HomeMy WebLinkAboutItem 4.04 TrafficSgnalStdy ~ ;,~~- . . . ~ , . CITY CLERK File # D~[2]~-@][{2] AGENDA STATEMENT CITY COUNCIL MEETING DATE: January 20,1998 SUBJECT: . Request for Additional Appropriation - Traffic Signal Coordination Study Capital Improvement Project Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS AlTACHED: 1) 2) Budget Change Form Schematic Diagram of Signal System RECOMMENDATION: ~ Approve additional appropriation in the amount of$17,000 from unallocated gas tax reserves to CIP #9645 FINANCIAL STATEMENT: The estimated cost for installation of two new master controllers is $15,000 to $17,000. There would be an ongoing additional telephone cost of approximately $500 per year for these locations to conununicate with the monitoring computer at the Civic Center. DESCRIPTION: Beginning in the 1996-97 Fiscal Year and extending into the current Fiscal Year, the City's traffic engineering consultant, TJKM, has been performing a signal coordination study that is intended to optimize signal timing on Dublin Boulevard, Amador Valley Boulevard, and San Ramon Road. The field work for this study has largely been completed, and one of the reconunendations to come out of the study is that the City's existing interconnected system should be split into three segments. Currently, the master controller for the entire system is located at the Dublin Boulevard! San Ramon Road intersection. When coordination programs are used with a single controller, the cycle length must be set the same for all intersections. The previous coordinated system, which has not been used for the past two years, utilized at various times either a 120-second or 107-second cycle length. This was appropriate for the downtown Dublin Boulevard peak period traffic volume; however, the intersections on Amador Valley Boulevard and the more easterly portion of Dublin Boulevard did not operate as efficiently as they might have with a shorter cycle length. This situation was detrimental to side street traffic in the lower-volume areas, and Staff did receive complaints :from time to time about excessive waiting time for the side streets. This project proposes to split the system as indicated on the schematic drawing, Exhibit 2, with new master controllers in two locations. This would allow variations in cycle length for the high-volume westerly "downtown" segment of Dublin Boulevard versus the lower-volume segment east of Village Parkway, and would also allow a shorter cycle length on Amador Valley Boulevard. San Ramon Road is proposed to be --------------------------------------------------------------- COPIES TO: TJKM ITEMNO.~ g: \agenmisc\sgnl coo r ... coordinated with the Dublin Boulevard system as far as Silvergate Drive, with the more distant Shannon and Vomac intersections allowed to run "free." TJKM has indicated these two intersections would be programmed with a longer green time for San Ramon Road to improve traffic flow. . {, The work to be performed under the cost estimate noted in the financial Statement above would consist of purchasing two new master controllers and appurtenant equipment, installing telephone lines to the two new locations, and modifying the existing interconnect. The equipment cost itself is approximately $10,000, and Pacific Bell has given Staffa worst-case estimate of $700 per intersection for connection costs. The balance of the estimated cost is for installing conduit from the controller cabinets to the nearest Pacific Bell service points and labor to make the necessary connections. This portion of the work is proposed to be accomplished through the City's contract with Alameda County in order to minimize the cost as much as possible. The consequence of not performing this work is that TJKM would make an alternate reconunendation NOT to coordinate approximately half of the City's traffic signals, which would reduce traffic flow efficiency. The intent of the coordination program, which is receiving grant funds based on improving air quality and reducing fuel consumption, would then largely be defeated. In addition, the current single interconnect is overly long, as it extends nearly two miles along San Ramon Road, two miles along Dublin Boulevard, over a mile along Amador Valley Boulevard, along Village Parkway between Amador Valley and Dublin Boulevard, and along Dougherty Road between Dublin Boulevard and Sierra Lane. This excessive length affects the performance of the system. . Staffis recommending an additional appropriation at this time rather than waiting for the next fiscal year's budgeting for two reasons: (1) the coordination project cannot be satisfactorily completed without the two new master locations, and (2) Staff would prefer to install the telephone conduit for the Dougherty/ Sierra location before the Kragen project paves and!or installs landscaping behind the sidewalk on Sierra Lane. The estimated timing for Kragen's work is about 30 days. Staffreconunends that the City Council approve an appropriation in the amount of$17,000 to perform this work. . Page 2 . . . ~ CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other llillillimmmtiiiG"Jftiw~IODWifi~tmI@1_QViTW111MHntli.n.1_1itlitatltiUltQUNlfl#fIllliKMti_1@ Name: Name: Signal Coordination eIP $17,000 Account #: Name: Account #:2Q6..9645-750-050 Name: Account #: Name: Account #: Name: Account #: Account #: City Manager: Date: Signature REASON fOR BUDGET CHANGE ENTRY: signal system To implement recommendation for coordinated traffic "::::::.:;:::;;.;:;;.:::: ..... :~)?::::::,:':::_::",:::,'-_.-,~;:-,N.P'P[<?y~,,~'!fj~'-G~t&G9ilij,qH~~~t~ijgQ~: .6~t~j'},::r...>:: ......;," ::::::::: :::::::~' :.:.:.:.:.::.;.":;':':':' Mayor: Date: Signature Posted By: Date: Signature f""""lbud,ohnll F=XHtBIT I .v- ~ ~ .... c z !e- en- u ii: &I. II( a::::E I-IU !;= :::!>-~ _ Cl)w ::>> z :ci CI 0 ~ CI - 0 IU=:"'" enZ"'" o _~ LQ...... o a:: 11::0 "'0 .&1. U . o u ~ ::E IU ::c U en :+ ~ o ocr o e::: () ocr :E o > :E W I- UJ >- UJ ~ ::.::: a.. w :E CJ w :5 I- ...J UJr5> >-I-U- UJWO Z>-t- ::iUJUJZ ~iUL5O O...J I- z...Jci<( ~~::iffi o~ma.. I-OZO ZO::iW ~<(mW O:E:JO::: o<(o~ ~0@. u.i > ocr z o z z ocr I lI) o > ...J m >- W ...J ...J :; 0::: o o <( :E <( W l- ocr D e::: w > -' (i) DOUGHERTY ROAD w z :5 ocr e::: e::: w Uj SIERRA COURT u.i > ocr lI) 3: w -' VILLAGE PARKWAY AMADOR PLAZA ROAD REGIONAL STREET SAN RAMON ROAD FXH~BIT ~ /.... ~ 8 ~ is' tS CLARK AVE. o > ...J m z :J m :J o GOLDEN GATE 1:-::;.::., ; -:.---:;1 =:-- ._--.~- ... . . .