Loading...
HomeMy WebLinkAbout4.05 RoofDeckRepair04-11 CITY CLERK File # D~[(2l[(2]-[3]GJ AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 17, 2005 SUBJECT: Acceptance of Work, Contract 04-11, Civic Center Roof Deck Repair Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: None RECOMMENDATION: /Î , nAeeept improvements constructed under Contract 04-11 and \ [/VI' authorize final payment to RoSa Construction, less retention to be paid in 35 days if no subcontractor or supplier claims arc received. ~ FINANCIAL STATEMENT: Printing/incidentals Design/construction administration Construction Bude:eted $2,300 Actual Expense $329 $31,500 $148,000 $37,810 $99.699 Total: $181,800 $137,838 This project was completed within funds budgeted. DESCRIPTION: This project included removal of the concrete pavers and gravel ITom the roof deck outside the City Manager's offices, repair of the deck surface, improvement of the roof drainage, and installation of a new concrete deck surface. The new surface will be easier and more eost- effective to maintain than the concrete pavers. One change order was incurred, which consisted of the following items: (1) The drainage design had to be changed when it was discovered that the grade of the deck was not per original plan. (2) Thresholds were installed in the Police Wing sally port area to prevent water from entering the sally port. (3) The police evidence and storage outbuildings were sprayed with a water repellent coating to resolve leaks. The change order was accomplished within the adopted budget for the project. In April, 2005, the City Council approved an amendment to the agreement with the Zahn Group for design and construction management services which provided for an additional $8,950 in consulting cost. This additional cost was primarily related to the change in drainage design noted above. ___w______~_______________________w_______________w_____p______ COPIES TO: (ot>2. RoSa Construction d 4 ITEMNO.~ g:\rnîscproj\civîc center roof0405\agst accept An additional component of this Capital Improvement Project, which was not incJuded in the actual construction contract, was investigation of the warranty for the Civic Center roof which was installed approximately five ycars ago. This investigation has indicated that any needed repairs can be accomplished within the warranty and no additional cost will be expended for roof repair at this time. Work on this project has been completed according to the approved plans and specifications. Staff recommends that the City Council accept the work constructed under Contract 04-11 and authorize final payment to RoSa Construction, less retention to be paid in 35 days ifno subcontractor or supplier claims are received. Page 2 ~