AGENDA STATEMENT
CITY COUNCIL MEETING DATE: May 19,1998
SUBJECT:
Award of Bid - Contract No. 98-06
Annual Street Slurry Seal Program
Report Prepared by: Public Works Director Lee Thompson
EXHIBITS ATTACHED:
1)
2)
3)
Budget Change Fonn
Resolution of Award
Bid Results
RECO:MMENDATION: 1)
\!^~2)
Approve budget change.
Adopt Resolution awarding bid to Valley Slurry Seal and
authorize Mayor to execute agreement
FINANCIAL STATEMENT:
BUDGET FOR THIS PROJECT
. BUDGET ACTUAL (A)
ITEM OF WORK AMOUNT & BID (B) FUND
1 Remove & replace failed pavement in
streets to be sealed (already completed $55,000.00 $ 44,642.48 (A) Gas Tax (206)
with overlay contract)
2 Slurry Seal Streets $40,000.00 $ 45,239.49 (B) Gas Tax (206)
.... Striping of Slurried Streets (remainder in
:>
budget) $4.500.00 $ 15.761.45 (B) Gas Tax (206)
TOTAL $99,500.00 $105,643.42
The low bid received for line items 2 and 3 is $61,000.94, which exceeds funds budgeted for this project.
An additional appropriation to the Street Maintenance Operating Budget from Gas Tax reserves in the
amount of $6, 144 is needed to complete the project.
DESCRIPTION: On April 21, 1998, the City Council authorized Staff to solicit bids
for Contract 98-06 Annual Slurry Seal project.
.
--------------------~---------------------------~---------------~--
COPIES TO: Bidders
ITEM NO.
4.jJ
g: \mtceproj\slurry\agstawrd
""'
Slurry seal is a preventive maintenance technique used to prolong the life of asphalt surfacing. It consists .
of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The City streets are
slurried approximately every five to seven years, depending upon the level of wear.
Failed pavement repairs, which are required prior to the placement of slurry seal, were previously
performed as part of the Overlay contract.
Five bids were received, the lowest of which was $61,000.94 from Valley Slurry Seal (see Exhibit 3).
The additional cost for this project is in two areas. The cost of slurry seal has increased from 4.25t per
square foot in 1996-97 to 5.7t in this bid, for an increase of34%. This increase appears to be due to the
bidding climate in which contractors are now very busy. The other increase is that there were some streets
in this program with a large amount of thermoplastic striping which needs grinding offbefore slurry can be
applied. This was not anticipated in the budget.
Staffhas reviewed the low bidder's proposal and is familiar with the low bidder's work. Staff therefore
recommends that the City Council approve the additional appropriation and adopt the Resolution awarding
the bid to Valley Slurry Seal.
.
.
Page 2
.
- ... - ... .. -- -
CITY OF DUBLIN
BUDGET CHANGE FORM
CHANGE FORM #
New Appropriations (City Council Approval Required):
Budget Transfers:
X From Unappropriated Reserves (gas tax) From Budgeted Contingent Reserve (1080-799.000)
Within Same Department Activity
From New Revenues Between Departments (City Council Approval Required) .
lJ.IJiitiCDXSEf:Bf6mtl1;.xmOlbnWEfu1.tMrr.oiJNTmmh%Wt1N~iirlmGiltjJjeouMlft:lmitltt4MQ~M:f.W
." ..... ...... -- "..-...-..........,......-.-.-.-... ." ........ ". ...-.-...-......,.....,...-.-.-.-...".... ..... .." -- ......... " --- -- ,,- ...... ....... ...-..........,'.....-......, -. .'......... ..-"......
Name: Name: Street Maintenance Operating Budget
(for slurry seal program) $6,144
Account #: Account #: 206-3020--740..Q25
Name: Name:
Account #: Account #:
Name: Name:
Account #: Account #:
City Manager:
Date:
Signature
. REASON FOR BUDGET CHANGE ENTRY: Slurry seal low bid received was in excess of funds budgeted.
.
.. .. ...................... .............................. ..................:.....>..{>>.::<:.....//):;t......:.:..:....?/;:....................$.S.:.J,.pptdy*4'\at-#id..qi'W..QP4A9~lM;~tmg:Q~:"... 'jjhte:>......:...............::t..:.:::>:.:::..
Mayor:
Date:
Signature
Posted By:
Date:
Signature
j""""v",d1chng
evil. ~~a,~~
"-,!, Hin;:;H t
lIIIr..-...r lli.r
J
RESOLUTION NO. -98
.
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*********
A WARDING CONTRACT 98-06 ANNUAL STREET SLURRY SEAL PROGRAM
TO VALLEY SLURRY SEAL
WHEREAS, the City of Dublin did, on May 12, 1998, publicly open, examine, and declare
all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for
Contract 98-06 ANNUAL STREET SLURRY SEAL PROGRAM authorized by the City Council on April
21, 1998, which Plans, Specifications, and Modifications are hereby expressly referred to for a description
of said work and for all particulars relative to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to the City Engineer, who has recommended that the
bid hereinafter mentioned is the lowest and best bid for doing said work.
