Loading...
HomeMy WebLinkAboutItem 6.5 5YrCapital Improvement Prgm <E . . ~ CITY CLERK File # D~~[Q].~~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 25,1997 SUBJECT: Public Hearing: 1997-98 Update to the Five Year Capital Improvement Program (1996-2001) Report Prepared by: Richard C. Ambrose, City Manager EXlUBITS ATTACHED: Draft Resolution Update to Capital Improvement Program provided under separate cover 1. 2. RECOMMENDATIO~lfiY' ;: 3. 4. 5. 6. Open Public Hearing Receive Staff Presentation Receive Public Comments Close Public Hearing Deliberate Adopt Resolution approving the 1997-98 Update to the Capital Improvement Program FINANCIAL STATEMENT: The updated costs for the Five Year Capital Improvement Program totals $29,542,917, inc1udingcosts incurred in prior years for those .projects that are part of the Capital Improvement Program. . Projected costs for the rernHining four years of the CIP total $23,105,547. The CIP also identifies projects which are unfunded or underfunded totaling $24,190,962. The recommended Capital Improvement costs for Fiscal Year 1997-98 total $5,273,637. DESCRIPTION: Last year, the City Council adopted a Five Year Capital Improvement Program (CIP) for the fiscal years covering 1996~2001. For Fiscal Year 1997-98 an update to the 1996-2001 CIP has been prepared which considers updated priorities of the Parks and Community Services Commission, City Council, as well as takes into account changing conditions with respect to Capital Projects financing. A total of 17 new projects have been included in the Update to the CIP for. the remaining four years. Those projects which are unfunded are included in the CIP in order to place the City in a better position to pursue funding for each project in this category. .------------------------------------------------------------------- COPIES TO: . ITEM NO. 6.'j H1c:c:-formsJagdastmt.doc f .. The City Parks & Community Services Commission has reviewed those projects included in the Parks & Community Services Program of the CIP. The Commission identified the Dublin Sports Ground Renovation project and Dublin Heritage Center Landscaping Improvements as its highest recommended priorities for utilization of Park In-Lieu Fees for park projects. The Commission also viewed Valley High. School Community Gymnasium as a high priority which should be financed with funds rather than Park In-Lieu Fees, the City Park Master Plan as a high priority which should be financed with Public Facility Impact Fees, and the Mape Memorial Park Pedestrian Bridge as a high priority which should be financed with a grant that the City has managed to apply for and receive. With respect to the Valley High School Community Gymnasium, no funding is presently identified in the Capital Improvement Program for the gymnasium because the costs will not be known until the Dublin Unified School District opens project bids during the month of August of this year. Once those bids are opened, the Council and the School District will be in a better position to adopt an agreement which will provide for the City's contribution to the construction of the Valley High School Community Gymnasium. One other project that is not included in the Capital Improvement Program which the Council may need to consider during Fiscal Year 1997-98 is the completion of tenant improvements and remodeling of the Civic Center to accommodate additional Staff associated with the City's growth. It is anticipated that the space planning and preliminary design will be completed during the first quarter of Fiscal Year 1997-98. This project may require a budget adjustment if it is to proceed during Fiscal Year 1997-98 once the costs are known. On June 24, 1997, the Dublin Planning Commission will review the proposed Update to the Five Year . Capital Improvement Program and determine whether the projects included in the Update are in conformance with the City's General Plan. The City Manager'~ Capital Improvement Program message which is included in the Capital Improvement Program document identifies changes and additions from the 1996-2001 which was adopted by the Dublin City Council last year. It is recommended that the City Council review the Update to the CIP by major program area, at which time Staff can identify any project or schedule changes, the Council can ask questions and receive public input At the end of the review of each program area, it would be appropriate for the Council to make any modifications it deems appropriate. Once the Council has completed its review of the four program areas, it is Staff's recommendation that the City Council adopt the attached resolution approving the 1997~98 Update to the Five Year Capital Improvement Program. . -;2- .. . . \0, RESOLUTION NO. ~ 97 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN *************************** ADOPTING THE 1997-98 UPDATE TO THE 1996-2001 FIVE YEAR CAPITAL I~ROVEMENTPROGRAM WHEREAS, in 1996 the City Council adopted the City's 1996-2001 Capital Improvement Program to address the City's future public infrastructure needs; and WHEREAS, the City Council is desirous of reviewing the recommended 1996-2001 Capital Improvement Program to assure the City's capital needs are met; and WHEREAS, a report on the conformity with the General Plan of proposed projects in the 1997- 98 Update of the 1996-200 I Capital Improvement Program has been reviewed by the Planning Commission; and WHEREAS, the Planning Commission review has found the public works projects to be constructed in the ensuring year to be in conformity with the adopted General Plan; and WHEREAS, the 1997-98 Update of the 1996-2001 proposed Park Improvements have been reviewed by the Park and Community Services Commission. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby take the following actions: (1) the City Council of the City of Dublin does hereby adopt the 1997-98 Update to the 1996-2001 Five Year Capital Improvement Program, which is attached to and made a part hereof; and (2) the items scheduled for implementation in Fiscal Year 1997-98 shall be included in the Capital Budget of the Annual City Budget and Financial Plan for Fiscal Year 1997-98. PASSED, APPROVED AND ADOPTED this 25th day of June, 1997. AYES: NOES: ABSENT: . ATTEST: Mayor City Clerk I I Five Year Capital I Improvement Program I 1996 - 2001 I I I I I I I I I I I I I I I CITY OF DUBLIN CALIFORNIA June 1997 Guy S. Houston, Mayor David C. Burton, Vice Mayor Valerie A. Barnes, Councilmember Lisbeth Howard, Councilmember Janet Lockhart, Councilmember SUBMITIED BY Richard C. Ambrose City Manager Proposed Update 1997 - 1998 I I I I I I I I I I I I I I I I I I I FIVE YEAR CAPITAL IMPROVEMENT PROGRAM 1996- 2001 PROPOSED UPDATE FISCAL YEAR 1997-98 TABLE OF CONTENTS CITY MANAGER'S LE'ITER OF TRANSMITI AL CAPITAL IMPROVEMENT PROGRAM SUMMARIES PAGE All Programs ............................ ................................. ............................ .................. .......................... i General..... ........... ............... ................... .......... .... ........ ... ............. ............... ................... ................... ii Community Improvements ............................................................................................................iii Parks. ... ...... ......................... ......... ....... .................... ............... .................. ......... ........... ..................... v Streets .............................................................................................................................. ............... vii GENERAL IMPROVEMENTS Network System Upgrade.. ..................................... ................................. ................... .................... 1 Aerial Photography Project..... ....... ...... ....................... .................................. .... .......... ....... ............. 2 Public Facility Impact Fee Study....................................................... ...................... ........................3 Civic Center Modification Design Services ......... ...................... ................ ..... ............ ................... 4 Central Data Processing System Upgrade ............... ....... ..................................... ............ .............. 5 Civic Center Building Exterior Wall Sealing............................ ............................... .............. ........ 6 Development Services Data Processing... .............. ............................................ ............................ 7 Civic Center Holiday Decorations... ... .......................... ... ........................................ ....................... 8 Eastern Dublin Financing Plan ............................ ............... .............. .... ......................... .................9 Internet Access - External Gateway ............................................................................................ 10 Automated Document Storage & Retrieval System .................................................................... 11 Fire Impact Fee Study............................... ............... .......................................... ........................... 12 Civic Center Roof Replacement Project ...................................................................................... 13 Communications System Upgrade... .............................. ................ ...... ....................... ...... .......... 14 Fire Apparatus.......................................................................................................................... ..... 1 5 I I, I I I I I I I I I I I I I I 'I I I COMMUNITY IMPROVEMENTS Sidewalk Safety Repair ..... .......... ... ......... .......................... .... ......................... .... ............ .... ....... .... 16 Arroyo Vista Handicapped Accessibility Renovations ............................................................... 17 San Ramon Road Landscape Road Repair ................................................................................... 18 Silvergate Median Landscaping .... ..... ......................................................................... ......... ....... 19 1-580 Beautification Project - San Ramon Road Off-Ramp...................................................... 20 Stagecoach Road Assessment District Landscape Upgrade....................................................... 21 Business Enhancement Sign Program... ............................ ................ ....................... ................... 22 Downtown Identity Theme Program. ......... ........ ........................ .......................... ...................... 23 Widen Village Parkway Sidewalks - Dublin Boulevard to Amador Valley Boulevard........... 24 Downtown Street Banner Additions..... ............................. .......................... .............. ................. 25 Arroyo Vista Project Improvements - Roof Repair ..........................................................:......... 26 Arroyo Vista Child Care Center............................................................ ...................... ................. 27 Replace Banner Poles - San Ramon Road ................................................................................... 28 Dougherty Assessment District Fence Painting....... ................................ .................... ........ ....... 29 Street Name Identification Sign Replacement Program ............................................................ 30 PARKS Mape Memorial Park Renovation ............ ............. ................................ ......................... ............. 31 Shannon Center Window Replacement .................................. ............................... .................... 32 Heritage Center Master Plan................ ............. ................... .............................. ................ ......... 33 Heritage Center Parking Lot....... .............................. ................................ .......................... ......... 34 Dublin Swim Center Chlorine System Replacement ................................................................. 35 Shannon Center Interior painting & Wallpaper ........................................................................ 36 Dougherty Hills Park Slope Repair ............................................................................................. 37 Old St. Raymond's Church Floor Repair ..................................................................................... 38 Shannon Center Floor Coverings Replacement ......................................................................... 39 Dublin Swim Center Exterior Painting and Fence Replacement.............................................. 40 Camp Parks Soccer Field.... ................... ........................ ...... ........................................... .............. 41 Dublin Swim Center Deck Replacement .................................................................................... 42 Dublin Elementary School Athletic Field Renovation................................................................ 43 Dublin Swim Center Boiler Replacement .................................................................. ................. 44 Dublin Sports Grounds Renovation..... .................... ...... ................................. ........ .................... 45 City Park Master Plan..... .......... ... ..... ..... ................ .... ................................... ......... ................. ...... 46 City Park, Phase I ................... ....................... ............. ............... ............. ..... .............. .............. ...... 47 Dublin Ranch Phase I Neighborhood Park................................................................................. 48 Dublin Heritage Center Improvements ................................... ..... ............................ .................. 49 Mape Memorial Park Pedestrian Bridge .................................................................................... 50 Shannon Park Pedestrian Pathway.................. ......... .......................................... ......................... 51 Shannon Park Subdrain ..... ........... ............... ............... .............. ......... ....................................... ... 52 Valley High School Community Gymnasium ............................................................................ 53 Frederiksen School Athletic Field Renovation ............................................................................ 54 I I I I, I I I I I I ,I I I I I I I I I STREETS Annual Street Overlay Program ........................................................... ....................................... 55 Dublin Boulevard Improvements Donlon Way to Village Parkway........................................ 56 Street Light Acquisition Program .... .... ............................... ........................................ ................. 57 Dougherty Road Improvements North of Amador Valley Boulevard to North of Houston Place... ............................. ........................... ........................ ............... ......... 58 Traffic Signal Coordination Project ......... ....... ......... ........................................... ........................ 59 Eastern Dublin Arterial Street Improvements ......................... ..... ................................ .............. 60 San Ramon Road Drainage Repair at Shannon Park ................................................................. 61 San Ramon Road Drainage Repair at Caroline Court ............................................................... 62 1- 580/1 -680 Direct Connector Project...... ............. .............................. ....................... .............. 63 Dublin Boulevard Improvements Silvergate Drive to Hansen Drive....................................... 64 Dublin Boulevard Improvements Village Parkway to Sierra Court......................................... 65 Traffic Signals - Village Parkway at Brighton Drive, Tamarack Drive and Davona Drive... 66 New Street Parallel and South of Dublin Boulevard. ................................................................ 67 Bike Lane Project - Amador Valley Boulevard Stagecoach Road to Dougherty Road ............ 68 Underground Utility District - Street Lighting .......................................................................... 69 Serra Court Subdrain .. .................... .......................................... ....... ............... ........ ..................... 70 Downtown Street Light Additions........ ............................... .......... ....................... .............. ......... 71 Alamo Canal Bike Path Project 1-580 to North City Limit ........................................................ 72 Bike Path - Alamo Creek North of Amador Valley Boulevard.................................................. 73 Dougherty Road Improvements - Houston Place to 1-580 ....................................................... 74 Dublin Boulevard Improvements - Sierra Court to Dougherty Road...................................... 75 Dougherty Road Improvements - Amador Valley Boulevard North to City Limits. ............... 76 Scarlett Drive Extension - Dougherty Road to Dublin Boulevard. .......................................... 77 1-580 Offramp Improvements at San Ramon Road................................................................... 78 San Ramon Road Slope Stabilization Between Vomac Road and A1costa Boulevard. .............79 I I I I I I I I I I I I I I I I I I I CITY OF DUBLIN . City Offices, 100 Civic Plaza, Dublin, California 94568 PO. Box 2340, Dublin, California 94568 June 13, 1997 Honorable Mayor and City Councilmembers: Transmitted herewith is the 1997-98 Update to the 1996.2001 Capital Improvement Program (CIP). The 1996.2001 Capital Improvement Program was adopted by the City Council in June, 1996. The CIP is the financial planning document for the future capital facility requirements of the City. The CIP is updated on an annual basis to reflect changing conditions and shifting priorities that may affect the scheduling of the different projects which are included in the CIP. The 1997-98 Update to the CIP will be submitted to the Planning Commission on June 24, 1997 in order that they may determine whether the CIP is in conformance with the City's General Plan. The Parks and Community Services Commission has reviewed and offered recommendations on those park facility projects included in the CIP. Funding has been included in the 1997-98 Preliminary Budget for those capital improvement projects which are recommended for Fiscal Year 1997-98. 1997.98 CIP Update The total estimated cost of the CIP for the remaining four years of the program is $23,105,547. Of that amount, $853,350 is proposed for General Improvements; $863,447 is proposed for Community Improvements; $4,230,842 is proposed for Park Improvements; and $17,157,908 is proposed for Street Improvements. The CIP also includes additional projects ~hich are unfunded or partially funded. The total cost of these projects is $24,190,962, of which the City has or will receive approximately $20,623 for a net shortfall of $24,170,339. Highlights and significant changes in each CIP program area are described below. General During Fiscal Year 1996-97, the City Council elected to advance the Internet Access - External Gateway project and to provide funding to study the options for access as well as purchase the necessary equipment. It is anticipated that all capital expenditures related to this project will be completed in Fiscal Year 1997-98. The Civic Center Modification Design Services project was carried over for one additional year due to a delay in obtaining the services of a consultant. Once completed it will be necessary to make a budget adjustment in order to proceed with the construction of the building improvements. Administration (510) 833-6650 . City Council (510) 833-6605 . Finance (510) 833.6640 . Building Inspection (510) 833-6620 Code Enforcement (510) 833-6620 . Engineering (510) 833-6630 . Parks & Community Services (510) 833-6645 Police (510) 833-6670 . PubliC Works (510) 833-6630 . Planning (510) 833-6610 I I I I, I I I I I I I I I I I I I I I New projects in this years CIP Update include Civic Center Roof Replacement, Communications System Upgrade and Fire Apparatus. The Civic Center Roof project is necessary to repair the asphalt surface which has bubbled and cracked; the Communications System Upgrade would upgrade the Voice Mail component of the Civic Center Phone System; and the Fire Apparatus is for the purchase of a fire engine to replace an existing engine which needs to be moved from front line service. Communi~ Improvements Several new community improvement projects are included in this year's CIP Update. The Downtown Street Banner Additions would add a set of "Shop in Dublin" banners for display on the City's street light poles. The Arroyo Vista complex has two new projects: one would provide for the repair and replacement of leaking and damaged roofs; the other would provide for the establishment of a childcare facility. Both projects will be funded with Community Development Block Grant funds. The San Ramon Road Banner Pole Replacement would replace the existing damaged banner poles with new poles. The Dougherty Assessment District Fence Painting would paint the tubular steel fences within the Assessment District. One project remains unfunded in this program area, the Street Name Identification Sign Replacement Program. Parks During Fiscal Year 1996~97, the City Council authorized two additional projects: Dublin Elementary School Athletic Field - Design Services; and Valley High School Community Gymnasium. The preliminary design for the athletic fields has been completed, but work on construction documents has not proceeded due to a funding shortfall to construct the improvements. The gym project was given conceptual approval, but the actual cost to the City will not be known until late July, 1997. A number of projects in the Parks Program will be carried over into Fiscal Year 1997-98. These include Mape Memorial Park Renovation, Heritage Center Parking Lot and Shannon Center Interior Painting and Wallpaper Replacement. Changes in this program area include the addition of three new projects in Eastern Dublin and the re-prioritization of several projects by the Parks and Community Services Commission. The changes are summarized below: 1. The Dublin Swim Center Exterior Painting and Fence Replacement project has been expanded to include the replacement of the existing wood and chain link fence with wrought iron fence. Additionally, the project has been deferred one year. 2. The Dublin Swim Center Deck Replacement project has been recommended for funding in Fiscal Year 1997-98 (preliminary engineering and design) and Fiscal Year 1998-99 (construction). This project was previously unfunded, but due to the continued deterioration of the deck and the related safety concerns, it has now been recommended for funding. I I I I I I I I I I I I I I I I I I I 3. The Dublin Swim Center Boiler Replacement project was previously unfunded, but due to ongoing repairs to the boiler, it has now been recommended for replacement in Fiscal Year 2000-01. 4. Based upon the recommendation of the Parks and Community Services Commission, the Dublin Sports Grounds Renovation Project Phases II and III has been included for funding in Fiscal Years 1998-99 and 1999-2000. In order to proceed with this project, it will be necessary to secure additional field space for user groups at another location and to gain the user groups' support for relocation during the renovations. 5. The City Park Master Plan/City Park, Phase I provides for consultant services to work with Staff and the community to develop the ultimate design and uses for the 56 acre City Park on the Santa Rita Property in Eastern Dublin. Upon completion of the Master Plan, work will proceed on Phase I of the City Park, which is estimated to be 17 acres. Staff recommends design of this Park commence in Fiscal Year 1997-98, with construction to follow in Fiscal Year 1998-99. This project should provide sufficient fields to enable the City to renovate the Dublin Sports Grounds. 6. The Dublin Ranch Phase I Neighborhood Park project provides for the design and construction of a 5 acre neighborhood park in the Phase I Dublin Ranch development. 7. The Heritage Center Improvement project provides funds to implement the recommendations of the Heritage Center Site Master Plan which was approved in Fiscal Year 1996-97. 8. The Mape Memorial Park Pedestrian Bridge project is funded by a Transportation Development Act grant. The bridge was originally bid as part of the park renovation project, but was not included due to lack of funding. 9. The Shannon Park Pedestrian Pathway provides for the construction of a pathway from the existing bike path on San Ramon Road to the rear parking lot of the Shannon Community Center. 10. The Shannon Park Subdrain project provides for the repair of an existing subdrain in the parking lot at Shannon Park which is backing up and will eventually cause the parking lot to deteriorate. The Nielsen School Athletic Field Renovation and the Wells-Cronin Athletic Field Renovation have been dropped from the CIP, as they are being funded by the Dublin Unified School District. Three additional projects remain unfunded in this program area: Dublin Heritage Center Improvements - Restroom Building; Dublin Elementary School Athletic Field Renovation; and Frederiksen School Athletic Field Renovation. I I I I I I I I I I I I I I I I I I I Streets During Fiscal Year 1996-97 the City Council authorized two additional projects: Serra Court Subdrain; and Underground Utility District - Street Lighting. The Serra Court Subdrain is a result of an underground spring which caused the pavement to break up. The Underground Utility District provided for the replacement of two street lights on wooden utility poles with steel poles on Dublin Boulevard between Village Parkway and Clark Avenue. A number of projects will be carried over into Fiscal Year 1997-98. These include Street Light Acquisition and Dougherty Road Improvements North of Amador Valley Boulevard to North of Houston Place. Changes in this program area relate to funding and timing of street projects. In addition, one new project is proposed for the CIP Update. The changes are summarized below: 1. The Eastern Dublin Arterial Street Improvements project has been expanded to include not only the arterial plan lines for major arterials in Eastern Dublin, but construction of improvements to those streets as well. This project also includes engineering studies to update the traffic impact fees as development occurs. 