HomeMy WebLinkAbout1986-91 Five Year Capital Improvement Program
CITY OF DUBLIN
PLANNING COMMISSION
Meeting Date: June 2, 1986
Agenda Statement/Staff Report
TO:
Planning Commission
FROM:
City Manager
SUBJECT:
1986-91 Five Year Capital Improvement Program
EXHIBITS:
Capital Improvement Program (under separate
cover)
RECOMMENDATION:
qJI
Review Capital Improvement Program; determine
conformity with the City's General Plan.
DESCRIPTION: Staff has completed the City's Five Year Capital Improvement
Program for 1986-91. The Five Year Capital Improvement Program consists of
projects which Staff views as desirable and are also within the City's
financial capability during the next five years. The projects included in the
Program will cost the City an estimated $22,867,850 during that period.
The only projects which are recommended for funding by the City Council are
those projects scheduled for Fiscal Year 1986-87.
It is Staff's recommendation that the Planning Commission review the Capital
Improvement Program and determine its conformity with the City's General Plan.
------------------------------------------------------------------------------
ITEM NO.
9./
""l- - J
,~~
QrlIfO~~'~
C I T y
0 f
DU 1) 1 I N
111 p RO P os E D
II
F I V E y E A R
C A P I TA L I M P ROV E M E N T P RO G R A M
II 1 9 8 6 - 1 9 9 1
iiiii!!:i!i!!i!!!!!!!I:!!!!!:!!!!!!!!!:!!!!!:!!!!!!ill
Eti
C I T Y
o F
DUB L I N
PROPOSED
FIVE YEAR
CAPITAL IMPROVEMENT PROGRAM
1986-91
NAY 1986
Peter W. Snyder, Mayor
Peter J. Hegarty, Jr., Vice Mayor
Linda J. Jeffery, Councilmember
Paul C. Moffatt, Councilmernber
Georgean Vonheeder, Counci1mernber
SUBMITTED BY
Richard C. Ambrose
City Manager
1986-91 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
PAGE
City Manager's Letter of Transmittal
Capital Improvement Program Summaries
All Programs
General
Community Improvements
Parks
Streets
l
ii
iii
v
vi
General Improvements
Police Vehicles
Word Processing Equipment
Civic Center
Data Processing System
Records. Management System
1
2
3
4
5
Community Improvements
Downtown Improvement Plan 6
Sidewalk Safety Repair/Bus Stop Pad Program 7
Sewage Facility Expansion 8
Dougherty Road Fencing - East Side 9
Bus Shelters 10
Catch Basin Grate Replacement Program 11
City Entrance Signs 12
Handicap Curb Ramps 13
Major Arterials - Fence Replacement 14
Street Name Identification Sign Replacement Program 15
Underground Utilities-Dougherty Road, Southern Pacific
Railroad to Amador Valley Boulevard 16
Parks
Amador Lakes Mini-Park
Kolb Park
Senior Citizen Center
Shannon Park Renovation
Dolan Park
Mape Park Renovation
East Dougherty Hills Park (Phase II)
Dougherty Hills Park
17
18
19
20
21
22
23
24
TABLE OF CONTENTS (Continued)
PAGE
Streets
San Ramon Road Improvements (Phase II) 25
Landscaping Village Parkway, Amador Valley Boulevard
to Kimball Avenue 26
Rehabilitation and Landscaping Amador Valley Boulevard,
Village Parkway to Dougherty Road 27
Traffic Signal - Dublin Boulevard/Sierra Court 28
Sierra Court Southerly Extension 29
Annual Street Overlay Program 30
Dougherty Road Widening at Southern Pacific Railroad 31
Dublin Boulevard Improvements Northwest Frontage at
Clark Avenue 32
Traffic Signal Interconnect 33
San Ramon Road Improvements (Phase III) and Hillside
Landscaping 34
Traffic Signals - Amador Plaza Road @ Amador Valley
Boulevard; Village Parkway @ Lewis Avenue; Landscaping
& Street Light Additions 35
Traffic Signal Pre-Emption for Emergency Vehicles 36
San Ramon Road Improvements (Phase IV) 37
Traffic Signals - Village Parkway @ Brighton Drive
and @ Tamarack Drive 38
Dublin Boulevard Improvements - SanRamon Road to
Village Parkway 39
Dougherty Road Improvements - South of Southern
Pacific Railroad 40
Dublin Boulevard Improvements West of San Ramon Road 41
Landscaping Silvergate Medianss 42
CITY OF DUBLIN
P.O. Box 2340
Dublin, CA 94568
(415) 829-4600
May 29, 1986
Honorable Mayor and City Council Members:
Transmitted herewith is the new Proposed Five-Year Capital Improvement
Program for Fiscal Years 1986-91.
This Five-Year Capital Improvement Program is a planning document,
which identifies the City's capital facility needs and the financing
of those needs for the next five years. This program is updated
annually and submitted to the City Planning Commission. The Planning
Commission's responsibility is to determine whether or not the Five-
Year Capital Improvement Program is in conformance with the City 's
adopted General Plan. The City's Park & Recreation Commission reviews
those projects within the scope of park and recreation. After review
and comment by both Commissions, the Five-Year .Capital Improvement
Program is submitted to the City Council for its review, consideration
and adoption as the official City capital facilities planning
document. Those capital improvement project appropriations
recommended for Fiscal Year 1986-87 are included in the 1986-87
Preliminary Annual Budget. Both documents will be considered by the
City ~ouncil during the City's annual budget hearings.
Projects included within the Five-Year Capital Improvement Program,
were included for the following reasons:
1. Work on a project had been initiated in a prior year.
2. The project had been in the last Five-Year Capital Improvement
Program, and a need for the project had not diminished.
3. The proj ect is wi thin the City's financial capability, provided
there are no major additional operating demands on the City's
budget.
4. The project will be needed because of the impact of new private
development on City facilities.
The total estimated cost for the Capital Improvement Program over the
next five years is $22,867,850 (1986 dollars). Of that total,
$6y568,550 is identified for General Improvements; $2,018,100 is
identified for Community Improvements; $4,329,100 is identified for
Parks; and $9,952,100 is identified for Streets.
For Fiscal Year 1986-87, projects totaling $7,385,100 are recommended.
Of this amount, $3,793,300, or 51% will have to be borne by the
General Fund. The remaining cost is funded by various grants,
developer contributions and long term financing.
, ~'.._~_-----~'-""--"'-""""""",,,: :_..r. ----~.<..........-...!"U~------~07..":..'."...-:-:.:_-~..~_:~~-~."'.-'";'.':!"~~.....'~..._c_;;;; ;;.:i;:..<i::.':~-~- :;......_.,~"'~~~;:-='._.,..,"!__
Described below are the highlights and changes in each program area:
GENERAL ($6,568,550)
The major project dominating this program is the development of the
City's new Civic Center. During Fiscal Year 1985-86, the City
acquired 10 acres of land for the purpose of constructing the Civic
Center. Funding has been included for the construction of City
Offices and a Police Facility. New projects in this area include the
purchase of 8 patrol cars, additional word processing equipment, a
data processing system and a records management system.
COMMUNITY IMPROVEMENTS ($2,018,100)
Most of the projects included in this program area have been carried
forward from the previous program. The only project which was changed
was the Bus Route Improvement proj ect. In the last program, this
proj ect provided for the construction of bus stop pads and asphalt
reinforcement in anticipation of the new transit system. This project
has been split in two, with the concrete bus stop pads being included
with the Sidewalk Safety Repair Program and the asphalt reinforcement
bus stop locations being included in the Annual Overlay Program in the
STREETS portion of this document. New projects include the Dougherty
Road Fencing East Side Project; Catch Basin Grate Replacement
Program; and the Underground Utilities Dougherty Road Southern
Pacific Railroad to Amador Valley Boulevard proj ect. It's important
to note that the underground utility proj ect is not in the location
which was next in line on the City Council's adopted underground
utility priority list. However, Staff believes that the City Council
should consider placing this underground utility project at a higher
priori ty, because of the widening of Dougherty Road which will be
undertaken by the developer of the Alamo Creek Villages. Wi th this
widening, the existing overhead utility poles would remain in a dirt
median between the new pavement and the old pavement on Dougherty
Road. It is Staff I s belief that consideration should be given to
removing these utilities, in order that this section of Dougherty Road
can be a completed 4-lane facility.
The Golden Gate Drive-Regional Street Connection Specific Plan Study
has been deleted from the Capital Improvement Program with the
anticipation that BART would be required to undertake such a study if
it is seriously considering a BART station in downtown Dublin.
PARKS ($4,329,100)
During Fiscal Year 1985-86, the City completed a park development plan
for 6 parks within the City. As a result of this plan, the size of
the recommended Parks Program has increased by $3,000,000. This
addi tional funding requirement will have to be borne by the General
Fund, unless other funding sources are secured. The construction of
Amador Lakes Mini-Park and the renovation of Shannon Park were
expanded in scope. The acquisition and improvement of a Senior
Citizen Center, the renovation of Mape Park and the development of the
Page Two
90 acre Dougherty Hills Park have been added to the new Five-Year
Capital Improvement Program. During Fiscal Year 1986-87, it is
anticipated that Amador Lakes Mini-Park, Kolb Park and the Senior
Ci tizen Center will be completed. The first phases of construction
for the renovation of Shannon Park, Dolan Park and Dougherty Hills
Park are included for Fiscal Year 1986-87.
No funds have been allocated for the renovation of the Shannon
Communi ty Center because the building improvement plan has not yet
been completed by the architect selected by the City during Fiscal
Year 1985-86. The Council may wish to modify the Capital Improvement
Program once the costs included in the renovation have been
identified.
STREETS ($9,952,100)
The Streets Program in the Capital Improvement Program is by far the
largest and represents the City Council's commitment to improving
overall circulation, the life blood of the community. The major focal
point of the streets program is the phased improvement of San Ramon
Road which will represent a total cost to the City of more than $4.3
million by the time it is completed. Funding is also included for the
improvement of Dougherty Road to a 4-1ane facility from Dublin
Boulevard to the Southern Pacific Railroad and Dublin Boulevard for
much of its length. There have been changes in the scope of several
projects in order to recognize an economy of scale when placing
projects out to bid; and also recognizing commitments for street
improvements, which the City has obtained from the development
community. Those projects which have been restructured include Dublin
Boulevard related improvements; Dougherty Road improvements; Traffic
Signal at Amador Plaza Road/Amador Valley Boulevard; Traffic Signal at
Village Parkway/Lewis Avenue; street lighting in the Downtown area;
Traffic Signal at Village Parkway/Brighton Drive; and Traffic Signal
at Village Parkway/Tamarack Drive. The San Ramon Road Improvement
Project (Phase III) has also been modified to include the Hillside
Landscaping Project, which was included in the Community Improvement
Program in the last Capital Improvement Program. The Landscaping
Project on Amador Valley Boulevard between Village Parkway and
Dougherty Road has been modified to include street lighting, as well
as roadway rehabilitation. The landscaping of the Village Parkway
median and the east side of Village Parkway from Amador Valley
Boulevard to Kimball Avenue has been modified to include median
lighting. On both projects, the median lighting was included in the
Community Improvement Program in the last Capital Improvement Program
under Street Light Additions. The only new project proposed for the
Street Program is the Sierra Court Southerly Extension, which will
provide direct signalized access to the Civic Center.
