Loading...
HomeMy WebLinkAboutReso 156-06 Antone Way Sidewalk Closure RESOLUTION NO. 156 - 06 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********* APPROVING TEMPORARY CLOSURE OF EXISTING SIDEWALK ALONG ANTONE WAY IN FRONT OF THE PROJECT SITE FOR JOHN GREEN ELEMENTARY SCHOOL, ESTABLISHMENT OF 4-W A Y STOP SIGN CONTROL AT ANTONE W A Y/NORTH BRIDGEPOINTE LANE, AND INSTALLATION OF TWO MARKED CROSSWALKS ON ANTONE WAY AT NORTH BRIDGEPOINTE LANE WHEREAS, John Green Elementary School is currently under construction on an approximately 9.8-acre site located on the northwest quadrant of Antone Way and North Bridgepointe Lane in Dublin; and WHEREAS, the said school is planned to open in August 2007, with the ultimate capacity for 650 students; and WHEREAS, the Dublin Unified School District has proposed that the existing sidewalk on the north side of Antone Way fronting the project site be closed for the duration of the project (ending in summer 2007) in order to facilitate construction activities for the project; and WHEREAS, the School District has proposed that an alternate pedestrian route be established before schools are back in session in August 2006 for children attending Eleanor Murray Fallon School by striping a crosswalk across Antone Way at North Bridgepointe Lane and installing stop signs on Antone Way for pedestrian safety; and WHEREAS, City Staff has reviewed the School District's proposal to implement the above pedestrian safety improvements and determined that such improvements are justified to ensure pedestrian safety in the area during and after construction of the Green Elementary School project; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby resolve as follows in the interest of public safety: Section 1: Pursuant to City of Dublin Municipal Code Section 6.04.070, 4-Way Stop sign control is established at the intersection of Antone Way/North Bridgepointe Lane and shall be added to Section 6.16.010 of the City of Dublin Traffic Code. Section 2: Pursuant to the 4-Way Stop sign installation specified in Section 1 above, installation of two marked crosswalks across Antone Way at North Bridgepointe Lane (one crosswalk on each side of the intersection) is authorized Reso No. 156-06, Adopted 8/15/06, Item 6.2 Page 1 of2 Section 3: Pursuant to the installations specified in Sections 1 and 2 above, Temporary closure of the existing sidewalk on the north side of Antone Way between Ted Fairfield Park and North Bridgepointe Lane is authorized for the duration of construction of the Green Elementary School project. PASSED, APPROVED AND ADOPTED this 15th day of August, 2006, by the following vote: AYES: Councilmembers Hildenbrand, McCormick, Oravetz and Zika, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None ,.-'", (k \ 1~:I ~ 21' ," !/i.{c/;/ ~ (/,.dA ( . l// Mayor A TTESr \ ,/' \ \ ( , ~. ;:~W\"--Ci C;~~'-- Reso No. 156-06, Adopted 8/15/06, Item 6.2 Page 2 of2