CITY COUNCIL MEETING DATE: June 20,2006
SUBJECT:
Approval of2006 Americans with Disabilities Act (ADA)
Transition Plan Update
Report Prepared bv' Mark Lander, City Engineer
A TT ACHMENTS:
Resolution Approving 2006 Americans with Disabilities Act (ADA)
Transition Plan Update, together with Exhibit "A," 2006 Update
-rf'~
q)R
Adopt the Resolution Approvmg the 2006 Americans with
DisabilitIes Act (ADA) Transition Plan Update.
RECOMMENDATION:
FINANCIAL STATEMENT:
The cost of completing the 2006 Americans with Disabilities Act
(ADA) Transition Plan Update (2006 Update) is estimated at
$30,000 Funding would be through the General Fund. These funds
will be included in the 2006-2007 Fiscal Year as a Capital
Improvement Project.
The assessment phase of the 2006 Update will identify
improvements needed to City facilities and public right~of-way in
order to comply with current ADA standards. The scope and cost of
these improvements will not be known until the assessment IS
complete.
The 2006 Update suggests an initial target annual fundmg amount of
$20,000 to allow measurable progress in completing improvements
needed to achieve ADA conformance. The first year of funding for
improvements would be in 2007-2008, after completion of the
assessment. This fundmg would need to continue, dependent on
the total cost of the needed improvements. Completion of the
assessment may show that the annual funding amount should be
increased in order to accelerate completIOn of high-priority
improvements.
______________________~_w______~____________________________~__________________________~_______________._____
COpy TO:
Page 10f3
ITEM NO. .J.l
O:\DEVELOP\ADA 2()()5 Tramition Plan Update-ADA Transition Plan - AgsLdm;
Annual funding for improvements would be from the General Fund
or Gas Tax. It IS likely that in given years grant funds would be
available for portions of the work, reducing the impact to the
General Fund or Gas Tax momes. It is also likcly that some
improvements would be completed in conjunction with City Capital
lmprovement projects or private development.
DESCRIPTION: The Americans with Disabilities Act (ADA) was signed into law on
July 26, 1990 In summary, the law prevents discnmination against physically or mentally disabled
individuals with regards to employment or access to public facilities. Title I of the ADA deals with
discrimination in the workplace. Title 11 deals with discrimination m access to puhlic places, and requires
that local agencies prcpare and adopt a transition plan that idenbfies barriers to aecessibility and methods
to remove those barriers. Title II also requires that an ageney develop a grievanee procedure whereby
individuals may report and request correction of facilities which are in non-compliance, and designate a
staff person as ADA coordinator for the agency
The City of Dublin, m response to the law, adopted thrcc rcsolutions on February 2, 1993 Resolution No.
27-93 adopted a Title I Compliance Plan, Resolution No 28-93 adopted a Title II Transition Plan, and
Resolution No 29-93 adopted a complaint procedure. The transition plan was limited to City facilities m
existence at the time the ResolutIons were adopted (the Civic Center, Shannon Center, Dublin SWIm
Center, Senior Center, and the Corporation Yard), and identified significant upgrades needed at the Swim
Center in order to hting that site into ADA compliance. Upgrades at the Swim Center and other minor
improvements noted in the plan were completed later in 1993
Staff recommends that the ongmal transltlOn plan be replaced by an update that addresses current ADA
requirements as well as the City's expanded infrastructure. The City has added several major facilities
since 1993, specifically the new Library, the new Senior Center, Fire Stations 16, 17 and 18, and the
Heritage Center. Furthermore, the 1993 Plan did not include an assessment of other City infrastructure
such as parks, trails, or streets, which arc all governed by ADA standards. ADA standards have heen
amended numerous times since 1993, and many improvements which may have complied 13 years ago
may no longer be in compliance. Standards are continuing to change; the U.S. Access Board, which
develops ADA standards, is proposing specIfic accessibility design guidelines for the public right-of-way
Altbough the City has continued to make progress in addressing specific areas such as park play
equipment or individual buildings, there is no overall plan addressing the City's entire current
infrastructure.
