previously identified in a separate CIP In Fiscal Year 2005-2006, the City Council selected a preferred alternative design for the Dublin Historic Park. It is anticipated that the final Dublin Historic Park Master Plan will be adopted by the City Council in August 2006. This CIP will accomplish the following High Priority City Council Goal carried forward from Fiscal Year 2005-2006. 2006-2007 GOAL Undertake a site master plan, programming and financial feaSibility study for the Dublin Historic Park including DHPA land/cemetery feasibility study ESTIMATED COSTS FINANCINGIYEARS SCHEDUlE Fund Prior V..I'$ 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Tot.l. Design / Inspection $ 159,935 001 $ 141.336 $ 19,795 Other Contract Services Land / Ri9ht of Way Improvements Machinery I Equipment Miscellaneous 1,196 $ 161,131 TOTAl PROJECT MANAGEMENT FTE $ 181.131 STAFF CONTRACT $ 141 336 $ 19.795 $ 161131 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95600 PROJECT DESCRIPTION Emerald Glen Park ACTIVITY PARKS DESCRIPTION - LOCATION ~'~-~'~'~I' -...... ~. .....""'- ....~........... I ,1: .....-...... - + I \- \ "^ ..__..-- I ,1:"'< ,.od"".-- c...... .~f,,- 1 I"", J- "I' . 1'- 7 [- ,I ,~' , .. ..11 r"p R F T, A ~,.I ~" ',~' , I ,I -I mD""jI~ ~~VD"~_J ~iYi: cen~;-.~--.J__ \ ..~ , 1-flI!UI, - ..- , Q This project provides for the design and construction of the 48.2 acre Emerald Glen Park located on Tassajara Road between Central Parkway and Gleason Drive. Phase I encompassed approximately 26.1 acres of the site and included: 2 - 60' ball fields; 1 - 90' ball field; 2 regulation soccer fields: 2 lighted basketball courts; 4 lighted tennis courts; a skate park; a play area; picnic areas; a plaza and promenade; a restroom/concession building; parking; and street frontage improvements, Phase I was completed in Fiscal Year 2000-2001 at a total cost of $7,389,306, which included $2.066,400 to purchase 4.92 acres. 'I I i- I'.! " , I,' 'I.' -l 'I:jc," -t- f'~ L J !'i, "" ~;, - \- 1/1 _I, 1', L - ~_CENT""'-..",.., il[IILlll-'::"!! II! _ -- I . - i', "<' ~ if 'II , COMMENTS I .1 I ~,... ~~ ~~,~."'''.'II:'''''--~~.~ Phase II included improvements at Tassajara Road and Central Parkway including a water feature and arbor structure, maintenance storage, temporary play area parkin9 and restroom building, landscaping and park furniture. Phase II was completed in Fiscal Year 2004-2005 at a total cost of $2,664,918. Phase III improvements included two regUlation soccer fields with cricket overlays, a restroom building, a group picnic area, a children'S play area, mini arboretum, and parking and street frontage improvements. Phase III was completed in late spring of Fiscal Year 2005-2006 at a total estimated cost of $4,431.367 Although the Recreation and Aquatic Complex and Community Center will be located at Emerald Glen Park, separate CIPs have been prepared for those projects which include the building costs as well as the landscape costs associated with the buildings, One additional phase of the park remains which is beyond the time frame of this CIP This includes the landscape improvements associated with the future Community Center, including a lake and an outdoor amphitheater As part of the Transit Center Development Agreement, the Alameda County Surplus Property Authority conveyed the remaining park acreage to the City (18.173 acres). The City reimbursed the Alameda County Surplus Property Authority for 4,584 acres of the land in the amount of $2,876,575 in Fiscal Year 2004-2005. ESTIMATED COSTS Fund Prior Years FINANCINGIYEARS SCHEDULE Z006-Z007 Z007-Z008 2008-2009 2009.Z010 2010-2011 Totals. Design I Inspection Other Contract Services Land' Right of Way Improvements MachInery I Equipm@nt MiscellaneQuS $ 559,96Z 1.00e,328 4.942.975 11.433.046 001 $ 78.437 224 25.996 300 290.900 310 14,992.56S 315 Z,066.400 Insufficient funding within CIP time frame $ 78.437 25.99S 290.900 14.992.565 :2,066.400 875.300 TOTAL PROJECT MANAGEMENT FTE 387,287 $ 18.329.598 STAFF CONTRACT $ 17,454298 $ 18 329 598 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95602 ACTIVITY PARKS Ilex MOM , '~'l -.- .""'!'''' ~.- ..~~...... I ....,........-. . I ...- r \1" ......- -1.' \lI ..-" ') ~_.......- DESCRIPTION - LOCATION Q ThiS project provides for construction of a Recreation and Aquatic Complex at Emerald Glen Park, located on Tassajara Road between Central Parkway and Gleason Road. i: "< ~.. C \ ~.....~"'_. .~""".:. I ,1~' L ',i~.J - Iii ./1 J _--..!.... f" I- I- in I 1'1 '.-' ~: - - r _ I 11 " " t r-- 1 "1., I J Ai{II._ill',- I" '~~l-I~) ,- ,r:.\,_ ;=::t! :.1 ~t,'f ., ~1~ 1'- . I'j:' 1~I:L'1._3CE~""'''KW'< j ikY"4 ;!:!..ip 1'-':'-'11 ~ _ - - _' ._~. I I, .-' I b"- I-e!,O -- / __.r. ,__~~ -!r!R'..'....----.. ,--- Civic Genter COMMENTS The Parks and Recreation Master Plan identifies the need for a Recreation Center and an Aquatic Center to serve the needs of the growing City During Fiscal Year 2004~2005, a Feasibility Study was conducted to assess community needs, demographic analysis, space components, construction and project costs. A full financial analysis of the operational costs and funding options for a larger, state-of-the-art, Recreation and Aquatic Complex was completed in Fiscal Year 2005-2006. The preferred option selected by the City Council includes a two-court gymnasium with two high-school reguiation courts, fitness center, dance studio, game room, tot-drop room, state-of-the-art recreation pool, and a lazy river The six-lane fitness/instructional pool would be indoors, with a small play feature for toddlers. The estimated cost for the state-of-the-art facility exceeds the available Public Facility Fee revenue. At this time. the City Council is evaluating the feasibility of a public-private partnership for a state-of-the-art facility Once complete, a determination will be made on how the City will move forward to provide a facility to meet the recreation and aquatic needs of the community For the purposes of this CIP, the project that is budgeted is similar to the Recreation and Aquatic Center es envisioned in the Parks and Recreation Master Plan. It includes a smaller two-court gymnasium, small fitness center. group exercise room. special events room/classroom, a small outdoor recreation pool, deep water competition pool, and six- lane fitness/instructional pool. FINANCING NEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 1.070.962 310 $ 67,954 $ 102.500 $ 604,366 $ 818,389 $ 8.799,534 $ 7.772,190 $18.184.935 Othe-r Contract Services 225.341 Land I Right of Way Improvements 14.289,132 Machinery I Equipment 843,000 Miscellaneous 285,153 InSufficient funding within CIP time frame 1,028.653 TOTAL $ 17193588 $ 67,954 $ 102,500 $ 804 388 $ 818,389 $ 8 799 534 $ 7772190 $17,193588 PROJECT STAFF 0.30 0.61 0.66 0.72 0.14 MANAGEMENT FTE CONTRACT This project provides for construction of a dog park for both large and small dogs at the base of Dougherty Hills Open Space on Amador Valley Boulevard between Stagecoach Road and Dougherty Road. Mil" , ....--. ACTIVITY PARKS \"\ _......P \. \ WI_...._.... i""'< ..,..... ...7'....,.. - ." I , " I "'J . ' " ,Ij 'r'- I ~Ii ~ ~.~ T A Ilt-i'l-. ~IJ .1 - <l~11 '1'[,' +-+._l] ili 0, _ .~ ~I DUBUN.ft,l-~ -.. r ' ..J:....-L_.____._.;~. enter I ,.... Hills Open Space for a provided from Amador reas with double-gated eluded in the project. d authorized production 7 2010-2011 Totals $ 596,639 $ 596.639 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95625 PROJECT DESCRIPTION Dougherty Hills Park - Dog Park DESCRIPTION - LOCATION e c ' .~. .......- I ......--:.~ I' .P!'" I ...~.....-:":,,\,,,'- I..\~ _~.,.r"'~.:7\\. \ .,..--:.; "", . r'-"~I '11,/ I I ....1..1 ',1~f ,tl__,~,,~. '..:.t'> ,1'U1T ,If,!IIU/I-, ""~ ",~ ie'ocl..,j!- I, t\' ''i;',' ',.,....'fI, .i-' I "'-. ,~, ''*~, - { r:' :'~r;~' )..," I " .. ~ ."". .,' ~j- -.\ \'}\.~ 1l1..iNaL"ii -- =}. ' " - 'r I ~ ......_~} .-=- I' , ) . 'J _ . ,j-....._........... ~ ------....--.--"' Civic C COMMENTS In Fiscal Year 2004-2005, the City Council determined that it was feasible to use Dougherty dog park. Approximately two acres of the site will be used for the dog park and access will be Valley Bouievard. Both small and large dogs would be accommodated in separate fenced a entries. Drinking water, garbage cans, benches, signage, landscaping and a parking lot are in In Fiscal Year 2005-2006, the City Council approved the conceptual design of the project an of construction documents for the project. Construction is scheduled for Fiscal Year 2006-200 ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund P,;o' Vo.,. 2006-2007 2007-2008 2008-2009 2009-2010 De5ign Iln.poetlon $ 29.608 001 $ 53,099 $ 543,540 Other Contract Services 16,011 l.~nd I Right of Way Improvements 430,120 Machinery { Equipment Miscellaneous 120.900 TOTAl. PROJ ECT MANAGEM ENT FTE $ 598 639 STAFF CONTRACT $ 53,099 $ 543,540 0.31 , , 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY I 95631 Park Furniture Replacement PARKS I DESCRIPTION - LOCATION This project provides for the replacement of aging wooden park picnic tables and benches with picnic tables and benches made of recycled materials, COMMENTS The wooden picnic tables and benches in most of the City parks are made of wood. Despite annual maintenance (sanding, staining, etc.), the tables and benches are worn and in need of replacement. It is proposed to replace the wooden tables and benches with recycled materials. Tables and benches of recycled materials are already in use at Mape Memorial Park, Emerald Glen Park, Ted Fairfield Park and Bray Commons. The City intends to use annual grant funds from the Alameda County Waste Management Authority and the State of California to fund the replacement. In Fiscal Year 2005-2006, the picnic tables and benches were replaced at Dolan Park. For Fiscal Year 2006-2007 this project will be undertaken at Alamo Creek and Stagecoach Neighborhood Parks. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior' Years 2006-2007 2007-2008 2006-2009 2009-2010 2010-2011 Totals Design I Inspection 224 $ 57.995 $ 79.874 $ 55.800 $ 52,800 $ 246,469 Other Contract Services Land I Right of Way Improvements $ 244.144 Machinery I Equipment Miscellaneous 2.325 TOTAL $ 246 469 $ 57,995 S 79 874 $ SS,600 $ 52.800 $ 246 469 PROJECT I ~T AFF 0.02 0.07 0.02 MANAGEMENT (FTE\ CONTRACT 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95635 PROJECT DESCRIPTION Park Play Area Renovations ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for the renovation of park play areas to bring play equipment into compliance with state and federal safety criteria and ADA accessibility .", , ~" ~i .' ',I' r7-~; COMMENTS State Law requires that all playground equipment areas accessible to the public be audited for safety The audit must be completed by a Certified Playground Safety Inspector The standards for the audits are the current Consumer Product Safety Commission and American Society for Testing and Materials playground guidelines. The evaluation was completed in Fiscal Year 2000-2001 The second phase of the project provides for the replacement of play equipment as recommended by the evaluation. Kolb Park was completed in Fiscal Year 2002.2003. Shannon Park and Dolan Park were completed in Fiscal Year 2005-2006 Alamo Creek will be completed in Fiscal Year 2006.2007, and Stagecoach Park will be completed in Fiscal Year 2007-2008. The priority for replacement is based upon the severity of the problem which needs to be corrected. The play equipment at the Dublin Sports Grounds was replaced as part of the Dublin Sports Grounds Renovation Project, and the play equipment at Mape Memorial, Ted Fairfield, Bray Commons and Emerald Glen Parks comply with the standards. The project will be funded through a combination of Park Dedication Fees ($347,535), General Fund monies ($81,085), a Roberti Z'Berg Harris Block Grant ($91,409) and Community Development Block Grant funds ($56,713). FINANCINGIYEAIlS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 7.210 001 $ 81,085 $ 81.085 Other Contract Services 10,508 209 $ 56.713 56.713 Land I Right of Way 213 91409 91.409 Improvaments 555.251 310 77.837 $ 76,460 156,297 Machinery I Equipment 315 191.238 191,238 Miscellaneous 3.773 TOTAL $ 576 742 $ 383,732 $ 134,550 78 460 $ 076,742 PROJ ECT STAFF 0.10 0.10 MANAGEMENT FTE CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95640 PROJECT DESCRIPTION Dublin Ranch Neighborhood Parks ACTIVITY PARKS This project provides for the design and construction of three neighborhood squares and two neighborhood parks in Areas B. F and G of the Dublin Ranch Development. .... , ......