HomeMy WebLinkAbout4.14 Accept Work Fuel Tank Removal CITY CLERK File # D~DJ~-r?iJ[5] AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 6,2006 SUBJECT: Acceptance of Work, Fuel Tank Rcmoval, Contract 05-13 _ Report Prepared hy Melissa Morton, Public Works Dire~fl f---/' ATTACHMENTS: None RECOMMENDATION: - - V Acccpt improvcments constructed under Contract 05-13 and ~ authorize final payment to American Construction and ";II, Envirorunental, less retention to bc paid in 35 days if no b suhcontractor or supplicr elaims are received. FINANCIAL STATEMENT: Design/inspection pcrsonnel cost Design cost, consultant Advertising, mailing, printing Construction, Gcncral Fund Construction, Internal Svc. Fund Total. Budget $3,92000 $5,000 00 $700 00 $20,000 00 $25,000.00 $54,620.00 Actual $4,570.00 $000 $178.00 $13,22900 $25.000.00 $42,977 00 This project was completed within funds budgeted. DESCRIPTION: This project removed the 10,000-gallon gasoline tank, fuel pump, and associated piping from the Civic Center site, performcd all required envirorunental testing, and backl1l1ed and paved the cxcavation. The gasoline tank was located under the drivc aislc of the police parking lot. The final result of the environmcntal tcsting is expected to be received sometime in June. It appears that no Icakagc occurrcd from the tank itself but that there may have heen minimallcakage associated with the piping to thc fuel pump. ______________________________________________________..__~__________________________________________ww______ COpy TO: Page I 0[2 ITEM NO. 4- . \ tt g;\miscproj\fuel tank closure\agenda stldeml;nt IIcceplancc:: The contractor has completed the work satisfactorily and in accordance with the project specifications. Staff recommends that the City Council accept the improvcments and authonze final payment to American Construction and Environmcntal, less retention to be paId in 35 days if no subcontractor or supplier elaims arc rcccivcd.