Loading...
HomeMy WebLinkAbout8.1 Traffic Signal UpgradeCITY CLERK File # E1Ma[n-&&1 AGENDA STATEMENT CITY COUNCIL MEETING DATE: March 16, 2004 SUBJECT: Authorization to Solicit Bids for Contract No. 04-02, Traffic Signal Upgrade — Dublin Boulevard and Scarlett Drive Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: 1) Location Map 2) Plans and Specifications will be available at the meeting RECOMMENDATION: Authorize Staff to advertise for bids for Contract No. 04-02 FINANCIAL STATEMENT: FY 2003-2004 budget for this capital project: Budget Salaries/Design/Miscellaneous: $ 19,208 Improvements: $ 35,000 TOTAL: $ 54,208 The project will be funded through Category 2 Eastern Dublin Traffic Impact Fees. DESCRIPTION: In Spring 2002, the City installed the Dublin Boulevard/Scarlett Drive traffic signal system as part of Contract No. 00-16, Dublin Boulevard Widening — Dougherty Road to Scarlett Drive. The current configuration of Scarlett Drive between Dublin Boulevard and Scarlett Court is two traffic lanes (one northbound and one southbound) along the west side of Zone 7 Water Agency's Chabot Channel. To accommodate the new commercial developments east of the existing Channel, it was necessary to widen Scarlett Drive from two lanes to four. The new configuration of Scarlett Drive will include two southbound lanes on the west side of the channel and two northbound lanes on the east side. The new northbound lanes have already been constructed as part of the development projects, but remain closed to through traffic. This project would modify the traffic signal system at Dublin Boulevard and Scarlett Drive to incorporate the new Scarlett Drive northbound lanes along the east side of the Chabot Channel. This project will add new traffic signal components and modify the existing pavement striping in order to re -configure the Dublin Boulevard and Scarlett Drive intersection. --------------------------------------------------------------- COPIES TO: a ITEM NO. 00 (Q,v G:IMISCPROJ1Dublin Blvd-Scarlett Dr Traffic SignalUS authorize.doc � Au Construction is estimated to start in May 2004, with completiOn anticipated in Summer 2004.. Upon completion of the traffic signal upgrade and pavement striping/signing modifications, northbound traffic will be switched to the new Scarlett Drive lane configuration. Staff recommends that the City Council authorize Staff to solicit bids for Contract No. 04-02, Traffic Signal Upgrade - Dublin Boulevard and Scarlett Drive. CONTRACT NO. 04-02 TRAFFIC SIGNAL UPGRADE - DUBLIN BOULEVARD AND SCARLETT DRIVE LOCATION MAP Dublin Blvd. and Scarlett Dr. Intersection