HomeMy WebLinkAboutAttachmt 9 Stg 1 Development Pln showing amendments
Revised May, 2006
DEVELOPMENT PLAN - AREA H
This is a Development Plan pursuant to Chapter 8.32 of the Dublin Zoning Ordinance for Dublin
Ranch' Area H' P A 98-070, located north of 1-580, east of Tassajara Road and south of future
Dublin Boulevard (APN 985-0005-02). This Development Plan meets all of the requirements for
Stage 1 review of the project.
This Development Plan includes Site, Circulation and other Plans, exhibits and written statements
contained in a document dated received November 19, 1999, labeled Exhibit C-2 of Attachment 3, Area
H to the Ordinance approving this Development Plan (City Council Ordinance No. 6-00). and on file in
the Planning Department. The Planned Development District allows the flexibility needed to encourage
innovative development while ensuring that the goals, policies, and action programs of the General Plan,
Eastern Dublin Specific Plan, and provisions of Section 8.32 of the Zoning Ordinance are satisfied.
I. Zoning: PD Planned Development Zoning District Stage I (General/Specific Plan land use
designations are as follows: General Commercial, Campus Office)
2. Permitted and Conditional Uses:
PD-General Commercial
1) Permitted Uses: The following are permitted uses for this PD/C-2 (Planned Development
General Commercial zoning district site):
a. Community-serving retail uses including but not limited to:
Auto parts
Bookstore
Clothing/apparel/accessories
Drug store
Electronics/computers
General merchandise store
Grocery/food store
Hardware/home improvement store
Hobby shop
Home furnishings and appliances
Other retail uses automatically permitted in the C-2 District
Pets and pet supplies
Shoe store
Sporting goods
Stationary and office supplies
Toy store
b. Regionally-oriented, high volume, retail uses including but not limited to:
Discount centers
Factory stores
Furniture outlets
Home improvement centers
Promotional centers
Attachment 9
Revised May, 2006
c. Service uses including but not limited to:
A.~!I!IiHi5JIft~jSf:_QtJi,~f;
Bank, savings and loan and other financial institutions
Barberlbeauty shop/nail salon
Copying and printing
Dry cleaner (no plant on premises)
Formal wear -rental
In-Patient and Out-Patient Health Facilities as licensed by State Dcvartm{''l1t ofI--lealth
SITyi~~li
Laboratory
Laundromat
Locksmith
Photographic studio
Real estate/title office
Shoe repair
Tailor
Travel agency
Watch and clock repair
d. Eating, drinking and entertainment establishments including but not limited to:
Bagel shop
H.!it[gQfk!Q.iJJ.Q..mJKt:;. __
Cafe
Coffee house
Delicatessen
Ice cream/yogurt
Mi~rQQrg\":_~'].:y
Restaurant - no drive-through
Theater - indoor (Dinner, Movie, Live Play, etc.)
2) Conditional Uses:.
Animal hospital (no kennel) (PC)
I , uuuuuuuuuuuDayCareCenter(PC)
Drive-through/drive-in facility (PC)
Hotel and motel(PC)
I L uu uuNightclub(ZA) uuuuuu uuuuuuuuuuuuun
Other uses which could meet the intent of the General Commercial land use
designation per the determination of the Community Development Director (PC)
Recreational facility/indoor (ZA)
Service station (PC)
2
Revised May, 2006
3) Temporary Uses:
Arts and crafts fair
Christmas tree sales
Farmers' market
Festival/street fair
f.arldng Lot Sales
Sidewalk sales
Temporary construction trailer
Tract and sales office/model home complex
4) Residential Uses: Mixed-use developments including residential uses may be permitted at a
Stage 2 Planned Development/Development Plan application if]ocation and design ensure
compatibility and ifthe incorporation of residential uses meets the intent of the Eastern
Dublin Specific Plan.
PD-Campus Office
1) Permitted Uses: The following are permitted for this PD/C-O (Planned Development
Campus Office zoning district site):
Administrative headquarters
Ancillary uses that provide support services to businesses and employees
including but not limited to: restaurants, convenience shopping, copying services,
blueprinting, printing and branch banks.