-........, .................. " -...... .~-~. y I I . DESCRIPTION. LOCATION e , I I - . I ! I~ c ITI i' ~ ' ~,~ li-' P ~ ~ r~' Aoi~f.~ - I I' ",~i~, ,I ;' ~'I r - ~rll=- --,.,}!f:~l!2Cfu"-'7~".- '.. ' . .+1-' ",ce". g, '_I-LE'I .11'.:'" -.,....... 8;;;"BL," 'L..,~I=-+- l! '-o!t.:.'l'"'1 -' +: 1'" . . - r-..~... ')1', -, I I --- ",----'--L._ ~ Civic c~.~ter ~..~~.I "--'-:--or- I,-Ji'~.__ - ~, ~: ifi '" r] \ il"j. . I I ~--- ,"". COMMENTS The Dublin Ranch Development Project identifies a total of two neighborhood parks and three neighborhood squares. Bray Commons, the 4.8 aCre Neighborhood Park in Area G, was completed during Fiscal Year 2004-2005. Design of the Neighborhood Square in Area F (2.0 acres) began in Fiscat Year 2005-2006, and construction will be complete in Fall 2007 Design of the Neighborhood Square in Area G will begin in Fiscal Year 2006-2007, and construction will be complete in winter 2008. Design of the Neighborhood Park in Area F (5.0 acres) will begin in Fiscal Year 2006-2007 and construction will be complete in late fall 2008. The Neighborhood Square in Area B (2.0 acres) is beyond the CIP time frame as a development plan for the area has not yet been submitted. The neighborhood squares and neighborhood parks will be designed in accordance with the standards contained in the Parks and Recreation Master Plan. This project assumes that the land for the neighborhood squares and neighborhood parks will be dedicated by the developer in exchange for credit against Public Facility Fees for Neighborhood Park land If development does not proceed at the pace anticipated, some of these projects will need to be deferred. ESTIMATED COSTS FI~ANCI~GNEARS SCHEOULE Fund Prior Veers 2006-2007 2007.2008 2008-2009 2009-2010 TOTAL PROJECT MA~AGEMENT FTE $ 5 807 708 STAFF CONTRACT $ 1.525,836 $ 924.872 1.57 1 519538 $ 886.750 1.22 0.19 2010-2011 Totlills $ 65.000 21.926 4,770,068 750,710 $ 5.607 708 Design !Inspection $ 508,262 Other Contract Services 4t:l5,567 land I Right of Way Improvements 4,094,161 MachInery I Equipment MiscellaneOuS 539.716 001 $ 65,000 224 21,926 31u 1436,906 $ 924,672 $1.519.538 $ 886.750 Insuffieient funding within CII=1' time frame 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95830 PROJECT DESCRIPTION Dublin Sports Grounds Renovation ACTIVITY PARKS DESCRIPTION - LOCATION 9 This project provides for the renovation of the Dublin Sports Grounds, which is located at Dublin Boulevard and Civic Plaza. ",. \ "( _.......- "'< \... \....~_.... .~~:~.~-~-~~~--;~~~~.~:-'~. ~fI"~!"J~'~(. - t _ J \' I 7 _~_.f-,\ '\ '" '~I jll . - '. - :- ':.' , I" :It _, - . ~'f!,1 ['~ ,'I I""-} ,. '\i' i,:g./I'L.'r-..,#"".....' ..:~,-~, ~,,"I '--' '. ,," -r'J....r;.R-,~.L. II:: PRFTA __ IlII:" - -\ _"I...L..;'rj l~' ' 'f ,L~,,'" it l I -1;;1117:". ',.Il-rl.:'"- \~. "":'.""'-'.." 1Ii--.. I ........' I ~"" "\ " -HiTi'!'~.lJJ 1 ~: /.,""1 I .__ ._~_~.-= . ','i-"' ,I \, "\~' .'e'-(' ~lt'L II_ I ._\, .~,_..l- ,.~t!"rt:~".. -.."_ """>"'~'~. ,~-~ ,,~ "",-",--~",~=,......f.~-~-~-~.'~'I "~I"I!O_. .' _ I -- ~""IC" .. II CMc Cont., ,,: rr . _< I. I' I ." ,. MI._ , COMMENTS The Dublin Sports Grounds Master Plan was adopted in May of 1990. The recommended improvements were divided into phases: Phase I included construction of a new 60' baseball field, installation of bleachers at Fields 2 through 7 and installation of drinking fountains at Fields 4, 5 and 6. Phase I was completed in Fiscal Year 1995-1996. the total cost waS $215.454. Phase II included renovation of the drainage and irri9ation system for Soccer Field #3; drainage improvements to Baseball Fields #3, #4 and #6, underground conduit for future lighting of Soccer Field #3 and Baseball Field #3: drainage and tree replacement along the freeway; and play area renovation. Phase II was completed in Fiscal Year 2002-2003; the total cost was $979,833. Phase III provided for the installation of lighting on Soccer Field #3 and Baseball Field #3. and waS completed during Fiscal Year 2004-2005, the total cost was $310,167 Also during Fiscal Year 2004-2005, softball field safety netting waS installed ($25,126). The Dublin Boulevard Parking Lot Renovation was completed in Fiscal Year 2005-2006 ($140,182). For Fiscal Year 2005-2006. a new project was included to remodel the restroom buildings at the Sports Grounds to replace worn restroom partitions and fixtures ($42,250). This project has since been deferred to Fiscal Year 2006- 2007 A new project for Fiscal Year 2006-2007 is the remodeling of the snack bar to comply with Alameda County Health Code Requirements ($15,000), The field turi renovation projects that were previously included in this CIP have been deferred pending further evaluation, as a number of the problem areas originally identified have been addressed through the park maintenance budget. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Y..", ~006-~007 2007-2008 2008-~00g ~008"~010 2010-2011 TOTAL PROJECT MANAGEMENT FTE $ 2,578.697 STAFF CONTRACT $ 1 870 762 $ 57 250 Totpl~ $ 43~ ,389 609,626 23,796 662,199 850,685 2 578 697 DeoQign Ilnspet.lion $ 108,916 Other Contract Services 130,059 Land I Right of Way Improvements 2,316.124 Machlnary I Equipment Miscellaneous 23,598 001 $ 375,139 $ 57,250 213 609.628 224 23.796 315 662.199 Insufficient Funding within elP Time Frame 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 95851 Fallon Sports Park PARKS DESCRIPTION - LOCATION Q ........., ~. ~.~.~.-.-. i - -....... This project provides for the design and construction of , .-' -.- -- ~ a 60.acre Sports Park located on the Dublin Ranch \. \ ~ ~..:..-_..."-" \. I property in the Eastern Dublin Specific Plan Area. \ 1" '< _.......,p.. I C, ....'"': ...._"1..:<:';1. , 'I , I"'" I "{ - -- , ,-- Ii! I J ~:.I..:\'1" I Ir l"".l "'u ~, h ',,1,,) ~ r , I I. Iii c ~' II I' ~ I -r I.l ,.u , If I~QI'. -. - ~!<\'" ! ' -j c. ['1-1 - I ,: ,H' 1'1 -1'1, Il -- -'I~\~II ': ~ I P R F T A C "Y-" I. ,_Ii! .', i" 'i'~1 ~m~~c -""~~ - - ., , " 6' ['-. '-p~1 ~I--. -., ~eL ~~ pue-;:llLBLvr! I I ~ ~ - [r;- --:.-il1 - - I ~"<i' , l' 1 r- - - CIYICCenter h--- ,,..\. I -I~ I ..------ ',I ~..,~,I~O - -,- ,....." . L.~-'" ,."... COMMENTS The Eastern Dublin Specific Plan provides for a 60-acre Sports Park to serve new development within the City The Parks and Recreation Master Plan envisions that the Sports Park would accommodate the majority of the competition ballfields in the City Additionally, the park would have a children's play area, picnic facilities, basketball and volleyball courts. tennis courts, a jogging or walking loop and permanent restroom structures integrated into concession/scoreboard areas. The project costs to date include a biological assessment of the Jordan property ($5.995), as well as an analysis of sports park aiternatives on the Lin property ($9,157). Both of these assessments were completed in Fiscal Year 2002- 2003. During Fiscal Year 2003-2004. a consultant was selected to develop a master plan for the Sports Park, and a community task force was appointed, The master plan was presented to the City Council in Fiscal Year 2004-2005. Also during Fiscal Year 2004-2005, an agreement with the developer of DUblin Ranch was approved whereby the developer could place excess fill on the sports park site in exchange for mass grading of the site in accordance with City specifications, The grading operation began in Fiscal Year 2004-2005 and will be complete in Fiscal Year 2005-2006. With the exception of 8 acres. it is anticipated that the balance of the land will be acquired through dedication (20448 acres has been dedicated to date). The land purchase was completed in Fiscal Year 2005-2006. In Fiscal Year 2006- 2007, monies have been allocated for improvements related to water meters and transformers, Phase I is scheduled to begin in Fiscal Year 2007-2008 and be complete in Fiscal Year 2009-2010 Phase I improvements include: 2 little league fields with associated plaza. picnic, and restroom/concession; 2 lighted softball fields with associated plaza, picnic, and restroom/concession; 4 lighted tennis courts; 4 lighted basketball courts; 2 lighted soccer fields; a parking lot; and a walking trail. Two additional phases of development are planned, but are beyond the time frame of this CIP FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008.2009 2009.2010 2010.2011 Totals Design {Inspection $ 2.737,930 310 $ 1,459.675 $ 214.230 $ 1.620.827 $ 7,196.304 $ 4.689,533 $ 15,180.5'l9 Othet Contract Services 1.449,370 315 4,141,527 4,141.527 Land I Right of Way 5.421.800 Improvements 22.637.350 Ml;lchinery I E:~uiprnent Miscellaneous 2.102,708 Insufficient funding within CIP time frame 15,077.062 TOTAL $ 34.399,158 $ 0801 202 $ 214 230 $ 1 620.827 $ 7,196,304 $ 4 889 533 $ 34.399 158 PROJECT I STAFF 0.66 0,74 0.21 MANAGEMENT IFTEl CONTRACT 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 95935 Cultural Arts Center PARKS DESCRIPTION - LOCATION This project is identified as a desirable facility as part of the Park & Recreation Master Plan. The long term plan suggests that the facility may consist of construction of a 16,000 square foot Cultural Arts Center at a location yet to be determined. COMMENTS The Parks and Recreation Master Plan as adopted identified the need for a 16,000 square foot Cultural Arts Center that will serve as a multi-use facility that affords cultural, educational and social opportunities for the community A location for the facility has not yet been determined. It is likely that future assessments will be required in light of these changes to refine the ideal scope of such a facility In any case sufficient funding to pursue this project is not anticipated during the five year Capital Improvement Plan time horizon. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006.2007 2007-2008 2008-2009 2009.2010 2010-2011 Totals Design / Inspection $ 504.700 Other Contract Services 322,855 Land I Right of Way Improvements 6,770,795 Machinery I Equipment 539,705 Miscellaneous 163.415 Insufficient funding within CIP time frame $ 8.401.470 TOTAL $ 8,401,470 $ 8,401470 PROJECT I STAFF MANAGEMENT IFTEl CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Eastern Dublin Parks ACTIVITY PARKS DESCRIPTION. LOCATION e This project provides for the design and construction of 20.74 acres of neighborhood parks and 10.6 acres of community parks to serve new development in eastern Dublin, excluding the Dublin Ranch Development. ~-~--'1 .......~... i ...__..."1'-.... I ..........- I ,.,. \ "\" ...~__".. I \ "'{ "( ..~';..\.....""_.... l __..',--7"-' 1 i ------1 , !:~;:\'1 ' I I, -, '1,-, I I . '------, ~~~ rl~i- - I~ I ,~,!;,:'i,t } ",~t . ,;, " I ~, P"FTA >L-,~~~ ' - j~t - , 'I / w:;:IT I" In I I ~" I > I_':__H.L - r .. 1_;-1 , '(Yo ~-",,,,,".rnf'- -J I 'CTJI L 'I~! >J\J. " ,.', I I J ' . "I I I --- .j...----- ......._-~;;-._~ ...._______r... .___.___._~..",~~....