NOW, TIffiREFORE, BE IT RESOL VED that the City Council of the City of Dublin does
hereby award City of Dublin Contract 97-04 to the lowest responsible bidder therefor, to wit Valley
Slurry Seal, at a bid of Sixty one thousand dollars and ninety four cents ($61,000.94), the particulars.
of which bid are on file in the Office of the City Engineer.
PASSED, APPROVED AND ADOPTED this 19th day of May, 1998.
AYES:
NOES:
ABSENT:
ABSTAINING:
Mayor
ATTEST:
City Clerk
g: Imiscprojislurrylresoawrd
.
""'-'. -'"! J!;"~,f.""~ -1L
'- y r".; .,-.... ~ t
$..; _1\ ~ a l:."H ~ .
.
.
.
~
BID RESULTS - ANNUAL SLURRY SEAl, CONTRACT NO. 98-06
BID OPENING DATE - MAY 12,1998
BID
ITEM ITEM DESCRIPTION
1 Street Slurry Seal Surfacing
2 Remove Oil Deposits
3 SP Grind Thermo Double CL Striping
4 SP Grind Thermo "stop" Legends
5 SP Grind 12" Striping(Stop BarlX-Walk)
6 SP Grind Thermo "Stop Ahead"
7 SP Grind Thermo "Slow School Xing"
8 SP Grind Thermoplastic "25"
9 SP Install Double CL Striping (Paint)
10 SP Install "Stop" Legends
11 SP Install 12" Striping (Stop BarlX-Walk)
12 SP Install "Stop Ahead" (Paint)
13 SP Install "Slow School Xing" (Paint)
14 SP Install "25" (Paint)
15 SP Install Double Centerline (Paint)
16 SP Install "Stop" Legends (Paint)
17 SP Install Stop Bar 12" x 20' (Paint)
18 SP Install Channelizing line Detail 38
19 SP Install "Keep Clear" (Paint)
20 SP Install "Ped Xing" (Paint)
21 SP Install Type IV Left Arrow (Paint)
TOTAL BID:
BID
ITEM ITEM DESCRIPTION
1 Street Slurry Seal SUrfacing
2 Remove Oil Deposits
3 SP Grind Thermo Double CL Striping
4 SP Grind Thermo "Stop" Legends
5 SP Grind 12" Striping (Stop BarlX-Walk)
6 SP Grind Thermo "Stop Ahead"
7 SP Grind Thermo "Slow School Xing"
8 SP Grind Thermoplastic "25"
9 SP Install Double CL Striping (Paint)
10 SP Install "Stop" Legends
11 SP In5ta1l12" Striping (Stop BarlX-Walk)
12 SP Install "Stop Ahead" (Paint)
13 SP Install "Slow School Xing" (Paint)
14 SP IInstall"25" (Paint)
15 SP Install Double Centerline (Paint)
16 SP Install "Stop" Legends (Paint)
17 SP Install Stop Bar 12" x 20' (Paint)
18 SP Install Channelizing line Detail 38
19 SP I Install "Keep Clear" (Paint)
20 SP Install "Ped Xing" (Paint)
21 SP Install Type IV Left Arrow (Paint)
TOTAL BID:
I
UNIT
MEASURE
SF
SF
LF
EA
LF
EA
EA
EA
LF
EA
LF
EA
EA
EA
LF
EA
LF
LF
EA
EA
EA
UNIT
MEASURE
SF
SF
LF
EA
LF
EA
EA
EA
LF
EA
LF
EA
EA
EA
LF
EA
LF
LF
EA
EA
EA
QTY
769,991
1,350
7,665
21
1,905
10
4
2
7,985
25
2,081
13
8
4
200
4
80
65
2
3
1
QTY
769,991
1,350
7,665
21
1,905
10
4
2
7,985
25
2,081
13
8
4
200
4 $
80 $
65 $
2 $
3 $
1 $
Page 1.
ENGINEER'S ESTIMATE Valley slurrv Seal
UNIT
PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
$ 0.048 $ 36,959.57 $ 0.057 $ 43,889.49
$ 0.80 $ 1,080.00 $ 1.00 $ 1,350.00
$ 1.05 $ 8,048.25 $ 0.66 $ 5,212.20
$ 33.60 $ 705.60 $ 23.00 $ 483.00
$ 1.50 $ 2,857.50 $ 0.68 $ 1,295.40
$ 40.00 $ 400.00 $ 55.00 $ 550.00
$ 50.00 $ 200.00 $ 82.00 $ 328.00
$ 25.00 $ 50.00 $ 25.00 $ 50.00
$ 0.30 $ 2,395.50 $ 0.38 $ 3,034.30
$ 30.00 $ 750.00 $ 23.00 $ 575.00
$ 0.90 $ 1,872.90 $ 1.05 $ 2,185.05
$ 30.00 $ 390.00 $ 55.00 $ 715.00
$ 40.00 $ 320.00 $ 63.00 $ 664.00
$ 20.00 $ 60.00 $ 25.00 $ 100.00
$ 0.30 $ 60.00 $ 0.50 $ 100.00
$ 30.00 $ 120.00 $ 23.00 $ 92.00
$ 0.90 $ 72.00 $ 1.10 $ 88.00
$ 0.30 $ 19.50 $ 0.30 $ 19.50
$ 30.00 $ 60.00 $ 55.00 $ 110.00
$ 30.00 $ 90.00 $ 45.00 $ 135.00
$ 35.00 $ 35.00 $ 25.00 $ 25.00
$ 56,565.82
$ 61,000.94
Graham Contractors Inc.