Business and commercial services
Business, professional and administrative offices
Laboratory
Research and development
2) Conditional Uses:'
Day Care Center (PC)
Health services/clinics (ZA)
Hotel/motel (PC)
Hospital/medical center (PC)
Limited light manufacturing. assembly, warehousing and distribution activities (uses
that do not produce noxious odors, hazardous materials. or excessive noise) (PC)
Other uses that could meet the intent of the Campus Office land use designation as
determined by the Community Development Director (PC)
Recreational facihty/indoor (ZA)
Service Station (PC)
3) Temporary Uses':
Arts and crafts fair
Festival/street fair
Temporary construction trailer
Tract and sales office/model home complex
3
Revised May. 2006
4) Residential Uses: Mixed use developments including residential uses may be permitted at a
Stage 2 Planned Development if the following conditions are met:
a. If the development meets a specific housing need in the community.
b. If the established traffic levels of service are not exceeded. Appropriate traffic
study(s) may be required to make the proper determination regarding traffic levels of
service.
c. If the development creates a pedestrian orientated attractive environment.
d. That the project is consistent with the intent of the Specific Plan and does not
result in adverse environmental or service impacts.
e. Residential uses may not occupy more than 50% of the developed area.
* Key/Decision Maker Authority: ZA Zoning Administrator, PC Planning Commission
3. Dublin Zouiug Ordiuauce - Applicable Requiremeuts: Except as specifically modified by the
provisions ofthis PD District Rezone/Development Plan, all applicable general requirements and
procedures of the Dublin Zoning Ordinance shall be applied to the land uses designated in this PD
District Rezone.
4. Site Plan: (See attached Stage I site plan contained in Exhibit C-2 of Attachment 3. Development
Plan, Area H.) This Development Plan applies to the General Commercial and Campus Office
parcels encompassing 73.1 acres shown on this plan. The 10.5 acres ofland located in the south-
west quadrant of Area H with a General/Specific Plan land use designation of General Commercial
may be developed with Campus Office uses to be determined at the Stage 2 Planned Development
Application Process. Any modifications to the project shall be substantially consistent with these
plans and of equal or superior site design quality.
5. Density: The maximum square footage of the proposed development for the General Commercial
and Campus Office parcels covered under this Development Plan (shown on the Stage I site plan)
are as follows.
General Commercial:
18.7 _~~_._qr:-~~~__
.203,643 Sq. Ft.
Campus Office:
43.9 Ac. Gross
860,528 Sq. Ft.
10.5 acres of additional land designated for
General Commercial uses located in the
southwest quadrant of Area H may be
developed with either Campus Office or
General Commercial uses pursuant to a Stage
2 PD Application Process:
10.5 Ac Gross
205. 82t Sa. l't. (Camous Officc)
) 14.345 Sa. Ft. (Gen. Commercian
6. Phasing Plan: Refer to attached Phasing Plan included in Exhibit C-2 of Attachment 3,
Development Plan, Area H.
4
Revised May, 2006
7. Design Concepts and Themes: Refer to attached Community Planning and Design Guidelines
(pages I-I to 1-3) contained in Exhibit C-2 of Attachment 3, Development Plan, Area H.
8. Master Neighborhood Landscaping Plan: Exhibit C-2 of Attachment 3, Area H, Community
Landscape Design Guidelines (pages 11-1 to 11-3) identifies the landscaping concept for Area H.
These Guidelines satisfy the requirements of Section 8.32.040 A 5 of the Zoning Ordinance.
A Preliminary Landscaping Plan shall be submitted with the Stage 2 Planned Development I
Development Plan Application for the Stage I PO area, to include public streets, entry statements
and perimeter site landscaping areas.
9. School Mitigation Fee: The developer shall mitigate the impacts ofthe development on the school
facilities of the Dublin Unified School District in accordance with the School Mitigation Agreement,
dated October 1997. The mitigation agreement establishes the level of mitigation necessary, the
amount of school impact fees, the time of payment of such fees and the required dedication of
property for use as school sites.
10. Ioclusionary Zoning Ordinance: The current project does not include residential uses, however,
residential uses may be considered at the Stage 2 Planned Development / Development Plan
application. Ifresidential uses are proposed at the Stage 2 Planned Development / Development
Plan application, the project shall be consistent with the Inclusionary Zoning Ordinance.
\:\pa#\980070ldevplan.
5
Dublin Ranch Area H . December // /998 . Revised ..!1,I_!W,_,,~_(l!/f)
Project Description
for
DUBLIN RANCH AREA H
Planned Development District and Stage 1 Development Plan
(PA 98-070)
Introduction
Dublin Ranch is located within the Eastern Dublin Specific Plan Area and comprises
approximately 1,311' acres. The portion of Dublin Ranch that has been annexed to the
City of Dublin consists of 1,111 acres. The 1,311 acre portion of Dublin Ranch was pre-
zoned in conformance with the East Dublin Specific Plan when it was annexed to the City
under P A 94-030. Therefore, this Development Plan will also serve as an amendment for
a minor modification to that prezoing. Additionally, this Development Plan is being
submitted concurrently with a minor modification of the Dublin General Plan/East Dublin
Specific Plan Amendment.