The proposed 2006 ADA Transition Plan Update, if adopted, will complete (during the 2006-2007 Fiscal
Year) an assessment of the City's current infrastructure, measured against current ADA standards or those
which are pending. The Update will develop a list of improvements needed to correct any noncompliant
areas, along with a cost estimate for the work. The assessment will also inelude a revIew of existing
complaints regarding noncompliant areas, and will include a pubhe outreach effort to solicit input from
the community as to other prohlems or needs. Needed improvements will be prioritized based on a
combination of the volume and type of use the facility sees and the severity of the issue. A funding plan
will be developed, Identifying funds that can be allocated to the work each year Following prioritization
and development of the funding plan, a schedule will be set for implementation of the work.
Page 2 of 3
The schedule for completing the 2006 Update is as follows:
TASK
Complete Inventory
Perform Assessment and Public Outreach
Develop List of Needed Inlprovements
Develop Cost Estimate for Improvements
Complete Prioritization of lmprovements
Develop Schedule for Completion ofImprovements
Complete Revisions to Standard Drawings
Implementation of Improvements
DATE
Complete
July 2006 - January 2007
February 2007 - April 2007
May 2007 - June 2007
February 2007 -- June 2007
July 2007 - August 2007
Complete
Fiscal Year 2007-2008
Regular updates will be made to the City Council on the progress of the plan's implementation. Over
time, minor adjustments to the prioritization of improvements may also be made to address mput from the
community. Staff anticipates that the inventory will be updated as new facilities and puhlie infrastructure
is completed in the City
The duralion of the work would be dependent on the total cost of the work and the funds availahle in a
gIven year. Staff has suggested an initial target funding level of $20,000 per year. This funding levcl
would be adequate to complete a reasonable set of improvements wlthm a given year For example, the
fund would be adequate to replace approximately 10 curb ramps, enough to improve access around or
along the route to a park or school. Available sources of funding are the General Fund or Gas Tax. It is
anticipated that grant funds, such as Community Development Block Grant (CDBG) funds, will continue
to be available each year in some amount. The City might also want to apply the value of ADA
Improvements that are completed as part of another CIP project or private development toward the annual
funding goal. Staff estimates that the $20,000 ammal target level can be met through a combination of the
use of grant funds and/or by crediting ADA improvements completed as part of other projects toward the
target, and that meeting the target will not result in an increase m the use of the City's discretionary funds.
The cost of the 2006 Update is estimated at $30,000, with funding through the General Fund. Funds will
offset the cost of consultants and/or temporary staff to assist with the field assessments. Costs will be
included in the 2006-2007 Fiscal Year Budget as part of the Capital Improvement Program.
Should the City Council choose to adopt the resolution approving the 2006 Transition Plan Update, this
resolution would replace Resolution No 28-93, which adopted the original transition plan. Resolution
No. 27-93, adopting the Title I Compliance Plan, and Resolution No. 29-93, adopting the complaint
procedure, would remalll m effect. At this time, Staff has not evaluated changes in ADA law on these
documents. These documents deal with subject matters outside the responsibility of the Public Works
Department and would require revIew by the City Attorney. Staff will initiate this review if directed by
the City Council.
Staff recommends that the City Council adopt the resolution approving the 2006 Americans with
Disabilities Act (ADA) Transition Plan Update.
