AGENDA STATEMENT
CITY COUNCIL MEETING DATE: May 16, 2006
SUBJECT: Award of Bid — Contract No. 06-01, 2005-2006 Annual
Sidewalk Safety Repair Program and Curb Ramp Installation
Report Prepared by: Melissa A. Morton, Public Works Director
ATTACHMENTS: 1) Budget Change Form
2) Resolution of Award
3) Bid Results
RECOMMENDATION: 1) Approve budget change in the amount of $9,277.71 from the
General Fund (Fund 001), and
2) Adopt resolution awarding Contract No. 06-01, 2005-2006
i Annual Sidewalk Safety Repair Program and Curb Ramp
Installation, to Sposeto Engineering
FINANCIAL STATEMENT:
FY 2005-2006
Sidewalk Safety Repair Program: Budget Estimated Actual
Design, Inspection & Miscellaneous: $ 16,200 $ 16,200
Construction: Low Bid
Sidewalk improvements (Remove & replace): $ 50,000 $ 52,266.10
Pedestrian curb ramps: $ 9,765 $ 10,500.00
Subtotal: $ 75,965 $ 78,966.10
10% Contingency (construction only): $ 6,276.61
Total: $75,965 $ 85,242.71
COPY TO: Sposeto Engineering
Alma Balanza, Alameda County HCD
Page 1 of 2
GAMAINT PROJECTS\SIDEWALK\2005-2006WS award.DOC
ITEM NO.
G�
o (�
The Sidewalk Safety Repair Program IS budgeted 111 tbe General Fund (Fund 001). The pedestnan
curb ramps are funded tbrougb a Community Development Block Grant (CDBG) III tbe amount of
$9,765
The low bid received for remmal and replacement of sidewalk, curb and gutter IS Ingher tban
budgeted amuunt. A budget change in the amount of $9,277 71 from the General Fund (Fund (01)
is necessary to fully fund this year's sidewalk improvements with a 10% contingency
DRSCRIPTlON: On Febmary 7, 2006 the City Council authorized staff to solicit bids for the
Contraet No. 06-0 I, 2005-2006 Arumal Sidewalk Safety Repair Program and Curb Ramp InstaUatlOn.
The Annual Sidewalk Safety Repair Program (Remove and Replace) repairs sidewalk offsets of 3!4-ineb
or more tbat may pose a tripping hazard. The Remove and Replace process is used in locations where the
offset is more signifieant or where tree roots are eausing tbe offset. This procedure requires remmal of
the existing sIdewalk, and III tbe ease of root problems, removal of the tree roots, and tben replacement of
tbe eunerete sidewalk.
While mamtenance of sIdewalks and other frontage improvements IS legally the responsibility of the
private property owner, tbe City Council has adopted a City-paid sHle"alk repair program all a year-by-
year hasis since 1983 At the budget heanng for Fiscal Year 2005-2006, the City Couneil extended the
funding of the repmr program for an additional year
This year, the side"alk safety repair program includes eonstlllction of approxImately five (5) pedestrian
curh ramps that are funded through a Commumly Development Block Grant.
A total of 2 hlds were reeeived for the project (Attachment 3). The low bidder is Sposeto Engineering,
With a hid of $62,766.10. A budget change m the amount of $9,277 71 from General Fund (Fund 001) IS
neeessary to fully fund the sidewalk improvements_
Staff has reviewed the bId results, cbeeked references, and recommends that the City Council 1) approve
a hudget ebange in the amount of $9,277 71 from the General Fund (Fund 001), and 2) adopt the
resolution awarding Contract No. 06-01, 2005-2006 Annual Sidewalk Safety Repmr Program and Curb
Ramp Installation, to Sposeto Engineering.
Page 2 of2
CITY OF DUBLIN
BUDGET CHANGE FORM
!()f3>
CHANGE FORM #
New Appropriations (City Council Approval Required):
Budget Transfers:
X From Unappropriated Reserves
(If Other than General Fund, Fund No -
From New Revenues
_ From Budgeted Contingent Reserve (l0800-799,00(1I
Within Same Department Activity
Between Departments (Citv Council Approval Required)
Other
Name;
Name:;
Sidewalk Safety Repair Program
$9,277 71
Account #:
Name:
Account #. 001-94250-750-050
Name:
Account #:
Na.me;
Account #: '
Name,
Account #-
Name:
Account #-
Name:
Account #-
Name:
Account #:
Name:
Account #-
Account #:
ASD/Fin Mgr
r"'~~~
Signature
Date: '5l L.-\ \.0 \.,
REASON FOR BUDGET CHANGE ENTRY:
Transfer necessary to fully fund tbis year's sidewalk safety repair program as part of Contract No. 06-01.