Dublin Ranch Area H, hereinafter called the Project Area, is bordered by Dublin
Boulevard on the north, Dublin Ranch Area C to the east, 1-580 on the south and the
property of the Dublin Land Company on the west. It is approximately 70.8 acres in size.
This area has two land use designations, General Commercial and Campus Office. The
Specific Plan shows 35.9 acres designated General Commercial and 36.7 acres for
Campus Office. In this Stage I Development Plan, these acreages have been modified,
proposing 43.9 acres of Campus Office"I.8}a~resofGeneraICommerciaIandthe .
remaining 10.5 acres as being either all General Commercial or all Campus Office.
P A 98-070 is a Stage I Development Plan as defmed by Section 8.32.030(A) of the
Dublin Zoning Ordinance. This submittal includes a listing of permitted and
conditionally permitted land uses; data on site area; proposed square feet; a phasing plan;
and textual information sufficient to establish consistency with the General Plan and
Eastem Dublin Specific Plan.
Existing Land Use and Site Conditions
Existing land uses within the Project Area is predominantly agricultural, consisting of
cattle grazing and dry farming of grain and hay crops. No residences or other structures
exist within the area. Adjoining properties currently employ these same uses.
The project area is primarily open grassland or dry farmed croplands with no existing
trees. The entire area is virtually flat with an average grade change of four feet, or
. Dublin Ranch includes all of the property in the Eastern Dublin Specific Plan area shown as being owned
by Chang Su-Q-Lin and Pao~Lin, excluding Phase I which is currently under development.
Planned Development District and Slage I Development Plan Project Description . Page 1 of 6
---
Dublin Ranch Area H . December J J J 998 . Revised J.!!!.!(',.f':/!{i.(?,
.0035%, across the site. Elevations across the project area generally rise from south to
north.
Various biological studies have been undertaken in the Project Area and surrounding
areas by H. T. Harvey & Associates relative to special status plants and wildlife species.
No special-status wildlife or plant species were detected on site. Please refer to the
Appendix for a summary of these studies.
A report prepared by Ted Winfield & Associates containing an analysis of the areas of the
site that are subject to Corps of Engineers' jurisdiction was formally submitted to the
USACE on May 20, 1999. This report was prepared with the field review and input of
Corps representatives and is expected to be verified in writing by the Corps very soon.
Maps and acreage estimates contained in the draft report are considered to be preliminary
until the Corps has officially verified the jurisdictional delineation. Proposed fill for this
project will require a Corps of Engineers permit. It is anticipated that the Corps permit
for Area H will be part of a larger permitting effort that will include all of the remaining
portions of Dublin Ranch which are encumbered with areas of Corps' jurisdiction. Refer
to the Appendix for a summary of this study.
No archaeological resources or indicators of such have been found on the site by Holman
& Associates Archaeological Consultants either during their work undertaken for the East
Dublin Specific Plan or a follow up site survey on May 20,1999.
A Phase I and 2 site assessment of the Project Area has been conducted by BerIogar
Geotechoical Consultants to determine the presence of anyon-site hazardous waste and
substance sites. The fmdings of the study indicated that no problem sites were found. In
addition, an environmental records search was conducted by BerIogar to determine if the
site was included on a site of hazardous waste and substance areas. The results of this
search indicated that neither this particular site nor any areas within a two mile radius of
the center of the site are listed as a hazardous site, hazardous material generator or
transporter, or known to have underground storage taok leaks. Refer to the Appendix to
review this document in greater detail.
Commuuity Theme
Area H is more urban and contemporary in use and appearance than the rest of Dublin
Ranch. To provide a degree of thematic unity throughout Dublin Ranch, certain common
elements such as community signage, light standards, street furnishings and similar plant
palettes will be utilized. Refer to the following Design Guidelines for further discussion
about key design concepts.
Planned Development District and Stage 1 Development Plan Project Description . Page 2 of 6
~
Dublin Ranch Area H . December / / /998 . Revised ~U-W'._;_U(j_Q
Proposed Development Plan
When the Eastem Dublin Specific Plan was prepared, the region-serving commercial and
office land use designations were located adjacent to 1-580 for three reasons: the land
there is generally level. these sites are highly visible and easy access is available from the
freeway. For these reasons Area H is a prime commerciaVoffice site. The site is fully
visible from 1-580 and is within 950 feet and 2,700 feet of the Tassajara Road and Fallon
Road interchanges, respectively. Area H. in combination with Area C of Dublin Ranch,
is the only remaining large (over 100 acres) commercial/office site in Dublin and, as such,
is highly desirable for users needing campus-type sites, especially high tech users
expanding from Silicon Valley.