__...... ~"""," "'~ .. COMMENTS This project provides for the acquisition, design and construction of parks in eastern Dublin, outside of Dublin Ranch, including 20 74 acres of Neighborhood Parks and a 10.6 acre Community Park. The parks will be designed in accordance with the Neighborhood and Community Park Standards contained in the Parks and Recreation Master Plan, Although it is anticipated that a portion of the land will be dedicated by the developer in exchange for credit against Public Facility Fees, for the purposes of this CIP. the land costs have been included. ESTIMATED COsTs FINANCINGNEARs SCHgDULE Fund Prior Vo." 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 1,244,375 Other Contract Services Land I Right of Way 25.301,750 Improvements 10,950,505 Machinery I EquIpment MisCi:lllaneoL1s 248.875 Insufficient funding within CIP time frame $ 37,740.000 TOTAL $ 37,745505 PROJECT 1ST AFF MANAGEMENT tFTE\ CONTRACT $ 37,745 505 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Emerald Glen Park Communitv Center ACTIVITY PARKS DESCRIPTION - LOCATION .~'1 -'~ _.......~.. I _...~...... ....... .~. ..... ' 1: ...... ,. \,. \ ""'~..-."'-" 1: "l _....- C \ ....._of .......~q I I I 11:- ",,1'1'" '1- -, 1- tiJ'l ; ,r" I 1'1 f 'j, Ih'/f0nI-,I~ ,~-,,,~ -- !I_~ ~",,;~:' ' 10 fl P R F T A ~l - !,'---=- r ~Iiil, I I: ~' -- iT I l---LU. - <'Im;!,' -;:; I I , ,,~,I',~~.11~~~~-'+- ,~~~,-,~t:~~"'~~~ __' ~ Civic Cent~;l_~__ I I, I, - I. . \ ,.'i,::~-~ 1-680 ':~-~~I~~ ~.~~. ------.~. .... , Q This project provides for construction of a 16,440 square foot Community Center at Emerald Glen Park, located on Tassajara Road between Central Parkway and Gleason Road in eastern Dublin. '\, COMMENTS The Parks and Recreation Master Plan identifies the need for 36,200 square feet of Community Center space to serve the ultimate build-out of the City The reconstruction of the Shannon Community Center is for 19,760 square feet, leaving a balance of 16,440 square feet for Emerald Glen Park. The goal of the Community Center is to provide a comprehensive multi-purpose center which responds to the recreational, cultural and social needs of all residents of Dublin. The Community Center may include the following program elements: Lobby/Reception/Office Area: Classrooms/Meeting Rooms; Community Hall/Assembly Facility; Caterer's Kitchen; and Preschool Room. Design and construction of the Community Center are beyond the timeframe of this CIP ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorY..", 2006-2007 2007-2008 2008.2009 2009-2010 2010-2011 Tot~l$ Dssign { Inspection $ Other Contract Services land I R.lght of Way IrnprovE:lments Machinery I Equipment Miscellaneous 567,145 342.620 6,990.780 370.045 147,870 f3roject scheduled beyond C1P time frame $ 8.418,465 TOTAL $ 8,415465 PROJECT I STAFF MANAGEMENT IHE' CONTRACT $ 8.418,485 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Schaefer Ranch Neighborhood Park ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for the design and construction of the neighborhood park in the Schaefer Ranch development in western Dublin, .,.. , .-"-., \ "" ., "i \.. ......". , C. \"'\: ...'":....~' , ....... ~ "_,,,:~"r~ ." '\. _.,,-,;,'--""1 -- -:./','.'~I' .. -] '......... ~ -,.., ! \\_" I "' r l l 'Ie., ~. II.;".~..... ..'"'' _II ~~-:. - I 1!_LJ_i,. ..l~' I '".' '\ - :(__:..~'di' ,l1.j1-',. _ '11- I\Y -- - t. I I ,. t ~, 1,1 ilr,.~ _. ;b, . ,'f,,, --"veL '-- --::l,-! ,., '. 't,'\' .~-~ . ,1[. :" \ -,.... . "'-"t:"'~~'Y"":,,:r,-, ----.-....---./'..--F:rc c~.. COMMENTS The proposed Schaefer Ranch project provides three contiguous parcels to be used for a neighborhood pa parcels total 10.27 gross acres with 6.6 acres of flat usable park land. The park will be designed in accordance with the Neighborhood Park Standards contained in the Pa Recreation Master Plan. These standards identify the following amenities: tot lot and apparatus play area tables and secluded space for informal family picniCS; open space meadow for informal sports. games and activities: and sports facilities such as practice ball fields, tennis courts. volleyball courts and basketball courts The conditions of approval for the Schaefer Ranch Project require the developer of the project to dedicate and design and construct the park. ESTIMATED COSTS FINANCINGfYEARS SCHEDULE Fond PdO' V..... 2006-2007 2007-2008 2008.2009 2009-2010 2010-2011 Design I Inspection $ 360,250 310 Other Contract Services 308,690 Land I Right of Way Improvements 2,818.750 Machinery / Equipment Miscellaneous 340,160 $1,234.470 $ 1,816.940 $ 776.460 $ TOTAL $ 3827870 PROJECT I STAFF MANAGEMENT (FTE\ CONTRACT $ 1.234.470 $ 1 816940 $ 776.460 $ 0.13 0.45 0.23 \ 1"........-1 .- , , " , " [.,1 I ~~.J' iJ.ti,"- , Jil ; ~' wi ~,<, ~, ~' , ' sl, .,' . ~ ',< .---- , rk. The rks and , picnic passive the land Tota.ls 3.827.870 3 827 870 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Stagecoach Park Assessment District Water Meter ACTIVITY PARKS DESCRIPTION - LOCATION Q This project provides for the installation of a new water meter at Stagecoach Park, located at Stagecoach Road and Turquoise Street. ~ \ 1: _.......... \... \-....-... C \ "\ ...:~"'~"''' ............."'1"0.~',' - '1 ...~.....-~ 1,llrl"1 I .....~~-r~\.....-r.,_'!" ',\ _I " :,il~:; I}J , r _~ .. t t. 1~.~1' -I I '..' .,:1- " ""~'i. . \' '.. ""''--'';;1 Ii ,i..<>- I=JCj , --( '\~. j ';IM:II,:-."#', i I-I I_~ [" .~~ - ii, 't, 'ii: '. ;' .. 'i4~."~. ~':', ~'~ I~r.. -P R..F-.T. A r~r'..i '. ~ ,_ ,r;,' i '" I, "'.\" '.w I" I' I' ~~ 'f "j ~(1t;lI' . 1," :.t::,\\ ., '-, ~I , I r" :ttr -~. ~ '\r-'~, f 16\. ...:.~B4N ...."0 "~eo! DUIUJN (~D~ _----=-~,i __1. "[ .~ \ _ .\- '("'!~,,!>__". I I I I -+ \ ~.,. .b.r:-_ ) I. I -';~._.;~~. '........-~~'!"'~~~\~\'!y~ cM~-~:er ~,I ,:..~~.I'!.;;-~' 'I,: . f"- r--[ ~i .-" \\ I .~; ~ \ 1"1 l\ -- ~'\' \\ .... , COMMENTS The water service for Stagecoach Park and the Stagecoach Assessment District comeS from one water meter In order to adequately water the parks and the landscaping in the assessment district during the warm summer months, two irrigation cycles have to be run. Since there is not enough time during the night to run two cycles. watering has to take place during the day In order to water these areas more efficiently in the summer, an additional meter to separate the park from the assessment district is recommended. Funding this project may result in reduced water usage for the Stagecoach Park Assessment District. ESTIMATED COSTS FINANCING/YEARS SCHEDULE Fund Prior V.a,s 2006-2001 2007-2008 2008-2009 2009-2010 2010-2011 Totals Dosign I Inspection Other Contract Services l..and / Right of Way Improvements Machinery / Equipment Miscellaneous $ 001 $ 50,025 $ 00,025 50,025 TOTAL PROJECT MANAGEMENT FTE $ 50,025 STAFF CONTRACT $ 50 025 $ 50,025 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Transit Center Park ACTIVITY PARKS DESCRIPTION - l-OCATION Q This project provides for an 8,7 acre community park on the Transit Center property in eastern Dublin. lI\ ' ,. _......~. \. ~............. C \ "' .:..,p"'.... ...-.~~\ I . - ~ ........~..... I' !fl I ."'.""':'~~' I ,~,' "\'l:~"I"" ,., ~\' <., .J _........t:"'--..r"1~\-. T]-i\"fLlj 'jll :11_1'_~\1__ I' - _ I t\'- +1 J I~ Jl= - \~Cr ,- - We' I I \'a' I l'!IJ! - ~# .1. \ . ""~.__ , ,11- .\\ ' ,) , ri!'^ ' l;' r P R F T A I I!i" I' I' '~"" - i'l11 i _I I I l_;-~ .\ I I~ ;.;.,~ r [ I I~ I - iti I '_ \ \'llr",~ ,,' 11.; ., lli_ -. - I r " T =11 4) " \\~\ ~\~~~~'fVlI _ _ a, DU8L1NBLV.p.. . ~n - 1'1'"." ""~'-i"'-..'" Ji" I 1 I I ~ I \ .....~, ,- ~ / I - I" t:,- - ---..::-4-.........---- ~=_ ~...:'~, ..."",,;z:,co \ , - -.--~,,;- :_^ r1-:A'!'I.- - - F--- ... 1\ ' ." CIVIC Center , . ,; -'.:\11, r,'- - (, ..~ "'M 1 COMMENTS This project provides for the acquisition, design and construction of a community park on the Transit Center properly The park will be designed in accordance with the Community Park Standards contained in the Parks and Recreation Master Plan. Depending upon the outcome of the Camp Parks land exchange process, it is possible that the location of this park could change in the future. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prio' V.... 2006.2007 2007-2006 2006-2009 2009-2010 2010-2011 Totals Design I Inspection $ 382.500 OthS~ Conlracl SeNlces Land f R;ght of W.y 6,367,922 Improvements. 3,365,999 Machinery I Equipment Miscellaneous 76,500 Insufficient funding within CIP tirne ftame $10.192.921 TOTAL PROJECT MANAGEMENT FTE $ 10.192,921 STAFF CONTRACT $10,192921 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New Community Needs Assessment PARKS DESCRIPTION - LOCATION This Project provides funding to undertake a Community Needs Assessment that can be used to collect information and to specifically develop a strategic plan identifying recreation service delivery needs and an implementation plan. COMMENTS It is anticipated that the project will take 15 months to complete. The total project cost is $62,000 The project will utilize Consultant Services to work with Staff and the Community to identify needs and opportunities for Recreation Services. Among the study components are the possible use of focus groups and community surveying. This project will assist in the data collection that will also be useful in assessing how services are provided to a diverse community Funding of this project will support data collection to address the following High Priority City Council Goal: 2006-2007 GOAL Develop a comprehensive community-wide diversity plan. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection 001 S 49,600 S 12.400 $ 62,000 Other Contract Services S 60,400 Land I Right of Way Improvements Machinery I Equipment Miscellaneous 1.600 TOTAL S 62,000 $ 49,600 $ 12,400 $ 62 000 PROJECT I ~TAFF MANAGEMENT (FTE) CONTRACT ~ 1 '2006 3:48 PM 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Wallis Ranch Neighborhood Parks ACTIVITY PARKS DESCRIPTION - LOCATION Q ........- This project provides for the design and construction of 7.66 acreS of neighborhood parks in the Wallis Ranch development project. ~. -....... -J....-.. .........., ~.~ .~. ... ~ \ 1:..."'........ \,. \ ....... , "1 i ...",po......... C, __".. .. ......~.. I .Os , 1'1 Ii "~I 'I' t.' 1__, I, ~', \... 11('-- /' .'11 ...1_...._ I I 'J , -I?'llh'- -. I ",1" -1-; ii, $?-1iI1 ~._'- I I.,/ll ,- "cl': " ~,I PR~A' IEr +,_ ,i'i~~"1 I" I, ilj, - -- ,,11,"1 :I. ;;! - "i!' -,.1-::l l - "8'-- i:j;-D!JIiiI~INBLVD_-- ___rElJll -_II"IA I .,,"" I 'f-/- ----, - q~ Ce~~ .__~.___Jh.....___.-,._ .--_~____. . , ~ 1 -~.. COMMENTS The proposed Wallis Ranch project provides two neighborhood parks totaling 7 66 net acres. The parks will be designed in accordance with the Neighborhood Park Standards contained in the Parks and Recreation Master Plan. These standards identify the following amenities: tot lot and apparatus play area; picnic tables and secluded space for informal family picnics; open space meadow for informal sports, games and passive activities, and sports facilities such as practice ball fields, tennis courts, volleyball courts and basketball courts. Although it is anticipated that the land will be dedicated by the developer in exchange for credit against Public Facility Fees, for the purposes of this CIP, the land costs have been included. