HomeMy WebLinkAboutOrd 10-94 Subdiv to Areas BenefC'rTY OF DUBL'rN
Ordinance No. 10-94
AN ORDINANCE~DING SECTION 9.~6.L20
TO CHAPTER 9.L6 OF THE DUBLIN
MUNICIPAL CODE RELATING TO
SUBDIVISION8 TO AREAS OF BENEFIT
The City Council of the City of Dublin does ordain as follows:
8eotion L Section 9.16.120 is added to Chapter 9.16 of the
Dublin Municipal Code to read as follows:
Sec. 9.16.120 Bridqes and Major Thoroughfares.
A. Purpose. The purpose of this section is to make
provisions for assessing and collecting fees as a condition of
approval of a final map or as a condition of issuing a building
permit for the purpose of defraying the actual or estimated cost
of constructing bridges or major thoroughfares pursuant to Section
66484 of the Subdivision Map Act, and in order to implement the
Circulation and Scenic Highways Element of the General Plan and,
in the case of bridges, the transportation provisions thereof, and
to implement adopted specific plans including the Eastern Dublin
Specific Plan.
B. Definitions. For the purposes of this section,
the following words and phrases shall have the following meanings:
(1) "Construction" shall mean design, acquisition'
of right-of-way, administration of construction contracts, actual
construction and inspections.
(2) "Major thoroughfare" shall mean a roadway as
shown in the Circulation and Scenic Highway Element of the General
Plan whose primary purpose is to carry through traffic and provide
a network connecting to the state highway system.
C. Payment of Fees Generally.
(1) Prior to filing a final map which includes land
within an area of benefit established pursuant to this Subsection
C, the subdivider shall pay or cause to be paid any fees
established and apportioned to such property pursuant to this
section and any resolution adopted pursuant to this section for the
purpose of defraying the actual or estimated cost of constructing
bridges over waterways, railways, freeways or canyons and/or
constructing major thoroughfares.
(2) Prior to the issuance of a building permit for
construction on any property within an area of benefit established
pursuant to this section, the applicant for such permit shall pay
or cause to be paid any fees established and apportioned pursuant
to this section for the purpose of defraying the actual or
estimated cost of constructing bridges over waterways, railways,
freeways or canyons or constructing major thoroughfares, unless
such fees have been paid pursuant to subsection (C) (1) of this
section.
(3) Notwithstanding the provisions of subsections
(C) (1) and (C)(2) of this section:
(a) Payment of bridge fees shall not be
required unless the planned bridge facility is an original bridge
serving the area or an addition to any existing bridge facility
serving the area at the time of adoption of the boundaries of the
area of benefit.
(b) Payment of major thoroughfare fees shall
not be required unless the major thoroughfares are in addition to,
or a reconstruction of, any existing major thoroughfares serving
the area at the time of the adoption of the area of benefit.
D. Consideration in Lieu of Fees. Upon application by
the subdivider or applicant for a building permit, the City Council
may accept consideration in lieu of the payment of fees required
pursuant to this section; provided that the City Council first
finds, upon recommendation of the Public Works Director, that the
substitute consideration has a value equal to or greater than the
fee; and provided further that the substitute consideration is in
a form acceptable to the City Council.
E. Public Hearing. Prior to establishing an area of
benefit, a public hearing shall be held by the City Council at
which time the boundaries of the area of benefit, the costs,
whether actual or estimated, and a fair method of allocation of
costs to the area of benefit and fee apportionment, and the fee to
be collected, shall be established. Notice of the public hearing
shall be given pursuant to Government Code Section 65091 and shall
include preliminary information related to the boundaries of the
area of benefit, estimated cost and the method of fee
apportionment. The area of benefit may include land or
improvements in addition to the land or improvements which are the
subject of any map or building permit application considered at
the public hearing.
F. Amount. The amount of the fees and the areas of
benefit established pursuant to this section may be established by
resolution.
G. Exemptions. Notwithstanding the provisions of
subsection (F), the Council may provide an exemption from payment
of such fees in the resolution establishing the area of benefit
and amount of fees.
H. Protest.
(1) At any time not later than the hour set for
hearing objections to the proposed bridge facility and/or major
thoroughfare, any owner of property to be benefited by the
improvement may file a protest against the proposed bridge facility
or major thoroughfare or against the extent of the area to be
benefited by the improvements or against both of them. Such
protests must be in writing and must contain a description of the
property in which each signer thereof is interested, sufficient to
identify such property, and, if the signers are not shown on the
last equalized assessment roll as the owners of such property, must
contain or be accompanied by written evidence that such signers are
the owners of such property. All such protests shall be delivered
to the City Clerk no later than 5:00 p.m. on the day of the public
hearing and no other protest or objections shall be considered.
Any protests may be withdrawn, in writing, by the owners making
such protests, at any time prior to the conclusion of the public
hearing.
(2) If there is a written protest filed with the
City Clerk by the owners of more than one-half (%) of the area of
the property to be benefited by the improvement, and sufficient
protests are not withdrawn so as to reduce the area represented to
less than one-half (%) of that to be benefited, then the proposed
proceedings shall be abandoned and the City Council shall not, for
one (1) year from the filing of that written protest, commence or
carry on any proceedings for the same improvement, or that portion
thereof so protested against, under the provisions of this section.
I. Funds. Fees paid pursuant to this section shall be
deposited into the City's Capital Projects Fund. A separate
account within such Fund shall be established for each bridge
facility project or each major thoroughfare project. Money in'such
accounts shall be expended solely for the construction or
reimbursement for construction of the improvement serving the area
to be benefited and from which the fees comprising the account were
collected, or to reimburse the local agency for the cost of
constructing the improvement.
Section Z. Effective Date and Posting of Ordinance
This Ordinance shall take effect and be in force thirty (30)
days from and after the date of its passage. The City Clerk of
the City of Dublin shall cause this Ordinance to be posted in at
least three (3) public places in the City of Dublin in accordance
with Section 36933 of the Government Code of the State of
California.
PASSED AND ADOPTED by the City Council of the City of Dublin
on this 24th day of October , 1994, by the following vote:
AYES:
NOES:
ABSENT:
Councilmembers Houston, HOward and Mayor Snyder
None
Councilmembers Burton and Mof~//
Mayor
ATTEST:
~ C~er~(