As these capital improvements are completed over the next five years,
it's important to bear in mind that the City's Operating Budget will
increase with additional maintenance costs. For Fiscal Year 1986-87,
approximately $1.6 million will be required from the City's reserves
to finance these projects. Over the subsequent four years, Staff
Page Three
projects that only $2.3 to $2.5 million will be available over and
above the City's operating and debt service commitments to fund
capi tal improvements, unless new major revenue sources are found.
Significant expenditures over-and-above this recommended range would
severely deplete the City's reserves and jeopardize the City's ability
to meet its debt service commitments. Keeping these financial
limitations in mind, there are a number of capital improvement
proj ects which will need to be done in the future, which cannot be
funded within the five year timeframe without additional revenue
sources or placing recommended projects at a lower priority. These
proj ects include: 1) the extension of Dublin Boulevard to the east;
2) the construction of a road connecting the Dublin Boulevard
extension and Dougherty Road; 3) any additional underground utility
projects; 4) construction of Dougherty Road to its ultimate 6-lane
width from the Southern Pacific Railroad to the County Line; 5) a
direct off-ramp into Dublin from Interstate 680; 6) the renovation of
the Shannon Community Center.
There are also several proj ects which have not been included in the
Five-Year Capital Improvement Program which have been requested by
other organizations or individuals: 1) construction of a soundwall
around Arroyo Vista (Pleasanton Housing Authority); 2) the
installation of television cable at Arroyo Vista (Pleasanton Housing
Authori ty residents); 3) grants for art equipment (Valley Artists);
4) assistance with the renovation of the old Murray School (Dublin
Historical Preservation Association); and 5) funding of a Local Access
Cable Television Studio (Community Television).
There is also the likelihood that the City will need to undertake
specific plan development in the City's eastern and western sphere
areas. It is Staff's anticipation that these projects would be funded
by the development community when requesting annexation to the City.
Staff has not included these projects in the Capital Improvement
Program because the timing for those requests is still uncertain.
The City Council may wish to consider adding anyone or several of
these projects to the Capital Improvement Program by giving them a
higher priority than other projects which are presently recommended by
Staff.
No Capital Improvement Program message would be complete without
acknowledging the invaluable support provided. by the Planning
Commission, Park & Recreation Commission and City Staff in not only
assisting the City Council in planning the program, but also in its
implementation.
RCA:kk
(2;J~ S~bm tted,
Richard C. Ambros
City Manager
Page Four
r-I C> C> C> C> C> C> C> C> '0
0'1 C> C> C> C> C> C> C> C> ~
I C> 0 ~ 0 ~ ~ 0 ~
0 ... ... ...
0'1 0 I.{) I'- 0'1 r-I r-I 0 r-I r-I
0'1 0'1 I'- I.{) \D 0'1 M \D 0'1 ~ rO
r-I ~ I'- M M M l--I
r-I ,N N N ~ ~
V}- V}- V}- V}- ill
ill ~
0 0 0 0 0 0 0 0 :>
0'1 0 0 I.{) 0 I.{) I.{) I.{) or-! s::
I 0 0 I'- 0 I'- I'- I'- ~ or-!
0'1 ... ... ... ...
eo 0 0 0 0 0 0 0 ..jJ 0
0'1 \D \D I.{) 0 I'- I'- I'- X C>
r-I \D I'- eo N N N 0) 0
... s::
N N N ~
V}- V}- V}- "J}- ill r-I
..c N
0 0 0 0 0 0 0 ..jJ ..
0'1 0 0 0'1 0 0"\ 0"\ 0'1 r-I
eo 0 \D \D 0 N N N 4-l V}-
I ... 0
eo 0 0 0 r-i N N N ill
eo 0 r-I r-I 0'1 .-1 \D \D ~ Ul
0'1 N N \D I'- eo I.{) I.{) ~
r-I fa
r-I N N N l--I U
{f}- {f}- {/}- V}- 4-l l--I
.~ :1
0 0 0 0 0 0 00 C> ~
0 .
eo 0 0 r-I 0 r-I r-I 000 r-I ..jJ'O 0
eo 0 0 M 0 M M 000 M ill ..jJ
I ... .. .. <!J'O
I'- 0'1 r-I M I.{) eo 0"\ 000'1 eo ..c :1 '0
eo 0'1 I'- N r-I 0 0 o I.{) 0'1 I.{) ..jJ ~l ill
0'1 M r-I \D eo 0 I.{) r-I N M N U Ul
r-I ... .. s:: s:: :1
I.{) r-I eo N I.{) eo . r-! . r-!
~ {/}- {/}- {/}- {f}- ..c ill
JJ ..jJ ~
.;.., 0 ~
~ 0 0 0 0 0 00 000000 0 2; s::
I'- I.{) 0 I.{) 0 0 001.{)001.{)00 C>
eo I.{) I.{) 0'1 r-I r-I eoM\DI'-O\DOO r-I '0 ill Ul
P; I ... .. .. .. .. .. ... .. .. 0) l--I 0)
\D 0'1 r-I \D I'- L~ N I.{) M eo r-I eo \D 0'1 I.{) ..jJ rO 'r-!
~ eo r-I 0 eo I'- eo eor-l I'- I.{) ~ \D ~ 0'1 eo ill s::
Ci'\ eo 0'1 eo I'- M eo I.{)I'-NI'- M r-I\D ~
I r-I ... ~cp
r-I M I'- N r-I r-I I'-
{f}- {J)- V}- {f}- 01.{) '0
Ueo ~
0'1
~ * 0 0 0 0 0 0 000 0 ~r-I
~ ~ 0 0 \D 0 \D 0 C> \D C> \D
6 Cf) eo ~ 0'1 0'1 0 eo o~eo 0 r-I ~ r-I
~ rO
H H r-I r- M ~ eo 0'1 eor-leo eo r-I ill ~
~ 8 ~ \D \D \D I'- \D IV) r- \D eo \D 'r-! ~ 0)
~ M ~ 0 0'1 r-I ~ N 0'1 2; s::
~ .. r-I 0)
H P; \.0 r-I r- r-I \.0 r- '0 rtl c..'J
~ V}- Vr {/}- {f}- ~ ~
~ 0)
u ~ 'r-! Ul
0 0 0 0 0 r-IOO 000000 0 ..~ :1
r-I I.{) 0 \.0 0 r-I ......... U") 0 1.{)00r-lOO r-I Ul rtl
0'1 ~ <<I M I.{) 0 0 0"\ <'1 M \.0 r-O.-1eo 0 0'1 Ul tJ1 U
I .. .. .. .. .. .. .. ... .. .. 0) s:: .8
\D gg 0 I.{) r'l I'- U") \DI.{)MCOO'lOMO'I U") ~.r-!
co M co Ci'\ N M O'Ir-Ir-l.{)r-ICOMU") M S~
0'1 0'1 0 I'- 0 eo \.0 I'- ~ 0'1 eo eo C>
r-I .. H'O 0
N N ~ r-I 0 M r-Ir-IN 0 ~'O I.{)
i r-I r-I M r-I r-I M ..
{J)- {f}- V}- {l}- s:: ill 0
. r-! ..jJ r-I
ill 0'1
illr-l V}-
:5 ~ ~ >,
Cf) 0 .Q
..c U
U '0
.r-! Ul ill
c: ..jJ ..jJ
~ U rtl
ill ..jJ
Ul 'n en
oW ..jJ 0 l--I
C U H ~
rtl illP;
H 'n 3
c..'J '0 0
l--I .
~ C ~~ en
8 ~ or-!
H H
r-I o tJ1 ..jJ
..jJ OJ U) :1 4-l 0 H
U) U '00)'0 H &
..jJ r::i'; ..jJ ~. r-! s:: ill U) P;
C s:: ~.... r-i ..jJ P4
GJ. c..'J oW '"d Q) I ~ -fa U) .w ::l
ffi z U s::: E s:: o s:: en
H ~2&~H~ r-I U GJ.
6 ~ .r-! E '0
'"d r-1..o s::.,....j rtl Ul Q) s:::
H s::: C Q) ~ OoW Ul ~ ~ 6 ~
~ Z SO):> :::> . ,....j . r-! ..jJ
H '0 N 0) oW r-I C :1 l--I
H ~ s::: .,....j 0 '0 rtl 'r-! Q) rgj 'd~ ~~
..jJ ?~..jJ '~UU~
:>-1 Ul ~ ;.!4 H' ,....j >, . ,....j rtl s::: CH H s:::
..jJ 0 mu..jJ 'Oti-lUl ~ .,-j ~~
E-1 r-I .r-! Ul U r-I P; 0 r-! r-I ill ~ .-1
U rO ; JJ rO HS::rOOU >'rO 0)
8 l--I (J) iu r-I H 0) 0 :::1 H .,-j -9 r-I r-I..jJ c..'J s::
ill ~ ill rO H 0) ..jJ . r-! j::: ill ~ r-I ~ rO 8o,-j rO
r' ~ H ..jJ ~ s:: rtl s:: 8 '"d ~ ..0 " ..jJ ..--..0
~ 8 ..jJ g <1J ..jJ ill (!) ~ 0) g ~ r-I H
P; U P; Cf) i< c..'JCf)Cf)U~P; ~ * U '--'::>
i
r-I 0 0 0 0
0'1 0 0 0 0
I 0 0 0 a
0 .. ..
0'1 0 a 0 0
0'1 0'1 0'1 0'1 0'1
r-I
{f}- {I}- {I}- {f}-
a 0 0 0 0
0'1 0 a 0 0
I 0 a a a
0'1
co a a 0 0
0"\ \D \D \D \D
r-I
{I}- {J)- {J)- {J)-
0'1 00 0 a 0
co 00 a a 0
I a 0 0 0 0
co ...
co 00 a a a
0'1 r- M a a a
r-I r-I N N N
~ {I}- {J)- {I}- {I}-
~ co 0 0 0 a
P; co a a 0 0
I 0 0 0 0
~ r-
co 0'1 0'1 0'1 0'1
~ 0'1 0'1 0'1 0'1 a,
r-I M M M (Y)
g; ...
L{) L{) L{) L{)
~ {I}- {I}- {J)- {I}-
~ r- 000 0 00 0
~ co L{) 0 0 L{) L{) 0 U")
H I L{) 0 0 L{) L{) C> L{) ,
~ \D
co (Y)\DO 0'1 0"\ 0 0'1
ffi ' 0'1 Or-lO r-I r-I 0 r-I
H r-I r-I r- co r-I r- eo
~ c..'J
U {I}- {I}- {I}- {I}-
r-I 0 0 o 0 0
0'1
I 0 0 00 0
\D 6 Cf) co eo oeo eo
eo ~ .. ...
0'1 H r-I r-I L{) \D r-I
r-i ~ \D \D r-I~ \D
(Y) (Y) r-IN (Y)
:>-t ... .. ..