Pagc 3 of3
/vb -t
RESOLUTION NO. - 06
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*********
ADOPTING AN AMERICANS WITH DISABILITIES ACT (ADA)
TRANSTTION PLAN 2006 UPDATF:
WHEREAS, the Federal goverlllnent enacted the Americans with Disabi]i(Jes Act of 1990 (ADA)
to prevent dlscnmination of the physically and mentally disabled relatmg 10 employment and access to
public facilitIes; and
WHEREAS, Title II of the ADA requires that mUJl1clpalities adopt a TransitIOn Plan that
documents barriers 10 accessibility, proposed structural modifications to remove those harriers, and a
schedule to complete the modifications; and
WHEREAS, the City Council approved ResolutIOn No. 28-93 on February 2, 1993, adopting an
ADA Transl(Jon Plan in conformance Witll Tille IT requirements; and
WHEREAS, the City of Dublin has lllcreased the number of facihties and other infrastructure
since 1993 that are not meluded under the 1993 Transition Plan; and
WHEREAS, ADA design standards have been modified by the Federal govennnent smce the
adoption oftlle I <)93 Transition Plan, and
WHF:REAS, the City of Dublin remains committed to the ADA and the elimination ofbarners to
puhhc facilities: and
WI-TERF:AS, Staff has prepared an update to the 1993 Transition Plan that reDccts current City
mfrastructurc and ADA design standards, referred to as the "2001i ADA Transition Plan Update;"
NOW, THEREFORE. BE IT RESOT,VED that the City Council of the City of Dublin herehy
approves the 2006 Americans WIth DlSahilities (ADA) TransitIon Plan Update.
PASSED, APPROVED AND ADOPTED this 20th day of June, 2006.
AYES
NOES
ABSENT
ABSTAIN
ATTEST
Mayor
_n
City Clerk
~'dlJ~D/.p 8. a
A-ffa.ch m01 r
:A~bf6
EXHIBIT "A"
ADA Transition Plan
2006 Update
I. Background
The Americans with Disabilities Act (ADA) was signed into law on July 26, 19<,10. The law,
in summary, prevents (hscflmination against physically or mentally disabled mdlvlduals with
regards to employment or access to puhlie facilities. Title I deals with discrimination III the
workplace. Title 11 deals with discnmmation in access to public facihties. Title 11 requires that
local agencies prepare and adopt a translhon plan that identifies bamers to accessibility and
methods to remove those barriers. Title II also requires that an agency develop a grievance
procedure wherehy individuals may report and request corrcetion of improvemcnts which are
in non-colllphance, and designate a staff person to serve as ADA coordinator for the agency
The City o(,Dublin, in response to the law, adopted three resolutions on February 22, 1993
Resolubon No_ 27-93 adopted a Title I Compliance Plan (Plan). ResolutJon No. 28-<,13 adopted
a Title II Translhon Plan_ Resolution No. 29-93 adopted a complaint procedure_ The 1993
Transition Plan was limIted to the existing city faclhhes at the time. These mcluded the Civic
Center, Shalmon Center, Dublin Swim Center, Semor Center, and the CorporatIon Yard. The
Plan noted that most facilitIes were in general confoilllance with ADA requirements, with the
exception of minor changes to the phone system and a numher or significant upgrades to the
swim center A capital Improvement project was completed at the swim center later 111 1993,
addressing the needed ADA upgrades.
II. Need fnr Updated Transition Plan
A 2006 Update to the 1993 Transition Plan has been prcpared for a numher of reasons.
The eXIsting plan has not been reviewed or updated since 1993 and IS now 13 years old. The
1993 plan 111eluded only facilities in existence at that time; the 1993 Plan did not include an
assessment of the puhlic right-of-way, parks, or trails, nor does it include buildings constmcted
since 19<,13 In additIOn, ADA design standards have changed since 1993 and many
Improvements assessed to be m conformance in I ll<,13 may not meet the current requirements.
Finally, the 1993 Plan does not include a schedu.le or funding plall for addressing any non-
compliant improvements not covercd in the 1993 plan_
The 2006 Update will include the f(ll1owing:
I) An updated inventory ofpLLhlie facilities and improvements subject to ADA
2) An assessment of the updated mventory against current ADA standards
3) A list of non-compliant features and the improvelllents needed to achieve compliance
4) A cost estimate of the improvements
5) Prioritization of the lmpruvements
6) Identification of a funding source and funding p Ian to complete the improvements.