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Year. 2006.2007 2007-2008 2008.2009 2009-2010 2010.2011 Total. Design I Inspection $ 287,470 Other Contract Services Land I Right of Way 6.479.290 Improvements 2,529,720 Machinery / Equipment Miscellaneous 57490 Insufficient Funding within CIP Time Frame $ 9,303,970 TOTAL $ 9,353970 PROJECT I sTAFF MANAGEMENT tHEl CONTRACT $ 9.353,970 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 94520 Tri-Valley Triangle Study STREETS DESCRIPTION - LOCATION The purpose of the Tri-Valley Triangle Study is to develop a sequencing strategy for improvements identified in the Alameda Countywide Transportation Plan for the 1-580, 1-680, and Route 84 corridors. Since needed improvements for these corridors are underfunded, consensus on critical projects is essential. , COMMENTS In partnership with the Congestion Management Agency, Livermore, and Pleasanton, the City will contribute a maximum of $60,500 to the Triangle Study's completion. The study is currently underway and expected to be completed by fall 2006. The City will be billed for these expenses in Fiscal Vear 2006-07 This CIP will accomplish the following High Priority City Council Goal carried forward from Fiscal Year 2005-2006: 2006-2007 GOAL Participate in Tri-Valley triangle analysis to prioritize 1-580, 1-80 and Route 84 transportation improvements FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006.2001 2001.2008 2008.2009 2009.2010 2010.2011 Totals Design I Inspection 001 $ 60,500 $ 60.500 Other Contract Services $ 60,500 Land I Right of Way Improvements Maohinery I Equlpmanl Miscellaneous TOTAL $ 60,500 $ 60,500 $ 60 500 PROJECT I ~TAFF MANAGEMENT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96010 PROJECT DESCRIPTION Dublin Boulevard Improvements - Sliver ate Drive to Hansen Drive ACTIVITY STREETS DESCRIPTION - LOCATION e This project will widen Dublin Boulevard between Silvergate Drive and Hansen Drive from two to four lanes and realign the Dublin Boulevard/Silvergate intersection into a standard 'T intersection. This widening will take place on the south side of the street where there is sufficient right-of-way to make these improvements. In addition, the project will repair the existing roadway section, which is creeping due to soil instability A traffic signal will be installed at the intersection of Dublin Boulevard/Silvergate Drive. \ "( --.... \.. \ "" -'*....-. ... 'i ..... c. ' '....-"".- .............1'7'.:.'.. -I .......!':I" I,ll ~ I' - - oI"II"\......\:\ \ ),,;,J.~ II'''I'!'''..'I'''''' \ ~ \ I r- ,..~.C~.i"\,:~ -,?: ;i) __ -11, ;~~I n ,I', I A'j~\; - ~/'I:<;~~# @ ~ I'~ f,JJjL!i \ " ", it 01% L ,~' ,I ~\ , iljl 1-- I'~~' ,\:l:i>'i"i\' '-;\<_~~<""",. ; DU.~I~I.:v-.,-1 j I-~" ~'I t "'\;I- ,--,"' ~ ,..-'-;._~ \~.' I I , ,...~.~.., '..:1,,~. -- '_~----I._ '_ ~ ,if.., or-~'~ 1 1-180- _.._~~.~, ,', -."':" - - "Civic. Center )oJ>:" 1"'. i ._ ~_I 'r"7':7"'\.; _ ~ y 1- -- ,~ .... , COMMENTS The addition of new residential projects and expansion of the Valley Christian Church/School require the widening of Dublin Boulevard from two to four lanes between Silvergate Drive and Hansen Drive, In 1992, an initial phase of the work realigned the Dublin Boulevard/Silvergate Drive intersection through restriping and pavement modifications, The developers of the Valley Christian Center, Hansen Hill, California Highland and SChaefer Ranch projects are obligated to share the costs of this project, based on their proportionate generation of traffic. To date, developer fees in the amount of approximately $720,000 have been expended to construct portions of the project, including the installation of a traffic signal at the intersection of Dublin Boulevard and Hansen Drive, the widening of DUblin Boulevard just west of Hansen Drive and the modification of a private driveway south of the intersection to align with Hansen Drive due to the signalization of the intersection. The final phase of the project will widen Dublin Boulevard to Silvergate Drive. For the purposes of this CIP, the estimated cost of this phase is approximately $2,880,000; however, Schaefer Ranch development will perform the actual construction of the final phase of the project as a condition of the project's Development Agreement The unspent development fees that have been collected by the City will be contributed toward the project's construction. As of June 30, 2006, $44.619 remains in the fees collected to fund the final phase of this project. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Ye.", ZOOS-Z007 Z007-Z008 Z008-2009 Z009.Z010 2010-2011 Totals Design I Inspection $ 556.686 300 $ 719.976 Other Contract Services 163,594 Land I RI9ht Df Way Improvements 2,861.926 Machinery I Equipment Miscellaneous 15,251 $ 2,B77,5B1 $ 3,597.557 TOTAL PROJECT MANAGEMENT FTE $ 3.597 ,~~7 STAFF CONTRACT $ 719978 $ 2,877,~81 0.45 0.38 $ 3 597,557 ThiS project would underground existing overhead utilities along Dougherty Road between Sierra Lane and Dublin Boulevard as well as a portion of DUblin Boulevard between Dublin Court and Dougherty Road and Scarlett Court from DUblin Boulevard to 560 feet south of Dublin Boulevard. Mil... , - PROGRAM N ACTIVITY oulevardl STREETS d Vicinity \ i ___.......-.. \. \ 1lI ........-.. '< --... c. \ 1"'......_..-- .._..--"(".....r ! , f'#'--"(!--'~ . ,_I 'r--~'\""..., . , \LJ.' ,- "', , """--L i"l' 'Iii ~' ,I', I J. ,-- '" w-'1'.' ill ',-' I I /Id-' .#.,: i - l I :'}i" , ~I~TI_~ ~,' [ '. , ,- IF -- ~:Jr~.. ,Ii ,'.' . .:.- I }t11 ; ~',,"~~oorNTI I' , , : ", '1<.,; " f- _.' .\ .~,.,._-j ""-_'P ,:;......____,____::;!"'_.. r',.~__ [ '1 ,.... ., Civic Center with PUblic Utility Commission (PUC) Rule ciated with Scarlett Court and traffic signal , and developer contributions would pay the included in CIP #96852 - Dougherty Road - /YEARS SCHEDULE 2008-2009 2009-2010 2010-2011 TotIIll;i $ 709.840 $ 759,840 2006-2011 CAPITAL IMPROVEMENT PROJECT NUMBER 96082 PROJECT DESCRIPTIO Underground Utilities - DUblin B Dou hen Road Intersection an DESCRIPTION -LOCATION 9 COMMENTS The majority of funds expended under this project will be reimbursed 20A funds collected by the City, except for improvement costs asso work. The Rule 20A PUC monies, reimbursements from other utilities City's project costs. Staff costs associated with this project have been Houston Place to 1-580 ESTIMATED COSTS FINANCING fund Prior YBars 2006-2007 ~007-2008 Doslgn flnspection $ 04,016 001 $ 756.840 $ 3.000 Othe~ Contract Services land I Righl of Way Improvements 704,295 Machinery I Equipment Miscellaneous 1,0:29 TOTAL PROJECT MANAGEMENT FTE $ 759 840 STAFF CONTRACT $ 70$,$40 $ 3000 2006-2011 CAPITAL IMPROVEMENT PROGRAI'I PROJECT NUMBER 96400 PROJECT DESCRIPTION Eastern Dublin Arterial Street and Freewa 1m rovements ACTIVITY STREETS DESCRIPTION - LOCATION This project establishes official Plan Lines for major arterials in eastern Dublin, and constructs improvements to those streets for the portion being funded by the Eastern Dublin Traffic Impact Fee (TiF). This project also inCludes engineering studies to update traffic impact fees as development occurs. repayment of loans from Pleasanton for the initial 2-lane construction of Dubiin Blvd. and Freeway Interchange; and from Alameda County and BART for roadway access to the eastern :'11 DUblin BART station. Also included are obligations to Alameda County for a BART Parking Garage expansion. COMMENTS Required improvements are currently estimated at approximately $127 million. This includes improvements already completed by Developers as well ' as future work required, The amounts shown as "prior years" reflect the work done by the City to date on engineering and fee studies. Projected expenditures for Fiscal Years 2006-2007 through 2010-2011 inClude improvements anticipated to be constructed by developers in return for Eastern Dublin TIF credits during each of these years; however. since these projects are not yet bonded. it is assumed for the purposes of this CIP that the City will pay for the work out of the Eastern Dublin TIFs. The insufficient funds estimate of approximately $38 million reflects projects forecasted to be constructed after the five-year time frame of the CIP This project does not include Eastern Dublin TIF projects that have become individual Capital Projects identified elsewhere in this document 9 MIIIII~ , ~",""'''1 ......-~.. I' .-" I L_ -" --- -....... -...... ~ \ i "....,... \.. \ .......... \ 'i ...... \ ......0: .-'1 \ ~ "'~', 1111':-- , , I".':'\:- ..: ,_.,.J ~.rll_~.; ..cT.l J~ 1'1 Projects completed or guaranteed during Fiscal Year 2005-2006 included; partial payment to Pleasanton for Interchange Improvements ($387,628) and Dublin Blvd. Roadway Advance ($788,738); median work in DUblin Boulevard just east of the old Southern Pacific Right-ol-Way; the extension of Dublin Boulevard to Fallon Road; the extension of Central Parkway to Fallon Road; the dedication of Tassajara Road right-of-way near its future intersection with Fallon Road; and the dedication of right-of-way and installation of two traffic signals on Fallon Road between Dublin Boulevard and Central Parkway Future projects include: 2006-2007 Installation of a westbound right-turn from Dublin Boulevard to northbound Hacienda Drive, pavement overlay on Central Parkway just east of Tassajara Road, dedications and improvements along Tassajara Road south of the proposed intersection with Fallon Road. and improvements to Fallon Road between Dublin Boulevard and 1.580. 2007-2008: Installation of the western side of Arnold Road along Camp Parks, and improvements to Tassajara Road from just north of its intersection with Fallon Road south to Dublin Boulevard. 2008-2009' Installation of a bridge and improvements along the east side 01 Tassajara Road north of its intersection with Fallon Road. the installation of an additional right-turn from northbound Tassajara Road to eastbound Dublin Boulevard, and the completion of the northerly connection of Fallon Road to Tassajara Road. 2009-2010: It is anticipated that the proposed park-and-ride lot at 1-580 and Fallon Road will be constructed. Throughout the 5 year period payments are expected to be made to reduce obligations for advances and loans held by the City of Pleasanton; Alameda County Surplus Property Authority; and Bay Area Rapid Transit District FINANCINGNEARS SCHEDULE Fund Prior V.... 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Tot.ls $ 178,667 300 $ 2,581,382 $12,193,679 $ 12,201,923 $ 6,479.786 $ 2,866,892 $ 375.218 $ 38,718,660 662,007 ESTIMATED COSTS Design I Inspection Olhe.. Contract Services Land I Right of Way Improvemsnls Machinery I ~qlJipment Miscellaneous. 61,635,061 14.250,409 $ 78,731 194 STAFF CONTRACT Insufficient funding within CIP timE! kame 38,012,334 $ 2.581.362 $12.193.879 $ 12201,923 $ 8.479.786 $ 2,BBB 892 $ 375.218 $ 76731194 0.04 TOTAL PROJ"CT MANAGEMENT FTE PROJECT NUMBER 96430 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION 1-580 & Fallon Road Freeway Interchange Improvements - Phase I ACTIVITY STREETS MlloIIt , , _.00; \... \ 1II '............ I \ 1" '< ...........P*.,' I .-'~ I i- I '" L-----I i l il, DESCRIPTION - LOCATION e Phase I of this project would improve the I-S80/Fallon Road freeway interchange to accommodate future traffic in the next 10 to 15 years, including traffic generated by several recently approved developments in eastern Dublin. Phase I consists of the following: c -'~ -..,.. .~. ~.~ .......-- ~.~ ,.......,.~- 1) Widen existing Fallon Road overcrossing to provide two lanes in each direction 2) Widen eastbound 1-580 offramp to provide a second left-turn lane at the ramp end at the EI Charro Road intersection and install a traffic signal at EI Charro Road 3) Construct a southbound to eastbound 1-580 two- lane loop onramp (one mixed-flow lane with an HOV bypass) , "I I I I -- r~l~ I !H'I '; J !1 :---.,--I~ ' I -,' ''''', 1,[ . I "I I I~. ~ 'f:;, P R F T A 1'-1 I!i ,=-~:~ ,,~I~, " i - -'- ~1_111 ~ h --"".~ I 'r' 1/ .ILLt. c. I_,~L __ DU rnroLVD ~--~ L..c'::1T1 ~'.II' ~I I ,- I 1-1 I )1 - - ~ L~- - -- _~_.._ __..., ..L.. ~'(- .!"'..~ . . -;""-"- ,- . "".-~~~. 