I \D \D \D \D
{I}- {I}- {I}- {J)-
00000 0 o 0 0
CJ) ~ L{)OOOO L{) L{) 0 L{)
E-1 L{)OCOOO (Y) L{) eo (Y)
Cf) .. .. .. .. .. ..
g 0 M\DOOO 0 ~L{) 0
U Or-l'..DN(y) (Y) co ~ (Y)
r-I ~ M 0'1 L{) (Y) 0'1
N N N N
{I}- r-I r-I r-I r-I
{I}- {I}- {I}-
..jJ m
s::
~ ..jJ
Ul
C1 ~
.,-j CJ)
B 'U
..jJ ~ Q)
s:: r-I
Ul tJ'l g'~ ~ .g
<1J s:: H Ul r-I
r-I .,-j . r-! tJ1 ~ <1J -,-j
U Ul lo-I Ul rO or-! rcl
.r-! Ul <1J Ul ~ ..jJ ~
..c<1J..jJ<1J ..jJ .,-j
~gffig Ul H rOr-I
0 ti.l ~ or-! ~
l--IUl--l~ U ' u
Q)P; P; ~ rtl &
u U lo-I r-I ~
E-1 .,-j rO or-! rO 0 rO r;d U
U r-Ilo-I:>oW~ ..jJ
~ o :2 -,-j rO g lo-I-r-! r-I
P; UQ~ ~ <1Jr-I rO
~~ ..jJ
P; r-IN(Y)~L{) i< g
ii
r-I 0 0 0 0 0
0'1 0 0 0 0 0
I 0 0 0 0 0
0 .. .. .. ... ..
0'1 U") 0 L{) L() L{)
C'l N L{) r- r- r-
r-i
{I}- i.Fr i.Fr {I}-
0 0 0 0 0 0
0 0 0 0 0 0 0,
m 0 0 0 0 0 0
I .. .. .. .. .. ..
0'1 L~ 0 L{) 0 0 0
eo N L{) CO \D \D \D
0'1 UI \D \D \D
r-I
{I}- {J)- {J)- {f)-
a 0 0 0 0 0 0
0 0 0 0 0 0 0
0'1 0 0 0 \D \D \D \D
eo .. .. ..
I L{) 0 0 UI 0 0 0
c:l N UI r- \D r-I r-I r-I
eo N N N
0'1
r-I
{I}- {I}- {I}- {I}-
0 0000 0 0 0
0 0000 0 0 0
CD 0 0000 0 0 0
CD .. .. .. .. .. .. .. ..
I L{) L{) 0 r- -<::I' r-I r-I r-I
r- N M L{) N M r- r- r-
eo r-I r-I r-I
0'1
r-I I{I}-
:8 {I}- {I}- {I}-
~ 0000 0 0 0
8 0000 0 0 0
0::; ~I L{) 0 0 0 L{) L{) UI
p,; .. .. .. .. ..
I '-:000 r-I r-I r-I
H \D M L{) 0 N 0 0 0
Z eo eo 0'1 0'1 0'1
,~ 0'1
en r-I
~ ~ {I}- {I}- i.Fr {I}-
~ 0 0 0 0 0
~
~ g2 0 0 0 0 0
~ Cf) 0 ~ -<::I' ~ -<::I'
H 0 o~
~ H ' r- r- r- r-
" ~ 0::; r - \D \D \D \D
~ P,;:>-t
H
H :>-t {I}- {J)- {J)- {I}-
6 E-i
H
Z , 000000000 0 0 0 0 0
r-I ~ ~ [;)1 000000000 0 0 0 0 0
0'1 Uloooooooo 0 0 L{) L{) L{)
I t5 gg .. .. .. .. .. .. ... ... .. .. .. .. ..
\.D cooo 0 L{)or--<::I' 0 \D L{) L{) L{) UI
co U O'IL{)ONMONMr- \D co eo eo eo
0'1 r-I co N L{) 0 0 0
r-I N N N
; {I}- {I}- {J)- {I}-
~ >..,
<1J
lo-I r-I
tJ'l I r-I
0 rtl
Cf) ~ ~ '0>
p,; rtl
o H
'U l--I ..jJ ~r8
rcl ~ tJ'l C
p,; 0 ~ t~
.,-j H
~ CJ) p,; ~ &
<1J
..jJ ..jJ ..jJ m-r-! ..c 0
CJ) Ul s:: r-1Cf) tJ'l..jJ
r0 ffi ~ :1'0
Ul ~ <1J s:: 8 rtl
~ :1 s:: ~ 0
CO 0 I ~ or-! 0
r-I "-.. - r-! <1JoW I H
P,;HUltJ'l r-1 U rtl r-1
. r-! ~ s:: O-l s:: u Ul-,-j
..jJ rtl 0 ,-j <1J <1Jo,-j ~ <1J rtl
s:: O-l ~ U 0::: Ul Ul ~4-l . r-! 0::;
~ <1J s:: <1J & ~ I 'r-! l--I oW
O:::~Q) oW 8' or-! U <1J
~ ..jJ o,....j s:: r-I . r-! r-1
:>>..,>.., cO CJ) 0::: Ul ,<1J lo-I -,-j 4-l CJ .g
OoW..jJ'U H r-1 'U ~ ..jJ - r-! Z
l--I <1J-,-j rtl c..'J<1J.ocOH ::>u H r-I
~ 4-l r-I 0 Ul U ~.,-j ..jJ cO ~ -,....j
cO .r-! 0::: lo-I s:: ~ H ~ s:: '"d ~ cO
H Cf) U <1J .,-j U <1J ~ B 'U ~
rO ~..jJ Ul ~..jJ c ..jJ z
F.; ~ ~..jJ r-I $..jJ O-l~ z 0 ~ ~ Ul H '0
~ r-I H <1J s:: cO U H Q) :> 0 ti.l ~ ~
o cO Q) <1J ..c ~ U oW rtl tJ'l..c <1J u
..jJ 2; tJ'l..c Cf) ..c ~ lo-I <1J r-I lo-I ..jJ r-I ~ ~
E-1 ~<1JrOtJ'l u>.., oruO-l<1J:1:1 r-I
,;> 'U ~ :1 Ul ..jJ ..jJ ffi -n lo-I Q) '0 0 S cO j r-I
U o . r-! <1J 8 :1 cO. r-! ~..jJ 0::: s:: Cf) ..jJ cO
~ OCf)Cf) o:luu:r: Cf) :::J g l--I r-I
~ <1J cO
C ..jJ
. . . .0 r-1 ~ g
~ r-1NM'<:j'L{)\Dr-eoO'lr-l r-I i<
- iii
r-I 0 0 0 0
0'1 0 0 0 0
I -<::I' ~ -<::I' -<::I'
0
0"\ I'- I'- r- I'-
0'1 L{) L{) L{) L{)
r-I ~ -<::I' -<::I' <;j1
{f}- V)- {J)- {I}-
0 0 a 0 0
0'1 UI L{) UI L{)
I I'- I'- I'- r-
0'1 ..
eo 0 0 0 a
0'1 UI L{) L~ L{)
ri I'- I'- I'- I'-
{I}- {I}- {f}- {f}-
0'1 a a a a a 0
eo N I'- 0"\ m a 0'1
I I'- 0'1 \D \D a \D
co ... ... ..
co L{) -<::I' 0 a a a
0'1 0 0 r-I 1..0 U") r-I
r-I (Y) ("f) \D (Y) N \.D
{f}- {f}- {f}- {f}-
co 0 a a a 0
eo (Y) eo .-: r-I ri
I 0 N (Y) (Y) (Y)
I'-
eo -<::I' ()) ("f) (Y) (Y)
~ 0'1 r-I 0 N N N
r-I -<::I' N \.D \.D \D
{f}- {f}- {f}- {J)-
8
~
~ I'- a a 0 a a 0 0 0 0 0 0 0 0
~ eo 0 0 0 ("f) N a L{) L{) L() 0 lJl 0 L{)
I L() (Y) 0 r-I 0 0 0'1 (Y) \.D ("f) \D 0 ())
.<:. \.D
~ co 1..0 r- N 1..0 I'- eo \.D 0'1 eo L{) (Y) 0 1..0
()) -<::I' r-I 0 L{) 0 L{) eo 0 \D r-I I'- N eo
6 r-I eo r-I -<::I' -<::I' eo ()) I'- r-I eo
{f}- {f}-
0::; r-I r-I
g: {f}- {I}-
H ,...... 0 0 0 0 0 0
CfJ. '-'
~ ~ 0 0 1..0 1..0 a \D 1..0
6 Cf) eo L{) 1..0 ()) L{) -<::I' ())
i::-l ~ ..
H ~ H 1..0 N -<::I' (Y) N r-I (Y)
~ 0::: ~ U") \D \.D '-D
p., ~ -<::I' ~ -<::I'
U {f}- {f}- {f}- {f}-
r-I
0'1
I a 0 a 0 a 0 0 0 0 0 0 0 a a a
\D
eo ~ <<I 0 0 0 1..0 1..0 N I'- L{) 1..0 a r-I 0 L{) 0 \D
()) (Y) co 0 r-I ()) I'- ()) r-I a a r-I ("f) \D 0 0
r-I ~8 .. ... .. .. .. ..
("f) C'l N a a L{) -<::I' \D ("f) -<::I' a L{) (Y) 0 (Y)
:>-t L{) r-I 0 I'- r- 0 0 1..0 ()) 0 eo r-I r- N ())
! eo r-I eo 0 (Y) (Y) N I'- r-I -<::I' r-I I'-
{I}-
r-I r-I ~ (Y) r-I -<::I'
{f}- {f}- {f}-
CJ)
H
H
<1J
Ul
cO
..c
P;
v '0
C ~ ~
~ 0 P;
~ H .,-j
ill ..1J C Ul ~ ::J ..jJ
~ ..jJ cO 0 r-I ~ ill ~
I C :> or-! r-I .,-j ill
.r-! ill 0 ..jJ -,-j P; ~ r-I
C U C cO :r: ~ I ..jJ '0 .g
.~ & 8 Ul c ~ c
s:: ~ r-I H H S r-I
ill ..jJ r-I ~ .r-!