7) A schedule for complehon of the improvements.
8) Standard Plans Update
10f7
EXHIBIT A
To the Resolution
3TJbct
The 2006 Update does not cause the City to be in compliance with current ADA standards.
Compliance will he achieved over a penod of many years through the implementatJon of the
improvements Idenhfied in the update.
The U.S. Access Board, whH;h develops ADA design standards and coordmates implementation
with government agencies, has developed a draft set of accessibility guidehnes for the public
nght-of-way that wcre recently released for public revIew and comment. Although the guidelines
are not yet m effect, it is likely that some version ofthese gUIdelines will ultimately he adopted
by law as the deslgn standard for new or altered improvements to the public right-of-way The
draft guidelines will be utilizcd as the standard for the 2006 Update.
Design gUldehnes have been amended numerous times since the adoption of the Act m 1990, and
as noted above new gUldelines continue to be developed. It is likely that standards will change
again during the Implementation phase of the 2006 Update. Ongoing updates will likely be
needed to keep the City's Transition Plan m conformance with current standards.
III. Proposed 2006 Transition Plan Update
As noted above, the 2006 "transition Plan Update consists of (I ) an updated inventory of
facilities for wInch the City is responsible, (2) an assessment ofthe facilities with regards to
current ADA standards, (3) a list of improvements needed to bring the nnprovements into
compliance, (4) a cost estimate of the improvements, (5) prioritization of the improvements,
(6) a funding plan for completing the improvements, and (7) a schedule for completing the
Improvements. In additIon, the City will revise Its standard design plans to adhere to current
ADA requirements, so that fulure improvements will he in ADA conformance. The schedule
for completing tlle work will he as lollows.
Task
Com lete Invento~y_
Perfonn Assessmenl and Public Outreach
--.- .,,---
Develo List of Needed Improvements
.Develop Cost Estimate for Improvements
Com lete Prioritization ofTmprovements
.' -,~
Devclop Fundi!lgIlan for Completion of Imrrovements
Develo Sehedull!JOl: Completion ofImprove!ilents
Com lete RevI~IOn_sto Standard Drawings__
Implementation of Improvements
Date
Com lete
July 2006 - March 2007
A ril2007 - June 2007
July 2007 - AllBust 2007
S tember 2007 - October 2007
October 2007 - November 2007
December 2007 January 20Q8
_.P .
Com lete
July 2008 through June 2038 or as
needed
The inventory IS complete; the standard plans update will be complete hy the end of Fiscal Year
2005-2006. The remaining components will be completed during the 2006-2007 and 2007-2008
Fiscal Years. Implementation of Improvements will not begin until the second hal f of Fiscal
Year 2007-2008. Each elelllent is described ill greater detail below
20f7
L-jot~
A. Inventory
Public Works staff, m conjunction with the Parks and Comlllulllty Services Department, has
identified those facilttIes that arc the responsibility of the City ofDuhlin and should be lllcluded
wlthin the 2006 Update. Facilities arc grouped mto four categories: Buildings, Parks, Trails, and
Streets. Staff has also identified the year of constructIOn and/or the most recent upgrade to the
facility, and determined if assessment of the facility is needed. Facilitics arc listed helow'
Building_ __
Civic Cente
Library
Police Depa
Senior Cent
Fire StatlOn
Fire Station
Fire Station
Herita~CC1
Swim Cente
Corporation
Shannon Cc
-- -- ..m -- -
Last
Year Built Up2rade Assessment R
r 1988 2005 Yes
---,,,. .....,
2002 None Yes (ext!"nor 0
---
rtment 1988 2005 Yes
--..,.
er 2005 N/A No
16 1993 2006 Yes
.".'- "-
17 2002 N/A Yes ( exterior 0
--
18 2003 N/A Yes (exterior 0
lter N/A 2002 Yes
- -, ----
r 1972 1'}<)3 2000 Yes
-- ._ .2_
Yard 1986 N/A Yes
- -
nter N/A 1989 No (Building t
-
e uired
nly)
nly)_
nl
o be repJ_a~ed
Kolb Park
Ma e Mem
Shannon P
Stagecoach
Ted Fairfie
Martm Can
...".'... --- -- --
Last
Year Built Up2rade Assessment Required
--- --
ek Park 1987, 1990 N/A Yes
---
ons 2004 N/A No
.."..