4) Widen northbound Fallon Road north of the 1-580 over-crossing for additional capacity at ramp intersection 5) Widen westbound 1-580 offramp to four lanes (two left- and two right-turn lanes) at the Fallon Road intersection 6) Widen Fallon Road southbound and north of 1-580 approaching the intersection with the westbound ramps 7) Widen westbound 1-580 onramp and install Fallon Road traffic signal 8) Adding one westbound 1-580 auxiliary lane 1,300' in advance of the interchange COMMENTS New traffic from eastern DUblin development and from adjacent communities will require a new bridge and ramp modifications at Fallon Road over 1-580 to maintain the level of service within the range established by the City's General Plan. The Eastem Dublin Traffic Impact Fee (TIF) is expected to fund Dublin's portion of this project The developer of Dublin Ranch has deposited monies for preparation of the State-required Project StUdy Report, Project Report and Project Design, and has agreed to fund the Phase I construction, Pteasanton requested that Dublin amend the Project Report to include additional improvements associated with proposed developments in Pleasanton, This work includes a northbound Fallon Road to westbound 1-580 loop to accommodate traffic from the proposed Staples Ranch development in Pleasanton, A funding agreement between the two cities has been approved for the design and construction of the northbound to westbound loop, and the cost of this improvement is being reimbursed by Pleasanton. DSRSD has also requested the installation of a 20" potable waterline within the Caltrans right-of-way as part of the project, and has agreed to pay for its design and ultimately its construction. The ultimate phase will be required once the area becomes fully developed. It is anticipated that Pleasanton and Livermore will contribute their fair share of the cost of this ultimate project ESTIMATED COSTS Fund !=Jrlor YiEl3r8 FINANCINGNEARS SCHEDULE 2006.2007 2007-2008 200S-2009 2009.2010 2010.2011 lotals Design I Inspection Other Contract Servioos Land I Right of Way Improvements Machinery I Equipment Miscellaneous TOTAL PROJECT MANAGEMENT FTE $ 329.925 3,904.725 001 300 $ 4Z5,623 $ 670,178 $ 125.000 2,429.030 8.525,759 3,238,099 $ 1...0,801 14.192.888 11,110.000 19.039 S 1$ 413 689 STAFF CONTRACT $ 2,854,853 $ 9,195,937 0.54 5.01 $ 3.363 099 0.33 1.79 $ 15.'13,689 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96452 PROJECT DESCRIPTION Downtown Traffic Signal Equipment Re lacemen! ACTIVITY STREETS DESCRIPTION. LOCATION e This project is designed to acquire advanced traffic signal controllers, central modems. controller modems, and other related equipment over a five-year period ending June 30, 2007 This project will improve the interconnection of traffic signals within Downtown Dublin and integrate these signals into the City's TOC communication network. Wi ' 1: ............... -< \-..~_........- ~~~~~' ,'-;~' ..... I'. ...... ", .......~. II"~ \ I _.-.~.~,'\ ' ' ' ,"'- ] ~"""'.L ,Iil-', ~,,-,::'';''~\\ \\ '-~"~ ~, I' - I' . I!..&Q.:' _ l - --, -J' ; iii, Cr'';<~', r-' L ' II - ( ,'i. .l.. :4~"', r It: , . ,~I . . ' gt~, ",.c " /: P R F TAL. "f . l.' " I g'l' 1 '" .,-- '\' ,. -- , ,0; T I I' z I _ c ,~-tl, ...." '1''' ~_. I !!! , I" -- -. 11;,.. !il' ,--I- o. , }. . ,,ta, ,!!>, ."'!fL", . 8\DoB~1II Lw:' --1- 'l! - I -, -<"'lI', '. \~~_..<'<> I I -=- r II.'. '.:: l""^"....._-:J L I ;-- , . . ~~ _ \ '<, ....!'_~~ - -~~ -~- ~ i--i ~-;:G8D - _________-=1..:-.-.." ~ " \, H -- ---:::--'-::'""""""L!i,," - ". CIVIC Center ,~'" . , - , " II --' }.- _'I 1--. ", I "N , COMMENTS This project is needed to establish central communications with traffic signals in Downtown Dublin and facilitate signal coordination to improve traffic flow. Some of the City's existing signal controllers are 1 0 to 15 years old and are technically outdated. The installation of state-of-the-art traffic signal controllers and communications equipment will help expand the central traffic management system for the 1-580 Smart Corridor Project by allowing the downtown traffic signals and future traffic monitoring cameras to be added to the system. The 1-580 Smart Corridor system is designed to allow the City to monitor traffic flows on major streets from a central location, detect traffic incidents, and manage the timings of the traffic signals based on an automated time-of-day schedule. The system also serves as an important tool to diagnose reported problems at signalized intersections from the Civic Center and possibly identify the nature of the problem before directing signal maintenance staff to travel to the site for troubleshooting purposes. This CIP project has enabled the City to accomplish the following tasks: ~ ~ 2003-2004. Upgraded traffic signal controllers at six intersections on Dublin Boulevard and coordinated the signals between Hacienda Drive and Scarlet! Drive during weekdays. ~ Year 2004-2005. Coordinated the signals on Dublin Boulevard between Village Parkway and Regional Street for the morning commute period. Fiscal Year 2005-2006: Upgraded traffic signal controllers at seven intersections on Amador Valley Boulevard and on San Ramon Road, and integrated these signals into the 1-580 Smart Corridor system. In Fiscal Year 2006-2007, four signal controllers on Village Parkway will be upgraded and integrated into the system. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund P,;o, Vo... 2006-2007 2007-2006 2006-2009 2009-2010 2010-2011 Totals Do.lgn flnspoction $ 16.507 001 $ 106.786 $ 24.057 Other Contrac.t Services Land J Right of Way Improvemenl.$ 114,336 Machinery I Equipment Miscellaneous $ 130.843 TOTAL PROJECT MANAGEMENT FTE $ 130,843 STAFF CDNTRACT $ 106766 $ 24057 0.02 $ 130,843 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96480 PROJECT DESCRIPTION Downtown Dublin Roadway Improvements ACTIVITY STREETS DESCRIPTION -LOCATION The City Council established a Traffic Impact Fee (TIF) for future developments within the downtown area of Dublin. The Downtown TIF program Identifies six roadway improvement projects as listed below. These improvements will be required to mitigate future traffic impacts generated by new development in Downtown Dublin. 1) SI. Patrick Way Extension 2) Golden Gate Drive Widening 3) Dublin Boulevard/Golden Gate Drive Intersection Improvements 4) Dublin Boulevard/Amador Plaza Road Intersection Improvements 5) Dublin Boulevard/Dougherty Road Intersection Improvements (includes widening of Dublin Boulevard between Dougherty Road & Sierra Court) 6) San Ramon Road/Dublin Boulevard Intersection Improvements 9 '" ' "'1'...._....-...... \.. \ ...- 1" '( ......... C \ ............,. ....-, .......-.., _..':'"'-~~~ I' I ,,",""~,'t~~ -, I,\I'~.' ....,.!',..~:r:'::.. ., " _oli : ,.' /-:.J I . .....~._r'-...I. _ -'1". .~I 1" _.J' "t-. ri.~'!"" '+ I ,I. ...l :E.I . ~ J '- ' .' \-' ! ("I," -'.... ~ ''''''-\'''';1 ~I ' I ,\, 1011' I ( :!i>"'~,. III:: . I J II I -.t, 'i~l#"".:, l;l- P R F T A 111-"'j- 1_'1,.-' ~\ \. '-.; '. .~>' , ,li~L r'"1 1l~1 ,-' ",,'Ir-,~~ - -c, '1g.. .--. .~L ,,'I' , ., I, "ii." ,'o,,"I.IN." . D. U'","'LVD. . __ lll_ _ \ .J,..,. I I . \}\_ .8.(.107j _._ :. j-I ...~ ~ '~~'; . J ' J 1 . I , ", ...~~., ....-. ....::.:.~__..,. -~..-;:;;, .__.f[~. -.---.-.-.-./ Civic ce~t;l ",- , I ' I The total cost for these improvements was estimated to be $8.711.298 in 2004 when the TIF program was adopted. including the cost of developing and updating the program. COMMENTS Specific CIP projects have been set up for improvements (1) and (5) listed above. As a result, expenditures using funds collected from the Downtown TIF or other sources associated with these improvements are not reflected in the schedule below to avoid double-counting of expenditures. The estimated cost for the remaining four improvements is $6.566,272. The City has accumulated fees and traffic mitigation contributions from a number of development projects, which will be used to fund the six improvements listed above. Through the end of Fiscal Year 2005-2006. total funds available for these improvements are estimated at $602,458, Depending on project priorities and needs to support development in downtown Dublin, these funds could potentially be used to fund the four improvements included in the schedule below. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior V..,. 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design {Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 300 $ 30,411 $ 2fl7,153 8.883 292,567 5,995,105 1.992 $ 345.761 $ 1.254,521 $ 1,632.685 1.992 $ 345761 $ 1 2S4,521 0-02 4,933.587 $ 6.566,272 TOTAL $ 6 566 272 PROJECT I STAFF MANAGEMENT (FTE\ CONTRACT $ 30,411 $ In5uffiCisnt Fl,lnding within CIP Time Frame 2.564 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 96580 Annual Street Overlay Program STREETS DESCRIPTION - LOCATION This project provides for the placement of a 1-1/2 inch asphalt overlay on streets that are presently in a deteriorated condition at various locations. COMMENTS As streets begin showing structural failures, it is important to reinforce these streets with pavement repairs and overlay to reduce the need for more costly pavement reconstruction in the future. The City's Pavement Management Program has provided the City with funding guidelines and priorities for maintaining the City streets. The scope of work in this annual program includes removing and replacing failed pavement, placing 1-1/2 inches of asphalt concrete overlay, and restriping the street. The City is receiving Traffic Congestion Relief Program funds (Fund 240) for improvements in Fiscal Year 2006- 2007 and Fiscal Year 2007-2008 as well as Alameda County Congestion Management Agency (CMA) TIP funds (Fund 228) in Fiscal Year 2007-2008 and Fiscal Year 2008-2009 for improvements on arterial/collector streets, This program will protect the substantial investment the City has in its street system. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Ptior YGi!lrs 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design { Inspection $ 224.860 206 Annual $ 240,000 $ 240.000 $ 480,000 Other Contract Services 43.866 217 Annl,Jl;Il $ 407.148 $ 115,400 $ 383,400 382,400 385.400 1.673,748 Land I R.ight of Way 228 Annual 289.000 217 .000 506,000 Improvements 2,727.873 240 166.673 172.000 338,873 Machinery I E.quipment Miscellaneou!i> 2.000 TOTAL $ 2,998.821 $ 574021 $ 576.400 $ 600 4D0 $ 622 400 $ 625.400 $ 2 998 621 PROJECT I STAFF 0.33 0.30 0.30 0.30 0.30 MANAGEMENT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 96585 Annual Slurry Seal Program STREETS DESCRIPTION - LOCATION This program would slurry seal existing street surfaces as a preventive maintenance technique used to prolong the life of asphalt concrete pavement. COMMENTS As streets begin showing some wear and stress cracking, it is important to seal the cracks to keep water from getting into the roadway subgrade, and to prolong the life of the asphalt concrete pavement. Slurry seal consists of a sandloil mixture which seals cracks and provides a new uniform wearing surface. The City's Pavement Management Program provides the funding guidelines and the priorities for properly maintaining the City streets. This program will protect the substantial investment the City has in its street system. It is proposed to complete specifications and bid process late in the current fiscal year and start improvements early the following fiscal year By doing so, it will minimize impacts to school traffic and maximize weather conditions to apply a slurry seal treatment. FINANCINGIYEARs sCHEDULE EsTIMATED COsTS Fund Prior' Yaars 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 206,020 206 Annual $ 78.020 $ 898.570 $ 020.000 $ 545.000 $ 570,000 $ 2,411.590 Other Contract Services land / Right of Way Improvements 2,203,070 Machinery I Equipment Miscellaneous 2,000 TOTAL $ 2.4",S90 $ 78 020 $ 698.570 $ 520,000 S 045 000 $ 570,000 $ 2411590 PROJECT I STAFF 0.19 0.30 0.30 0.30 0.30 MANAGEMENT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96773 PROJECT DESCRIPTION Alamo Canal Trail Under 1-580 ACTIVITY STREETS DESCRIPTION - LOCATION e The City of Dublin is working jointly with the East Bay Regional Park District, the City of Pleasanton, Caltrans and Zone 7 in preparing an engineering study to determine the feasibility of constructing a trail underneath 1-580 This section of the trail will connect the segment of the Alamo Canal Trail north of the freeway (adjacent to the City Library) with the Pleasanton trail south of the freeway to transform it to a regional trail. ",,' "1'.........