The Development Plan proposes to increase Campus Office uses by either 7.2 acres or
17.7 acres above what is depicted on the Specific Plan (the difference being whether the
10.5 acre GC/CO flex parcel is developed with Campus Office uses or not) and the
General Commercial area is being reduced by a like amount. In addition, the
Development Plan proposes that the midpoint of the density range of the floor area ratio
(FAR) for Campus Office uses be increased from the 0.35 in the Specific Plan to 0.45,
with .60 FAR being the maximum of the range. This will allow the flexibility to exceed
.45 FAR for some parcels; however, the average FAR for all CO parcels would not
exceed.45 FAR.
This FAR revision would set a maximum oQ18.000 s'I,ft.ofc;eneraIConunerciaI withd.
the "Least Office" scenario or a maximum of 1,066,349 sq. ft. of Campus Office in the
"Most Office" scenario. However. in either scenario. the total square footage of any
combination ofGC and CO shall not exceed.L.Z~J~92;1,.Forcollll'arison,theEast.Dublin.. .
Specific Plan has 390,951 square feet of General Commercial and 559,528 square feet of
Campus Office, for a total of 950,479 square feet. If the property is subdivided,
individual parcels may be developed at greater than their respective midpoint F ARs (0.25
for GC and 0.45 for CO) as long as the overall square footage maximums are not
exceeded. For example, if.;29.2 acres ofGC-designated land is developed and it is
subdivided into two parcels, one of those parcels could be developed at a FAR greater
than 0.25 as long as a corresponding decrease in the FAR on the other parcel kept the
overall building square footage at or below the<3),~"QQQ sq.ft.figure'd
The changes described above are based upon the result of market assessment studies
undertaken by EDA W, Inc., whose analysis concludes that the 1-580 corridor is "over-
zoned" for regional/community-serving commercial uses. The corridor is saturated with
large format, specific market and full service retailers. Approximately 150 acres ofland
intended for such users are still available in the Specific Plan area, however, recent
market studies show the buildout population of Eastem Dublin will not be at high enough
levels to warrant a commercial area of this size. Additionally, the market assessment
indicates a considerable demand at present for regional and headquarters office land.
That need is especially acute for large parcels of such land. It is for these reasons that the
Development Plan for Area H is proposing the flexibility to have either a 7.2 acre or 17.7
acre reduction in General Commercial and a corresponding increase in Campus Office-
designated property. Because demand caunot be predicted with complete accuracy very
Planned Development District and Stage J Development Plan Project Description . Page 3 of 6
-----
Dublin Ranch Area H a December 11 1998 a Revised .l!.!!(,".;'fL~/f;
far into the future, the 10.5 acres at the southwest comer of Area H is being shown as
having a flex designation of either GC or CO.
Area H is intended to work in harmony with the remainder of Dublin Ranch, especially
Area G. One of the premises on which the viability of the Village Center is based is that
a large percentage of its daytime activity will come from employees and visitors from
businesses in Area H. Therefore, whatever can be done from a physical desigo standpoint
to integrate the two areas would be beneficial to both. The Development Plan proposes to
achieve this goal by aligning the principal north-south access point into Area H with
Main Street of the Village Center within Area G. The concept is that the Village Center
would, in effect, be extended into Area H by designating the southwest and southeast
corners of the intersection as a "gateway" for uses which would directly complement
Area H businesses and employees. The northeast comer of Dublin Boulevard and the
Village Center Main Street is visualized as the site of an approximately 50 room
executive, extended stay hotel. It is likely that the majority of customers of this hotel
would be visitors to the office complexes in Area H and the adjoining office (CO)
properties to the east.
The primary north-south access point would generally serve as a dividing point between
the CO uses to the east and the generally GC areas to the west. The,l.8.7acreparcelat
the northwest corner of Area H would be the site for large format retailers. It could
attract freestanding uses such as large bookstores, office supply, electronics, etc. or a
conununity-serving shopping center with a supermarket anchor. The CO sector to the
east of this street could either be subdivided into smaller individual parcels for small
office building developers or kept intact as a campus for one or two large owner-users.
The 10.5 acre site at the southwest corner of Area H would serve either conunercial or
office users depending upon area need.