1987,1988 2005 Yes
--
Hills Open Space 1984 N/A Yes
rts Growld 1976 2005 Yes
..
len Park 1')\)9,2003, N/A Yes (Phases I and n Only
2005
- .'~.'.
1987 2003 Yes
-" ..~.
(ll;al Park 1965 1996 Yes
-- --.. --- ..."~
ark 1989 2005 Yes
--"'
Park 1986 N/A Yes
...,.. --
ld Park 2000 N/A Yes
--.
yon Open Space 1<;196 N/A Yes
)
Park
Alamo Cre
Bray Conlm
Dolan Park
Dougherty
Duhlin S 0
Emerald G
The CUrrL'1lt five-year CapItal Improvement Program allocates funds to upgrade playground
eqUipment and access in all City parks hy 2008. The park assessment will therefore exclude play
equipment.
3 on
606 t{,
.-.-
Trail
Iron Horse TraJ!
Alamo Canal Tmil
Alamo Creek Trail
Tassajara Creek Trail
Year Built
1998
2001,2002
20113
1')<)8, 2000,
2001,2004
1996
2000
Last
U rade
N/A
N/A
N/A
N/A
Duhhn Boulevard Trail
Dublin Ranch Phase I Streanl
Corridor Trail
N/A
NlA
Yes
Yes
Streets
The City of Dublin has approximately 80 miles of public nght-of-way, including sidewalks,
roadside trails, and intersections. The mdividual facilities are too numerous to be listed here.
The City's GIS system identifies those streets that have becn accepted as puhlic right~of-way;
the street inventory was last updated in November 2005 and will be updated again in early 2U06.
The GIS can be considercd an accurate inventory ofpublie right-of-way for whH;h the City is
responsible.
B. Assessment
The assessment of buildings and parks will be completed dunng the 2006-07 Fiscal Year. It
will include the interior of the huilding (harriers, path of travel, access to phones or drinking
fountains, and restrooms) as well as the exterior (path of travel from the huilding to the parking
lot and adjoining street). Public Works and Parksl Communitv Services staff will narrow the
scope of the assessment to tlle extent possible through review of existing construction
docLlmenls, and will conduct portions of the assessment As the assessment will reqUIre
speclalized architectural knowledge not held hy City staff, it is anticipated that the assessment
will also reqUIre the assistance ofa consultant. The assessment will begin in early fiscal Year
2006-2007, mne months is allowed to hire a consultant and complete the assessment
The City's five-year Cap]tal Improvement Program for 2()ll4-2009 includes funds to upgrade
play equipment to meet ADA standards within City parks. Play eqlLlpment is therefore within
compliance or will be brought mto compliance by 2008. The assessment of parks will exclude
play equipment and will be limited to other facilities.