-&""Ci"'M=g~ ~
Signature
Date:~
~1:1:Al4
As approved at the City Council Meeting on: Date:
Mayor:
Date:
Signature
Posted BY'
T"\",4-c..
Signature
4.Q sl/blob
ATTAUBMENT ,.
G.-IM.AlNr pRaJECT,'j1,8JDEW.4LK11005.2006lblldHf!f c:harrg~ fO/7TI - flWdrd,Mt
~ (}j8
RESOLUTION NO. - 06
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*********
AWARDING CONTRACT NO. 06-01
2005-2006 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM AND CURB RAMP
INSTALLATION TO SPOSETO ENGINEERING
WHEREAS, the City of Dublin did on April 27, 2006, publicly open, examine, and declare all
sealed bids for domg the work described in the approved Plans, Speeifieations, and Modifieations for
Contract No. 06-01, 2005-2006 Annual Sidewalk Safety Repair Program and Curh Ramp Installation,
authorized by the City Council on Pebmary 7, 2006, which Plans, Specil1cations, and Modifieations are
hereby expressly referred 10 for a desenptlOn of said work and for all particulars relative to tbe
proceedings under the request for bids; and
WHEREAS, said bids were submItted to the Publie Works Direetor/Assistant City Engineer, wbo
has reviewed the bids to determine the lowest bid whieh was responsive to the requirements uf the bid
documents;
NOW, THEREFORE, BE IT RESOLVED that the City Council of tbe City of Dublin does
hereby award Contraet No. 06-01 to tbe lowest responsible bidder therelor, to wit, Sposeto Engineering, at
a bid of Sixty-Two Thousand, Seven Hundred and Seventy Six Dollars and Ten Cents ($62,776.10), the
particulars ofwbicb hid are on file m the office of/be Public Works Director.
PASSED, APPROVED AND ADOPTED this 16th day of May, 2006
AYES.
NOES
ABSENT
ABSTAIN:
Mayor
ATTEST
City Clerk
",IMAI NT PROJECTSISIDEW ALK\2005-2006\RESOA WRD,DOC
ATTAUHMENT 2.
BID RESULTS - CONTRACT NO. OS'{)1, SIDEWALK SAFETY REPAIR PROGRAM I
~PENING DATE - April 27, 2006 I I
I- ----. -
I I
1--.- ENGINEER'S ESTIMATE SPOSETO ENGINEERING ROSAS BROTHERS
i ! --
BID UNIT I UNIT ;
ITEM ITEM DESCRIPTION MEASURE: QTY PRJCE I TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
1 Sidewalk (Remove & Replace) SF , 3986 $ 8.71 . $ 34,718.06 $ 11,60 $ 46,237.60 $ 14.00 $ 55,804 00
2 Saw Cut Concrete LF 845 $ 3,01 . $ 2,543.45 $ 3.30 I $ 2,788,50 $ 4.00 $ 3,380,00
3 Curb/Gutter (Remove & Replace) LF 54! $ 31 17 S 1,683.18 $ 46,00 ! $ 2,484,00 $ 45.00 I $ 2,430 00
4 AC Paving (Remove & Replace) LF 54, $ 9,53 $ 514.62 $ 14,00' S 756 00 : $ 15.00: $ 810.00
f--_. Pedestrian Curb Ramp (CD-l05) 4' $ 2,000,00 S $ 2,100.00 ' S 8,40000 , $ 2,000.00 ! $
5 EA 8,000.00 8,000.00
--
1-6 Ped c:urb Ramp - Antone/Grafton EA 1 $ 2,50000 $ 2,500.00 $ 2,100,00 S 2,100,00 1$ 1,810.00 . $ 1,810.00
! ; I
TOTAL BID' $ 49,959.31 I $ 62,766,101 $ 72,234.00
,