-..... \... \ ....~- C \""t ;.......... ....~-..r ..... I .o:....~..~ ','. ...",-r-~~ ,'I "I _..~" , ~. .-.~. '-,' ~i'~.,.,-"~I 'Ti" ",1'-=4 I . I . _I (E.I ~~I, I I -"--I' "I " ' -, _ ~ ~\.o:, ,. ] ,-', - _,!/g,li'-" "~c ,,',....~ -I, - [~I I '1' I .~. :,~lllll ""~" I Q' I - ,. I --:' ;.' '\' I!, ';$ "'IILP R F T A I ~-- i!i '1' I > IT-.. .~L ',I . ;,",~.~" ," ,',-' , ~,f-+t I L.... ~ jl~1 '.-, I.JI:~~-'I\!.: "\ r '-' - j!:" -- I :: .1.., .~ \.. ,~OtJal'i.. ". ~i-DUBUN BLVD .'."L] -.. ': '~" -'7~<'" , !-T,-,}- I r, "T I'. \ \ r...... -_.~""'...._._-__.l._.. ,~... !:, , ,r......_......- I-l1Il!IIo _____.._..____11 .""' , COMMENTS The Alameda County Transportation Improvement Authority has approved Measure B funds in the amount of $50,000 for the study, requiring a local match of $25,000 each from Pleasanton and Dublin. The study is scheduled to be completed in November 2006 and based on the results of the study, the City will join together with other agencies to acquire the funds necessary to construct the project. ThiS CIP will allow completion of the following City Council High Priority Goal: 2006.2007 GOAL Complete work with EBRPD and the City of Pleasanton to conduct a preliminary engineering study and identify funding sources to facilitate the connection of Alamo Creek Trail under 1-580 to Pleasanton trails. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorY.." 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design II nspection $ Othe~ Contract Services Land! Right of Way Improvements Machinery I Equipment Miscellaneous 6.490 25.000 227 $ 16.500 $ 14,990 $ 31,490 TOTAL PROJECT MANAGEMENT FTE $ 31 490 STAFF CONTRACT $ 16.500 $ 14880 0.02 $ 31,480 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 96775 Citywide Bicycle I Pedestrian Plan STREETS DESCRIPTION - LOCATION This project provides for the development of a City-wide Bicycle Master Plan that would evaluate existing bicycle conditions and incorporate an integrated plan including access to parks and open space areas. The Master Plan is scheduled for completion in October 2006 and will be used to prioritize future bicycle projects. COMMENTS The City applied for Transportation Development Act Article 3 funding in the amount of $45,144 that would partially fund the development of the Plan. Supplementary funds from the Measure B Bicycle Program would be used to fully fund the project This CIP will allow completion of the following City Council High Priority Goal: 2006-2007 GOAL 1 Develop a City-wide Bicycle Master Plan including bicycle access to parks and open space areas FINANCINGIYEARS SCHEDU~E ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008"2009 2009-2010 2010.2011 Total. Design I Inspection $ 20.555 211 $ 39,000 $ 6.144 $ 45,144 Other Contract Services 60,144 ,27 13.500 22.255 35,755 land I Right of Way Improvements Machinery I Equipment Miscellaneous 200 TOTAL $ 80.899 $ 52 500 $ 28 399 $ 80 899 PROJECT I STAFF 0.06 MANAGEMENT (FTE) CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96840 PROJECT DESCRIPTION Scarlett Drive Iron Horse Trail Extension ACTIVITY STREETS DESCRIPTION - LOCATION e This project would provide an extension of Scarlett Drive and relocate and enhance a portion of the Iron Horse Trail. The roadway element is a connection between Dougherty Road and Dublin Boulevard (within the former Southern Pacific Railroad Right-of-Way). V \ " .............. \.. \ ...-..".~ \ \..'!..~'f."'- ........... 'I','"> - -I __....-~ ,11111\ r _"'l"''''' il:, '\ I .,."....~1"1'o:"'.. ~..,. C :-r :- , L \- I; ) '- ~..,. " -,-,J -~. _I' --c-' ~-~-,' . ',\,,\ _', ~I "" r lL '-,'1 l \ I .1-'.II.h -:' ~ 1111 I' '\\~. '. ~IV ~ j ,I" i',;,--j.,_:" ~~~ ;" l: I J 1-11n-;~__1 "\ I .~ ';'\ '\~~/J""t,-= ,D\J '1 -' I \ ., ')~ -'7'-<....FIJ I I.J I - I" - , \ " ~]. ~ ~_... <o,I.~'!.___ _ ~_.""~~___ -^.,._,"C~-:> ''\; . - ','_, '''''''1.. - ";:.:""1---- '-""':,~-:::~fv.- ". CIvIc Canter ,..;<t;:: '. '-\i.' ::1 111- .'.. , COMMENTS The extension of Scarlett Drive, which is included in the Dublin General Plan, will relieve traffic congestion at the Dougherty Road/Dublin Boulevard intersection, especially for BART Station-bound traffic. The project costs will need to be funded by developer contributions, County-Wide half-cent transportation sales tax. Eastern Dublin Traffic Impact Fees (Category 2), and Contra Costa County contributions. Approximately $81,955 in project specific miti9ation contributions are available for this project This project is included in the voter-approved Alameda County Transportation Expenditure Plan funded by the half-cent sales tax. The sales tax funding programmed for this project is presently $5.82 million. and is subject to approval by the Alameda County Transportation Improvement Authority (ACTIA). A portion of Scarlett Drive from Dougherty Road to Houston Place was constructed by a private developer as part of the Scarlett Place housing development, located next to Scarlett Drive, The value of the dedicated street right-of-way and street improvements was estimated at $2.386.360 The total cost of the project has been reduced by this amount to reflect this improvement. A future development that could impact this project is the City General Plan Amendment being proposed by the Federal Government at Camp Parks. This development would be located on the southern parl of the Camp Parks property generally bounded by Dublin Boulevard, Dougherty Road, Arnold Road, and 5th Street Any proposed streets within this area could impact the extension of Scarlett Drive. Project development, including preliminary engineering and environmental work, was performed in Fiscal Year 2005- 2006, using traffic mitigation fees specifically collected for this project Design work is proposed for Fiscal Year 2007- 2008, right-of-way acquisition in Fiscal Year 2008-2009, and construction in Fiscal Year 2009-2010 FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Yelilre. 2006-2007 2007-2006 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 787.160 217 $ 3.500.000 $ 2,323.465 $ 5.823,465 Other Contract Services 783.956 300 $ 234,632 $ 495,817 1.806.146 2,426.378 4.962,972 Land f Right of Way 6.170.000 Improvements 4.023.352 Machinery I !::.quipment Miscellaneous 21.969 TOTAL $ 10,786.437 $ 234.632 $ 495 817 $ 5306145 $ 4,749,843 $ 10 786.437 PROJECT STAFF 0.18 0.16 0.32 MANAGEMENT HE CONTRACT 2.82 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96850 PROJECT DESCRIPTION Dougherty Road Improvements . North of Amador Valley Boulevard to North of Houston Plsce ACTIVITY STREETS DESCRIPTION - LOCATION e This project consists of two phases. The first phase widened the travel lanes by removing existing dirt medians on Dougherty Road and replacing them with new pavement. This completed the ultimate pavement improvements for southbound traffiC for this segment of Dougherty Road. A second phase of this project will widen Dougherty Road from four to six lanes and will include landscaped medians from Amador Valley Boulevard to north of Houston Place. \""( --.... \..' ~"......,;.. -T't .... c. \ '.........."'.. _...--~!'f'?'1 I --'!!''' I I~ 'r~ I ~. - _.."...~.._- ~ - \ 1. -~- ~II"'I'" I - Ii'" 1 ~..-~r~ ,'\ \ . (J!:I,,,,,-; ~. ~ - 1'-, c,\g" !. j~!i;" "," ,,,,<;\"";;;,11 ,~II tl ~I \;Z" ~~J - ,",,~,- p:; I 1-: --. i -", \\i'" ,~., '~G#'" Ii ,P R F T A 11111.' '-r"'" \' 'IF ili I' :l~11 \:~ " Ij~ji'~~ _', ~.~-\ I, - '~ ,~- !i'r- ~I' '1'-' -. " If.~ ", - '><IB,,,, IS -DUJI,,,,!.cv,;' il--I L, "\ ~ ~ -" '\:;. >-- ~~"?~ ' 1 I I - . I\.J A7h .J~...L - , ~ " ,\ ~- .~,,--~" '-'<,- -~~-~-"'l"" ~ - ~'!""t..-~'!-~""'~ I L ~a,.L.!.9~ - I ":-i -- J" -i~'" I CIVIC Ce"t"r ~ .", \ 'n ' ---L .." _~ I .... , COMMENTS The first phase of this project allowed the two southbound lanes to move away from the westerly curb, thus improving intersection sight distance and providing an area along the curb for bus stops, emergency parking and on-street bicyclists. The City received an intermodal Surface Transportation Efficiency Act (lSTEA) Grant to fund the bulk of this project. The City also overlaid this segment of Dougherty Road, including a portion of Dougherty Road north of Amador Valley Boulevard. The second phase of this project is anticipated to be funded by Traffic Impact Fees, including contributions from the Dougherty Valley (Contra Costa County) projects and eastern Dublin. To date, approximately $168.675 of project mitigation contributions have been collected and are available for this project. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund PrlOtVeats 2006-2007 2007-2006 20011-2009 2008-2010 2010-2011 Totals Design II nspection $ 450.959 206 $ 139,186 $ 139.186 Other Contract Services 149.090 210 285.044 285.044 L.and I Right of Way 217 62.269 62,269 Improvements 3,481.346 220 69.340 69,340 Machinery I Equipment 300 14.430 $ 3,664.698 3,679,128 Mi5c;;:all~nsou$ 153.572 TOTAL $ 4 234 967 $ 570 269 $ 3,664,698 $ 4 234 867 PROJECT STAFF 0.82 MANAGEMENT FTE CONTRACT 0.26 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96852 PROJECT DESCRIPTION Dougherty Road Improvements - Houston Place to 1-580 ACTIVITY STREETS DESCRIPTION - LOCATION This project provides for acquisition of right-{)f-way and widening of Dougherty Road between 1-580 and Houston Place, and required improvements at the intersection of Dublin Boulevard and Dougherty Road, To accommodate the necessary left-turn, right-turn and through lanes, the following improvements are proposed: 1) Widen northbound Dougherty Road between 1- 580 and Dublin Boulevard 2) Widen southbound Dougherty Road between the 1-580 westbound onramp and Dublin Boulevard 3) Widen southbound Dougherty Road between Dublin Boulevard and Sierra Lane 4) Widen westbound DUblin Boulevard between Dougherty Road and approximately 500 feet east of Dougherty Road 5) Widen westbound Dublin Boulevard between Dublin Court and Dougherty Road 6) Widen eastbound Dublin Boulevard between Dublin Court and Dougherty Road COMMENTS 6) , ~- L \ 1JI. ;,........-.....- "t'l .......... ~~1-~;~ , ........-.. ,111,.,1 I ~. .....,o"I"'I-...~.., ,-,-' .....~~.... ! -, \- ~ - I -'~' ,." ' i1 [' rt ...... 'I '" - '" I 'J \. o,J.,-" ,,~,<>,., I., 1"- f \ I "II', J- ~ ~.."~ ,," I '\'i' :~1Iil-;.i#<'1 ~ ,~ - II ,LI_ __ "II" \~'" , '-1, ,,' C:,:J:1V ,)I,~P R F T, A t~,,--~ ; I i- \ '- ~;,..", ",I, "llll:j 1.',,1,'_'-,,'\" d,;"'''' ' '1,1 .,,1 i ill ' . , ',t -:1, "Ttr:,~ ." ~"" ,"',' C,' S, _ I L_I II'-"L," , :~"J Il~,./ "l!ii,~ ....!!!iSi.' ;. . 8\...11I ~'LVD 'T;!" _ -' 'i H 1 ~.k '-!"&'-' '-.['--'] 1 ' , --1_" ." \~ ,,,It>,~ J -.,j\1 '\,.--\. ~'~ - ,," -'" :"" I I " ,','" "'.A' 'I", .il-","~-=- .~-4*...",-----~",~_-""", I .....~~..,,~ t" '.L', 1"'80" ," ,. -. , 'Il"'~~"''':: "-~"'" . ~._~~- J.