2. The Dublin Boulevard Improvements Silvergate Drive to Hansen Drive project was previously scheduled for completion in Fiscal Year 1997-98, but has been deferred until Fiscal Year 1999-2000, However, a traffic signal at the intersection of Dublin Boulevard and Hansen Drive will be installed and part of Dublin Boulevard west of Hansen Drive will be widened in Fiscal Year 1997-98. 3. The Dublin Boulevard Improvements Village Parkway to Sierra Court project was previously scheduled to begin in Fiscal Year 1997-98 and be completed in Fiscal Year 1998-99. Now the entire project will be accomplished in Fiscal Year 1998-99. 4. The Bike Path Project - Alamo Creek North of Amador Valley Boulevard was previously scheduled for completion in Fiscal Year 1999-2000 and was to be done using Gas Tax funds. It has since been determined that the project is ineligible for Gas Tax funds, and there is not another identified source of funding for the project. 5. The Bike Lane Project - Amador Valley Boulevard between Stagecoach Road and Dougherty Road was advanced one year from Fiscal Year 2000-01 to Fiscal Year 1999- 2000. 6. The Downtown Street Light Additions project was previously unfunded, and is now scheduled for funding in Fiscal Year 2000-01. 7. The Alamo Canal Bike Path Project - 1-580 to North City Limit provides for the construction of a bicycle path along the Alamo Canal and San Ramon Creek. The bike path will be constructed on Zone 7 Flood Control right-of-way. I I I I I I I I Respectfully Submitted, 11:~ASb~ I City Manager I I I I I I I I I Nine additional projects remain unfunded in this program area, totaling $23,410,097; however, the City has received or obligated $20,623 for these projects. Conclusion The projects that have been included for funding iin the CIP Update address the City's infrastructure needs in the foreseeable future, and will enhance the quality of life for our residents, businesses and visitors. No CIP message would be complete without expressing thanks to the City Staff, Commissioners, Committee members and Councilmembers who plan the City's capital projects, as well as those Staff members who inspect and administer the City's infrastructure in such an excellent manner. I I I I I I I I I I I I I I I I I I I ~ ~ ~ ~ :2 ~ ~ 0 E- U ; N eeeV"l 8~~ e~ r-f M C\vl'"" _ r-~ M ~ I N ~ ...-l eeeV"l eV"lvOO ~r-OOC\ Mr-:OO O\eOOM N M- V~ ~ ~ ~ ...-l eeoe 8V"lV"l0 ~ N~ C"1, 1oO~ OV"lVM =.......00....... ___100 ff'l.n ~ ~ ~ ...-4 ~!;:~~ MVV"lM OOMO:: ~~Gl~~ M fA I"'" ~ ~ ...-4 IoOV"lNO l'""MOV'l _00V"lC\ MOM~ ONV"lN -N 0\ I"'}., - fA V"l eN l'"" -N r- 1oOV"l o Moc" ..:t r-- _ Nv M fA _NvO OOCV"lOO MNC\M r-~ v~ r: M C\00V"l0 e~e~'<:t'~~ ....-I .... lr) .....,I N ~ i i 5 ~ e - .~ - a i ~ ~ 001 Q) 0 ~ .5 c:Ju,. Vl ~ l .... ~ Vl Iii N ..... 00 ..; ~ 8 ..... .. ~ ..... = ~ ~ I"'" ~ ~ "t lI'l ~ ~ ''It ~ N ~ ~ N :{ l"') ~ I"'" ...-4 ~ ~ 0'1 N ~ o V"l \C~ - N - c:> o o o N N g N 0:: l'"" - V"l 00 M vi 00 v~ M fA e V"l .:> r-: M M ~g 00 M o N~ 00 l'"" M - C\ M v~ M o r-~ M 100 -g, oc" - N iI"'t o ~ r-f l'"" v e\C l'""C\ - M O::oc" V"l V"l 100 N _C:> ~~ vio 0- 1oOC\ N N~ M - M ~ C M fA - V"l c:>~ - M - - 00000-00 r-ooc:>vIoOOC MV"lMOCV"lMO 0:: M ...: v~ ~ v~ 0 \Cr-V"l-MC\1oO N M--- r-O 100100 -v ~~ loON N~ g O~ V"l <o:r iI"'t 100 00 r- N~ 100 O~ - eMV"l IoOvoo MOC\ O::r-fvi vooV"l N eooNlI"lOOvV"lr-O V"lMlI"lll'lor-ooNO vNv\CNV"lr-O\C r:O::";r-fNO::Or-:O \CMV-V --- ("f"l~ v ... ~ 0\100""- v\CN O\Nl'"" r-:r-:r: loO-lI'l N 100 - l'"" vi b r-f l'"" - M v~ - N M - r-v C'i. -~ Oll'l r- - - ~ - C\ - o N - N o lI'l N~ ~ \C~M__OOOvNlI'lMlI'lV"l\CONO r-\c_MOvMMlI'lV"lIoO-OOvC:>OC:> _Nl'""\COooMvvloOvr-l'""C\OV'lO Mr:"':viM";oc"M";N~O::o";or-f"; C\_NV"loo_lI'lVO--C\-r-- N M M-v--M- 0- - M -~ N _~M ""'~M - fA ~ o U :2 ~ E- - M s; -,.....,,.....,- o O_Nr- N -.-....-11......."'-" _ r-r-r--.:::S "-"'->''''''''a i =_ ]-.:::S-e~ c:J NV"l ~55.... - - C' ~ ~ .~ ~ ~~ N ~~~.b _ 0 < ~a N ,....., S 'S'C'C'~ o E5....c: -8- "'1,;;1,;;0 ~ -= Q)~ ]CC~ooo-= -e Q) a~_ ~]]c-=i:!=eQ) c: e 0 .- r- tlO ::I = ~ Q) Q) Q) '" ::I_go 1)1- c:~~ c: e e e ~ ~f~]~!ii~~~~~i~~~ -e .- -e ~ ;;- g '':: ~ ~ a:: u .~ ~ ..( < < ~ !~!~5~J=5o~~llig~ - ~ a ~ 1:: ~ ~ l.l.. ~ .:l ~ Q.'- 0 ~ 1: 11~~~tt~!~t~~il~t c:Juc:J8~~~2C1'.l2~~l.l..CI'.lCl'.lCl'.l8 o 8 ..t N lI'l ~ "t ~ ~ .... "'" Vl I"'" III N ..... ~ ~ -e Q) .~ - .0 o :5 "i ] (5 u f j ~ u .s ..c: u :; ... ..s '" ~ i ~ ~ i N ...:.::v ~ v~ "v ~~ .~ ~ e~ e~ 0_ ~~ ~.,g ~ : a ~ .5 ~ Nt.S ~ '" ~-e o c: ~~ ~~ v Q) ~~ ~ 'S ::I '" - ~ g c: .... .""", ....0 g ~ '" ~ 8a ';' - I .- I 8 ...-4 ~ ...-4 ~ 0'1 "'" l"- ~ ~ "t lI'l ~ ~ ''It ~ N ~ ~ ~ N :{ l"') "'" l"- ...-4 0'1 N ~ 0'1 N "'" :2 S ~ I I I I I I I I I I I I I I I I I I I ~~ ~~ ~~ 00 ~u ; N o ~ I i - o ~ ; - ~ VI - ~ GO ct'I i - 8 ..E N ~ S\ I - f""lo"<t 0'I00r-- O'I\CVI MoOa\' - ~ _ f""l- Vloo"<t f""lN- "<t~ ....; In"' O\f""l- ~ 8 ~ .n 0 \C N 88 vloO N- 88 f""l\C oq-~ 0 _ f""l 8 - o "<t 00 8~ .no r--- 0'1 f""l 0\ ...;' ~ o r-- VI o f""l M - 888 ~ ...;' o.n i"'l. \CNoo f""l VI 00 r-- o - = "" 8~ l f""l f') N ct'I "" l 8 - "" "" ~ - sf - "" ~~~8g$S~g~g~888 - ~ ~ ~ ~t'), ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ..0 0'1 "<t VI r-- 0 0 f""l VI N 0 0 f""l 0 00 .- :!MNNO\t"'I..o r--Nr---..oN~ ~ ...; ~ t co t:n ~.s -; .2 lG1 1 t ~ ~ t:n co '1=: ~ GI _.S u'= t:n Cl.'il !:l ;>:...... 2 ~~~ ~ If:!'';'lU.... g;; GI i';;; j l$ d: .0 i' ~ ~ 5 1 ~ t:n ~ ~'6 ~ ~ ~ 0 ~ I ~ GI ~ GI c:: t:n ~ 1ij u co'il.s "i .= ~ .0 OJ) t1J Cl ~ c:: E t:n - j ~ ~ i ~ .; l.B ~ .~ ~ ! i ~ $.; e}.5"8g:aj~ti:, at:n8lf:! i1 bO ~ ~ ,t = .... == .S ~ 8 ~ a: .~ ~ ~1'1~1~1~~11~ii ~ ~~~~]~~~~~l]~e~ 8 1~~~e6~~~~~~6S~ ~ ~ i "';NM"';orilCir..:ociO\c::l"';NM"';ori ~ ....-l ..... .... "'""" ... IiI _,s,_ ~ , - "" "" o '-4 8 o M 0'1 ~ 8~ 8 - ~ o VI M g VI ~ 88 .,.j'.,.j' r-- N r-- - 00 &f "<tVl r--OO VIr-- a\'o - ~ 00..0 - ..0..0 "<t M~ t't - oor-- .n 0- - - ~ VI\COVlVl t"'I..oo-oo "l t't o~ r--~ r--~ oq-r--VlO'IO "<t-r--"<t- 0'1 ~ I ,-... 8'8,-...,-... NC;:O -'if""lN 'Oa-c ~~~11 8.~~~~ ->....~8 l'e ~~ ~ ~l.5~tt ] 'a e .g oS ~~~~~ = "" l ~ "" l 8 - "" ~ i "" \C r-- - sf - "" It'l ~ ~ - "" - = "'l. ~ q,. - I ..... ..... I "" ~ I ~ -d GI 8 ~ .s co Q .~ t:: I ~ e l ~ t) GI .= ~ '" ~ ~ I I I I I I I I I I I I I I I I I I I ~~ f !: g~ E-' U N ~ - Z .... i ~ i .... g c~ 01 It"l .., o o o o It"l .., ! ~ .... 8 o It"l .., 00 ~ g: .... o 8~ o It"l OIQOI 1t"l0i1t"l "'t ~ O'I~ MOON I"-O'IN .., i .... gOllt"lC0I8 _~Vlt"l 0'1 _It"l ~ ~ ~ ~ ~ 01-0'1 I"-N 01 It"lN\D\D - .., 01 .., 01 01 01 o V - co 01 It"l OIl"- vi'N' 1t"l0 - o It"l l'1 I"- It"l 8 00 8~ It"l ~~g8 ; ~ vl -:..;- 0 v--N 1Il !f'I .., QOlt"lgOOQC o;::::o~8og o_~N'..ovi'ooo It"lNv\DN-\C\D N fIIIIII'l'llllllllll .... 8 8 ~ :a 8 8~ ..,:..1 o 00 a\ vi' ...:..; ~ .., v--N - .., ! ;, .... .., ~ S N .., ~ .... .... .., !i ~ Q. II 1! .~ c 5 g g 'i.1i .~ !.::s j:O ~ oQ.. := 13 5 >- I Pi:: 8 :S .... 'S lib 5 .:. .!:! Ie:l C C J!.~~~~rl~t I$J~ " lllll~G~t-lii~~~ .~.~ Iii j ~ '" 5 t: .9 ~ ~ u ] 5e ....-o.::s o<a,e. ~-oo i ~ 1 .1 .~ 1 8 '5 rz 1 ! Ie b ~ ~~~~!E~~:S PI:;fI)SE i< l>i~ft.ci~~~~~;';>j:Oi ~ ~~~~ ~i5~=~~~-a u p ~ 00 'fij;J -0 - ~ p e - = ~ ill~h:z.,&l,!ii>.s.s~<~,!i ~ 8 'i ~ ~ :g i "':NM.";-.or-:ocia\ O"':NM. ~ ~ ~ ~ """'" 11111 1Il S N N .., o .., 88 ~~ - .., 01 It"l l"- t-:' 01 N .., 01 11"I l'1 It"l - - .., 8~~~8~ 8~ \D\D1t"l0'l :!; \DI"-\D- '. - .., 21t"l0 o~;: 0'" 00..,,-4" It"lMN - 8 o - .., 01 .., 8aS888 a\ vi't-:'a\ 0"; ooIt"lOO--N ..,...,. .., I ~ ~~ N =:l ;: CI"- ~ -0- o ~1 .IOl ~ ~ s:i.j 1:;-00 ~!j~ll gNt!l~ ::O-jo"Q<< ~~'i!li 1~~!IJ I .... .., ~ ~ .., a .... .... .., i .., >> .., . .., ;1 ~ ~ .... .., oil C :a .a c u '0 ~ .5 .~ ~ .;3 -5 ~ I ...... ...... ...... l ... <Sl Q.. ti ~ \D ~ - -!! .5 ~ ~ ~ E ~ ~ ~ 'e' CI. 5 I .~ I o u ... <Sl .~ t J! :g I I = 0 g c I ~ 8 g ~~ ~ vi II'l .,) 0'\ '" '" I E=t,.) rLJ. ~ ~ ~ ~ I I I I I I , > ...... , I ~ I e ~ = I ~ ~ ! I .~ rJ:l ~ c::: 0 I .~ ~ t+= ...... l ~ i I - rLJ. rLJ. N ~ 0 " t,.) t+-. ~ ~ 0 z I N "S ~ II) ~ ~ g ~ rJ:l ~ I I I I I I I I I I I I I I I I I I I I I !~ ~~ ~ -< r-oU} ~~ N ... o ~ Cl. i N o 1;0'1) I ... o 1;0'1) o ; ... 1;0'1) ~ r-- ~ ... N on - ..; N 1;0'1) i ... ....,1"-~onO'\ NO'\ _I"- O'\N NI"- O".,";Mo' ...., - - .., 1;0'1) 8 on S 1;0'1) o on I"- !;f ~~ ";M ...., - - on ...., _ l"- N .., ~..; I"- .., ~ 0'\ ..... ~!;2on~2~~:Z onNO~I"-Ooo"'oo """"";00''';0''';''; \0...... 'l"'liillfool('f')O'\ ...... .., on 1;0'1) i i '6 8 oc 'li on ~ ..; - o .., oc 'j i: o N N 8 o N on on o M o on N !;j ~ g ..... ~ ~~ 0' oON on -0'\ _l"- N ~~ g~ - ~ 00 oc i: ~ N 8~~ Mr-:'r-:' r-- .., ~"B - c: I ! u ~8~~~;8~8~8~~ 'liO":oON9,OoONMr-:'r-:O<( onN~ "'l:Ooc~~I"-'" -:z N ~ ~ "" l ~ "" ~ i ... ffi' "" N ~ ~ QI "" _roiM..tvi..or-:ocio\~ ':roiM..tvi..or-:ocio\o"'::roiM .....'IIIIIIIII--'...-I.....tI!"'I..........1oP'IiNNMN ,-..,.-......-...,,-...,...-....,-...........~ ~ ~ ~ ~ ~ ~ ~ ~ c: c: c: c: c: c: = c: "'-"''-''''-''''"-'''''-'''-'''''--''''-'''' o ~ N .., i4 o o .., oc o oc ...., i4 Sf on ..,. - N g - 0' on i4 Sf:;;:2~ .....tf"\OVl NoOr-:'li 0'\ ..,...., - - 1;0'1) ~ ~ ~::l N - :sg on i4 oon on on "'\0 r-:'N \0- ...., "" o ... IoCl t!:! N "" r-- - ..... ..; M ~ 0' on i4 ~I ~ ltl "" tor!2~~2 ~ ..,..,0....,\00 Gi ...: 00 r-: 00 NOr-- N\o"'on-on ltl ~ ~ ~ ~ i4 i4 i4 ~ ~ ] ~ ~ --- on - 1 :;- ~ eo 3 c. 'E! ~ 8 II> ~ ~ ! :::3 ~ ~ =..2 c a... 8 1I>~-:;-.5 ~ IIhigf ~ 1 e ~ Q ~.!:! ~ SS~~~~ S ~ ~ ~ Sf ~ 6 i 0:. ... N ffi' "" ~. ~ 0'\ ~ ~ QI ~ "" l i ~ ~ N ~ ~ ~ ~ = ... IoCl t!:! N "" e.h c: ~ '6 '0 ~ .5 , > , .~ e .s -5 :a ~ .. .s Cl. o ~ J, ~ II> oS .5 ~ .~ Cl. -S Cl. .. .s '> ~ 0. II> II> 00 ~ I I I I I I I I I I I I I I I I I I I ~ ~ ~ ~ Q ~ ~~ ~u ~ ~ M .... o M ~ ca' ~ OOt.rl OM M 0000 r-: -~ r-: M\Ooo t.rl ~ VJ. E- U e; ~ ~ Q ~ ~ ~ d o .~ > S 8 .... ~ ctj~ :> ca 8~ ~ ~ ~ :Es: S .2:a "0 d ~ s:::l 11) 0 d S ',g '"d l1)"';::lo:i 83~ 0......... 0 S -'.... _ 0 d) ......8"';::l 11) 0 ':;:l 'E!cn< o t'"O 11) ~ ..8 $11)~ 'J:: e d ~~] d d 1: ~;.:~ ~ .g e QO~ If) \C 00 vi 00 \C """ E- VJ. o u ~ o E- "0 11) d OJ:) . ... -' .D o ..... o "0 11) +-' ~ -' -' . 0 U en 11) 11) ~ ::::s 11) ~ - s .~ o ~ 11) o ~ A.. rn rn 11) H o If) \C 00 vi !Xl \C """ t==' ~ ...... 05= ::::: ,'" :.: S ~ ~ ~ o == VJ. ~ ~ ~ I I I I I I I I I I I I I II I I I I I ; N ~ 00 = 1'01 ~ .0 ~ N = ~ o 00 ::il ""l. Q"I ..... ..... "" I ~ ~ <to I: ~ .... "" ~ o 00 ~ - S "l - !::l ::il g .... ...... s-:;" ~ ..... ""l. - ~! ~. ~ 1'01 .... ~ ~ g i ..... .... N 8 ~ ..... N' "" ! ! ~ ~ .... .... i ~ 8 &' :i ~ 1'01 ..... r--. - -; ~ ~ ~ If'I "" 3 ~ :i N .... "" i .... ~ l;;l:$ l'1 l'1~ .... 00 r-- IC -.... 0-- 1'01 1'01 ..... r-- OOQ"l :f t Q"INQ"Ir--r-- \C"''''~'f'\ all.........=..... "';":NOO N t"'-- fIIIIIIII C'I") ... r-- IC "" = s ~ ~ ~ ~ ~ - - - - .... 0- 00 - =r-- 0\.0 ~2: l;;l ~ ::;::; 5 ::;} - - ..... - ..; !~ f~ "" ~ iBl f"I'i 'fIIIIR" 0'\,.. ::il 8: ...; ....IC ~~ 0\.0 00 .., S~~2~ a Vl 00 0\ C5... i'}. ..: ..' .." =''': If'I N............OO. c- - 1'01 Vl .... N '" g~ !-<u NN-r--r--r-- 0- ..... ",...Nt"1V1= M t- Nr--OO=.....- .. r-- ~~~gg8 00 g tr) 2 :2 3: ~} "" ~ ~ ~ i ~ '2 lij l.! !-o c:i:: -= > ~~ s s ~ ~1 ; 5 ~~~ ~ i ~ ~~ u : ] i6~ ~ ~ ~ l! J ~ = ~ ti8~H~~ u ~ ~ ~ Z e e ~a ~6 ~ ~ ~~ ~ s ~ I~glji!~ ~ ~ ~~ E g~ (~ !~~l~:!~! ~ i ~~ ~ ~; II {I~~!JJII I ~,I~ I ~f ~! ~iei]~~5! ! j~i~ ~t !lfl!~ui]]ll~l~~j~j!~iJ~ i l!i~J]i~~~~~~~~'ll!tll~~~ ~ 1 .8 := RUlE ~ ~ Ii! ~.$ i.S I!! IS U ! ~ ~ 8 ~~~! j~~!!~~~~!~~~~s~j~~ ~ l :: :! ~ 1'01 ~ e - "';C'i .,.;..cr'oci~= - .,.;..cr'oci ..... .. .... -- ~:t ..;. I ~ E !Of .... ~8 gig ~ ~ ~ ....; ::: ~ ..; "" I .... <oF .... ~ ~ N ..; r-- = _ r-- ..; S~ ""l.~ ICOO .., - 1'01 "" . If'I ~ ~ ~ ~ ~ N N ~~ rJ't .., .... "" ""~S~82~2 Qll ~-""l.ClO""l.C5-C5 ::t ~sf::::~; g:f:i 0- .., .... ....;} S "" .... ~ ~ t1. .... 00 1'01 00 r-- ..,.....=1'01 1'01 .. 1'01 0- . . N " :;:;:..::: .... ..- ..... ..... ..... =..,00 r--. ... Q"I. IC=..... .... -..... .. - foot "" .... ~ :l .... ""t If'I .... OO"IC ....0-1'01 N OON..... t-...c N ~:::~ ~::r;} :l Q .,.. t- f""- .... .... ....... C '!IIIIiI ~ M .... .., "" .... ..OO-!2..N..,ICN C ......... S 00"'''''' IC" = 00 ~~..;r.:'~i~:-;} ~ ~Oll~IC~_~::: ~ N ..;..; ..; .... N "" .... St:i' r:r: ...,.,...,., ~'S ~ -j 'So g-j ~ .., __ 5 ...,.,Q ~ ~ 1 i ~ t.:I "'*'" ,...., .... 1.1... Ii -!s t!,ss '" ~ 8N-~"SZt:!"" r4'i U '-' ...,., 1'01"" B'~ -< ~ ~ ~llji~jI16~ ~H~~HUi ~ .,., ~ R If'I foot i .... <oF foot ! !Of .... ~ It) '" 1i .j ]8 8) Jj j u U}1oIo . 101o :J I Ii ~ ~ l ~ ';;.Il 1-<.- U ~~~ ~jj ji!~ 8 .El.~- 8~g3 :0 .!! .~ >- I:: ~] .o.!(l8 ... I<. ~i~liE ~ ll'....11 1illi B:] il ~.!(l) _ @ ";' 11 '" _!!l "i ~ I j !.j!J~ ~I~tl ""ill<.ofi t ~~ ~ ~ 0-8i31-< ~~i~.i 8~~~~ ~i~~] -1-=]:1 ~ 8 i.i: ~ .j la:; Ili}} li-!(ll>.>. ~i3!!Bg ~~i~a :~lii1l I [1 r~ u!o fh CI.I '" J!;;;i!!i!!~ I :~ I ~ loG t1. .... :g~:Ei:!: I I I I I I I I I I I I I I I I I I I = ~~ ~u tI1 ~ tI1 ~ u ~ ~ ~ = ~ i N - 0" - \0 V'l" ('<"\ OONOO('<"\OO OO('<"\NO('<"\OO OO-.:tN\OooOO O~ .,.) ...; l(')'" 00 M ~ 0 -.:tr-...r-...N('<"\--.:t-.:t N r-...\OV'l('<"\oo-.:t N _"NMoO ~ ] .~ ~ ~ 0 i 0 ~ _ _u ~ "30 ~o 0 '-'..=0_ Co) ~ ],€6 <2 t' ~0"O "0 :a "0 oZ ~ ~ > ~ t]lI) "i ~ ~~~~~ ~ "0 0 V'l :s "3 Co) 1 !il<'l....8 O,E ~ ~ ~g.s.s~8"i~ ~ ~~]~~.s~d 1: c:::~~u>"05:B Z Z~~~.g.9~~ 8 :s8g:jll)cc.....~~ e=e.(.$oo8€~g ~ ] 0 ~..... I .( lI) 00 '':= I ..so':l'~ ~ :l :s,€:ld:l:s1O;.::: 5e:,a505~58~~ ~~1~~~~d800 e s:: 0 e 2 a e .9 ~ ~ 0.8 C:::"'U ~8 0.8 ~ e- ~ 13 0 ..:l - ~ 0. 00 i:8I!!li~~! t~l~t~t~fj 6~~~~~~5~~ o..