Ul N ~ & lo-I .,-j s:: '0 rtl
ill -,-j ~ ill :r: 0 s:: s:: Ul ~
~ ..jJ ~ ..c ..jJ z -,-j S ill ..jJ
~ or-! ~ ~ ~ tJ'l 8 Ul H '0 oW N C
~ ~ U ~ :1 0 ~ & cO -,-j ~ Ul
s:: P; 0 ~ U U ~ oW 'D
~ P; lo-I ~ P; Q <1J ~ ;B ~ .r-! ~
.g 0 ffi ..c r-I U Ul
E-1 .0 -,-j Q) oW g cO ~ r-I ill p., ~
U ~ r-I C r-I ~ Ul ..jJ cO 0 lo-I
8 :2 Q) ..c 0 cO 8 g l--I Q) 0 r-I
CJ) CJ) Q ~ ~ Q) ~ ..1J or-! cO
C ~ ro s:: -,-j ..jJ
0::: ~ ..jJ Q) ill g
p., r-I N (Y) -<::I' L{) \D r- eo i< p., Cf) Cf) 0::;
iv -
~
~
p.,
~
~
~
~
HCJ)
E-I
~~
~~
6Cf)
r-I
m
I
1..0
eo
m
r-I
I,
VSl
r-I
m
I
o
0'1
0'1
r-I
o
0'1
I
0'1
eo
0'1
r-I
m
eo
I
eo
eo
0'1
r-I
eo
CO
I
r-
eo
0'1
r-I
V}-
V}-
V}-
{J)-
o
o
o
..
o
(Y)
r-I
o
o
o
..
o
(Y)
r-I
o
o
o
..
o
(Y)
r-I
o
o
o
o
I.{)
.-j
o 0 0000 0
o 0 0000 0
r-I 0 0000 0
r-
eo
I
1..0
eo
0'1
r-I
~ ~ "~ ~ ~
eo 0 m CO 1..0 0 0
0'1 r- COr-l-<::l'(y) N
N mNI.{)r-1 r-I
..
r-I
V}-
..
r-I
:>-1
<1J U
r-I . r-!
r-1'O 4-l ~ ~
cO cO - r-! lo-I:>-1 rtl
>0..jJ ~ 0<1J U 9 ~
H lo-I~~ ~ ~ ~~ 53 ..--. Q)~ b 0
H l--I 0:>-10 . H E Ul tJ'l ~ :> s:: ..jJ Ul
Q) .Q <1J '"d ..jJ U s:: 8= ~ Ul C lo-I Q) C!2J -:: g ..c Ul s::
'v ::J rtl H H Q)" -,-j 0 ~ M ffi ..jJ ~ cO
~~~~~~B ~ ~ ~ ~~j~ ~~~o::: ~ ~ ;B
.:::. I ~ g' 8::J .~ -@EiSUl P; ~ ~ ~ ~ .:::. ~ ~ ~ I Ul ~
r-I - ,-j CJ) s:: id Cf)..jJ cO cO r::J:: ~ cO lo-I Cf) ..jJ Q)
Ul ~ r-I O-l "-.. <1J l--I S::..jJ Ul r-I ~ Ul P; cO Ul s:: :>
~ ~ ~ G B rg ~ ~ ~ ~ Q) ~ ~ ~ ~ ~ B ~ Q) ~ I ~ ~ ~ -d
~ ~ -,-j ~ :>-1 @ ~ tJ'l :> 2 2 ~ ~ p., -~ -.0 ~ g 8 13 ~ 8:> Q
:> p., ~ ffi ~ c ~ :>-1'~ 8 ~ 8 ~ 01 'D~m OJ ~ ~ :> ~ ~ ~s:: :>::=j 8 .8
o 0 f-4 ~ -,-j ~ rO s:: ~ "'" ~ 0 ~ Q'"'l.j..J ~ 0 .,-j 0 cO 01 cO
H ~ oW '0 ~ r-I ~ ~ ~ ~ Q) H -,-j cO Q) I H > '0 :>-1 lo-I 0::: 8 tJ'l
~cO'Offi~"8oWQ)-~ ~~~~I ~~~ ~I ffi13~~u~ ~
H ~ ~ Q) Q is <3 'B r-I H H ~ Ul ->r-! &S ~ H ~ lo-I H or-! H '0 :>
'0 -,-j :> s:: tJ1 r-I Cf) '0 cO U r-I '0 '0 r-I r-I rO ~ ~ 8 cO '0 ~ cO cO::=j
~ > ~ _~ ~ ~ ..jJ ~ ~ ~ ..jJ ~ ~ ffi ~ rd 0; ~ cO cO -,-j H p., cO U :> 0 CJ)
~ ~ is ~ ~ .~ ~ ~ 0::: 3 cO.~ 0::: f-4 .~ ~ .~.~ ~ _~ ts ~ ~ ~ ~ ~ ~ ~
s:: . ,-j o:l ..jJ > Cf) 0 oW :>-1 '0 0 Q) Cf) s:: Q) Cf) o:l O-l Cf) Ul s:: Cf) C r-I cO :>-1 s:: 0 ~ - ~cO
~ O-l - r-! U CJ) ..jJ cO o:l tJ'l ~ '0 cO Q) ~ 0 co r-I ..jJ l--I co ~
cO :>-1 r-I I U lo-I 0 cO U .,-j U :>-1 U U r-I U..1J r-I lo-I Q)
U Q) - ,-j - ,-j cO r-I Q) l--I s:: ..jJ - r-! Ul . r-! Q) en - r-! U . ,-j.c c. ,-j Q)..c C 0::: U ..jJ
0::: en r-I .0 '0 4-l lo-I cO ..c r-I . r-! s:: 4-l 0:: r-I 4-l r-I 'D 4-l . r-! 0::: 4-l tJ'l. r-! > ..c ..jJ - ,-j en Ul
'"d r-I cO :> 4-l l--I ::J tJ'l - r-! r-I 0 4-l r-I 4-l r-I ~ 4-l ..c 4-l . r-! r-I tJ'l :1 r-I ffi 'D 0
ffi ~ ~ ~ @ ~ -~ ~ 8:1 ~ .s ~ ~ ~ -::2 ~ ~ ~ ~ ~ ffi ~ Bj "8 B 8:1 c7S "8 CJ) ~ U
CJ)~ 0::: ~CJ)~ 0 E-1CJ) 8 E-1 CJ)E-I Q Q ~r-1
cO
o..jJ
~g
~
, rv'
B
H
0:::
p.,
E-1
Cf)
o
U
!
~
p.,
o
o
0'1
(Y)
(Y)
r-I
V}-
o
o
o
..
N
(Y)
-<::I'
..
r-I
V}-
r-1N
o
o
o
r-
eo
I.{)
o 0 0
000
000
co N N
r- o:::t' o:::t'
o
o
o
0000 0
0000 0
0000 0
...
r-
I.{)
1..0
... ... ...... ...
r-oeoo 0
1..0 1..0 eo r- (Y)
ONI.{)\O r-I
(Y)
-<::I'1.{)\Dr-
o 0
00
o 0
r-I 0
1..0 UI
r-1r-1
o
o
o
o
r-I
o 0
00
00
r-10
1..0 0'1
r-1N
ex)
o
o
o
r-
(Y)
r-I
o
o
o
(Y)
· 0
0'1 r-I
o
o
o
(Y)
I.{)
N
...
r-I
o
o
o
..
N
(Y)
o
o
o
I.{)
1..0
o
o
o
...
o
I.{)
(Y)
r-I
r-I
r-I
o
o
o
N
-<::I'
N
o
o
o
o
eo
r-I
o
o
o
..
I.{)
m
o
o
o
..
o
N
o
o
o
..
eo
N
o
o
o
00
o 0
o 0
I.{) N
0'1 (Y)
I.{)
...
o
r-
-<::I'
N
r-I
- V
o
o
o
m
r-I
~
..
r-I
o
o
o
...
(Y)
~
o
o
o
o
r-
..
r-I
(Y) -<::I'
r-Ir-1
o
o
o
..
o
r-
N
o
o
o
..
o
r-
N
I.{)
r-I
o
o
o
..
o
o
I.{)
o
o
o
...
o
o
~
o
o
o
..
o
o
0'1
\0
r-I
o 000
o 000
o 000
..
m -<::1'\00'1
I.{) eoO'l\O
CO r-I r-
r-I
V}-
a
o
o
o
o
o
1..0
r-I
o
o
o
o 0 0
o 0 0
000
o 1..0 r-
o m N
N 0
..
0'1
I.{)
eo
r-
r-I
..
o
o
eo
V}-
o
o
o
..
r-I
0'1
r-
r-I
V}-
o
o
o
..
I.{)
r-I
eo
r-I
V}-
o
o
r-I
r-
r-
r-
(Y)
V}-
o
o
0'1
<;j1
r-
o
..
r-I
V}-
..
r-I
r-I
{I}-
o
o
o
0'1
o
r-
r-I
V}-
a
o
o
o 0
o 0
o 0
ro
.~
..
o 0'1
1..0 1..0
r-
r-I
V}-
a
o
o
r-I
cO
lo-I
.gj
<1J
~
s::
-,-j
o
o
o
-<::I'
r-I
N
r-I
V}-
...
o
o
eo
V}-
..
o
o
co
V}-
o 0
o 0
o 0
..
~ r-I
0'1 m
r- r-
r-I r-I
V}- {J)-
Q)
Ul
cO
..c
U
H
::J
O-l
o
..jJ
'0
Q)
Ul
:1
<1J
H
~
Ul
Q)
or-!
s::
S
'0
~
00 0
00 0
00 0
...
I.{) 0 I.{)
r-10 r-I
r-r-1 co
... ..
r-I r-I
V}- V}-
o 0 0 0 0 0
000000
-::ror-OOr-l
Nr-IeoO'lI..Or-
UI-<::I'I.{)r-~r-
0'11.{) \D1.{)r-
..
r-I M
{J)- {J)-
00 00
00 00
0'1 0 0 0'1
-<::I' eo N-<::I'
U") r- ~ r-
0'1 0
r-I
m
lo-I
Q)
s::
~
..
r-I
V}- V}-
*
000000
000000
Mor-OOO
Q)
Ul
~
U
Q)
..0
o
o
I.{)
.... .... ... ... ... ..
NO'ICOO'leor-
Nr-ILf")(Y)CON
mr- r-I.{)O
..
r-r-1 r-I
V}- r-I
{I}-
..
o
r-I
m
V}-
~
i
H
~
..1J
~
lo-I
o
~
~
r-I
~o:l
~~
~
C O-i Ul r-I
cOO Q)-,-j
..0 r-I - ,-j rtl
~<1JUl.j..J~
::> :> ..jJ . r-! "'"
'd Q) C r-I
~ ] ~ ~ 'g ~
..jJ(J)~S
r-I r-1'r-! l--I ~
cO cO C :1 U
l--I lo-I ::l.Q or-! r-I
Q)Q)~8r-1cO
C 'D .r-! ~ ..jJ
Q) Q) <1J 2
c..'J~UO::: ~
.6
'd
<1J
..jJ
cO
..jJ
Ul
H
Q)
'D
B
rO
~~
Ul
-,....j
..jJ
H
&
~
Ul
'"d
~~
~~
Q)
s:: ffi
~..o
lo-I
* :::>
~
j
~
i<
G
E
N
E
R
A
L
It.
I
M
P
R
o
V
E
M
E
N
T
5
1986-91 CAPITAL IMPROVEMENr PRcx;RN-i
FUND
PROJECT
ACTIvJ:TY
CAPITAL PROJECTS
Police Vehicles
GENERAL
Description-Location
This item provides for the purchase of eight
(8) patrol vehicles.
Corrments
This purchase was authorized by the City
COQ~cil during Fiscal Year 1985-86.
However, the City will not take delivery on
the vehicles until July. Therefore, it is
necessary to allocate funds in Fiscal Year
1986-87.
Estimated Cost
Financing
Year(s) Scheduled
Patrol Vehicles $103,550
General $103,550
Prior Years
1986-87 $103,550
1987-88
1988-89
1989-90
1990-91
Total:
$103,550
$103,550
$103,550
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 1 -
1986-91 CAPITAL H1PROVEMEl\1T PRCGRAl~
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Word Processing Equipment
GENERAL
Description-Location
This i tern provides ftmding for an additional
word processing work station and a high-
speed printer which would interface vnth the
existing word processing work stations in
Development Services and the City Manager's
Office.
Comments
Tne additional word processing work station
would only be purchased if additional office
space becomes available. The high-speed
printer would inl?rove the overall
productivity of existing units on large
typing projects. Annual maintenance is
estimated at $1,000 for the additional work
station and $660 for the high-speed printer.