~.'l-"--~~~"'- ',\; Civic Center I --" V:'-: \,' t ' .... , Recent traffic studies have indicated the need to widen Dougherty Road and Dublin Boulevard to improve the level of service at the intersection of the two roadways, which is necessary to accommodate planned growth in the Dublin General Plan and the proposed Transit Village at the eastern Dubiin BART Station. The project cost is proposed to be funded by developer dedications/contributions, Traffic Impact Fees (TIF), and/or outside grants. The City will have approximately $6,763,962 in Dougherty Valley TIF in Fiscal Year 2006.2007 which can be used for this project. The Downtown TIF program is intended to cover 16% of the total project cost when sufficient funds are collected from this program. The project is also proposed to be funded by $6,159,432 of Eastern Dublin Traffic Impact Fees (Category 2). Preliminary engineering and environmental work for this capital project were completed in Fiscal Year 2003-2004. Design and right-of-way acquisition started in Fiscai Year 2004-2005, with compietion in Fiscal Year 2006-2007 Construction is scheduled to start in Fiscal Year 2006-2007 ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior V..rs 2006-2007 2007-2008 2008-2009 2008.2010 2010-2011 Totlilll1o $ 15,753.964 Design Ilnspectioll $ 889.109 300 $ 2,830.570 $ 12,923.394 Other Contract Services 1,123.425 Land I Right of Way 8,660.0 17 Improvements 5.039.204 Machins!)' I !;.qulpment Miscellaneous 37,209 TOTAL $ 15753.964 $ 2,630,870 $ 12923394 PROJECT STAFF 0.97 MANAGEMENT HE CONTRACT 1.20 15753964 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96870 PROJECT DESCRIPTION Saint Patrick Way - Re ional Street to Golden Gate Drive ACTIVITY STREETS DESCRIPTION - LOCATION e This project will construct a 2-lane roadway between Golden Gate Drive and Regional Street, south of and parallel to Dublin Boulevard. \,. -.......... \,.,. ..... "( \. .-..... ~ ' 1: _.pIf!~" ~, . ......-..i1; I' -I --~-~,- , "ii' J- - .._~.~"'t.oot':\;:"" \:,~_.'. _..~~0~':"\ "...:. _'"I '"I'" I'e.;" , roo _~....., . ~1. >- "1 ,.k ~.1 :~j ~_:T. \-.~.._ ,- ~'-'l. '1' ,$1;_" ~"I I I ~ \i 1:/,1" ...~...." '1'1__. , ,-i,,}I:_ \l\",' :.,~t~~/~. ~ p Rf ~ T ~Ii~. --!In "1-' r" I ,.\\ ,,\"'.j __+.': ,- t rrr"\\~_-:,-\'\ .' ..'-,' gr - '--I-r' ~cr" .. -~:" :\','t\ ':;-'\~"!!!';'fe'~.:,~::~I~~~l'.!!' I J. 'I:" ,< '1 _ ~{(""c"'-'''-~-' .1"..,..._1 M-'~ ..:...~-...;...____.A:~bJII~~~~..;~t". I Civic cen~r '" I _I ,I~.ll~. I ~ ~~: --- '--r",;,--"'(II",: ," , .~ ',.,. ~!l .,\ .... , COMMENTS The need for a connector road for three long commercial cul-de-sacs Was first identified in the City's original Downtown Study This need is becoming more apparent as this portion of the Central Business District develops further and the proposed BART parking lot is constructed along Golden Gate Drive. The section of Saint Patrick Way between Amador Plaza Road and Golden Gate Drive was constructed by the Alameda County Transportation Authority (ACTA) as part of the 1-560/1-680 Interchange Improvements. It is anticipated that the City's project, between Golden Gate Drive and Regional Street, will be funded through private contributions in the form of the Downtown Traffic Fee, BART mitigation funds, and developer-built mitigation improvements. For the purpose of this Capital Project, the cost estimate is based only on the portion of Saint Patrick Way that is anticipated to be built by the City, which is physically the easterly one-third of the roadway segment ESTIMA TEa COSTS FINANCINGIYEARS SCHEDULE Fund Prior Year' 2006-2007 2007-2008 2008.2009 2009-2010 2010.2011 Totals Design ( Inspection $ Other Contract Services Land I Right of Way Improvements Machine!)' I Equipment Miscellaneous 170,735 300 $ 113,700 522,130 893,100 6.942 $ 592.490 $ 1 107.600 $ 1.707.032 1.367 TOTAL PROJECT MANAGEMENT FTE $ 1 707 032 STAFF CONTRACT $ 6.942 $ 592 490 $ 1.107,600 0.10 0.26 0.17 $ 1,707032 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96920 PROJECT DESCRIPTION Dublin Boulevard Improvements - Villa e Parkwa to Sierra Court ACTIVITY STREETS DESCRIPTION - LOCATION e ... , \" -_..- \.. \ 1J.".......... i.... \ \..."':""""'.. , This project widened and overlayed Dublin Boulevard from Village Parkway to Sierra Court including the DUblin Boulevard bridge over Alamo Canal. The project increased the capacity of this segment of Dublin Boulevard from 4 lanes to 6 lanes plus bike lanes, It also included the improvement of Alamo Canal under the Dublin Boulevard bridge to protect the bridge piers and it restored the failed segment of Alamo Canal bike trail underneath the bridge, c ........~~ . ~!'.... "111,1'\ .....~~~... ' ,I, ,",'~: ......., ,~, _..-,<~~', ,-' iI" r' '->'-'~ ""'-C1 ' \'\,,; -- ~";f. ,__ "~~J ;'i" ,.- --0 - ~~ ,I... "'II - .". -, )., ~I I L '''.' 1/ [I <<,,- I I \~ !_J , "lr-- I - 'I' -.co IJei;@'" Ii' PRFTA l'i_ I ., , \? ",I ~ " ~ ,,~ -_, \ I~~.,~ . \ ' ffill, __ II i- i ,\'I,il-~~ '\ I, -; ~, I--I 1-" ~ 1_. '~~~. __ ~tDUS.'N .VD ;! ,.' - _1 ,I \ \....\ O::!-_Ion......,.. 11 I - ~ . ~ c ' , .'_ -t ':i ~_:K...:;=-__ C,*_ _____ - , ~ ""rI:...~~~~.::J ~ o:.-v 1.&B1l - !- __________ "(IIIto~ ~- II \ ~. -_:- --:- _ ,~- CIVIC Center l..:>- e- I ,. -, I-t' f? I - - COMMENTS Traffic model studies indicated the need for Dublin Boulevard to become six lanes wide to avoid heavy congestion at intersections in the future. The City received $3,060,268 under the State Transportation Improvement Program (STIP) and $400.000 of CMA Transportation Improvement Program (TIP) funds for this project. In addition, the City utilized $1,604,667 in Developer Fees. Also included in the project is a recycled waterline and other appurtenances requested by Dublin San Ramon Services District (DSRSD) to be included in the project The City will be reimbursed by DSRSD for all of this additional work. The overhead utilities along the roadway were undergrounded under CIP Project # 96080 and included in the construction contract to facilitate construction. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Vo." 2006-2007 2007-2008 2008-2009 2008-2010 2010-2011 Totals Os-sign { Inspection $ Other Contraot Services Land I Right of Way Improvements Machinery I ECjulpment Miscellsn$OI,lS 708,087 1.179,246 513,687 3.422,931 10.074 001 $ 142,845 $ 142.840 206 421,630 421.635 219 3.080.268 3.080,268 228 400.000 400,000 300 1.604,667 $ 185.110 1.789,777 $ 5,649 415 $ 185110 $ 5.834.525 0.08 TOTAL PROJECT MANAGEMENT HE $ 5834 525 STAFF CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96930 PROJECT DESCRIPTION Dublin Boulevard Improvements - Sierra Court to Dublin Court ACTIVITY STREETS DESCRIPTION - LOCATION 9 This project will widen Dublin Boulevard from Sierra Court to Dublin Court and underground existing overhead utilities. This project will increase the roadway capacity from four to six lanes. "I. . .,~ , I-'~- - .~~,- " " .l ", COMMENTS This Is the third phase of the Dublin Boulevard widening. The widening of this segment of Dublin Boulevard will complete the improvements on Dublin Boulevard from San Ramon Road to Dougherty Road. Recent traffic studies have shown that six lanes of traffic will be needed as Dublin continues to expand to the east. It is anticipated that this project will be funded through Traffic Impact Fees (TIF) and outside grants. Through the end of Fiscal Year 2005.2006, approximately $602,458 of project mitigation contributions have been collected and are available for this projectlly for this project. In addition. the project may be funded from Category 2 Eastem Dublin TIF fees. The budget proposes to proceed with preliminary engineering and environmental work In Fiscal Year 2010-2011 Insufficient funding is available within the CIP time frame to address: design; land acquisition; and construction. Existing overhead utilities will also need to be relocated along Dublin Boulevard prior to the road improvements. It is anticipated that insufficient Public Utility Commission Rule 20A funds will be available in the next five years to reimburse the City for these improvements, -" ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Y.." 2006-2007 2007.2008 2008.2009 2009-2010 2010-2011 Tota's Design flnspectlon Other Contract Services land I Right of Way Improvements Machinery f Equipment Miscellaneous $ 255.896 120.941 549.477 1,783,748 300 "". IY....~\;'. .'rl~ $ 119.495 $ 119;495 -- 'i, TOTAL PROJECT MANAGEMENT FTE 57.858 $ 2747920 STAFF CONTRACT Insufficient Funding within C1P Time Frame 2.628,42& $ 119.495 $ 2,747, 20 0.18 / " \ I " . . i"!". -, ........ eiJ 2006-2011 CAPITAL IMPROVEMENT PROGRAM - PROJECT NUMBER N/A PROJECT DESCRIPTION Tri.Valley Transportation Development Fee Regional Transportation Projects rlh" 1"." \ ' ' A;CTIVI STREETS L"'\""'" DESCRIPTION - LOCATION This project would contribute to the construction of the following Regional Transportation projects: 1) 1-580/1-680 Interchange Improvements (Complete) 2) Improvements - SR 84 between 1-580 and 1-680 3) 1-680 Auxiliary Lanes from Bollinger Canyon Road to Diablo Road 4) West Dublin/Pleasanton BART Station a.) $4 million TVTDF obligation - fulfilled using 80% funds b.) $2.5 million TVTDF (20% setaside funds) advance to BART - $1.25 million FY 2006~2007 and $1.25 million FY 2008-2009 5) 1-580 HOV Lanes between Santa Rita Road and Greenville Road 6) 1-680 HOV Lanes between SR84 and Sunol Grade 7) Improvements to the I-S80/San Ramon Road Interchange (Dublin portion of project complete) 8) 1-680/Alcosta Blvd Interchange Improvements 9) Crow Canyon Road Safety Improvements west of Bollinger Canyon Road 10) Vasco Road Safety Improvement North of 1-580 11) Express Bus Service in the Tri-Valley Area COMMENTS The seven Tri-Valley jurisdictions (Dublin, Pleasanton, Livermore, Alameda County, San Ramon, Danville and Contra Costa County) are collecting Tri-Valley Transportation Deveiopment Fees (TVTDF) from developers as a mitigation for new developments in the Tri-Valley area. These fees are to be collected and used to construct projects On the above project list. The local match for the 1-58011--680 Flyover Project, which was completed in June 2002, was funded first. and the remaining projects were prioritized based on the recently adopted Strategic Expenditure Plan 2004 Update through the development of a funding priority list. The TVTDF is projected to generate $93.9 million over the lifetime of the program, of which approximately $22.536 million is expected to be collected in Dublin. Approximately $5,716,600 has been disbursed to date, excluding the 20% set-a-side funds for the West Dublin BART Station. Each jurisdiction submits 80% of the fees collected to the Tri-Valley Transportation Council (TVTC) and retains 20% of the fees collected to fund top priority projects. Dublin designated the 1-580/San Ramon Road Interchange and the West Dublin BART Station as its two top priority projects for the 20% set-aside monies. The 1-580/San Ramon Road Interchange project on the Dublin side of 1-580 was completed in 2004, and the West Dublin BART Station is in the planning stages. In 2003, the TVTC appropriated $800,000 in 80% TVTDF funds for the 1-580/San Ramon Road Interchange project, which was expended in conjunction with Dublin's 20% set-aside funds for construction of this project in 2004 Additionally, the City received $4000,000 in Fiscal Year 2003-2004 from the 80 % TVTDF for the West Dublin BART Station project, and passed these funds through to BART for use on this project. In 2006-2007 and 2008-2009 it is proposed to use 20% TVTDF funds for the West Dublin BART Station project pursuant to its agreement with BART, Alameda County and the City of Pleasanton. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior V.a,. 2006.2007 2007.2008 2006.2009 2009.2010 2010.2011 Total. Design / Inspection Other Contra~t Services Land I Right of Way Improvements $ 14,319,400 Machinery I Equipment Miscellaneous 2.500,000 300 $ 1,250,000 $ 1,250,000 $ 2.500.000 Insufficient funding within CIP tlme frame $14,319.400 TOTAL $ 16,819,400 PROJECT I STAFF MANAGEMENT IHE) CONTRACT $ 1,250,000 $ 1,250,000 $16.819400 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER N/A PROJECT DESCRIPTION Bike Lane. Amador Valley Boulevard Sta ecoach Road to Dou hert Road ACTIVITY STREETS DESCRIPTION - LOCATION 6) This project would construct a Class 2 bicycle lane along the north side of Amador Valley Boulevard between Stagecoach Road and Dougherty Road to allow for the exclusive use of bicycles and pedestrians. \ 1" _",,,.