HomeMy WebLinkAbout4.03 Solicit Bids Library Repair
CITY CLERK
File # D[6J[O][Q]-~[5]
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: September 5,2006
SUBJECT:
Authorization to Solicit Bids - Contract 06-08, Library Repair
Report Prepared by Melissa Morton, Public Works Director ..J~! ~ .
.#/} 'il
ATTACHMENTS:
Specification will be available at the City Council meeting
RECOMMENDA nON ~ ~AUthOrize Staff to solicit bids for Coutract 06-08, Library Repair
"r '\
<. ~
-"'<,'~.,'
FINANCIAL STATEMENT:
The construction budget for this project is $25,300. The cost of the
work is expected to be reimbursed through insurance claims.
DESCRIPTION: The rear wall of the library building was damaged in a vehicle
accident in March 2006. This project would repair the damage, which consists primarily of metal
framing, drywall and exterior plaster (stucco) work and replacement of the tubular bicycle rack. The
specifications for the repair are consistent with the specifications for the original construction of the
building.
It is anticipated that the City will be reimbursed for the cost of the work through insurance claims. It is
recommended that the City Council authorize Staff to solicit bids for Contract 06-08, Library Repair.
COPY TO:
ITEM NO.
l.\~
Page 1 of 1
g:\miscproj\library repairs\agenda statement auth