Bond Blacktop
UNIT
PRICE TOTAL PRICE
$ 0.062 $ 47,739.44 $
$ 0.50 $ 675.00 $
$ 0.71 $ 5,442.15 $
$ 33.00 $ 693.00 $
$ 0.77 $ 1,466.85 $
$ 66.00 $ 660.00 $
$ 110.00 $ 440.00 $
$ 27.50 $ 55.00 $
$ 0.33 $ 2,635.05 $
$ 27.50 $ 687.50 $
$ 1.10 $ 2,289.10 $
$ 38.50 $ 500.50 $
$ 55.00 $ 440.00 $
$ 27.50 $ 110.00 $
0.33 $ 66.00 $
27.50 $ 110.00 $
1.10 $ 88.00
2.20 $ 143.00
55.00 $ 110.00
38.50 $ 115.50
22.00 $ 22.00
UNIT PRICE TOTAL PRICE
0.063 $ 48,509.43
1.50 $ 2,025.00
0.68 $ 5,212.20
31.50 $ 661.50
0.74 $ 1,409.70
63.00 $ 630.00
105.00 $ 420.00
26.25 $ 52.50
0.32 $ 2,555.20
26.25 $ 656.25
1.05 $ 2,185.05
36.75 $ 477.75
52.50 $ 420.00
26.25 $ 105.00
0.32 $ 64.00
26.25 $ 105.00
1.05 $ 84.00
2.1 $ 136.50
52.5 $ 105.00
36.75 $ 110.25
21 $ 21.00
$ 64,488.09
$ 65,945.33
.' 3
,:,:Nt:v~ r' ~ .~ ~~
~ f~ Hf8t ~ ,_-,,-~_
-A
I California Pavement American Asphalt Repair
BID UNIT UNIT
ITEM ITEM DESCRIPTION MEASURE QTY PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
1 Street Slurry Seal Surfacing SF 769,991 $ 0.068 $ 52,051.39 $ 0.079 $ 61,060.29
2 Remove Oil Deposits SF 1,350 $ 1.00 $ 1,350.00 $ 1.78 $ 2,403.00
3 SP Grind Thermo Double CL Striping LF 7,665 $ 0.69 $ 5,288.85 $ 0.49 $ 3,755.85
4 SP Grind Thermo "Stop" Legends EA 21 $ 23.43 $ 492.03 $ 44.00 $ 924.00
5 SP Grind 12" Striping (Stop BarlX-Walk) LF 1,905 $ 0.69 $ 1,314.45 $ 0.80 $ 1,524.00
6 SP Grind Thermo "Stop Ahead" EA 10 $ 56.45 $ 564.50 $ 106.00 $ 1,060.00
7 SP Grind Thermo "Slow School Xing" EA 4 $ 84.15 $ 336.60 $ 158.00 $ 632.00
8 SP Grind Thermoplastic "25" EA 2 $ 19.17 $ 38.34 $ 35.00 $ 70.00
9 SP Install Double CL Striping (Paint) LF 7,985 $ 0.38 $ 3,034.30 $ 0.32 $ 2,555.20
10 SP Install "Stop" Legends EA 25 $ 23.43 $ 585.75 $ 16.52 $ 413.00
11 SP Install 12" Striping (Stop BarlX-Walk) LF 2,081 $ 1.07 $ 2,226.67 $ 0.60 $ 1,248.60
12 SP Install "Stop Ahead" (Paint) EA 13 $ 56.45 $ 733.85 $ 40.00 $ 520.00
13 SP Install "Slow School Xing" (Paint) EA 8 $ 84.14 $ 673.12 $ 60.00 $ 480.00
14 SP Install "25" (Paint) EA 4 $ 19.17 $ 76.68 $ 18.00 $ 72.00
15 SP Install Double Centerfine (Paint) LF 200 0.38 $ 76.00 $ 0.60 $ 120.00
16 SP Install "Stop" Leaends -(Paint) EA 4 $ 23.43 $ 93.72 $ 16.52 $ 66.08
17 SP Install Stop Bar 12" x 20' (Paint) LF 80 $ 1.07 $ 85.60 1 $ 80.00
18 SP Install Channelizing Line Detail 38 LF 65 $ 0.30 $ 19.50 1 $ 65.00
19 SP Install "Keep Clear" (Paint) EA 2 $ 54.31 $ 108.62 40 $ 80.00
20 SP Install "Ped Xing" (Paint) EA 3 $ 41.54 $ 124.62 32 $ 96.00
21 SP Install Type IV Left Arrow (Paint) EA 1 $ 20.00 $ 20.00 20 $ 20.00
TOTAL BID: $ 69,294.59 $ n,245.02
.
.