=oZ~~~~oo~lZl t'-- ~ = ~ ~ ~ ~ - ('<"\ N \0 o N '-' ~ o u ~ ~ ~ i! ~ C7\ QCl ~ ff) N ~ 1 bJ) .... ~ ~ o 1 - - o U ~ lI) lI) ~ ~ j ~ Eo- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ lI) ~ :@~ .s.; "O~ y~ :::: 8 8 d 5 lI) lI).B $:I lI) lI) > ~~ ..c:::..c::: ..c::: Co) Co) '!:l :a1 ~ ~ ~ lI) :B~ ~i ~.5 - Co) Co)~ ~ ~ E-E- c::: .5 .... ('<"\ 0\0 \OV'l o " ,,\0 ~;; ~ ~ ]] u Co) .5 .5 - ~ h ~~ I .... :~ I ~e I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9315 ACTIVITY GENERAL DESCRIPTION ~ LOCATION This item provides for additions and upgrades to the City data processing system. The improvements began in Fiscal Year 1994-95 with the installation of a Local Area Network with a PC based server and replacement of obsolete equipment. COMMENTS The expenses shown in Fiscal Year 1996-97 include two carryover projects from Fiscal Year 1995-96. The City purchased an Automated Fixed Asset System, which was not fully installed at the end of the Fiscal Year. Approximately $1,962 was expended in Fiscal Year 1996-97 to complete this project. The final payment of $320 was made to the Consultant who prepared an analysis of the City's Masterplan. The 1996-97 new projects undertaken provided the following: 1) Additional access to the Local Area Network through the addition of Network Hubs and cabling; 2) Installation of two new workstations in Police Services; 3) Installation of a high speed shared printer in Police Services; 4) Memory upgrades to four workstations which were originally purchased in 1994. The proposed update to this project includes expenditures in Fiscal Year 1997/98 to address additional hardware constraints related to the provision of access by additional workstations to a single server. The existing server is in need of significant upgrades in order to continue to support the LAN and increased numbers of workstations. Instead of upgrading the server it is proposed to purchase a second server. This will provide additional redundancy to the system and will also allow room for software programs currently on the IBM minicomputer to be migrated to a Windows based platfonn. The benefits obtained from the second server outweigh the incremental cost of purchasing a new server. The cost attributable to the server addition is $12,400 including an allowance for installation services. It is also proposed in Fiscal Year 1997-98 to provide memory upgrades to existing workstations in order to extend their useful life and provide more efficient operation. This is estimated at $4,000. This funding will also provide for the purchase of a portable back- up storage device, which can be used when servicing' the workstations and providing Network Support ($500). The project also includes funding to purchase two workstations for use by Fire Prevention personnel who were relocated to the Civic Center under the new contract for Fire Services. A total of $6,000 is allocated for the purchase of the workstations and any necessary software licenses. The workstations will need to be capable of accessing both the City Network and the Alameda County Fire Department Network. The original Information System Master Plan provided for processor and operating system replacements in Fiscal Year 1998-99. It appears that processor upgrades may not be desirable due to changes in the compatibility of newer PC workstations. However, it will be appropriate in accordance with the Master Plan to consider upgrading the operating system. This expenditure is necessary because the current DOSlWindows 3.11 operating system is no longer supported by software developers and does not interface well with Internet applications. The memory upgrades undertaken in Fiscal Year 1997-98 should allow for hardware compatibility with the new operating system. The change in operating systems is also problematic if it were implemented prior to replacement of the IBM minicomputer. The expenditures shown in Fiscal Year 1998-99 include software licensing costs as well as training. EsnMA TED COSTS FINANCINGIYEARS SCHEDULE Fund PrlorVears 1888-87 1887-88 181..... 888-200 2000-01 Totals Operating Supplies $ Printing Training Contract Services Mach & Equip Hardware Mach & Equip Software 537 205 8,240 14,628 104,940 17,794 001 $ 200 77,085 $ 12,993 $ 24,000 $ 15,000 17,266 $ 129,078 17,266 TOTALS "S "" IiU'A4 TOTAUS >. $:1"8.344 -1- I I I I I I I I I I I I ,I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9318 PROJECT DESCRIPTION Aerial PhotoaraDhy Project ACTIVITY GENERAL DESCRIPTION ~ LOCATION The aerial photography project is a cooperative effort to create aerial photographs of the City that can be read in a computer format and provide the basis for a cornprehensive base rnapping system. COMMENTS The City of San Ramon coordinated this project the later part of Fiscal Year 1994-95. The City contracted with the firm of Hammon Jensen and Wallen to prepare the final project. Aerial photography that will be provided by the project will be in a digital format. This data will be utilized by various Departments in preparing reports or analyzing development applications. Ultimately, the intent is to coordinate the images with other data, including a Geographic Information System. Due to the interest of other agencies in pursuing such a project, the City of Dublin committed to participating ahead of implementing its GIS system. The City obtained a significant cost savings by jointly sharing the cost with other agencies. Hard copy reproducible prints will be available. It is expected that all of the data collection and refinement will be completed by June 30,1996. ESTIMATED COSTS FINANCINGIVEARS SCHEDULE Fund Prior Vears 1988-87 1897-98 1888-81 1888-2000 2000-01 Totals Printing Contract Services $ 8,680 31,283 001 $ 31,283 $ 8,680 $ 39,963 toTAL $' '31;113 "OTALS.;.I';;;;;::;~1;_ " '.880 $ ,;81,183 '...;.:<.:..:...),........ -2- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9450 PROJECT DESCRIPTION Public Facility Impact Fee Study ACTIVITY GENERAL DESCRIPTION ~ LOCATION This study will establish a Public Facilities Fee Program to pay for municipally owned public facilities: park improvements, community facilities, a library and buildout of the Civic Center. COMMENTS The Eastern Dublin SpecifiC Plan was adopted in 1993. The Plan includes financing goals, including a goal that new development in the Specific Plan area should pay the full cost of infrastructure needed to serve the area. The Public Facilities Fee will establish a mechanism whereby the City can fund identified public facilities in the Eastern Dublin Specific Plan area. During Fiscal Year 1995-96, the City Council adopted a Public Facility Fee, During Fiscal Year 1996-97, consultant services are needed to complete the development of the Administrative Guidelines for the Fee, and the Fee Study will need to be updated to include the Trumark Homes and the Schaefer Ranch developments. The estimated cost for the update is $6,000, and the cost will be born by the developers. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 1996.97 1997-98 1998-99 1999~2000 2000-01 Totals Contract Services $ 24,715 310 $ 15,141 $ 9,574 $ 24,715 TOTAL :$ 24i71 1 , TOTAL.S$11;il41 1::8;114 $24.715 .... -3- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9391 PROJECT DESCRIPTION Civic Center Modification Desl n Services ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for the services of an architect to prepare preliminary designs for modification of the Dublin Civic Center. located at 100 Civic Plaza. COMMENTS As the City continues to grow with the annexation of Eastern Dublin, it will become necessary to increase personnel to adequately service this area. Several Departments are currently out of space and cannot accommodate additional Staff to serve Eastern Dublin. The Dublin Civic Center was designed with about 4,500 square feet of unfinished expansion areas, which will need to be modified to house the additional personnel. This necessitates hiring an architect to conduct a space planning assessment and develop preliminary designs and costs to modify the Civic Center. The costs for this project will be paid for by Public Facility Impact Fees. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1986-97 1997.aS 189S-89 1999-2000 2000-01 Totals Design & Inspection $ 25,000 310 JOTAL $ 25,000 $ 25,000 .'.. ,.~/.~.. ,:,"> 'j25;OOO -4- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9319 ACTIVITY GENERAL rade DESCRIPTION ~ LOCATION The City currently operates several centralized functions on an IBM System 36. The initial hardware and finance software packages were purchased in 1988. Significant advancements have been made in technology since that time. The reliability of the systems also deteriorate with age. In addition, the software packages are not compatible with the year 2000. This item would provide for the replacement of IBM System 36. COMMENTS The City currently uses an IBM System 36 minicomputer (System 36) to operate and store software programs related to: accounting; business licenses; City Clerk records; and facility scheduling. The System 36 is at the end of its useful Iifecycle and must be replaced in the near future. It is anticipated that the replacement cost of the System 36 hardware will be funded from Equipment Replacement Fund reserves, and these costs are not shown as part of this project. It is proposed to phase the migration of software from the IBM System 36, In Fiscal Year 1996-97 the Recreation Program Registration software was moved from the System 36 to a PC based system. It is proposed to proceed with the migration in Fiscal Year 1997-98 by selecting and installing new systems to handle Business License Registration ($14,000) and City Clerks Records ($4,000). It is anticipated that the systems selected will be PC based and that the programs can reside on the back-up Network Server, which will be accommodated in Fiscal Year 1997-98 under Project 9315 - Network System Upgrade. The selection of software and hardware necessary for the Financial system is planned for Fiscal Year 1998-99. The availability of Windows based products for governmental accounting is broadening and proceeding with the project at an earlier date would severely limit the options available. It is intended for the analysis and identification of systems to begin in Fiscal Year 1997-98, with the actual purchase occurring in Fiscal Year 1998-99. This project only consists of replacement costs for software that currently only runs on the System 36 and must be replaced prior to the replacement of the System 36. EsnMATED COSTS FINANCINGIVEARS SCHEDULE Fund Prior Years 1888.97 1887-88 1118.88 1898.2000 2000-01 Totals Operating Supplies Contract Services Mach & Equip Hardware Mach & Equip Software $ 14,300 $ 18,000 $ 65,000 $ 97,300 $ 1,700 6,200 3,100 86,300 001 JOTAL ..'_.. __t,.. '> < S. ~.~:: '~)fIi.1!'~:~ . .7;300 .:It::!!hU;OOO. . -5- I I I I I I I I I I. I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9392 PROJECT DESCRIPTION Civic Center Building Exterior Wall SeaUn ACTIVITY GENERAL DESCRIPTION ~ LOCATION This project would clean and apply a sprayed..on moisture barrier sealant to the exterior walls of the City's Civic Center building, as well as below- grade waterproofing for a portion of the building. COMMENTS The Civic Center building is 8 years old and has experienced water leaks into the interior of the building. Rain has been penetrating the stone exterior of the building, causing leaks to appear at the floor level in several locations. resulting in carpet damage and additional maintenance costs. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 1996-97 1997.98 1998.99 1999-2000 2000-01 Totals Improvements $ 30,600 $ 30,600 $ 30,600 001 ". .~. '~.' .:: TOt .' , . "30,600 -6- I I I I I I I I I I I, I I I I I I II I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9320 PROJECT DESCRIPTION Development Services Data Processln ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for additional data processing improvements specifically related to Development Services activities. This project is shown separate from the Network Systems Upgrade Project #9315. COMMENTS This project consists of two activities. The first consists of the purchase of software, minor hardware additions, and support services necessary to implement a computerized permit issuance and tracking system. Originally, this project was scheduled to begin in Fiscal Year 1996-97; however, the project has been rescheduled to begin in Fiscal Year 1997-98 so that the City can explore opportunities to participate in a regional project which seeks to standardize procedures and to achieve cost savings by purchasing the software and services as part of a multi- agency project. It should be noted that the project does not include the cost associated with the conversion of all existing records. A total of $40,100 is budgeted for the Automated Permit processing system in Fiscal Year 1997- 98. The second project involves software and hardware components necessary to implement a Geographic Information System on one workstation. The $10,000 budget for this project does not include ongoing costs to update and support GIS data. ESTIMATED COSTS FINANCINGIVEARS SCHEDULE Fund Prior Years 1996.97 1997.98 1998~99 1999-2000 2000-01 Totals Training Contract Services Mach & Equip Hardware Mach & Equip Software $ 4,000 24,175 13,850 18,075 $40,100 $ 20,000 $ 60,100 001 TOTAL, 60,100 -7- I I I r I I I I I I I I I I' I. I I I. I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9301 Civic Center Holiday Decorations GENERAL DESCRIPTION - LOCATION This project involves the placement and removal of holiday lights at the Civic Center. COMMENTS This project will help set a theme that makes the City inviting to visit during the holidays. The City Council placed as a high priority the lighting of City Hall with holiday lights. Placement and removal will be completed with contract services. The lights will be City owned and the annual energy and maintenance costs are estimated to be $2,100. ESTIMATED COSTS FINANCINGIVEARS SCHEDULE Fund PrlorVears 1996-97 1997-98 1998~t9 1999-2000 2000.01 Totals Contract Services Holiday lights $ 1,627 2,312 001 $ 3,939 $ 3,939 TOT' 'is 3.939 :',1,1,939;'.',;; -8- I ,I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9340 Eastern Dublin Financing Plan GENERAL DESCRIPTION ~ LOCATION This project would provide for the development of a Capital Improvement Financing Plan for the Eastern Dublin area (Santa Rita property, Dublin Ranch annexation). This plan would coordinate those public/private financing measures for Eastern Dublin major infrastructure requirements. COMMENTS This plan would include coordination of DSRSD, Zone 7, the County, the development community and City responsibilities and provide feasible financing measures and specific recommendations to the affected agencies and the development comrnunity. Resources needed include engineering services to prepare the CIFP. A Financial Advisor and Bond Counsel will also be necessary. Costs for the Consultant engineering services for CIFP preparation can be recovered through developer, agency deposits or assessment district bond proceeds. The costs for the Financial Advisor are unknown at this time. but will need to also come from the development community. This project will only proceed if there is sufficient interest among property owners in public infrastructure financing. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Vears 1996.97 1997.98 1998-99 1999.2000 2000-01 Totals Professional Services 300 $ 75,000 $,11,000<'" ," "" $ 75,000 :$ 75,OO<<f DU,L,: ~9~ I I . . . I , I ~ -- 1 1 I I I I I -' 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9321 Internet Access ~ External Gateway GENERAL DESCRIPTION - LOCATION This item provides hardware, software, and installation to esti:lblish an external gateway on the Civic Center Local Area Network (LAN). This would improve the ability of City Staff to receive and obtain documents in an electronic format as well as provide Internet Access. COMMENTS The original Data Processing Master Plan established a standard in order to standardize operations within the City internal operations. Technology has advanced in several arenas, and there are increasing opportunities to share and obtain information electronically. Examples include the ability to fax a document from a network workstation to an external party, or to obtain information that an external source has posted on the Internet. In Fiscal Year 1996-97 the City Council elected to advance this project and provide funding to study the options for access as well as purchase the necessary equipment. The City Council also funded the cost to develop a Website. In Fiscal Year 1996-97 the following activities are anticipated to be complete: 1) The completion of a study identifying the design options for the hardware and software required ($5,000); 2) Selection of a firm to assist with the Website Design (costs will not be incurred until design is complete in 1997-98); 3) Purchase of the hardware and software necessary to provide remote access to 20 workstations ($6,510); 4) Installation of the ISDN Communication Lines for Internet access ($795). With the City Council decision to advance this project, it is expected that all capital expenditures will be completed early in Fiscal Year 1997-98. This includes: 1) Installation of the equipment and configuration of user workstations ($5,120); 2) Final completion of the Website design and posting of the information on an Internet server maintained by a third party ($5,130). It should be noted that the project will result in additional operating costs which are reflected in the Administrative Services Budget including: monthly charges to host and maintain the City of Dublin Website and home page; communications charges; training; etc. In addition, Staff time will be required to write the text to appear on the Website as well as updating information. The impact of Internet updating on Staff resources is unknown at this time. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Years 1888-97 1997~18 1188.18 1188-2000 2000-01 Totals Contract Services Mach & Equip Hardware Mach & Equip Software $ 16,045 4,133 2,377 001 $ 12,305 $ 10,250 $ 22,555 TOTAL i,,- ",'. $ .22,665 .,;:-:. -10- - -- -------- ---- ----. I I I I I I I I, I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Automated Document Storage & Retrieval S .tem ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for an automated document storage system. The intent of the system is to reduce storage demands while providing an efficient method to index, store, and retrieve records in the City. COMMENTS The project is estimated in 1996 dollars based upon a review of available technologies by an independent consultant. The estimate is based upon a mid-level network based system. Multiple users would be allowed access to documents which would be stored on CD-ROM. The costs shown do not address any personnel or contract costs required to convert historical documents and install them on a new system. Additional information will need to be presented at a future date. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Y.ars 1918.97 1997-98 1998-99 1999-2000 2000..01 Totals Training Contract Services Mach & Equip Hardware Mach & Equip Software $ 4,000 17 ,000 25,000 24,000 $ 70,000 $ 70,000 001 -11- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9451 PROJECT DESCRIPTION Fire Impact Fee Study DESCRIPTION ~ LOCATION This project consists of a study to determine the capital fire costs necessitated by new development the City of Dublin anticipates in the future and the impact fee required of the future development to pay for these fire facilities. COMMENTS This study is funded by fire impact fees. ACTIVITY GENERAL ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996.97 1997-98 1998.99 1999-2000 2000-01 Totals Professional Services $ 10,785 320 TOtAL :,:,,'$10,785 TOTALS, $ 10,785 '. 10,781, ""::;':':;::>" ' -12- $ 10,785 ,;<$10.785 I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Civic Center Roof Re lacement Pro ect ACTIVITY GENERAL DESCRIPTION . LOCATION The existing roof of the Civic Center building was recently inspected and found to be in need of extensive repair. The asphalt surface has bubbled and cracked, causing leaks which will ultimately damage sheetrock and carpeting. COMMENTS The City has a considerable investment in the Civic Center building. As the building ages, certain maintenance projects will need to be accomplished on a regular basis. Installing the new roof surface at this time will prevent damage to interior components and will, therefore, be cost-effective in the long run. ESTIMATED COSTS FINANCINGIVEARS SCHEDULE Fund Prior Years 1818.97 111748 1118.11 1111~2000 2000-01 Totals Prelim Engineering Design & Inspection $ 1,000 Professional Services 1,000 Right~f-Way Improvements 61,000 Machinery/Equipment Miscellaneous $ 63,000 $ 63,000 001 TOTAL,''',: .,..,.:":::.:.:,,1 :::U~OOO' TOTALS ..::Y?:T'::: ::::::, '3~OOO ~13- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Communications S stem U rade ACTIVITY GENERAL DESCRIPTION - LOCATION This is a new project which is proposed to be added with the Fiscal Year 1997-98 Update to the Capital Improvement Program. Although the City owns and operates telephone and communications systems at several locations, the most complex system is the Civic Center Phone system. This project would upgrade the Voice Mail component of the Civic Center Phone System. COMMENTS The Civic Center telephone system including the Voice Mail equipment, was purchased and installed in 1989. The Voice Mail system has significant limitations due to the fact that it will only allow four simultaneous users and the hardware manufacturer is no longer in business. The Voice Mail system is basically a computer device which is capable of storing and retrieving voice messages. Computer technology has changed significantly since the system was installed. The system allows Staff to more efficiently carry on City Business in the event that the person called is not available. The City continues to utilize staffed answering points for all initial main department contacts by the public. Given the age of the equipment and the need to have reliability with the system it is recommended that the existing Voice Mail be replaced in Fiscal Year 1997-98 at an estimated cost of $20,000. In the future it would be appropriate to analyze the options available to extend voice mail to other facilities (Shannon Center, Senior Center, etc.). This may require a change in the phone systems used at the other facilities which would affect the total cost and timing of the improvements. Due to the uncertainty of these items no costs has been shown in this update; however, these changes should be considered with future updates to the CIP. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1886-87 1887-88 1198.89 1919.2000 2000.01 Totals Contract Services $ 3,000 Machinery/Equipment 17,000 001 $ 20,000 $ 20,000 TOTAL 120.000 TOt $ 20;000 -14- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Fire Apparatus ACTIVITY GENERAL DESCRIPTION - LOCATION Prior to July 1, 1997 Fire Protection services were provided to the City of Dublin by the Dougherty Regional Fire Authority (DRFA). This entity was a Joint Powers Authority serving the City of Dublin and a portion of the City of San Ramon. All of the Fire Apparatus was owned by DRFA and that entity scheduled the replacement. Beginning July 1, 1997 the City assumed ownership of various pieces of Fire Apparatus. This project will provide for replacement of the Fire Apparatus. COMMENTS Effective July 1, 1997, Alameda County will begin providing Fire Protection services to the City of Dublin, pursuant to a multi-year agreement. The City will retain ownership of the fleet assigned to Dublin stations. Typically the City would establish an Equipment Replacement Plan to accumulate the funds over a period of years. Due to the fact that Fiscal Year 1997-98 will be a transitional year, it is expected that future updates to the CIP will more clearly assess the timing and need for fire equipment. In addition the City Council has identified as a 1997 goal, the need to develop an Equipment Replacement Plan, which will provide for an Internal Service Fund, to finance major equipment replacement. This system is already used for City owned computers, vehicles, and copiers. The Fire Service attempts to balance the age of its equipment to maintain adequate front line equipment along with an operating back-up reserve Fire Engine. The typical life cycle has major apparatus in front line service for 15 years and 5 years as a reserve unit. The actual life may differ depending on the type of equipment and its operation. Passenger vehicles used by Inspection and Supervisory Staff typically have a Iifecycle of 7 years or 70,000 miles. This project provides for the purchase of a new Fire Truck which will need to be ordered in Fiscal Year 1997-98. In order to provide flexibility in the capabilities of the fleet, it is proposed to purchase a Truck outfitted with a pump and a rear mount 55' ladder, which could also provide protection at those times when the 1995 Ladder Truck is unavailable due to servicing. It is estimated that the cost would be approximately $350,000 plus approximately $35,000 of emergency equipment to make the Truck fully functional. In Fiscal Year 1999-2000 it is proposed to replace a 1992 Crown Victoria, which is used by the Battalion Chief overseeing Fire prevention activities. ESTIMATED COSTS FINANCINGIVEARS SCHEDULE Fund Prior Vears 1898.17 1117.18 1918-81 1819.2000 2000-01 Totals Machinery/Equipment $ 408,000 001 $ 385,000 $ 23,000 $ 408,000 TOTAL''''''', !,~,;::ii;:;',:'f::;'. ,,401100, ~A" ': ",,1::,'/:':""';:>")';:, ", ,', ':td::,{i.!:'!I8LOOO:'::::~~~llllm!;~li!":"I:''?:''::,:rr>4t!'''_:""'" ," ", '!<i!, 1408,000 -15- I I I I I I I, I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9425 PROJECT DESCRIPTION Sidewalk Safe Re air ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project provides for the replacement of damaged curb, gutter and sidewalks at various locations. The sidewalk repairs are made by either removing and replacing concrete or by grinding the high side of the offset sidewalk. The method is determined by the severity of the damage. COMMENTS State Law provides that sidewalk repair is the responsibility of the property owner, yet cities are also held liable for hazards associated with sidewalks in need of repair. This program reduces the property owners', as well as the City's, liability exposure. Dublin's program has been funded by the City on a year-ta-year basis. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Vears 1996-97 1997.11 1998-99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 35,000 Professional Services Right-of-Way Improvements 213,500 Machinery/Equipment Miscellaneous 1,500 001 Annual $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000 roTAL '..