Loading...
HomeMy WebLinkAbout4.08 AnnualOverlaySolicBid CITY CLERK File # [~ olr - AGENDA STATEHENT CZTY COUNCIL MEETZNG DATE: April 20, 2004 SUBJECT: Authorization to Solicit Bids. Contract No. 04-06, 2003-2004 Annual Street Overlay Program Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: 1) Budget Change Form 2) Map of streets to be overlaid 3) Specifications will be available at the meeting RECOMMENDATION: 1) Approve budget change in the amount of $7,000 from x/~ General Fund  2) Authorize Staff to advertise for bids for Contract No. 04-06 - 2003-2004 Annual Street Overlay Program FINANCIAL STATEMENT: FY 2003-2004 2003-2004 Annual Street Overlay: Budget Salaries/Inspections/Miscellaneous $ 28,100 ImprovementS- Overlay $357,000 TOTAL: $385,100 The Annual Street Overlay Program is funded by Gas Tax ($133,100), Measure B Local Streets & Roads ($245,000), and General Fund ($7,000) in the form of reimbursement received from FCI Constructors, Inc. to repair portions of Amador Plaza damaged during the construction of 1-580/1-680 Interchange Improvements. A budget change in the amount of $7,000 is required to appropriate. fUnds collected from FCI Constructors to the overlay CIP. DESCRIPTION: The Annual Street Overlay project consists of removing and replacing failed asphalt concrete (AC) pavement to a minimum depth of 3 inches on residential streets and 4 inches on collector/arterial streets, resurfacing the street with a minimum 1-1/2-inch overlay of AC, and COPIES TO: ITEM NO. g:\overlayX2004~S authorize \ re-striping pavement markings. Major cracks will also be sealed prior to resurfacing in order to prevent the cracks from reflecting through the new AC overlay. Notices regarding the proposed street work will be sent to affected residents and schools prior to the beginning of work. The 2003-2004 Annual Street Overlay project proposes to repair and overlay the following streets: Birch Court Oxbow Court Corto Court Peppertree Road, from Shannon Avenue to Ladera Drive Ladera Drive Regio Drive Langmuir Court Rosita Court Los Ranchitos Court Serena Court Amador Plaza Road, from Amador Valley Boulevard to 200' North of St. Patrick Way During the construction of the 1-580/1-680 interchange improvement project, the contractor, FCI Constructors, Inc., damaged portions of the pavement on Amador Plaza between Dublin Boulevard and St. Patrick Way. As a result, FCI agreed to pay the City $7,000 to include the pavement repair and overlay of Amador Plaza in the City's 2003-2004 Annual Street Overlay Program. A budget change is required to appropriate funds from the General Fund for the overlay CIP. Staff recommends that the City Council approve the budget change in the amount of $7,000 from General Fund and authorize Staff t° solicit bids for Contract No. 04-06, 2003-2004 Annual Street Overlay Program. Page 2 CITY OF DUBLIN \~'L~- BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget .Transfers: ~g~ From Unappropriated Reserves From Budgeted Continger~tRese~rve (10800-799.000) (If Other than General Fund, Fund No - Within-Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other Name: Name: Improvements- Overlay $7,000 Account#: 001-96580-750-050 Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: ASD/Fin Mgr .,~']V' ~-~ ~ Date: kAL l \ ~ [~ Signature REASON FOR BUDGET CHANGE ENTRY: Transfer funds collected from FCI Constructors, Inc. to repair portions of pavement on Amador Plaza. City Manager: -~' - Date: As approved at the City Council Meeting on: Date: Mayor: Date: Signature PoSted By: Date: Signature H:ICC-FORMSIFORM-budget change, doc A-I-FACHMENT U 0 i A1-FACHMENT 2