- \.. ' 't,f. "........... "1 "i ..... C \ ....~...'i".. ....,.~ .....~.......... iI11r\," II _..~~-~G~." I :':w.i. .....I"'I'!"'"~. ...," r-:- .-'c'''''\-- ".~\ " ~I ij, :'1: ! -' I : '''''~I}{ ,ti~il'-,-_ ':r I. I' I~;~'! r ,'~\&. ':,5 I -"" iT -- ,II, \i ' ;;;; --,,$. - '" P R F T A __,i!i._ I-I~ t::;-,~ \~ .', ,j-.'l!: ; , ~ '. i~'::' 1 l il"1 ,.- HI'o-;\''ll'' 11>.,', ~' ;" 1-.-,1. I :-{.:r . ,,1\:-" \"' '\"' lJliil.' 1.--- ~"I.'I --I '~I',. ,cc" 'r),' ,,~,\;~-,Jc"!.~.,; \~U.r.LVD, 14----' 1"1 ,.,', ~ ,. -.~ '~I ' I - ~ .~ ,~" .. -~:i...~ / ,I . I: "'"J'I ...:;. ~...- -- T"'>*~':-T':;ij--"-,', .'" ~,_~=--__~",:".~{:!"~~,,..:=a.-._.,'~I. CiYiccent~r'~~t 'I -- ..r' I'': ti \. I I i -f-_." MII,,~ , COMMENTS This Bike Lane Project on Amador Valley Boulevard will connect the Iron Horse Trail, the Alamo Creek Bike Path, and the Dougherty Road Bike Path. As of the end of Fiscal Year 2005-2006. developer fees in the amount of approximately $62,962 have been collected for this project. The balance of the project is proposed for funding from future Measure B Bike/Pedestrian Funds, ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Ye.", 2006-2007 2007.2006 2008.2009 2009.2010 2010-2011 Totals Design Ilnspsction $ 79,675 227 Other Contract Services 8,023 300 land I Right of Way Improvements 197,762 Machinery I Equipment Miscellaneous 1.540 $ 224,038 62.962 $ 224,038 62,962 TOTAL PROJECT MANAGEMENT FTE $ 267 000 STAFF CONTRACT $ 287,000 0.27 $ 287 000 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER NIA PROJECT DESCRIPTION Dublin Boulevard - Rioht Turn at Villaoe Parkway ACTIVITY STREETS DESCRIPTION - LOCATION Q This project will construct an eastbound right-turn lane on Dublin Boulevard at Village Parkway \,. --.... \-' WI............. C \ 1" 'i'~.........- ~.~.,.,;~.-:, _..~~..... L~". ~ I ___ ~....,-~." II, "",l ,.. _fI"~~.r~. .,,' _J"' 1 r'" ,'-- P..-"t,,'f'-.i \ ,\. ,"-' ~l .~ I ,. - f~ ,L ," _- I \~r~ 111) l_., ~~:'I~ I_---r"f - 1'= .. ,\~ !~II"-,,~ '~~~ I '~-' __ '\i:~ ;j'i :""1~~fiJt '" ~ P R F T A ! :/11, i;:J \~,' , ~.;r ,"' E, :j: '11 -~':li ,- ,t]ii~,~ -;"':-~\ '. " L - T __- - ~ ''(I ." '/.-.\ ""'"."""<,,, & DU'~'" "Lvo I _J "" LI . - =~,~. '- ":,)>.. ....'. \, '(~<",:>- 't' L I I I 'r. ,\ '._ "--.~ "~~.~., y .,"" ~ -".~~_ ~.~"",:":,,__,,,;,.~~~~_,,!...~-~,.. .,~i~ 'r .. .. ,.' 1\,,1 -;-.l..mI_,!,. I ~.-,..: -.-7=::"':-~,itj.....- j CIVIC Centet 1\;<,. I . ""I", _\" ' . ---I '1'-- i -.. , "m .o,. , COMMENTS The 1-58011-680 Direct Connector Project identified the need to construct an eastbound right-turn lane on Dublin Boulevard at Village Parkway This project will accommodate additional traffic from downtown Dublin attracted to the new 1-680 northbound on-ramp at Village Parkway and will improve the level of service at the intersection of Dubiin BOUlevard and Village Parkway This project will be funded from availabie Traffic Impact Fees (Eastern Dublin TIF Category 3). ESTIMA TEO COSTS FINANCINGIYEARS SCHEOULE Fund PriorY.... 2006-2007 2007"2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land f Right of Way I mpr'ovE:lmenls Machinery I Equipment Miscellaneous 70.200 300 12,116 145.1S3 444.721 $ 200.761 $ 473.153 $ 673.934 1.734 TOTAL $ 673.934 PROJECT I STAFF MANAGEMENT (FTEI I CONTRACT $ 200 781 $ 473.153 0.10 0.10 $ 673,934 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER NIA PROJECT DESCRIPTION Dougherty Road Improvements . Amador Valle Boulevard North to Clt Limits ACTIVITY STREETS DESCRIPTION - LOCATION Q ,~ \..~_.................. This project consists of constructing the ultimate northbound lanes from Amador Valley Boulevard north to the Dublin City Limits. This would make Dougherty Road a six-lane facility " .... , COMMENTS The present configuration of the road is four lanes: however. the easterly lane is in the future median. This project will widen Dougherty Road to a six-lane divided roadway with landscaped medians within the limits of the project. The need for this project is being driven by development in the Dougherty Valley It is anticipated that developers' Traffic Impact Fees, inCluding Contra Costa County's Dougherty Valley fees, will fund the project. In Fiscal Vear 2002-2003, Dougherty Valley impact fees funded the traffic signal at the intersection of Dougherty Road and Willow Creek Drive. Through the end of Fiscal Year 2005-2006, the Traffic Impact Fees collected specifically for this project is approximateiy $377,543 ESTIMATED COSTS FINANCING/YEARS SCflEDULE Fund PrlorY.a,. 2006-2007 2007-2008 2006-2009 2009-2010 2010-2011 Totals Design I Inspection $ 430,599 Other Contract Services 163,007 Land I Right 01 Way Improvements 3.372,115 Machinery J Equipment Miscellaneous 118,837 Insufficient funding within CIP time frame TorAL PROJECT MANAGEMENT FTE $ 4 084,~~8 STAFF CONTRACT $ 4,084.558 $ 4.084,~58 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Dublin Boulevard Bridge Resurfacing at Alamo Canal ACTIVITY STREETS DESCRIPTION - LOCATION e This project will resurface the existing bridge deck on Dublin Boulevard across the Alamo Canal. \ 1: ....,_....- \. \ ~........- , -' C \ "'\ .....-..... ......~.....r ~.- ..~~...."'!~ I, I', ..~..""":,:"~. ',~ I ~.'!--'"-1 _."""I"~:r:!' -1 "i-'i~ I -'''-.-r- ,p" , ,'('~I. 'ii) .'. .-'.1'.1 - "I ,', 'I "-{.':'i ~.1 ~-_. '1- - -- " ...L., "'1'1 1."1,,-,, .' ....<$i,... Il.~ I 1\". iC!J'IJ'i- ,,~"':', I ---11._ i,Ll, '\..".' . .':5. ,'f'/,."",,}"'-. lil.. P R F T A {I l'C'::: ,- - I . !t,,<1'f ' /:11 ... 11' I\C:'~ ]"",:' ,'151, '-t-_J "'Ie. I .1.':I,','II'! -&" ,':, c.,_; I i'! I :''::1,. -~, ,_' ,~" otJiil.."! '-OUPUN 8LVD "_!. '- ,,'j"'; '"""',," '~"""__"~'~<<'ri '~~I-'; r h." I r T.. Jv ~..l~~' -'::: -- ~'~" . ""'c -.~~T-.~-~'{~ .:.......-. -'-~~--;"~.".~~~'"'" "" -tavlc Cent .' -. -I..... 'I .,. \-.'-1 . ".' ,- ~" --", '-. \ , . I I , f- Mil... . COMMENTS California's Department of Transportation (Caltrans) is responsible to inspect all bridges in California. A recent Caltrans inspection report recommends that the Dublin Boulevard bridge deck at Alamo Canal be resurfaced with a protective chemical treatment The older portion of the bridge is experiencing some deterioration. Despite the fact that the widened portion of the bridge, the entire bridge surface has to be coated for the treatment to be effective. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Yea", 200tH007 20D7.2DD8 2D08.2009 2009-2010 2010-2011 Totals Design Ilnspec:tion $ Other Contract Services Land I RighI 01 Way Improvements Machinery I Equipment Miscellaneous 6.704 206 $ 29,009 $ 29,009 22.205 100 TOTAL $ 29 OD9 PROJECT I STAFF MANAGEMENT (FTE) I pONTRACT $ 29,DD9 D.D6 $ 29.009 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION East Dublin BART Station Corridor Enhancement - Dublin Boulevard - Tasse"era Road to Clark Avenue ACTIVITY STREETS DESCRIPTION - LOCATION 1) Gateway feature and landscaping at the intersection of Dublin Boulevard and Dougherty Road 2) Dublin Boulevard streetscape enhancement including replacement of sidewalk tree grates and installation of identity markers. median and bridge railing treatment and City entrance signs 3) Installation and/or replacement of bus shelters along Dublin Boulevard 4) Widening of the Iron Horse-to-Tassajara Creek Bikeway to 12 feet along the north side of Dublin Boulevard 1 I 1'1 - '~ . '...1'+ I' ' i~lL. j ..101+" I irl'!' , iil',' r' wf!~ lIL~-. "-',-,',,1, 1,I,I,!,0,,' f ':<ffc" ,,"~ ~ P R F T ~'111 ~ltro~1;'J: I '/ ,;Jt'" , Ili +. iI!"Cl-t ~ ..1'.". ~ r"i"l, I 3 '\ ':,~, "O~ I , .' ,.. I, 1:!.:iL_,", ,I ~,._n-r '\ ,,'!<'&M",,< .J II, .11' >- _ " )....P- -~:_~..r-"'.L..:...~J Jr.,... I;"" ,;0-.. l.sf(! ..-.. -...------- .-.. --'" OvlC O!ln .~. ~.~ ....... I _.~ p-~ .A ,~ .....-"'..... \ 1'" ...... -..( \...~......- C \ 1" .....~... "...-...,.... _.....- \ I ......~.. ,I .\ _.. .. h ~. ~- . M'~ , 6) This project will improve a variety of transportation modes by improving pedestrian, transit and bicycle facilities leading to the East Dublin BART Station. The enhancements will primarily be on Dublin Boulevard, the arterial directly serving the station. The project includes the following: COMMENTS In 2005, the City applied for Housing Incentives Program (HIP) funds through the Metropolitan Transportation Commission (MTC), in conjunction with the high density housing component of the Dublin Transit Center project. With the City approval of high density housing next to the BART Station, MTC has granted $1,743,000 of HIP funds to the City FINANCINGIYI':ARS SCHI':DULI': I':STIMATI':D COSTS Fund Prior Years 2006-2007 2007.2008 2008-2009 2009.2010 2010.2011 Totals Design !Inspection $ 177 400 206 $ 42,750 $ 91,000 $ 93,.50 $ 227.000 Other Contract Services 329.600 210 207,000 514,700 1.021.300 1,743,000 Land I Right of Way Improvements 1 459.000 Machinery I Equipment Miscellaneous 4.000 TOTAL $ 1,970,000 $ .49.750 $ 805 700 $ 1114,550 $ 1,970.000 PROJI':CT STAFF 0.38 0.50 0.58 MANAGI':MI':NT FTI': CONTRACT 2006-2011 CAPITAL IMPROVEMENT PROGRAM ACTIVITY STREETS PROJECT DESCRIPTION West Dublin BART Station Corridor Enhancement - Dublin Boulevard . Hansen Drive to Clark Avenue PROJECT NUMBER New DESCRIPTION - LOCATION This project consists of several improvements in the corridor of the West Dublin BART Station which is scheduled to start construction in 2006. The improvements will primarily be on Dublin Boulevard, the arterial directly serving the station. The main features of the project are: 1) Dublin Boulevard streetscape enhancement. including replacement of sidewalk tree grates and installation of identity markers, median and bridge railing treatment and city entrance sign 2) Improvements at the vicinity of Dublin Bouievard and Donlon Way including raised landscaped median, sidewalk bulbouts and angled parking 3) Widen sidewalks aiong Dublin Boulevard to 8 feet between the 1-680 freeway overpass and Village Parkway 4) Install and/or replace bus shelters along Dublin Bouievard 5) Raise catch basin grates along Dublin Boulevard to improve rideability and bicycle safety COMMENTS e l' -... \.. ' ""...~_..-.."''' ~ i .......- C \ _...... -......... ..... I _......~~... II .~~'I!""~., " ~.'!:"" 1_- ...~l"r.....~~,'~ ,~ " I I r}J .,.,.--;:-, ,'c' .' '1' o/li. I h - I .\ _\,.1 /1_, I ~ I I[ --- .-- , r c'- ~~'--.I "" ,.:;;J,',:\,',':,,' - ii{~"r,~ 1~1~III--=!l, , ,I Ii: I~I", I,' - ~~,~ t I. ; f I'~ I' rc' l\, " ' . g,.' - -I __jW >1: _I ~ Ot.iStJNl(i, 8t DUiNBLVD - ~ _~'~' .." T}-.-. 1- T , .. _~~~_-.-.__l_fII. illt. I .... ~ ~.._- ~ - - ~ - WiiIilO- -- - -~ ~~.__._:.~~~.:_-"'_OI!'''':.,-o.''''' I aVlccenterll --T--- ,I' "'''--I .. 1- ~'.- I ' , ,I II 1- Ii' I M'M , In 2005, the City applied for Housing Incentives Program (HIP) funds through the Metropolitan Transportation Commission (MTC), in conjunction with the high density component of the Dublin Transit Center project. Upon issuance of the building permits for the Avalon Bay housing development, MTC will grant $1,257,000 of HIP funds to the City The permits are anticipated to be approved in June/July 2006, FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006.2007 2007.2008 2008-2009 2009.2010 2010.2011 Totals Design J Inspection $ 133.870 206 $ 42,750 $ 65.620 $ 55,000 $ 163,370 Other Contract Services 231.000 210 132,500 388.100 736,400 1.257,000 Land / Right of Way Improvements 1.052,000 Maohinery / Equipmonf Miscellaneous 3,500 TOTAL $ 1,420,370 $ 175250 $ 453,720 $ 791.400 $ 1.420 370 PROJECT I STAFF 0.36 0.35 0.39 MANAGEMENTIFTEI CONTRACT