The assessment oftrails and streets will be conducted hy Public Works staff, who have the
technical knowledge to evaluate conformance ofthese facihhes with ADA standards. The
assessment will include the curb ramps at each intersection; the assessment will evaluate the
need for detection warnings (truncated domes) and! or the need to reconstruct the ramp. The path
of travel between each intersection will also be assessed. This would include obstrucllOns such as
signs or street fuml ture, gaps or broken areas in the sidewalk, the sidewalk grade, and the cross-
slope grades at driveways or nther crossings where the eross~slope exceeds the ADA maximum
of 2%. Traffic signals will be evaluated as to accessibility of pcdestrian pushhuttons and audible
pedestnan crossmg devices. The assessment would hegm III June 2006, with the field work in
the public right-of-way completed by September and the results compilcd by early 2007
40f7
Lo~b1>
The assessment will include a review of existing complaints from the community regarding
ADA compliance, and contact by stalf of the concerned parties to better discuss the problem and
potential solutions. The assessment will also include a public outreach component, through
nohces on the City's Web sIte and in the City newslettCT In addition, the Dublin Unified School
Distoct, local churches, and other parties that generate pedestrian traffic will be polled as to any
known prohlems or complaints. Upon completion of the Update, a public comment period will
be allowed so that interested partles can review the proposed actions prior to the Update being
approved by the City Council.
C. Needed Improvements
Improvements for buildings or parks would be listed by site and the nature of the needed
improvements.
Improvcments for trails and streets would be listed by mtcrscction (specific as to each comer) or
by locahon on the path of travel betwcen each intersechon. Thc type of improvement would be
noted (mstall detectable waming, reconstruct ramp, reconstruct drivcway, remove ohstruction,
rclocate pedestoan pushbutton). The types ofmlprovements would he grouped into a selected
number of categories m order to accommodate cost estimates.
The intent of the assesslnent is to identify the locahon of problem areas and identify correctIOns
m sufficient detail to develop a budget-level cost estImate lor the Citywide Transition Plan. The
plan would not develop specific designs for the corrective work. As part ofthe Ihturc
Illlplementation of the upgrades, more detailed evaluation and design will he required prior to
any construction work.
Development ofthe Improvclllcnt list will he completed by mid-2007
D. Cost Estimate
Cost estimates will he developed lor each buildmg or park site, and for each trail. Cost estimates
will be of adequate detail to incorporate needed upgrades into the Capital Improvement Program.
Cost estimates for the public oght-ol~way will focus on groups of improvements needed, listing
the number of curb ramps needing reconstruction, traffic signals needing modificahon, etc. Since
the street improvements will be prioritized over a period of years, the intent is to develop a
phased implementatIOn plan .lor incorporation mto the Capital Improvement Program. In a gIven
year, the scope of the work that can be completed will be balance agamst the funds available m
that year
The cost estimate will be completed by mid-2007
E. Prioritization
Improvements wlthm huildings or parks will he given the highest priority for complelHll1. These
facilities are used by the gcncral public and expenditure of funds will provide benefit to a greater
number of people. Further, these l'acilities can be reached hy automobile and lack of compliant
facihhes m the adjoining public oght-ol~way would not be a deterrent to use by mdividuals with
disabllities.
50f7
1~bi
The next level ofpnonty will be improvements wlthlll the puhlie right-of-way Higherpriority
will be given to routes that provid" access to schools, parks, or other public facilities (for
example, the Senior Center), commercial areas within walklllg distance of residential areas
and/or are expected to aUract pedestrian traffic, and high-density or senior residential areas.
Routes to proposed projects such as the West Dublin BART Station which arc anticipated to
attract pedestrian traffic will also he given priority, as in some cases the BART Station may
provide the only accessible mode oftransportation for persons who cannot otherwise use an
automohile. The BART Station will also encourage residents to live wlthm 'Walking distance of
the station makmg it Imperative that barriers to the stahon he eliminated.
The next level or priority will be to smgle-family residential areas, as pedestnan traffic is less
concentrated on thes" streets. However, areas of known travel by citizens WIth disahilities would
have greater pnority over other neighborhoods.
The prioritization will be completed by latc 2007
F. Funding Plan
The total amount of funding required to implement needed upgrades cannot be detennined until
the cost estnnate IS completed in mid-20ll7 The Translhon Plan Update sets an imhal targct of
$20,000 per year 10 Implement the improvements listed in the update. This funding should make
it possible to complete a reasonable set of improvements within a given year. For example,
$20,O()() will allow upgrade of approximately 10 curh ramps, adequate to eliminate any harri"rs
around a school or park.
