Loading...
HomeMy WebLinkAbout4.04 Accept Work #06-04Street Overlay t\"l. Of Dlr/3/>., 6~~ r~@~~~~ ,~, C1llF09,'t<\~ CITY CLERK File # D~[!2]~-[3]~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 1, 2006 SUBJECT: Acceptance of Work - Contract 06-04 2005-2006 Annual Street Overlay Program Report Prepared hy Melissa Morton, Public Works D~ None ATTACHMENTS: RECOMMENDATION: 't /l ,~Acccpt improvemcnts undcr Contract No. 06-04, 2005-2006 Annual \[NV;I Street Overlay Program, and release retention after 35 days if there are no subcontractor claims FINANCIAL STATEMENT: 2005-2006 Annual Street Overlav: Salarics/Inspections/Misccllaneous: Improvements - Overlay' FY 2005-2006 Budget $ 58,940 $ 737.651 TOTAL. $ 796,591 Est. Actual $ 48,203 $ 721.578 $ 769,781* * The estimated actual includes $305,268 in expenditures for the 2004-2005 Annual Street Overlay Program completed in early FY 2005-2006. The estimated actual total for the FY 2005-2006 Annual Street Overlay Program is $464,513, The Annual Street Overlay Program is funded by Gas Tax and Measure B Local Streets & Roads funds. DESCRIPTION: On April 18, 2006, the City Council awarded Contract No. 06-04, 2005-2006 Annual Street Overlay Program, to G Bortolotto & Company, Inc. The Annual Street Overlay project consists of removing and replacing tailed asphalt concrete (AC) pavement to a minimum depth of 3 inches on residential streets and 6 inches on collector/arterial streets, rcsurfacing the street with a minimum 1-1/2-inch overlay of AC, and re-striping pavement markings. COpy TO: G. Bortolollo & Company, Incorporated Page 1 of2 ITEM NO. '+. L/- G:\uVERLA Y\2006\AS acceptance. doc Major cracks were also sealed pnor to resurfacing in order to prevcnt pavement cracks from reflecting through the new AC overlay The 2005-2006 Annual Street Overlay Program repaired and overlaid the following streets: Street Ashford Way Carlow Way Castilian Road Dillon Way Galindo Court Galindo Drive Rampart Dnve Limits Edenberry Street to Longford Way Edenberry Street to Bandon Drive Padre Way to Silvergate Drivc Betlen Drivc to Silvergate Drive Galindo Drive to End Deervale Road to Deervale Road Betlen Drive to Betlen Drivc Staff has inspected the work and recommends that the City Council accept improvements under Contract No. 06-04,2005-2006 Annual Street Overlay Program, and release retention after 35 days ifthcre are no subcontractor claIms. Page 2 of2