> ;$:'.''''110;000' TOTALS ...10;000 $ 250.000 ....,.::'..' -16- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9420 PROJECT DESCRIPTION Arroyo Vista Handicapped Accesslblli Renovations ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would remove architectural barriers to handicapped persons in the Arroyo Vista public housing project. It will also improve the exterior appearance of the project and provide employment opportunities for public housing residents in construction contracts. COMMENTS The City Council, in reviewing projects for inclusion in the 1996-97 Community Development Block Grant program, approved $21,910 from this program to make Arroyo Vista fully accessible to handicapped persons. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right..()f-Way Improvements $ 21,910 Machinery/Equipment Miscellaneous 209 TOTAL ..; /'21~O,' TOTAtS $21,910 $ 21,910 " ;:21.810;;,,: $: 21.910 -17- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9462 PROJECT DESCRIPTION San Ramon Road Landsca e Re ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would replace the roadside Vinca ground cover between West Vomac Road and Silvergate Drive. Phase I completed the area from Shannon Drive to Silvergate Avenue on the west side of the roadway. Phase II would be from West Vomac Road to Shannon Avenue on the west side of the street and from West Vomac Road to Silvergate Drive on the east side of the street. COMMENTS Due to the soil conditions along San Ramon Road and flooding in the vicinity of Shannon Park, the Vinca ground cover has not done well, which has allowed weeds to flourish. This project replaces the upper soil with an imported topsoil and re-Iandscapes with ivy and shrubs. After establishment, the ground cover will tend to choke out weed growth and reduce the cost of weed control. It will also improve the aesthetics of the roadside landscaping. Phase I was completed in Fiscal Year 1996-97. EsnMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Veal'8 1991-97 1997-98 1998-99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 16,000 Professional Services Right..()f-Way Improvements 126,095 Machinery/Equipment Miscellaneous 490 206 TOTAl. ' $ 69,235 $ 73,350 $ 142,585 $: 142;585 . ...US'..../" " -18- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9461 PROJECT DESCRIPTION SlIve ate Median land.ca In ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION. lOCATION This project would upgrade the existing landscaping in the medians at the south end of Silvergate Drive. Both areas are to be fully irrigated. The plant materials are proposed to be primarily trees and shrubs irrigated with drip irrigation systems. Extensive brick areas will be added to reduce future landscaping and irrigation costs. COMMENTS The landscaping on the south end of Silvergate Drive has never reached its potential, basically due to lack of irrigation plus the need for a more integrated design for the plant materials. The medians at the east end of the street have never been landscaped and have been left as bare soil. The annual irrigation and maintenance costs are estimated at $7,000. The east end of Silvergate Drive was landscaped as Phase I in 1996-97. The southerly end (Phase II) is proposed to be undertaken in 1997-98. Median reconfiguration will be required near Dublin Boulevard to match the proposed Dublin Boulevard Widening and intersection modification. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1888-87 1887-88 1888-88 1888-2000 2000-01 Totals Prelim Engineering 206 $ 67,140 $ 79,900 $ 147,040 Design & Inspection $ 13,670 300 19,000 19,000 Professional Services Right-of-Way Improvements 138,930 Machinery/Equipment Miscellaneous 13,440 TOTAL ' '. '17.140 . ..~ $ 188.040 -19- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9460 PROJECT DESCRIPTION 1-580 Beautification Project San Ramon Road Off-Ram ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would plant bushes for approximately 900 feet along the approach to the 1-580 westbound offramp to San Ramon Road. COMMENTS As Caltrans has been experiencing reduced revenues in recent years and has tended to reduce or eliminate roadside landscaping projects, the westbound approach to Dublin from 1-580 at San Ramon Road has become an unsightly strip of weeds and wild grasses. This project was designed to screen off the view of the rest of the unsightly State right-of-way to enhance this major entrance to Dublin. The actual operating cost for this project is estimated to be $2,000. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior V..rs 1996-97 1997-98 1998.9. 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 3,600 Professional Services Right..()f-Way Improvements 15,190 Machinery/Equipment Miscellaneous 6,710 206 IAUS'. $ 2,550 $ 22,950 $ 25,500 -20- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9463 PROJECT DESCRIPTION Stagecoach Road Assessment District Landsca e U rade ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would upgrade the irrigation system and fill in and enhance the roadway and slope plantings within the Stagecoach Road Maintenance Assessment District. The areas especially targeted for improvement were the street corner monument areas, the wrap-around street areas and the areas missing significant plantings. COMMENTS In past years, this district has experienced the loss of groundcover and some of the trees and shrubs due to a heavy freeze and rodent and snail infestations. The district has not had sufficient funds to adequately replant these areas. Savings from recent reduced costs from the City's maintenance contractor have made monies available to begin a re-Iandscaping program. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Yea,. 1986-97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Improvements $ 10,000 Miscellaneous 711 $ 10,000 $ 10,000 TOTA.L $: 10,000 TOTALS . ';"<'OfOOO' . $: 10,000 -21- I I I I I I I I I I I I I I I I I I II 1996.2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Business Enhancement Sian Proaram ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCA liON This project would provide signage which would identify the City of Dublin from the 1-580 freeway for the purpose of raising the level of identity of the City and attracting additional business to the Dublin community. COMMENTS This project is a recommendation of the City's Business Task Force. A sign location in the western part of Dublin has yet to be secured. Sign content and location would have to be approved by Caltrans and the Federal Highway Administration. With the private development sign of Valley Auto Center, Dublin is receiving adequate exposure to the east on 1-580. It is recommended that only one sign be located in the western part of Dublin. A number of possible locations exist at the Western boundaries of the City. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Yea,. 1996.97 1997.98 1998-19 1199-2000 2000-01 Totals Design & Inspection $ 4,000 001 $ 5,000 $ 55,000 $ 60,000 Prelim Engineering 1,000 Professional Services Right..()f-Way 7,000 Improvements 47,500 Machinery/Equipment Miscellaneous 500 TOTAL. S ..000 TOTAL;S """""'.""','<"":' 1;000" ','I ..000 7' S ,: '.,000 ..,)>~:i;..!?~.. ::?:::;;,.' '0": ,"";:...>:.... ..... -22- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned DESCRIPTION. LOCA liON PROJECT DESCRIPTION Downtown Identl Theme Pro ram ACTIVITY COMMUNITY IMPROVEMENTS This project would 1} establish and carry out a public sign support and framing program; 2} prepare a design for private shopping center identification pylons consistent with other theme elements in the downtown area; and 3} design and construct district identification improvements at the four major intersections in the downtown area. COMMENTS These improvements were identified in the Dublin Downtown Improvement Plan approved by the City Council in 1986. This project would implement some of the larger improvements from that study. 1. Public Signing Program 2. Study for design of Center 3. Downtown entries identification TOTAL $ 50,000 10,000 100,000 $ 160,000 This project will be one fo the issues reviewed by the Downtown Task Force which will be formed during the Summer of 1997. ESTIMATED COSTS Prelim Engineering $ 20,000 Design & Inspection 15,000 Professional Services Right-of-Way Improvements 124,500 Machinery/Equipment Miscellaneous 500 TOTAL, 160.000 TOTALS ~ FINANCINGNEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1998.99 1999.2000 2000-01 001 Totals $ 57,250 $ 102,750 $ 160,000 ,,$ 160.000 -23- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned PROJECT DESCRIPTION Widen Village Parkway Sidewalks Dublin Boulevard to Amador Valle Boulevard ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would widen the sidewalk from its present 5 feet to 8 feet on both sides of Village Parkway between Dublin Boulevard and Amador Valley Boulevard. COMMENTS Most of the sidewalks in the downtown commercial area are 8 feet wide. The 5 foot sidewalk is a residential standard for areas where a high volume of pedestrian use is not expected. This segment of Village Parkway allows parking directly in front of a large number of small retail businesses. Pedestrian use of this sidewalk is made more difficult because of obstructions typically found in a downtown area such as bus benches, sign posts, and fire hydrants. The City presently has 8 feet of right-of-way from the curb face on both sides of the street. This project will be one of the issues reviewed by the Downtown Task Force which will be formed during the Summer of 1997. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 19M-97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering $ 4,000 Design & Inspection 10,000 Professional Services Right..()f-Way Improvements 125,500 Machinery/Equipment Miscellaneous 500 206 $ 140,000 $ 140,000 1'GTAl. .. ....OOO~ TOTAlS,' . $: 1 '000 -24- I I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Downtown Street Banner Additions ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would add a set of "Shop in Dublin" banners for display on the City's downtown street light poles. COMMENTS The banner program enhances the appearance of the downtown shopping area and is intended to help stimulate shopping in Dublin. The added annual installation cost is estimated to be $1,600. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1198-99 1999.2000 2000-01 Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements $ 8,000 Machinery/Equipment Miscellaneous 001 TOTAL ";000: TOt! $ 8,000 -25- Totals $ 8,000 $ 8.000 I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Arroyo Vista Project Improvements Roof Re air ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project provides funding for repairingl replacing leaking and damaged roofs in approximately 16 buildings at the Arroyo Vista complex. COMMENTS The goal is to maintain a useful life of the Arroyo Vista property through roof repair; and to provide employment opportunities for the public housing residents. This project will be funded by Community Development Block Grant Funds. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996.97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design and Inspection Professional Services Right..()f-Way Improvements $ 49,597 Machinery/Equipment Miscellaneous $ 49,597 $ 49,597 209 TOTAL ...., .....7 TOTALS .. $: 48,197 ',I '. -26- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Arro 0 Vista Child Care Center ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCA liON The City Council approved $15,650 of Dublin's Fiscal Year 1997-98 CDBG funds for the establishment of a childcare facility within the Arroyo Vista complex. These funds will be used for renovating the existing Arroyo Vista Community Center for the day care facility. COMMENTS The goal is to provide much needed affordable child care to Arroyo Vista residents so that they can seek employment or continue working. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1991-97 1997-98 1998.99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements $ 15,650 Machinery/Equipment Miscellaneous 209 . 11;110 ! '~ TOTAL $ 15,650 $ 15,650 $: 11,650 -27- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION ACTIVITY Re lace Banner Poles - San Ramon Road COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION The banner poles are located on San Ramon Road between Dublin Boulevard and Amador Valley Boulevard, and accommodate a 20' by 3' banner which hangs over the northbound lanes. The existing poles were installed in 1986, and one pole recently became fatigued and fell during a severe windstorm. This project proposes to replace both poles with new ones. COMMENTS City Engineering Staff recommends replacing both banner poles, as the remaining pole may present a future liability risk due to fatigue from wind stress. The project proposes relocating the median pole to a flat area of the median and reusing the existing foundation on the east side of the street. The banner poles are used to advertise approximately five City events per year and are also available to advertise events held by nonprofit groups which benefit Dublin residents. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior V..rs 1996-97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right..