Sources of I'unding for the improvements ll1clude the General Fund, Gas Tax, and grants.
The current (2005-06 Fiscal Year) budget includes $q,765 in Community Development Block
Grant Funds (CDBG) to be used tor reconstruction of approximately four curh ramps. The
UpCOmlllg (2006-07 Fiscal Year) budget includes an additional $17,5S I in CDBG funds. It is
reasonahle to assume that some level ofCDBG funds or other grants will remain available in
future years. The General Fund and/ or Gas Tax would be used to make up the shortfall between
the annual target I'unding and available grant funds.
Additional sources of funding lllclude the City's Capital Improvement Program and pnvate
development Capital Improvement proJects wi]] he designed according to current ADA
standards and wi]] correct any existing deficienCies wlthm the limits of the proJect Tn many cases
(for example, a street widening) correction of a prohlem will result in no incremental cost to the
ClP project, as the prohlem area would have been removed.
As noted under the Assessment discussion, the existing five-year capital improvement program
mcludes $540,036 in funding to upgrade park play equipment to meet ADA standards. The
$20,000 annual target would exclude these funds.
G. Schedule
The schedule for completmg the improvements noted m the transition plan update IS dependent
on the total cost of the improvements and the funds available each year for the upgrades. Pending
completion of the cost estimate in early 2007, the plan will set an imhal target of thirty years for
60f7
,
SUb~
completion of aU items listed m the plan. This tIme penod is consistent with the time frame set
by other agencies and found acceptable by ADA advocacy groups_ Smce it is also likely that
ADA design standards will change over the thirty year implementatmn period, this time frame
will alluw the City to adjust to the changing standards and prevent a maJ<mty ofimprovemcnts
from fallmg out of compliance within a short time of completion.
Since the plan scts a target funding of $20,000 per year, the thirty year implementation pcriod
would allow completion of $600,000 in improvements. Once the actual cost of the improvcments
has been detenninud, it will be necessary to re-examine either the annual allocation or the
lmplementatJon penod.
Following completion of the assessment, cost estmlate, and prioritization phases of the
Transition Plan in 2007, a 200H Transition PIal] Update will he prepared that includes the actual
improvement list and a recolllmended annual target funding and Implementation period. The
2008 Update should he completed hy early 2008, allowing implementation to begm that year
Accordingly, the 2007-2008 Fiscal Year Budget will include funds to implement prioritIes set for
the first year
H. Standard Plans Update
The update of the City standard plans is currently underway The update IS scheduled lor
completion in June, 2006. The update will include new sidewalk and dnveway standards that
confonn to current ADA guidehnes.
The revised plans will he utihzed mthe design of all future City and private development
projects. The City has been utlll7.lng the draft plans since early 2005
IV. Implementation Cost
Public Works staff will continue to take the lead in completmg the remaining portions of the
work. Completion ufthe assessment and dcvelopment of the scope of lmprovements/ cost
estimate for huildings and parks will requirc coordination with Parks and Community Service
staff and the assistance or an outside architectural consultant. Further, staff proposes to utilize
student mtems over the summur of 2006 to complete the assessment of facilities Within the
public nght~of"way In additmn, tJme will speot hy the City's GIS coordinator in asslstmg With
data collection and map preparation. The mtemal City cost is estimated at $12,000
The buildings/parks assessment will require inspection of approximately 20 facilities. The cost
of retaining a huilding inspection consultant to complete the mspectlOns IS estimated at $15,000.
The total cost for consultants, mterns, and staff GIS assistance is a total of $27,000. Allowing
for an additional 10'Y., contingency increases the cost to $30,000. This will be tlle anlount
budgeted in the 2006-2007 Fiscal Y car for outside services. The remaming costs associated
With Puhhc Works staff IS mduded in the salary costs for staff.