Estimated Cost
Financing
Year(s) Scheduled
Word Processor $
Printer
8,500
7,500
General Fund $ 16,000
Prior Years
1986-87 $ 16,000
1987-88
1988-89
1989-90
1990-91
Total:
$ 16,000
$ 16,000
$ 16,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 2 -
1986-91 CAPITAL IMPROVEl-1EN'r PRO:;RAH
FUND
PROJECT
ACTIVITY
GENERAL
Civic Center
PL~LIC FACILITIES
Public Facilities Fund $12,345,800
General Fund 115,000
Description-Location
This project includes the acquisition of 10
acres of land adj acent and west of the
Dublin Sports Grounds, the construction of a
Ci ty Hall and Police Station on that site,
and furnishings.
Comments
The City Hall and Police Station facilities
will not occupy the entire Civic Center site
and ",rill therefore provide future
opportun i ties to provide future communi ty
facilities.
In December, 1985, the City issued
$11,968,000 in Certificates of Participation
to acquire the land and construct the City
Offices and Police Station, as well as
associated road and park improvements
required for access.
The access road and associated park
improvement costs are identified separately
as the Sierra Court Southerly Extension
proj ect under the STREETS Section of the
Capital Improvement Progr~~.
Estimated Cost
Financing
Land Acquisition $ 5,677,168
Cost of Issuance 88,726
Underwriters Discount 394,944
Design 499,962
Improvements 5,800,000
Total:
$12,460,800
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 6,361,800
700,000
5,399,000
$12,460,800
$12,460,800
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 3 -
1986-91 CAPITAL IHPROVEMENT PR(X;IW'1
FUND
PROJEcr
AcrIVITY
CAP ITAL PROJEcrS
Data Processing System
GENERAL
Description-Location
This item provides for the installation of a
comprehensive data processing system which
would handle not only the financial needs of
the City but also provide services to all
other operating departments except Police
Services.
Comments
The funds allocated for this item are based
on the development of a centralized data
processing system in comparable cities.
The actual data processing needs of the city
and ultimate configuration of a data
processing system will be reviewed during
Fiscal Year 1986-87 and 1987-88.
Estimated Cost
Financing
Year(s) Scheduled
Computer Hardware $ 170,000
Computer Software 150,000
General Fund $ 320,000
Prior Years
'1986-87
1987-88
1988-89
1989-90
1990-91
$170,000
60,000
90,000
$ 320,000
$320,000
Total:
$ 320,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 4 -
1986-91 CAPITAL IMPRO\?EMENT PRCGRN-1
FUND
PROJ"".c,CT
ACTIVITY
CAPITAL PROJECTS
Records Management System
GENERAL
Description-Location
Tnis item provides for the services of a
records management consultant to develop a
records management program, as well as
equipment to implement that program.
Comnents
Jl~ though this study could b2 undertaken at
t..his tLrre, it could not be adequately
implemented due to space limitations.
It is recommended that this item be funded
during the first year of occupancy of the
new Civic Center.
Estimated Cost
Financing
Year(s) Scheduled
Professional Services $ 15,000
Machinery & Equipment 15,000
General Fund $ 30,000
Prior Years
1986-87
1987-88
1988-89 $ 30,000
1989-90
1990-91
$ 30,000
Total:
$ 30,000
$ 30,000
-------------------~_CITY OF DUBLIN, CALIFORNIA---------------------
- 5 -
"
c
o
M
M
U
N
I
T
y
I
M
p
R
o
V
E
M
E
N
T
5
1986-91 C.n..pITAL n-~ROVEMEr-.--r PRcx;RAL1
FUND
PROJECT
ACTIVITi
COMMCJNITY IMPROVEMENTS
CAPITAL PROJECTS
Downtown Improvement Plan
Description-Location
This project would provide for the
professional services of a contract urban
designer/planner to assist U1e City in
developing a plan for the Ci ty 's downtown
area. This plan would address issues such
as intensi ty of development, land use
alternatives, parking, pedestrian amenities,
public landscaping, street furniture, etc.
Comments
Through a downtown improvement plan, the
Ci ty and corrmercial property owners could
work together to assure that the vitality of
Dublin's retail center is maintained.
Estimated Cost
Financing
Study
$ 98,500
General Fund
Total:
$ 98,500
<'.
Year ( s) Scheduleq > '
1, .'
$ 98,500
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 67,000
31,500
$ 98,500
$ 98,500
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
. ~....:. . h,. .~_....-..-: ....
- 6 -
1986-91 CAPI'l"'AL n~.PRO\TEMENI' PRcx;F1\tvi
FUND
PROJECT
ACTIVITY
COMMUNITY IMPROVEMENTS
O.PITAL PROJECTS
Sidevlalk Safety Repair/
Bus Stop Pad Program
Description-Location
This project would provide for the
replacement of damaged sidewalk at various
locations and installation of bus stop pads
at designated stops along the LAvrA/BART
transit routes.
Comnents
State law provides that sidewalk repair is
the responsibility of the property owner
adj acent to the sidewalk, yet ci ties are
typically held liable for hazards associated
wi th sidewalk in need of repair. Tnis
program reduces the City's liability
exposure.
Bus stop pads are needed to protect private
property at bus stop locations, facilitate
subsequent installation of bus shelters, and
promote the use of public transit.
Reimbursement for installation of the bus
stop pads may be a possibility.
Estimated Cost
Financing
Year(s) Scheduled
Design/Inspection $ 27,000
Improverrents 123,000
$150,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
General Fund
Total:
$150,000
$150,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 7 -
$ 50,000
25,000
25,000
25,000
25,000
$150,000
1986-91 CAPITAL IMPRO\lR.MENT PROvl{AM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Sewage Facility Expansion
COMMUNITY IMPROVEMENTS
Description-Location
Alameda COUTlty, prior to Dublin I s
incol~ration, agreed to enter into the
DSRSD/LAVMA sewer plant expansion on behalf
of Dublin to resel-ve 100,000 gallons per day
se\~r capacity for industrial (non-
retail/commercial) 'use. The County has paid
the constnlction bills to date. In 1984,
the City of Dublin filed an erninent domain
lawsui t against Alameda County in order to
secure the 100,000 gallons acquired by the
COll.l1ty. This i tern covers the anticipated
acquisition cost of the sewage capacity, if
the City is successful in its eminent domain
lawsuit.
Comments
. The City would be responsible for a portion
of this plant expansion and can establish
sewer hookup fees to recoup the City's
costs. This capacity allows DW)lin to
approve additional industrial projects
within the City limits.
Financing
Year(s) Scheduled
Estimated Cost
ACquisition cost $800,000
General Fund $800,000
Prior Years
1986-87 $800,000
1987-88
1988-89
1989-90
1990-91
$800,000
Total:
$800,000
$800,000
--------------~------CITY OF DUBLIN, CALIFORNIA---------------------
- 8 -
1986-91 CAPIT..Z\L IMPROVEMENT PROGRAM.
FONTI
PROJECT
ACTIVITY
CAPITlUJ PROJECTS
Dougherty Road Fencing
East Side
COM!>1UNITY IMPROVEl\1ENTS
Description-Location
'This proj ect provides for the installation
of chain link fencing on the east side of
Dougherty Road from Amador Valley Bl vd. to
a point approximately 2,000 feet to the
north.
Corrnnents
During Fiscal Year 1985-86, the City agreed
to construct this fence as well as a number
of other long-range improvements along
Dougherty Road in exchange for an easement
along the east side of Dougherty Road from
the U. S . Army. This easement w:::mld enable
the City to widen Dougherty Road to its
ul timate width in the future. The U. S. Army
has not yet completed processing of the
agreement.
'This fence \o\Duld b2 constructed behind a
landscaped bem which will be constructed
along the east side of Dougherty Road by the
developer of the Al&~ Creek ,Villages.
Estimated Cost
Financing
General Fund $ 20,000
Improvements $ 20,000
Total:
$ 20,000
Year(s) Scheduled
Prior Years
1986-87 $ 20,000
1987-88
1988-89
1989-90
1990-91
$ 20,000
$ 20,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 9 -
1986-91 CAPITAL I..!\1PROVENENT PRcx:;RAM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Bus Shelters
COMMUNITY IIvlPROVEMENTS
Description-Lo8ation
This proj ect provides for the erection of
five (5) bus shelters at heavily used bus
stops to protect those waiting for buses
from the elements. Locations for bus
shel ters are yet to be detel.'1Tlined, pending
approval of the proposed bus routes and
stops.
Comments
Bus shelters will encourage the use of
public transportation, especially during
inclement weather. On-going costs will
include normal maintenance plus vandalism
(estimated at $2,000-$3,000 per year). The
cost of the shelters and maintenance may be
ftmded with Tr2..Dsportation Development Act
Article 4 funds, if grants become available.
Design of these structures is proposed to be
recommended by the Downtown Study Committee.
Estimated Cost
, Financing
Year(s) Scheduled
R/W Negotiations
Design/Specifications
Shelters
$ 1,000
4,000
30,000
General Fund
$ 35,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 35,000
$ 35,000
Total:
$ 35,000
$ 35,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 10 -
1986-91 CAPITPL HIJPROVEME:.NT PROGRN-1
FUND
PROJECT
ACTIVITY
CAPITAL PROJH'..LTS
Catch Basin Grate Replacement Program
CO!v1MUNITY IMPROVEMENTS
Description-Location
Tnis project vlOuld provide for the phased
replacement of 550 existing catch basin
grates with a new standard bicycle grate.
The first phase of this project will focus
along existing designated bike routes.
Corrments
Prior to incorporation, Alameda COlli'1ty had
modified existing catch basin grates by
adding steel bars in order to make them
safer for bicyclists. Over the years, many
of these bars have broken lOJse. These
grates present a maintenance problem.
Staff 'will endeavor to obtain grant funding
for this project, if at all possible.
Estimated Cost
Financing
Design/Installation $ 20,000
Improvement 180,000
General Fund
Total:
$200,000
Year(s) Scheduled
$200,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$200,000
---------------------CITf OF DUBLIN, CALIFORNIA---------------------
- 11 -
$ 50,000
50,000
50,000
50,000
$200,000
1986-91 CAPITAL ll'iPROVEMEl\lT PRCGRAH
FUND
PROJECT
ACTIVITY
CAP ITi\L PROJECTS
City Entrance Signs
CCMIvlUNITY IMPROVEMEl\lTS
Description-Location
Comments
----
~
r
This project provides for the construction
of City entrance signs at the following
locations: (1) San Ramon Road at 1-580
off-rarrp, (2) San Ramon Road at Alcosta
Blvd., (3) Dougherty Road at 1-580 off-r~~p,
(4) Village Parkway at Kimball Ave., and (5)
Dougherty Road at the northerly City limit
line.
Ground signs will be placed in City right-
of-way so as not to obstruct traffic sight
lines. No specific design has been
determined at this time but is proposed to
be a product of the Downtown Improvement
Committee's report. Annual maintenance
costs are estimated at $500.
Estimated Cost
Financing
Year(s) Scheduled
Design/Inspection
Construction
$ 7,000
20,000
General Fund $ 27,000
Prior Years
1986-87
1987-88 $ 27,000
1988-89
1989-90
1990-91
Total:
$ 27,000
$ 27,000
$ 27,000
---------------------CITY OF DUBLIN, CALIFORl~IA---------------------
- 12 -
1986-91 c..~ITAL IMPRCJvEMENr PR03RAM
FUND
PROJEcr
AcrIV IT"r'
Cl-\PITAL PROJEcrS
Handicap Curb Ramps
COMMUNITY IV@ROVEMENTS
Description-Location
rrhis project provides for the construction
of approximately 55 handicap curb ramps at
various intersections throughout the City as
a continuation of the progrmn commenced
during Fiscal Year 1984-85.