Planned Development District and Stage I Development Plan Project Description . Page 4 of 6
~
Dublin Ranch Area H ~ December 11 1998 ~ Revised J.Y!I,(.~,,,){I!j!;
Below, land use acreages and square footages depicted on the proposed Development
Plan are compared to the approved Specific Plan acreages and square footages. The two
alternatives are illustrated, one for the maximum GC and the other for the minimum GC
areas possible under this proposal. The following table uses a density mid-range of 0.45
FAR for the Stage 1 Development Plan CO uses, while a density mid-range of 0.35 FAR
is used for the Specific Plan CO uses. For GC, a 0.25 mid-range FAR is proposed in both
instances.
Alternative 1: Maximum CO/Minimum GC Scenario ("Most Office")
Proposed PD Stage I East Dublin
Development Plan Specific Plan
Desi2l1ation Acres Sa. Faatape Acres Sa. F ootaffe
GC ,187 ____'1'_ 35.9 390,951
203.643
CO 54.4 1.066.349 36.7 559528
Total 73.1 --- -------------y-- 72.6 950,479 u
1.269.992
Alternative 2: Minimum CO/Maximum GC Scenario ("Least Office")
Desimatian
Proposed PD Stage I
Development Plan
Acres Sa. Footaffe
East Dublin
Specific Plan
Acres Sa. Footaffe
GC
35.9
390.951
559528
;'92
__'1'__
318.000
860528
36.7
CO
43.9
Total
.73.1
72.6
......... u...... 950,479
---------------- --y--
1,178.528
~
The square footage figures cited above establish the maximum limits for Area H. They
indicate that a maximum oQ18,OOOsq. ft. of GeneralCormnercialwiththe "Least.~
Office" scenario or a maximum of I ,066,349 sq. ft. of Campus Office in the "Most
Office" scenario is permitted. However, in either scenario, the total square footage of any
combination of GC and CO shall not exceed,1.269.992.Forcomparison,theEastDublin
Specific Plan has 390,951 square feet of General Commercial and 559,528 square feet of
Campus Office, for a total of 950,479 square feet.
Attached aud detached dwellings at densities established for the Medium. Medium-
High, and High Density Residential land use desigoations per the East Dublin
Planned Development District and Stage 1 Development Plan Project Description . Page 5 of 6
Dublin Ranch Area H . December / / /998 . Revised -!WY:,~,~~~@,6_
Specific Plan maybe allowed as a Conditional Use if the following conditions are
met:
. Established traffic levels of service are not exceeded. Appropriate traffic
study(s) may be required to make the proper determination regarding traffic
levels of service;
. That the project is consistent with the intent of the Specific Plan and does not
result in adverse environmental or service impacts; and
. Residential uses may not occupy more than 50% of the developed area.
Neither this Development Plan nor the Specific Plan include schools, parks or other
public facilities since the plans for Area H are devoted exclusively to conunercial and
campus office uses. However, since a certain number of employees from the area will
utilize nearby public parks, a per square foot public facilities fee for conunercial and
office building construction has been established by the City to help pay for recreation
facilities.
Project Access and Circulation
The major east-west access to the Project Area will be from Dublin Boulevard, a six-lane
arterial. Secondary east-west access will be provided by an existing frontage road along
the north boundary of 1-580 that extends from Tassajara Road to approximately the
middle of Area H. The primary north/south access point to the Project Area would be the
southerly extension of Main Street. This connection will tie the Project Area to the
Village Center (inunediatelyto the north in Area G) where many of the conunercial uses
that will serve employees in the Project Area will be located. Secondary access point(s)
may be located at the Class II Collector B and Dublin Blvd. intersection and/or other
locations along Dublin Blvd. in accordance with the East Dublin Specific Plan and
Dublin General Plan standards and approved by the director of public work.
Circulation within the Project Area may be via a system of individual internal streets, a
collector loop, or some other system. However, the preference is for larger land users
since campus-type developments are more in line with the design concept envisioned for
Area H. Larger blocks ofland would entail fewer public streets and these streets would
be replaced with internal private circulation systems. Whatever the case, the internal
street system will be created only as users are found.
An analysis has been prepared by TJKM to determine whether the proposed project land
use changes would have a greater impact on traffic levels than those shown in the Eastern
Dublin GPA/SP ElR. Because offices generate considerably less P.M. peak hour traffic
than do retail conunercial uses and the P.M. peak is the critical traffic period for Eastem
Dublin, the analysis concluded the traffic impacts of this Development Plan would be less
than those anticipated by the Specific Plan even though more building square footage is
possible. For this reason, the traffic ramifications of the Area H Development Plan will
not require modification of the existing EIR or preparation of a new EIR. The TJKM
report can be reviewed at the City of Dublin.
Planned Development District and Stage I Development Plan Project Description . Page 6 of 6
~
Dublin Ranch Area H -DecemberJJ J998. Revised-'.yfl,~:;",.,;_!,!!!.~~_ _ __
Project Description
for
DUBLIN RANCH AREA H
East Dublin General Plan/Specific Plan Amendment
(P A 98-070)
Introduction
Dublin Ranch is located within the Eastem Dublin Specific Plan Area and comprises
approximately 1,311* acres. The portion of Dublin Ranch that has been annexed to the
City of Dublin consists of 1.111 acres. 11ris Stage I Development Plan is being submitted
concurrently with a minor modification to the Dublin General Plan/East Dublin Specific
Plan Amendment. The 1,311 acre portion of Dublin Ranch was pre-zoned in
conformance with the East Dublin Specific Plan when it was annexed to the City under
P A 94-030. Therefore, this Development Plan will also serve as an amendment for a
minor modification to that prezoing. These modifications are addressed in a General Plan
and Specific Plan Amendment (P A 98-070) being processed concurrently with this
Development Plan.
Dublin Ranch Area H is bordered by the extension of Dublin Boulevard on the north,
Area C of Dublin Ranch to the east, 1-580 on the south and property of the Dublin Land
Company to the west. The project area is 70.8 acres in size. This area has two land use
designations, being General Commercial and Campus Office. The Eastem Dublin
Specific Plan shows 35.9 acres designated as General Commercial and 36.7 acres as
Campus Office. These acreages have been modified in this Stage I Development Plan to
propose 43.9 acres of Campus Office, IS.7acresof General COInlllerciaI and theu
remaining 10.5 acres that could be developed as either all General Commercial or all
Campus Office.
The Development Plan Project Description for Area H describes the physical nature of
the area, existing land uses, the nature of the development proposed for it, and the
community theme. Please refer to that document for further information on this site.
Area H (PA 98-070) is a Stage I Development Plan as defined by Section 8.32.030(A) of
the Dublin Zoning Ordinance. This submittal includes a listing of permitted and
conditionally permitted land uses; data on site area; proposed square feet; a phasing plan;
and textual information sufficient to establish consistency with the General Plan and
Eastem Dublin Specific Plan.
Conceptual Development Piau
Specifically, the Development Plan proposes to increase Campus Office uses as either 7.2
acres or 17.7 acres above what is depicted on the Specific Plan (the difference being
whether the 10.5 acre GClCO flex parcel is developed as Campus Office or not) and the
General Plan/East Dublin Specific Plan Amendment Project Description . Page I of 6
Dublin Ranch Area H . December // /998 . RevisedJ.w!"',,,;'!l'!.lx _ _
General Commercial area is being reduced by a like amount. In addition, the
Development Plan proposes that the midpoint of the density range of the floor area ratio
(FAR) for Campus Office uses be increased from 0.35 in the Specific Plan to 0.45, with
.60 FAR being the maximum of the range. This will allow the flexibility to exceed.45
FAR for some parcels; however, the average FAR for all CO parcels would not exceed
.45 FAR. These minor modifications create the necessity for this General Plan/Specific
Plan Amendment (GPAlSPA).
This FAR revision would set a maximum oQ18.0QQs'l. ft. of GeneralCommercialwithu
the "Least Office" scenario or a maximum of 1,066,349 sq. fl. of Campus Office in the
"Most Office" scenario. However, in either scenario, the total square footage of any
combination ofGC and CO shall not exceed,1.269.992,For comparison,theEastDublin
Specific Plan has 390,951 square feet of General Commercial and 559,528 square feet of
Campus Office, for a total of 950,479 square feel. If the property is subdivided,
individual parcels may be developed at greater than their respective midpoint F ARs (0.25
for GC and 0.45 for CO) as long as the overall square footage maximums are not
exceeded. For example. if.;29.2acres ofGC~designated land isdevelopedand it is
subdivided into two parcels, one of those parcels could be developed at aFAR greater
than 0.25 as long as a corresponding decrease in the FAR on the other parcel kept the
overall building square footage at or below the maximum.;nS.OOO sq. ft. figure. u
The changes described above are the result of market assessment studies undertaken by
EDA W, Inc. for Area H that concludes that the 1-580 corridor is "over-zoned" for
regionaVcommunity-serving commercial uses. As mentioned in the Area G Development
Plan and GP AlSP A Project Descriptions, the corridor is saturated with large format,
specific market and full service retailers. Approximately 150 acres ofland intended for
such users are still available in the Specific Plan area, however, recent market studies
show the buildout population of Eastem Dublin will not be at high enough levels to
warrant a commercial area of this size. Additionally. the market assessment indicates a
considerable demand at present for regional and headquarters office land. That need is
especially acute for large parcels of such land. It is for these reasons that the
Development Plan for Area H is proposing the flexibility to have either a 7.2 acre or 17.7
acre reduction in General Commercial and corresponding increase in Campus Office-
designated property. Because demand cannot be predicted with complete acc]IDlcy very
far into the future, the 10.5 acres at the southwest comer of Area H is being shown as
having a flex designation of either GC or CO.