Corrrrnents
The City proposes to apply for
Transportation Development Act
Bikeway/Pedestrian funds in Fiscal Year
1986-87. If the city is successful in
obtaining these funds, they will become
available in Fiscal Year 1987-88 and would
obviate the need to use General Fund monies
for this project.
Estimated Cost
Financing
Year(s) Scheduled
Design/Inspection $
Construction
4,000
30,000
General Fund
$ 34,000
Prior Years
1986-87
1987-88 $ 34,000
1988-89
1989-90
1990-91
Total:
$ 34,000
$ 34,000
$ 34,000
---------------------CITY OF DUBLIN, CALIFOP~IA---------------------
- 13 -
1986-91 CAPITAL TIvJPROVEMENT PROGRAM
FUND
PROJEcr
AcrIVITY
COMMUNITY IMPROVEIv'lENTS
CAP ITJ.L PROJEcrS
Major Arterials - Fence Replacement
Description-Location
This project would replace the existing
older wood fences along J.~ador Valley Blvd.
just east of Village Parkway and just west
of the Southern Pacific right-of-way with a
decorative masonry wall.
Corrunents
The original subdividers constructed wooden
fences along arterial streets with units
backed onto these streets. The wooden
fences have run their life span and are now
in various stages of disrepair. In 1984-85,
the fence along the west side of VLLlage
Parkway was replaced with a precast concrete
wall. A similar, but not 'necessarily the
same, type of wall is proposed for the
residential portion of Amador Valley Blvd.
Estimated Cost
Financing
Design/Inspection
Construction
$ 10,000
60,000
General Fund
Total:
$ 70,000
Year(s) Scheduled
$ 70,000
Prior Years
1986-87
1987-88
1988-89 $ 70,000
1989-90
1990-91
$ 70,000
$ 70,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 14 -
t
1986-91 CAPITAL IMPRCJ\TFYJENT PROSRAz.1
FUND
PROJEcr
AcrIVITY
CAP ITAL PROJEcrS
street Name Identification Sign
Replacement Program
COMMUNITY IfVlPROVEMENTS
Description-Location
This project would replace the existing
black-lettering-on-white-background street
name identification signs at approximately
400 intersections throughout the City with
distincti ve reflector ized green-and-whi te
street name signs with the City's logo as
adopted by the City Council during Fiscal
Year 1985-86.
Comments
The new sIgns are easier to read because the
signs are reflectorized. These signs are
presently being installed on all new
subdivision streets.
Estimated Cost
Financing
Year(s) Scheduled
DeSign/Inspection $
Construction
6,000
60,000
General Fund $ 66,000
Prior Years $ 400
1986-87
1987-88
1988-89 65,600
1989-90
1990-91
Total:
$ 66,000
$ 66,000
$ 66,000
---------------------CITY OF DUBLIN, CALIFORl~IA---------------------
- 15 -
1986-91 CAPITAL IMPRavEHENT PROSRl\M
FUND
ACTIVITY
PROJECT
Underground Utilities -
Dougherty Road, Southern Pacific Railroad
to p~ador Valley Blvd_
CAP ITAL PROJECTS
Description-Location
This project will underground the overhead
utilities in the center of Dougherty Road
from the Southern Pacific Railroad to ~~ador
Valley Blvd.
Comments
As a condition of the development of the
Alamo Creek Villages, the developer was
required to construct an additional two (2)
lanes of pavement on the west side of
Dougherty Road between the Southern Pacific
Railroad and Amador Valley Blvd. With the
construction of these new lanes, the
existing overhead utilities would be left in
a dirt median in between the new pavement
and the existing Dougherty Road, unless the
poles were relocated or placed underground.
It is anticipated that the new road
construction will commence during the summer
of 1988.
There are no PUC Rule 20 funds available for
this project.
Estimated Cost
Financing
General Fund $585,000
Survey/Inspection $ 20,000
Improvements 565,000
Total:
$585,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
COMMUNITY IHPROVEL'1El\lTS
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90 $585,000
1990-91
$585,000
$585,000
- 16 -
P
A
R
K
S
~
1986-91 C..1\PITAL IMPROVEMENT PRcx:;RAM
FUND
PROJECT
ACTIVITY
PARKS
Amador Lakes Mini -Park
CAPITAL PROJECTS
Description-Location
This proj ect provides for the construction
of a 3/4-acre park at the intersection of
Stagecoach Road and Turquoise Street. Park
improvements include a children1s play area, -
picnic tables, barbeques, and turf area.
Comments
As a condi tion of development of Amador
Lakes, the developer was required to
dedicate the land for this park and
construct $88,000 in park improvements.
During Fiscal Year 1985-86, the City Council
approved the design for this park, which
resulted in an estimated cost of $141,300 to
construct the improvements. The City ,has
agreed to contribute $53,300, which is the
amount over and above the developer'?
commitment.
Estimated Cost
Financing
Park Dedication Fund $ 53,300
Design/Inspection
Improvements
$ 7,800
45,500
Total:
$ 53,300
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 6,800
46,500
$ 53,300
$ 53,300
---------------------CITY OF PUBLIN, CALIFORNIA---------------------
- 17 -
1986-91 CAPITAL IMPROVEMENT PRffiRAM
FVNJJ
PROJECT
ACTIVITY
Ko1b Park
CAPITAL PROJECTS
PARKS
Description-Location
This project provides for the acquisition of
a 5-acre park from the Murray School
District at the Fallon School Si te. The
project includes the renovation of existing
recreational facilities as well as the
construction of new facilities.
Comments
Land acquisition would occur under the
auspices of the Naylor Bill which enables
the City to purchase the park at 25% of
market value.
Major elements of this project include
installation of park furniture, installation
of tot and children's play areas, field and
irrigation rehabilitation, lighted walkways,
renovation of tennis courts and lighting.1
group picnic and shade structure, parcourse,
barbeques, and restrooms.
Annual maintenance costs are estimated at
$36,800.
Estimated Cost
Financing
Design/Inspection "$ 89,630
Improvements 640,170
Land Acquisition 90,000
Year(s) Scheduled
State Park Bond Act $ 15,300
Park Dedication 514,900
General Fund 289,600
$ 2,500
817,300
'Ibtal:
$819,800
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$819,800
$819,800
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 18 -
1986-91 CAPITPL IMPROVEMENT PRcx;r:w1
FUND
PROJECT
ACTIVITY
Senior Citizen Center
CAPITAL PROJECTS
PARKS
Description-Location
This project provides for the acquisition,
renovation, and furnishing of the Fallon"
School Multi-Purpose Room for use as a
Senior Citizen Center.
Comments
It is anticipated that the City would
purchase the land and the building from the
Murray School District at a price which
would only include the cost of the land.
This acquisition cost would more than offset
the 15% local match required under the terms
of the Senior Citizen Bond Act.
L~ual operation and
estimated at $48,720.
maintenance
is
Estimated Cost
Financing
Acquisition
Improvements
Furnishings &
Equipment
$ 28,350
53,500
20,150
Senior Citizen Bond Act $ 73,650
General Fund 28,350
Total:
$102,000
Year(s) Scheduled
Prior Years
1986-87 $102,000
1987-88
1988-89
1989-90
1990-91
$102,000
$102,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 19 -
1986-91 CAPITAL IMPROVEHENT PROSRAM
FUND
PROJECT
ACTIVITY
Shannon Park Renovation
CAPITAL PROJECTS
PARKS
Description-Location
This project provides for the renovation of
Shannon Park, which is presently owned by
the Dublin San Ramon Services District
(DSRSD). This park is located on the
northwest corner of San Ramon Road and
Shannon Ave.
Comments
It is proposed that this proj ect be
undertaken in two phases. Work undertaken
in both phases would include: derrolition,
grading, drainage & irrigation work,
concrete paving, lawn replacement, and the
installation of new park furniture. Shown
below are the other major elements to be
included in each phase of park construction.
Phase I ($456,130)
Older Children's Play Area
Tot Lot
Spray Pool
Phase II ($414,030)
Pond Construction
Hillside Landscaping
Stream Bank Planting & Irrigation
Parking Lot & Drop-Off Improvements
Lighting
Bridge at Creek
Plaza Area & Fountain
Southwest Garden Renovation
Outdoor Plaza at Building
Pursuant to discussions with D.S.R.S.D., the District has indicated that it
would make its park dedication funds available for improvements at Shannon Park.
As of July 31, 1985, these funds were estimated at $200,000, less corrmitted
funds for 1985-86 improvments at $100,000.
Estimated Cost
Financing
Design/Inspection $106,950
Improvements 763,210
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
Park Dedication $124,050
General Fund 646,110
Reimbursements 100,000
Total:
$870,160
$456,130
414,030
$870,160
$870,160
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 20 -
1986-91 CAPITAL ll'.iPROVEMENT PR<X;RAM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Dolan Park
PARKS
Description-Location
This proj ect provides for the acquisition
and construction of a 5-acre park at the
Dolan SchCXJl Site, which is located on Padre
Way, west of Castillian Road.
Corrments
,
The City purchased approximately 4 acres of
this site from the Murray SchCXJl District
and 1 acre was dedicated to the City by the
adj acent subdivider during Fiscal Year
1985-86.
It is proposed that this project be
undertaken in two phases. Work undertaken
in both phases would include: tree
planting, concrete walkways, park furniture,
and lighting. . Shown below are the other
major elements to be included in each phase
of park construction.
Phase I ($407,020)
Grading
Drainage
Lawn & Irrigation System
Children's Play Area
Phase II ($209,280)
Sports Court
Parcourse
Group Picnic
Day Camp & Shelter
Tot Play Area
Annual maintenance is estimated at $31,150.
Estimated Cost
Financing
Design/Inspection $
Improvements
Land Acquisition
Year(s) Scheduled
75,600
540,700
454,660
Park Dedication $
General Fund
454,660
407 "Q2-0
. 209;280
Total:
$1,070,960
537,860
533,100
Prior Years
1986-87 $
1987-88
1988-89
1989-90
1990-91
$1,070,960
$1,070,960
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 21 -
1986-91 CAPITAL IMPROVEMENT PRc:x:;RA..M
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Mape Park Renovation
PlffiKS
Description-Location
This project provides for the renovation of
t-1ape Park which is presently owned by the
Dublin San Ramon Services District (DSRSD).
This park is located on Plata Way.
Corrments
Major improvements at this park would
include play area reconstruction for tots
and older children, a parcourse, lighting,
additional trees, rehabilitation of turf and
irrigation system, and portable restroom
facilities.
Estimated Cost
Financing
General Fund $305,720
Design/Inspection $ 32,650
Improvements 273,070
Total:
$305,720
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89 $305,720
1989-90
1990:-91
$305,720
$305,720
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 22 -
1986-91 CAPITAL nJjpRovr~?I' PROGRAM
FUND
ACTIVITY
PROJECT
CAPITAL PROJECTS
East Dougherty Hills Park (Phase II)
PARKS
Description-Location
This project \".Quld fund the second phase
construction of p~k inprovernents at East
Dougherty Hills Park. This park, which has
not yet been constructed, will be located on
Dougherty Road north of Amador Valley Blvd.