Acreages allocated to designated land uses depicted on the proposed Development Plan
altematives have been compared to the approved Specific Plan and are given below. The
two alternatives are illustrated, one for the maximum and the other for the minimum GC
and CO area acreages possible under this proposal. The following table uses a density
mid-range of 0.45 FAR for the Stage I Development Plan CO uses, while a density mid-
range of 0.35 FAR is used for the Specific Plan CO use. For GC a 0.25 mid-range FAR
is proposed in both instances. The square footage figures cited below establish the
maximum limits for the two options for Area H.
General Plan/East Dublin Specific Plan Amendment Project Description. Page 20f6
~
.~
..~
Dublin Ranch Area H . December II 1998 . Revised.!!'!.t<,'-'-";!NfJ.
Alternative 1: Maximum CO/Minimum GC Scenario ("Most Office")
Proposed GP/SPA I EDSP
Desimation Acres Sa. F ootafle Acres Sa. Footal!e
GC .187 ,203.643 35.9 390,95 I
CO 54.4 1.066349 36.7 559.528
Total 73.1 t ,269 ,992 72.6 950,479
Alternative 2: Minimum CO/Maximum GC ("Least Office")
Desimation
Proposed GP/SPA
Development Plan
Acres Sa. Footafle
EDSP
Acres Sa. Footafle
GC
CO
,29.2 uuuuu)18.000
43.9 860.528
.........390>951.
559.528
35.9
36.7
Total
72.6 uuuuuu950,479u
.73.1 uuuuJ,178.528
Attached and detached dwelliogs at densities established for the Medium, Medium-
High, and High Density Residential land use designations per the East Dublio
Specific Plan may be allowed as a Conditional Use if the followiog conditions are
met:
. Established traffic levels of service are not exceeded. Appropriate traffic
study( s) may be required to make the proper determination regardiog traffic
levels of service;
. That the project is consistent with the intent of the Specific Plan and does not
result in adverse enviromnental or service impacts; and
. Residential uses may not occupy more than 50% of the developed area.
Project Circulation
An analysis has been prepared by TJKM to determine whether this project proposal
would have a greater impact on traffic than levels shown io the Eastem Dublio GP AlSP
EIR. Because office uses generate considerably less P.M. peak hour traffic than do retail!
commercial uses, and the P.M. peak is the critical traffic period for Eastem Dublin. the
analysis concluded the traffic impact of this Development Plan would be less than
anticipated by the Specific Plan, even though more building square footage is possible
with the Development Plan. For this reason, the traffic ramifications of the Area H
General Plan/East Dublin Specific Plan Amendment Project Description . Page 3 of 6
---
Dublin Ranch Area H . December II 1998 . Revised-!yu.~:,__::'!!fj!>.
~
Development Plan will not require modification of the existing EIR or preparation of a
new EIR.
The table below compares the vehicle trips projected to be generated by the land uses
shown on the Development Plan with those predicted in the Specific Plan. The two
scenarios are given for the Development Plan. "Least Office" and "Most Office". The
former is based on the iocrease io Campus Office designated land of 7.2 acres above what
is depicted on the Specific Plan and the latter on the increase of 17.7 acres. The mid-point
of the range, .45 FAR, was used to determine the square footage of the Campus Office
use. For GC, a 0.25 FAR mid-range is proposed in all instances.
Land Use
Quantity Daily A.M. Peak P.M. Peak
ISa.Ft.) Trips Hour Trips Hour Trios
390,951 16,780 403 1,462
559.528 4.538 694 604
950,479 21,318 1,097 2,066
Existing Specific Plan:
General Commercial
Camous Office
Total
"Least Office" Scenario:
General Commercial
~ _____________________ I__ ___ ____________~_
1,269,992 17,388 1.532
.
1.914
Camous Office
,-
318.000
860.528
....-. -
13.649
6.979
. uuu,}94
1.067
_____________11:._
1.189
929
Total
~ - - - - - - - - --- - - - - - - - - - - -"- - - - - - - - - -- - - --------"- - - - - ----- -- - - - - - -- -~ --
1.178.528 20,628 1,461 2.118
"Most Office" Scenario:
General Commercial
Camous Office
..
;1.QJ,(l41
1.066349
.
8,240
8.648
___ _ _______Y____________________I_
JIo 7(,J
1.322 1.152
Total
As can be seen from the table, the "Most Office" scenario generates the fewest P.M. peak
hour trips. It projects .tg.fewer such trips than does the Specific Plan, .1be. "Least..
Office" scenario contemplates,/l Ie", additional P.M. peak hour trips than the Specific..
Plan with the difference in this iostance beioggtrips.u
General Plan/East Dublin Specific Plan Amendment Project Description . Page 4 of 6
Dublin Ranch Area H . December / / /998 . Revised..!U.!.!,i.;",,;/,i,(j,tj
Utility Services
Dublin San Ramon Services District (DSRSD) will provide water, wastewater and
recycled water service to the Project Area. These services are planned io accordance with
the DSRSD Eastern Dublin Facilities Master Piau (and/or subsequent revisions). At the
present time it is auticipated that existing aud future water storage reservoirs aud tumouts
from Zone 7 mains will provide water service for the Project Area through buildout.
Distribution mains are planned to be located in all streets. Final locations and sizing of
these facilities will be in accordance with the standards and reconunendations ofDSRSD.
Sewer service for the Project Area will require connection to DSRSD's existing sewer
system. Gravity sewer maios will be extended easterly in Dublin Boulevard aud then
northerly into the project site. Fioal sizing and location of sewer facilities will be
determined in conjunction with DSRSD.
When available from the DSRSD wastewater treatment plant. recycled water will be
provided for irrigation of landscaped areas, thereby reduciog potable water demaud. The
zones withio which recycled water will be supplied will be created by DSRSD after
completion of ongoing studies. The details regardiog how recycled water will be
integrated with development of the Project Area will need to be coordioated with
DSRSD. Final location and sizing of recycled water facilities will be determioed by
DSRSD in accordance with its Facilities Master PIau (aud/or subsequent revisions) and
the Recycled Water Ordinance. DSRSD has recently constructed a recycled water main
io the Dublio Boulevard alignment as part of its "Cleau Water Revival (CWR)" program.
This maio will remaio in service aud additional recycled water distribution mains will be
constructed to serve landscaped areas within the project site as required.
The storm drain system for the Project Area will consist of major backbone facilities and
local facilities. The backbone facilities will generally consist of larger diameter pipes
networked throughout the site. These larger collector pipes will connect to open channels
or box culverts that will direct the flow towards the existing G-3 channel, a Zone 7
facility located at the south end of the site. Local facilities will generally consist of
smaller diameter pipes connecting individual sites or areas to the collector system. The
actual sizes aud locations of proposed storm draio facilities will be determioed at an
iodividual project's tentative map stage.
The PD application modifies the type aud location of proposed land use withio the Area
F, G and H boundaries. To determine if there are any substautive changes to the timing
and amount of storm water runoff, a hydrology study of the proposed laud use map was
prepared aud compared to the hydrology of the Specific Piau land use map.
The results of this aualysis iodicate that the overall hydrologic characteristics of the
proposed PD site plan, dated July 1999, are nearly identical to the Specific Plan approved
in May of 1993. Using the runoff coefficients for various land uses published by Zone 7
aud accepted by the City of Dublin, it is anticipated that the proposed laud use plan will
have approximately one acre less of impervious surface thau the original Specific Plan.
General Plan/East Dublin Specific Plan Amendment Project Description . Page 5 of 6
---
Dublin Ranch Area H -December 11 1998 - RevjsedJ.Y!.I,~:;",,,;!8J.,?___
There are seven fewer acres of conunercial and office land use than the Specific Plan.
However, the additional acreage allocated for high density residential land use in the
proposed PD site plan will offset this reduction.
Therefore, the hydrologic impacts and mitigation measures identified in the
Environmental Impact Report (certified 1993) and the subsequent 1993 Eastern Dublin
Specific Plan (certified by City Council Resolution 51-93, May 4, 1993, amended August
22, 1994) are adequate. No additional environmental assessment or mitigation measures
are required.
General Plan/East Dublin Specific Plan Amendment Project Description . Page 6 of 6
---