Comments
The developers of the Alarro Creek Villages
Residential Development have dedicated 8
acres of parkland to the City and will
construct the first phase of park
inprovements at a cost of approximately
$666,380 to the developer. First phase
improvements include basic park improvements
such as turf area, lighting, parking lot,
park furni ture, fencing, and a bridge
connecting those portions of the park which
are divided by Alamo Creek.
Second phase improvements include restroom
facilities, children's play area, picnic
areas, and revegetation of Alamo Creek.
Annual maintenance is estimated at $54,480.
Estimated Cost
Finarlcing
Design/Inspection $ 37,750
Improvements 267,220
Year(s) Scheduled
Park Dedication $250,000
General Fund 54,970
Total:
$304,970
Prior Years
1986-87
1987-88
1988-89 $304,970
1989-90
1990-91
$304,970
$304,970
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 23 -
" .'
1986-91 CAPITAL IMPROVEl>1ENT PRcr..:RZ\M
;..w:
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Dougherty Hills Park
PARKS
Phase I ($58,000)
Safety fencing
Phase II ($436,950)
Firebreak & hiking trails
Parcourse
OVerlook Interpretive Area
Day Camp Gathering Place
Buffer Planting Along Stagecoach Rd.
Description-Location
TIlis provides for the development of a 90-
acre natural park along the ridge of the
Dougherty Hills between Amador Valley Blvd.
&~d the COllilty Line.
Comments
TIlis parcel was dedicated to the City by the
developer of Tract 4719 in 1985.
Development of this park could be undertaken
in four phases as shown below.
Phase III ($313,800)
Amador Valley Mini-Park
Phase IV ($457,400)
Interpretive Center
Restroom
Hillside Park ,(Stagecoach Rd.)
TIle developers of Tract 4719 and Amador
Lakes have agreed to contribute $20,000
toward the cost of safety fencing.
Annual maintenance is estimated at $32,200.
Financing
Year(s) Scheduled
Estimated Cost
Design/Inspection $ 148,400
Improvements 1,117,750
General Fund
Reimbursements
$1,246,150
20,000
Prior Years
1986-87 $
1987-88
1988-89
1989-90
1990-91
58,000
750,750
457,400
Total:
$1,266,150
$1,266,150
$1,266,150
---------------------CITY OF. DUBLIN, CALlFORNIA---------------------
- 24 -
5
T
R
E
E
T
5
1986-91 CAPITAL IMPROVEMENT PRcx;RAM
FUND
PROJECT
ACTIVITY
STREETS
CAPITAL PROJECTS
San Rarron Road Improvements (Phase II)
Description-Location
This project would provide for the widening
of San Rarron Road to six ( 6 ) through lanes
between Dublin Blvd. and Silvergate Drive.
This project would also include median
street lighting, landscaping, extension of
the 84" storm drain for Martin Canyon Creek,
rrodification of the traffic signal at the
intersection of Amador Valley Blvd. and at
Dublin Blvd., and installation of a new
traffic signal at the intersection of
Silvergate Drive.
Corrments
In 1983-84, the City Council approved a
traffic study which established the ultimate
width and street configuration of San Ramon
Road. This project combines the first two
of four phases for the ultimate improvement
of San Ramon Road.
During Fiscal Year 1985-86, the City
purchased $614,000 in Federal Aid Urban
funds from the City of ~Bdera for $460,500.
The ' City of Dublin will be required to
recognize $614,000 in Federal Aid Urban
funds as 1986-87 revenue. This results in
an understatB'1lent of General Fund support
(see asterisk below) of this project
by $460,500. The total actual General Fund
support of this project is $692,500. Annual
energy and maintenance costs are estimated
at $38,000.
Estimated Cost
Financing
Year(s) Scheduled
$
133,900
44,000
General Fund $
Federal Aid Urban
Reimbursements
232,000*
854,000
346,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 133,900
1,298,100
Design/Survey
Inspection
Construction
Signals
Landscaping
Street Lights
Road Inprovements
Staking
Total:
222,000
100,000
30,000
892,100
10,000
$1,432,000
$1,432,000
$1,432,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 25 -
1986-91 CAPITAL IMPROVEMErU' PRcx;RAM
FUND
PROJEcr
AcrIVITY
CAP ITAL PROJEcrS
Landscaping Village Parkway
Amador Valley Blvd_ to Kimball Ave.
Description-Location
This project provides for the installation
of median lighting and upgrading of the
landscaping on Village Parkway from Amador
Valley Blvd. to Kimball Ave., both in the
median and on the east side of the street.
Comments
The improvement of the landscaping will
improve the aesthetics of this major,
north/south thoroughfare. Median street
lighting will improve, traffic safety.
Annual maintenance and energy costs are
estimated at $30,000.
Estimated Cost
Financing
Design/Inspection
Landscape/Irrigation
street Lighting
$ 90,000
480,000
87,000
General Fund
Total:
$657,000
STREETS
Year(s) Scheduled
$657,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$587,000
70,000
$657,000
$657,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 26 -
1986-91 CAPITAL IMPROVEMENT PRcx::;RPM
FUND
ACTIV.lTY
PROJECT
Rehabilitation and Landscaping
Amador Valley Blvd.
Village Parkway to Dougherty Road
CAPITAL PROJECTS
STREETS
Description-Location
This project would provide for the
rehabilitation, overlay, and median
landscaping of Amador Valley Blvd. from
Dougherty Road to Village Parkway. This
project would also provide for the
rrodification of the raised median in order
to move the existing travel lanes away from
the parking lanes to enhance the residential
character of the street. The project also
includes the installation of 37 median
street lights.
Comments
The City Council has previously approved the
conceptual plan for the street and
landscaping design as a result of a lengthy
series of traffic studies. The developers
of Amador Lakes, Dublin Hills Estates,
Heritage COilln8nS and the Alamo Creeks
Villages are required to contribute to the
cost of these improvements as shown below.
During Fiscal Year 1985-86, the City
purchased $600,000 in Federal Aid Urban
(FAU) funds from the City of Foster City for
$450,000. The City of Dublin will be
required to recognize $ 6 00, 000 in Feder al
Aid Urban funds as- 1986-87 revenue. This
resul ts in an understatement of General Fund
support of this project by $450,000.
Annual energy and maintenance costs are
estimated at $30,000.
Estimated Cost
Design/Inspection $ 116,000
Construction
Overlay
Median Modification
Street Lights
Landscaping
Staking
Total:
Financing
Federal Aid Urban $
Reimbursements
765,000
302,000
Year(s) Scheduled
Prior Years $ 78,000
1986-87 989,000
1987-88
1988-89
1989-90
1990-91
250,000
296,000
185,000
200,000
20,000
$1,067,000
$1,067,000
$1,067,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 27 -
1986-91 C.~ITAL IMPRCJ\TD1ENI' PR(X;RP..M
FUND
PROJECT
ACTIVITY
STREETS
CAP I TAL PROJECT'S
Traffic Signal
Dublin Boulevard/Sierra Court
Description-Location
This project would include full vehicle and
pedestrian signalization as well as safety
street lighting for the intersection at
Dublin Blvd. and Sierra ct. It will calso
provide protected landscaped and lighted
left turn medians on both Dublin Blvd.
approaches to Sier~a Court.
Comments
A total of $31,000 of the signal cost will
be borne by the developer of Sierra Trinity
Business Park. Annual maintenance and
energy costs are estimated at $6,500.
Estimated Cost
Financing
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 42,000
218,000
Design/Inspection $ 50,000
Construction 210,000
General Fund $229,000
Reimbursements 31,000
Total:
$260,000
$260,000
$260,000
---------------------CITY OF DUBLIN, C.~IFORNIA---------------------
- 28 -
1986-91 CAPITAL IMPROVEMENr PR03RAM
Fill'ill
PROJECT
ACTIVITY
PUBLIC FACILITIES
Sierra Court Southerly Extension
STREETS
Description-Location
This project provides for the extension of
Sierra Court through the Dublin Sports
Grounds to provide access to the Civic
Center site. The project includes street
improvements, street lighting, and
utilities. It also includes reconstruction
of those playfields which are displaced,
additional Sports Grounds parking areas,
park restrooms, relocation of a park storage
facility, and drainage facilities.
Cormnents
During Fiscal Year 1985-86, the Ci ty
purchased 10 acres adjacent to the Dublin
Sports . Grounds for the construction of a
Civic Center. Optimum access to the
property requires the extension of Sierra
Court through the Dublin Sports Grounds.
The Ci ty has agreed to a number of
condi tions, imposed by the Dublin San Rarron
Services District in order to extend the
road across the Sports Grounds.
This project will be funded from the
proceeds of the City's $11,968,000
Certificate of Participation issue for the
Civic Center Facility.
Estimated Cost
Financing
Public Facilities Fund $588,000
$ 42,000
546,000
Design/Inspection $ 63,000
Construction 525,000
. Total:
$588,000
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$588,000
$588,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 29 -
1986-91 CAPITAL IMPROVEMENr PRc:GRAM
FUND
PROJEcr
AcrIVITY
c.~ ITAL PROJEcrS
Annual Street Overlay Program'
Description-Location
This project provides for the placement of
at least a one- and one-half (1-1/2) inch
asphalt overlay on streets that are
presently in a deteriorated condition at
various locations. This project also
provides for pavement reinforcement at bus
stop locations on residential streets.
Comments
As streets begin showing major structural
failures, it is important to reinforce these
streets with repairs and overlay to reduce
the need for more costly reconstruction at a
later date.
The Street Maintenance Account in the
Operating Budget includes funding ,for
preparatory patching for this project.
The Public Works Administration Account in
the Operating Budget includes funding for
development of a Pavement Management System.
Bus stop pavement reinforcement is proposed
in the second operating year of the transit
system to make certain of the permanent
locations of the bus stops.
This program will protect the substantial
investment the City has in its streets.
Estimated Cost
STREETS
Financing
Year(s) Scheduled
Design/Inspection
Construction
General Fund
$670,000
$100,000
570,000
Prior Years
1986-87 $
1987-88
1988-89
1989-90
1990-91
Total:
$670,000
$670,000
---------------------CITY OF DUBLIN, CALIFORNIA-------------~-------
- 30 -
130,000
150,000
130,000
130,000
130,000
$670,000
1986-91 CAPITAL IMPROVEMENT PROGRAM
FUND
AcrIVITY
PROJEcr
CAP I TAL PROJEcrS
Dougherty Road Widening
at Southern Pacific Railroad
STREETS
Description-Location
This project would provide for the purchase
of right-of-way from the Southern Pacific
Transportation Company and D.S.R.S.D. to
allow for future widening of Dougherty Road~
Comments
Community Development Block Grant funds can
be used for public improvements within a
qualified "targeted" area. This project
would set the groundwork for the future
widening of Dougherty Road. This project
would use up a two-year allocation of
Community Development Block Grant (CDBG)
funds. The City would have to pay the cost
of acquisition and would be reimbursed for a
portion of the acquisition cost from the
CDBG program.
Estimated Cost
Financing
Right-of-way
Acquisition Costs
$ 120,000
10,000
CDBG
General Fund
Total:
$130,000
Year(s) Scheduled
$ 58,700
71,300
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 10,000
120,000
$130,000
$130,000
---------------------CITY OF DOBbIN, CALIFORNIA---------------------
- 31 -
1986-91 CAPITAL IMPROVEMEl\"'T PRCXiRAM
FUND
PROJEcr
AcrrvITY
STREETS
CAP ITAL PROJEcrS
Dublin Boulevard Improvements
Northwest Frontage at Clark Avenue
Description-Location
This project will implement a portion of
those improvements identified in the Dublin
Blvd. Traffic Study, which was approved by
the City Council in 1983-84. These
improvements include the widening of Dublin
Blvd. at the northwest corner of Dublin
Blvd. and Clark Avenue to allow for on-
street parking and an eastbound-to-westbound
"u" turn.
Cormnents
Right-of-way acquisition will be required at
the AAA property.
Estimated Cost
Financing
General Fund $161,000
Design/Inspection $ 16,000
Right-of-Way 18,000
Construction 127,000
Total:
$161,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
Year(s) Scheduled
Prior Years
1986-87 $161,000
1987-88
1988-89
1989-90
1990-91
$161,000
$161,000
- 32 -
1986-91 CAPITAL n1PROVEt~ PRcx;RAM
FUl\1D
ACTIVITY
PROJECT
Cl\PITAL PROJECTS
Traffic Signal Interconnect
S'IREETS
Description-Location
This project would tie together
electronically the City's traffic signals in
order that traffic progression could be
programmed. This project would require the
upgrading of all existing traffic
controllers, by interconnecting each
controller wi th a wire to indi vidual
arterial master controllers.
Comments
This project would facilitate a smoother
flow of traffic and reduce vehicle delays.
The proposed staging for this project would
be as follows: (1) Dublin Blvd., (2)
Village Parkway, ( 3) Amador Valley Blvd.,
( 4 ) San Rarron Road. Condui t for the
interconnect has been installed on much of
Dublin Blvd.
Estimated Cost
Financing
Design/Inspection $ 30,000
Improvements 260,000
General Fund
Total:
$290,000
"
Year(s) Scheduled
$290,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 3,000
150,000
137,000
$290,000
$290,000
---------------------CITY OF DUBLIN, CALlFORNIA---------------------
- 33 -
1986-91 CAPITAL IMPROVEMENT PRCGRAM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
San Ramon Road Improvements (Phase III)
and Hillside Landscaping
STREETS
Description-Location
This proj ect will provide for the widening
of S&'1 Ramon Road to four (4) through lanes
b2tween Vomac Road and Alcosta Blvd. This
proj ect would also include roadway median
and hillside landscaping, the installation
of a new traffic signal at the intersection
of Vomac Road, and street lighting.
Corrments
This project is the third of four phases for
the ultimate improvement of San Ramon Road.
This year, the landscaping of the large
hillside parcel along the west side of San
Ramon Road was included with this project
instead of b2ing shown as a separate project
as was indicated in last year's Capi tal
Improvement Program.
The City may receive an additional $400,000
in Federal Aid Urban funds if Congress
reappropriates funding for this program.
Annual maintenance costs are estimated at
$35,000.
Estimated Cost
Financing
Environmental Review $
Design/Inspection
Construction
Signal
Landscaping
Street Improvements
Street Lighting
Staking
Soundwall
7,000
135,000
Year(s) Scheduled
General Fund $1,250,000
Federal ,Aid Urban 100,000
100,000
300,000
600,000
42,000
20,000
146,000
Total:
$1,350,000
Prior Years $ 65,000
1986-87 32,000
1987-88 1,253,000
1988-89
1989-90
1990-91
$1,350,000
$1,350,000
---------------------CITY OF DUBLIN, CALlFORNIA---------------------
- 34 -
1986-91 CAPITAL IMPROVE1.-1El\"T PRCGR.N-1
FUND
ACTIVITY
CAPITAL PROJECTS
PROJECT
Traffic Signals - AnBdor Plaza Road @
Amador Valley Blvd.; Village Parkway @
Lewis lwe.; Landscaping, & Street Light Additions
STREETS
Description-Location
This project provides for the installation
of traffic signals at the intersections of
Amador Plaza Road/Amador Valley Blvd. and
Village Parkway /Lewis Ave. This proj ect
will also complete the landscaping of Amador
Valley Blvd. from Amador Plaza Rd. to
Village Parkway and add street lights on
Golden Gate Drive (7), Clark Ave. (9),
Sierra Ct. (4), and Sierra Lane (6).
CO!1unents
These proj ects have been combined to
maximize an economy of scale when bids are
solicited.
Annual maintenance costs are estimated at
approximately $19,000.
Estimated Cost
Financing
Design/Inspection $ 73,000
Improvements 397,000
General Fund
Total:
$470,000
Year(s) Scheduled
$470,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$ 28,000
20,000
180,000
242,000
$470,000
$470,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 35 -
1986-91 CAPITAL II-1PROVEMENT PRcx;RAM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Traffic Signal Pre-Emption
For Emergency Vehicles
STREETS
Description-Location
This proj ect W)uld provide radio receivers
and pre-emption equipment at the Ci ty 's 17
signalized intersections to allow fire
trucks to turn their approach direction
signal to green.
Comments
The DSRSD Fire Department has already
equipped their trucks with sending devices.
Estimated Cost
Financing
Year(s) Scheduled
Design/Inspection $ 10,000
Improvements 85,000
General Fund $ 95,000
Prior Years
1986-87
1987-88 $ 95,000
1988-89
1989-90
1990-91
Total:
$ 95,000
$ 95,000
$ 95,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 36 -
1986-91 CAPITAL IMJ?ROVEl~'T PRcx;RA."1
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
San Ram:m Road Irrprovernents (Phase IV)
S'IREETS
Description-Location
Ii
This proj ect will provide for the widening
of San Rarron Road to four (4) through lanes .'
between Silvergate Drive and Vomac Road.
This project would also include roadway and
median landscaping, street lighting, sound
walls, and reconstruction of the Shannon
Ave. traffic signal.
Corrments
This project is the fourth and final phase
for the ultimate improvement of San Rarron
Road.
Annual maintenance and energy costs are
estimated at $30,000. ·
Estimated Cost
Environmental review $
Design/Inspection
Construction
Signal
Landscaping
Street Irrprove~ents
Street Lighting
Staking
Soundwall
Total:
Financing
Year(s) Scheduled
3,000
165,000
General Fund $1,532,000
Prior Years$
1986-87
1987-88
1988-89
1989-90
1990-91
70,000
43,000
100,000
286,000
734,000
54,000
25,000
165,000
1,419,000
$1,532,000
$1,532,000
$1,532,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 37 -
1986-91 C..APITlili IMPROVEMENT PRcx.;RAM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Traffic Signals - Village Parkway
at Brighton Drive and at Tamarack Drive
STREETS
Description-Location
This project would provide for the
installation of traffic signals at the
intersections of Village Parkway and
Brighton Drive and Village Parkway and
Tamarack Drive.
Comments
A traffic study conducted during Fiscal Year
1983-84 fOW1d that these signals were
marginally warranted.
Annual maintenance costs are estimated at
$10,000.
Estimated Cost
Financing
General Fund $270,000
Design/Inspection $270,000
Total:
$270,000
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90 $270,000
1990-91
$270,000
$270,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 38 -
1986-91 CAPITAL IMPROVEMENT PR(X;RAM
FUND
PROJECT
ACTIVITY
CAPITAL PROJECTS
Dublin Boulevard Improvements
San Ramon Road to Village Parkway
STREETS
Description-Location
Tnis project will implement those
improvements identified in the Dublin
Boulevard Traffic Study, which was approved
by the City Council in 1983-84. These
improvements include the development of
Dublin Blvd. to a six (6) lill1e street
between San Ram~n Road and Village Parkway.
It will provide additional right-turn lanes
vlhere needed.
Corrments
Right-of-way acquisition will be required in
five locations.
Estimated Cost
Financing
Design/Inspection $ 80,000
Right-of-way 320,000
Improvements 500,000
General Fund
Total:
$900,000
Year(s) Scheduled
$900,000
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91
$400,000
500,000
$900,000
$900,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 39 -
1986-91 CAPITAL IMPROVEl1Et\"'T PR((;RAl1
FUND
PROJECT
ACTIVITY
STREETS
c.~ ITAL PROJECTS
Dougherty Road Improvements
South of Southern Pacific Railroad
Description-Location
This project provides for the acquisition of
right-of-way and the widening of Dougherty
Road, primarily on the east side of the
street between Dublin Blvd. and the Southern
Pacific right-of-way. It would also provide
landscaped medians, street trees, and street
lights for this same section of street.
Comments
The section of Dougherty Road between Dublin
Blvd. and the Southern Pacific right-of-way
will soon be developed for its entire
length. There are sections of the street on
the east side that have not been widened.
Some right-of-way will be required to be
purchased to complete this project.
Estimated Cost
Financing
General Fund $859,000
Design/Inspection $ 65,000
Right-of-way 344,000
Improvements 450,000
Total:
$859,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91 $859,000
$859,000
$859,000
- 40 -
1986-91 CAPITATJ IMPROVEMEI.-IT PRCGRAM
FUND
PROJECT
ACTIVITY
STREETS
Cl-\P ITAL PRo.JECTS
Dublin Boulevard Improvements
West of San Ramon Road
Description-Location
This project would fund the relocation of
the Dublin Boulevard median immediately west
of San Ramon Road, provide new median street
lights, and provide for an additional five
(5) feet of pavement on the west side of the
street.
Comments
This project is necessary to accommodate
additional traffic demands on the
intersection of Dublin Blvd. and San Ramon
Road by providing an additional left-turn
lane to northbound San Ramon Road.
Estimated Cost
Financing
Year(s) Scheduled
Prior Years $ 16,000
1986-87
1987-88
1988-89
1989-90
1990-91 184,000
$200,000
Design/Inspection $ 24,000
Right-of-Way 16,000
Improvements 160,000
General Fund $140,000
Reimbursements $ 60,000
Total:
$200,000
$200,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 41 -
1986-91 CAPITAL IMPROVEMENT PRcx;RAM
FUND
PROJ".c..CT
ACTIVITY
STREETS
CJl.J>ITAL PROJECTS
Landscaping Silvergate Medians
Description-Locatio~
This project \\Dald upgrade the landscaping
that exists in the medians at the south end
of Silvergate Drive, and install new
landscaping in the medians at the east end
of the street. Poth areas would be fully
irrigated.
Comments
The landscaping on the south end of
Silvergate Drive has never reached its
potential, basically due to lack of
irrigation plus the need for a more
integrated design for the plant materials.
The medians at the east end of the street
have never been landscaped and have been
left as bare soil. The annual irrigation
and maintenance costs are estimated at
$4,000.
Estimated Cost
Financing
General Fund $ 96,000
Design/Inspection $
Landscape/Irrigation
10,000
86,000
Total:
$ 96,000
Year(s) Scheduled
Prior Years
1986-87
1987-88
1988-89
1989-90
1990-91 $ 96,000
$ 96,000
$ 96,000
---------------------CITY OF DUBLIN, CALIFORNIA---------------------
- 42 -