()f-Way Improvements $ 2,900 Machinery/Equipment 8,100 Miscellaneous $11,000 $ 11,000 001 TOTAL '. ,il 11~ TOTALS ,$ 11,000 <: .".I(.:;;:"~. -28- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NUMBER Dougherty Assessment District ACTIVITY New Fence Palntlna COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would paint the tubular steel fences within the Dougherty Landscape Maintenance Assessment District. The fences are along Willow Creek Road, Wildwood Road and Fall Creek Road, and separate the public right-of-way from Zone 7, Flood Control's Alamo Creek Channel. COMMENTS These painted fences were installed in 1986 as part of the 'Villages" development. The maintenance of these fences, as well as the landscaping along the fences, is paid for through annual assessments within the Dougherty Landscape Maintenance District. The fences are beginning to show the need for maintenance as the paint is starting to chip oft and rust spots are becoming visible. FINANCINGIYEARS SCHEDULE eSTIMATED COSTS Fund Prior Years 1196-97 1997.98 1998-99 1999-2000 2000-01 Totals Prelim Engineering 713 $ 24,000 $ 24,000 Design & Inspection $ 1,000 Professional Services Right..()f-Way Improvements 23,000 Machinery/Equipment Miscellaneous TOTAL ,1>,ilM.ooo: TOTALS :S':;!"_ ...."i...... ,$ 24,000 ~Z9~ I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned PROJECT DESCRIPTION Street Name Identification SI n Re lacement Pro ram ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project would replace the existing black lettering on white background street name identification signs at approximately 400 intersections throughout the City with distinctive, reflectorized green-and-white name signs with the City's logo, as well as block numbers, as adopted by the City Council during Fiscal Year 1985-86. COMMENTS The new signs will be easier to read because the faces are reflectorized. These signs are presently being installed on all new subdivision streets. In addition, the existing signs are aging and beginning to show rust stains on the faceplates. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1998-97 1997.98 1998-99 1998.2000 2000-01 Totals Prelim Engineering $ 2,000 Insufficient funding within the CIP time frame Design & Inspection 7,500 Professional Services Right..()f-Way Improvements 85,000 Machinery/Equipment Miscellaneous 500 $ 95,000 TOTAL . $:96,000 '91.* . -30- I I I I I I I I I I I I I I I I' I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9576 PROJECT DESCRIPTION Ma e Memorial Park Renovation ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the renovation of Mape Memorial Park which is located on Plata Way. COMMENTS Major improvements identified for Mape Memorial Park include: 1) separated younger and older children's play areas with accessible equipment and surfacing; 2) new park furniture including benches. trash receptacles and picnic tables; 3) two small group picnic areas; 4) concrete walkway encircling the park; 5) upgraded park lighting; 6) enhanced shrub and tree plantings; 7) sand volleyball court; 8) restroom building; and 9) pedestrian bridge over the creek. The pedestrian bridge was not included in the construction contract for Mape Park due to a lack of funding. The project has since been identified as an eligible project for Transportation Development Act Funds and is included as a separate project. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1111-17 1887.18 1888-88 1899.2000 2000-01 Totals 001 $ 10,500 $ 6,500 $ 17,000 42,258 209 60,133 $ 8,341 68,474 215 351,635 15,811 367,446 224 12,655 12,655 Prelim Engineering Design & Inspection $ Professional Services Right-of-Way Improvements 414,329 Machinery/Equipment Miscellaneous 8,988 TOTAL , ": ::,.:~ :.... ,:: ; '_.175 ,12,>;,' .10;100 .:,' -31- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9548 Shannon Center Window Replacement PARKS DESCRIPTION - LOCATION This project provides for the replacement of approximately 41 windows at the Shannon Community Center, 11600 Shannon Avenue. COMMENTS As a result of graffiti etched into the glass of approximately 41 windows at the Shannon Community Center, the windows must be replaced. This project provides fundS for replacement and installation of the windows as well as the application of a vandal-resistant film to the windows which will protect the windows from etching in the future. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1996.97 1997.98 1998.99 1999-2000 2000-01 Totals Prelim Engineering 001 $ 15,297 $ 15,297 Design & Inspection $ 970 Professional Services Right-of-Way Improvements 14,327 Machinery/Equipment Miscellaneous TOTAL $ 15.217 TOTAL ':$11.297 . ":., ";" '.' .. '. .,$. .11;297 -32- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9550 PROJECT DESCRIPTION Herlta e Center Master Plan ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the development of a master site plan for future site improvements at the Heritage Center located at 6600 Donlon Way. COMMENTS The Heritage Center was acquired in 1993 and building renovations were completed in 1995. The Heritage Center Master Plan would identify: driveways, parking and maintenance vehicle access; accessible paths of travel linking parking, use areas and structures; picnic areas and interpretive features; patios, plaza and gathering areas linked to structures; access to creek and other natural features; site lighting and signage; and fencing, benches and plantings. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1996-97 1997.98 1998.99 1999.2000 2000..01 Totals Prelim Engineering 215 $ 4.000 $ 4.000 Design & Inspection $ 4,000 Professional Services Right-of.Way Improvements Machinery/Equipment Miscellaneous TOTAL . .,;,$ .,000 TOTALS S .,000.:, S 4.000 -33- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9551 PROJECT DESCRIPTION Herlta e Center Parkin Lot ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the addition of a paved parking lot at the Heritage Center, located at 6600 Donlon Way. COMMENTS The Heritage Center was acquired in 1993 and building renovations were completed in 1995. The current parking area is dirt with compacted gravel and is rutted and uneven. Because there are no barriers between the parking area and the remainder of the site, cars frequently drive to the back of the cemetery grounds or behind the buildings and park for extended periods of time. The design for the parking lot was included as part of the Heritage Center Master Plan. This project provides for construction of the parking lot as well as for installation of an irrigation line from the school to the church and for bollards on the driveways and pathways. EsnMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1888-87 1187.88 1988.88 1191.2000 2000..01 Totals Prelim Engineering $ 3,215 Design & Inspection 1,000 Professional Services Right-of-Way Improvements 46,750 Machinery/Equipment Miscellaneous 215 $ 3,215 $ 47,750 $ 50,965 TOTAL ..$ 10,181 ,""'10.. TOt 47.710:, ':'.. -34- I, I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9594 ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for the replacement of the current gas chlorine system with a liquid chlorine system at the Dublin S......:m Center, located at 8157 Village Parkway. COMMENTS The State of California has enacted requirements for the use of gas chlorine. Compliance entails the installation of either a scrubber system, which would neutralize a gas chlorine leak, or changing to another form of chlorine such as liquid (sodium hypochlorite) or tablets (calcium hypochlorite). After reviewing the different options, it is recommended that the current gas chlorine system be changed to a liquid chlorine system. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1998-99 1999.2000 2000.01 Totals Prelim Engineering Design & Inspection $ 362 Professional Services Right-of-Way Improvements 19,417 Machinery/Equipment Miscellaneous 001 TOTAL '. 11;m TOTACS' $ 19,779 $ 19,779 '$ ~9;779 ,'" S 19779 ~35- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9549 PROJECT DESCRIPTION Shannon Center Interior Palntln and Wallpa er ACTIVITY PARKS DESCRIPTION ~ LOCATION . This project provides for interior painting and replacement of worn wallpaper at the Shannon Community Center, located at 11600 Shannon 'Avenue. COMMENTS Due to heavy use, the walls throughout the Shannon Community Center are in need of a fresh coat of paint. Additionally, the wallpaper in the social hall, upper level entry area and hall area, stairway and east room is discolored and has numerous holes, necessitating replacement. \ ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Y..... 1996.97 1997-98 1998.99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements $ 34,000 Machinery/Equipment Miscellaneous 001 $ 34,000 $ 34,000 TOTAL, ,> . :::>/..: ~IM~OOD,;~: : 'i\Af>:}:'>"" 34 000 -36- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9405 PROJECT DESCRIPTION Dougherty Hills Park Slope Repair ACTIVITY PARKS DESCRIPTION . LOCATION This project provides for slope repair, concrete vee ditch repair and inStallation of sub-drains on the east side of Dougherty Hills Park above Crossridge Road. and on the west side above Jade Circle and Topaz Circle. Phase I repaired the west side of the slopes and the south of the Crossridge Road slope. These all had active slope failures. Phase II will mitigate potential instabilities in the north end of the Crossridge Road slope. COMMENTS Heavy rains in January of 1995 and 1996 caused several localized land slides in the Dougherty Hills Park area. After examination of the area by a geotechnical consultant, it was recommended that the existing slide areas be re-graded with more stable material, and the existing vee ditches be repaired to improve drainage. The existing drainage inlet at the south end of the Crossridge Road slope will be remodeled to help prevent debris from blocking the surface grate. The cost for this project may increase as a result of an outstanding claim by the contractor for Phase I. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Yea,. 1896-87 1887.88 1888.99 1999-2000 2000.01 Totals 001 $ 39,247 $ 447,215 $ 113,400 $ 599,862 Prelim Engineering S Design & Inspection Professional Services Right-of-Way Improvements MachlnerylEqulpment Miscellaneous 1,726 188,463 165 44,330 364,506 672 AI. .,' _,862 -37- I. I I I I I I I I I I I I i I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9552 PROJECT DESCRIPTION Old St. Ra mond'. Church Floor Repair ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for the refinishing of the wood floors in the Old St. Raymond's Church located at the Heritage Center located at 6600 Donlon Way. COMMENTS Old St. Raymond's Church was acquired in 1993 and building renovations were completed in 1995. This project would provide for refinishing of the wood floors in the foyer, sanctuary and utility room, and replacement of the carpet on the stage. Additional funds are included for the installation of a door between the sanctuary and the utility room, and for electrical wiring to install a light switch. (Currently, the lights are turned on with the breakers in the electrical panel). ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund PrlorYears 1996-97 1997-98 1998.99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements $ 4,473 Machinery/Equipment Miscellaneous 001 TOTAL . . :::''''~J' TQTAL$ $ 4,473 $ 4,473 ;,;,1iI?'3 S .,473 .38- I I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9547 Shannon Center PARKS Floor Coverings ReDlacement DESCRIPTION - LOCATION This project provides for replacement and refinishing of floor coverings at the Shannon Community Center, 11600 Shannon Avenue. COMMENTS This project provides for the badly needed replacement of floor coverings at Shannon Center, including: vinyl tile floor in the lobby, hallway, kitchen, stairway, storage area and preschool room; and carpet in the preschool room. Additionally, the hardwood floor in the East Room will be refinished. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1996.97 1997-98 1998-99 1999.2000 2000-01 Totals Prelim Engineering 001 $ 14,860 $ 14,860 Design & Inspection Professional Services Right-of-Way Improvements $ 14,860 Machinery/Equipment Miscellaneous TOTAL <::$ '1". TOTALS "'m,:",;-." ":,:":<:,,,,, : <&,14,.gn' .,;.'../:.'....,.. >:,,/;'\": '" $1.,860 -39- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Dublin Swim Center Exterior Painting and Fence Re lacement ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for exterior painting of the exterior of the swim center bathhouse as well as the removal and replacement of the chain link and wooden fencing with wrought iron fencing at the Dublin Swim Center located at 8157 Village Parkway. COMMENTS The interior of the bathhouse was renovated in Fiscal Year 1993-94. Painting of the exterior will complete the renovation to the building. Replacement of the chain link and wooden fencing with wrought iron fencing will increase the security of the facility, eliminate nearly all wood fencing which is currently experiencing dry rot, as well as improve the aesthetics of the facility. Exterior painting is estimated at $11,000 and replacement fencing is estimated at $45,800. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PrlorYears 1996.97 1997-98 1998.99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements $ 56,800 Machinery/Equipment Miscellaneous 001 ,. TAL, ........ m , 58.aDO. TOTA $ 56,800 $ 56,800 -40- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9510 PROJECT DESCRIPTION Cam Parks Soccer Field ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for the development of one regulation-sized soccer field on approximately two acres of land at Camp Parks. COMMENTS The Dublin United Soccer League plans to develop soccer fields on approximately twenty acres of Camp Parks land over the next three to five years. The first phase of the project began in May of 1996 and consists of development of one regulation-sized soccer field (approximately two acres of the available land). ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 11M-87 1997.98 1888.19 1888-2000 2000-01 Totals Prelim Englneerin9 Design & Inspection Professional Services Ri9ht-of~Way Improvements $ 20,000 Machinery/Equipment Miscellaneous 001 $ 20,000 $ 20,000 OTAL' ... .,.>..,.:.':,/<F'" 20,000 TOTALS 20;000 -41- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9591 PROJECT DESCRIPTION Dublin Swim Center Deck Re lacement ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the replacement of the deck at the Dublin Swim Center, located at 8157 Village Parkway. COMMENTS The Dublin Swim Center pool deck was repaired and resurfaced in 1990. Due to earth movement and ponding water, the deck has cracked and failed in several areas. During Fiscal Year 1995-96, a project to repair and resurface the deck was put out to bid, but no bids were received. In evaluating the deck further, it has been recommended that the entire deck be removed and replaced with concrete decking with a medium broom finish. Replacement of the lifeguard stands/chairs and the 5-meter dive stand are also included as part of this project. It is proposed that design be undertaken in Fiscal Year 1997-98 and the actual replacement in Fiscal Year 1998-99. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Yea... 1996-97 1997.98 1998-99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection Professionsl Services Right-of-Way Improvements MachinerylEquipment Miscellaneous $ 13,000 13,104 $ 22,080 $ 146,840 $ 168,920 3,055 001 215 $ 3,055 132,345 10,655 2,871 TOTAL +$1'71,171 TOTA' .' :3;051 S 171,975 -42- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9553 PROJECT DESCRIPTION Dublin Elementary School Athletic Field Renovation ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the renovation of the athletic fields at Dublin Elementary School and development of a mini-park on the former pool site. The project is located at 7997 Vomac Road. COMMENTS This project was developed by the Dublin Schools Facilities Improvement Task Force. The project provides for renovation of the athletic fields, including complete regrading, reseeding, new irrigation and replacement of backstops, as well as conversion of the site of the former pool into a mini-park. Phase I of the project (mini- park) is currently underway and is being funded by the Dublin Unified School District. Design Development for Phase II was completed during Fiscal Year 1996-97 and was funded by the City. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Y.ars 1898-97 1997.98 1988.99 1981-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of.Way Improvements Machinery/Equipment Miscellaneous 215 Insufficient funding within the CIP time frame 561,030 $ 54,760 511,570 3,300 TOTAL ;:. :"';11I'-.. $ 8,600 $ 8,600 :.'\J;HtI..:ra,1OO '<_;830 .43- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned PROJECT DESCRIPTION Dublin Swim Center Boller Replacement ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the replacement of the boiler at the Dublin Swim Center, 8157 Village Parkway. COMMENTS Although the Swim Center was renovated during Fiscal Year 1989-90, the boiler was not replaced. The boiler has exceeded its usable life, thus it is recommended that it be replaced with a more energy efficient unit. The proposed replacement is 97% efficient and a cost savings through reduced fuel costs will be realized upon replacement. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements Machinery/Equipment $ 42,150 Miscellaneous 100 $ 42,250 $ 42,250 001 TOTAL .$ 42j250 TOTA~::>'0!'t'< )'),.:.>"w... <42,250 ,$., 42.250 -44- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9583 PROJECT DESCRIPTION Dublin S orta Ground. Renovation ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for the renovation of the Dublin Sports Grounds, which is located at Dublin Boulevard and Civic Plaza. COMMENTS The Dublin Sports Grounds Master Plan was adopted in May of 1990. The recommended improvements have been divided into phases: Phase I includes construction of a new 60' baseball field, installation of bleachers at Fields 2 through 7 and installation of drinking fountains at Fields 4, 5 and 6. Phase I was completed in Fiscal Year 1995~96. Phase II includes renovation of the drainage and sprinkler system for the east half of the Sports Grounds. Phase III includes renovation of the drainage and sprinkler system for the west half of the Sports Grounds. The jogging trail around the perimeter of the Sports Grounds, the softball field lighting modifications and the reorientation of Field #3 which were identified in the original master plan have not been included. Phase I $220,808 Phase III $281,135 Phase II $158,875 While this project is a high priority of the Parks and Community Services Commission and the sports groups, until alternate fields are available for use during the renovation, the project is unable to move forward. It is therefore proposed to proceed with design of Phases II and III in 1998-99, but delay construction of the improvements to 1999-2000, providing that the City Park Phase I improvements are installed on the Santa Rita property. This is the only facility in sufficient size to provide adequate replacement fields for groups using the Dublin Sports Grounds. ESTIMATED COSTS FINANCINQIYEARS SCHEDULE Fund Prior Years 1998.97 1117-18 1998-99 1119.2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements Machinery/Equipment Miscellaneous 001 $ 215 $ 9,546 651,272 9,546 211,262 $ 12,900 79,758 $ 59,170 $ 380,840 547,223 16,369 4,546 TOTAL. .. ...380,_ , 680.818 220;108 -45- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER NEW PROJECT DESCRIPTION CI Park Master Plan ACTIVITY PARKS DESCRIPTION . LOCATION This project provides for the development of a master plan for future site improvements on the City Park located on Tassajara Road between the Transit Spine and Gleason Road on the Santa Rita property in Eastern Dublin. COMMENTS c..............>:: '..............................7...... ..........1 ........ i "."~I'" i ..........\.## ! '" "" .... i i \ E' i I ~ 'c" .' \ {,. I. \. I oJ , I f L., ~~E~;;~::~~~:.::~........ -m' '~'t:~^ '71;., , ......... m.c.........J.....~ ! 't~~ :.................i ",fIR""" v .................. ""'*""'"' """'" ~/! . I !""" 0.'''' f~d . '"'""""'" It"",*, iUt"......1IIR1 ntf.....mnlllllll'...ft i ~... 0" 0 " l:I ...........r.... ''''It.oll "'........ _ ~IIO /' . The Eastern Dublin Specific Plan provides for a 56 acre City Park located on the Santa Rita property. With development in Eastern Dublin, it is necessary to begin planning for future site improvements on the City Park site as well as a phasing plan for the improvements. This project will provide funds for a consultant to work with Staff and a community task force to develop the ultimate uses for this park. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1996.97 1997-98 1998-99 1999.2000 2000-01 Totals Prelim Engineering 310 $ 80,000 $ 80,000 Design & Inspection Professional Services $ 80,000 Right-of-Way Improvements Machinery/Equipment Miscellaneous TOTAL $80,000 TOTALS ....<....,., .000 $ :80,000 -46- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION City Park, Phase I ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the design and construction of 17 acres of the City Park located on Tassajara Road between the Transit Spine and Gleason Road on the Santa Rita property in Eastern Dublin. (................~::::: \~..../................7...... ..........~ ..... f" ......... I' -', .... ......... \. .. . .... '. ... 1 \ #., ...~ \ ! \ .....i ,...) i:\ ,...'0<"0" .... i .. .\......U..............\ r.................................... #,1), i I '....:....11.. ."'.'''' I;~ : I"'mm................. ''''i: 1 f....~(".. I'f'.,mnn..mn IInIn.n'." , \,,,, 1....;-.,.. ...... I, mtt..... nil ''''''""', I ................1 . ,tIft.iiI'li.~ I J""'"'" ,ntf...nnnnn .............. """" f i I " I ! ~ ~~ : i ~1Rn n:rtftI'n,,,IIIIIn'I,JJJnn' "",,""",I I,n,'" t".nll""'"I~I'1 11"111'llIlInlll'."n"""''''''9'''' :~.~~. 0 ~ (] I;' i . - COMMENTS The Eastern Dublin Specific Plan provides for a 56 acre City Park located on the Santa Rita property. The City Park Master Plan, which is being prepared as a separate project, will identify phasing for development of this park. The first phase of 17 acres will be constructed upon completion of the Master Plan. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 11M-97 1197-98 1118-99 1919-2000 2000-01 Totals Prelim Engineering Design & Inspection $ 227,800 Professional Services Right-of-Way Improvements 2,004,640 Machinery/Equipment Miscellaneous 45,560 310 $ 159,460 $ 2,118,540 $ 2,278,000 TOTAL $ 2.27';000, TOTALS... .... . '. . "2.278.000 t;1jl,. -47- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Dublin Ranch Phase I Nel hborhood Park ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for the design and construction of a five-acre neighborhood park in the Dublin Ranch Phase I development. OuIMiMwtI ~.., 0 [J a"lollllo. ~ COMMENTS Dublin Ranch, Phase I provides for a five-acre neighborhood park. The park will be designed in accordance with the Neighborhood Park Standards contained in the Parks and Recreation Master Plan. These standards identify the following amenities: tot lot and apparatus play area; picnic tables and secluded space for informal family picnics; open space meadow for informal sports, games and passive activities; and sports facilities such as practice ball fields, tennis courts, volleyball courts and basketball courts. The City is presently developing guidelines which may allow this park to be constructed by the developer of Dublin Ranch in the future. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1818.97 1897.98 1898.88 1819-2000 2000-01 Totals Prelim Engineering Design & Inspection $ 79,200 Professional Services Right-of-Way Improvements 697,000 Machinery/Equipment Miscellaneous 15,800 310 $ 792,000 $ 792,000 . ..$ ,7UoOoo _000' ~ i' -48- I I I I I I I I I I I I I I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Ani ned ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for improvements to the grounds at the Dublin Heritage Center, located at 6600 Donlon Way. COMMENTS The Dublin Heritage Center Master Plan was completed in Fiscal Year 1996-97 and identified improvements to the grounds including walkways, landscaping, plaza and gathering areas, picnic areas, fencing and signage. The improvements have been grouped into projects as follows: 1) Parking lot landscaping - $30,000; 2) Church landscaping and wedding court - $15,000; 3) School landscaping and picnic area - $20,000; 4) Cemetery landscaping and walkways - $8,000; and 5) Restroom building - $37,000. The grounds landscaping and improvements is scheduled for Fiscal Year 1997-98 and the restroom building is scheduled for Fiscal Year 1999-2000. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996.97 1897.18 1898.99 1999.2000 2000-01 Totals Prelim EngineerinQ 215 $ 73,000 Design & Inspection $ 10,400 Insufficient fundinQ within the CIP time frame Professional Services Right-of-Way Improvements 99,600 MachinerylEquipment Miscellaneous $ 73,000 37,000 >:=\J, .. $,110_ TOTALS of 110,000 . "0<" '1",;:" '"" -49- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Ma . Memorial Park Pedestrian Brld e ACTIVITY PARKS DESCRIPTION - LOCATION This project will connect the bicycle and pedestrian path in Mape Memorial Park to the bicycle and pedestrian path south of the Park with a bridge spanning Martin Canyon Creek. COMMENTS This bridge was designed into the project to refurbish Mape Memorial Park; however, as the total project cost was over budget, the bridge was deleted from the project. The City has since obtained a Transportation Development Act grant to build the bridge. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund PrlorYears 1996-97 1997.98 1998-99 1999.2000 2000~1 Totals Prelim Engineering Design & Inspection $ 4,900 Professional Services Right-of-Way Improvements 41.000 Machinery/Equipment Miscellaneous 1,100 211 TOTAL. \ifl'OOO:: $ 47,000 $ 47,000 "~I.' ..:,,$ 41,000 -50- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Shannon Park Pedestrian Pathwa ACTIVITY PARKS DESCRIPTION - LOCATION This project would construct a six foot asphalt pathway and railroad tie stairway from the existing San Ramon Road bike/pedestrian path to the rear parking lot of the Shannon Community Center. COMMENTS Pedestrians have been using this alignment as an access to Shannon Park on an informal basis. The slope at the rear of the Shannon Community Center is very steep and is difficult for pedestrians to climb. This would formalize and improve the safety of this existing access. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Y..... 1996.97 1997-98 1998.99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 1,050 Professional Services Right-of-Way Improvements 6,500 MachinerylEquipment Miscellaneous 250 001 $ 7,800 $ 7,800 TOTAL>,'; 7,800 -51- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Shannon Park Subdrain ACTIVITY PARKS DESCRIPTION - LOCATION This project would place a subdrain in the Shannon Park parking lot to pick up underground spring water and drain it to the creek exiting the Park. COMMENTS A subdrain now exists in the Shannon Park parking lot which ties into the San Ramon Road storm drain. It has been found that the hard water from the spring has caused minerals to adhere to and build up in the concrete storm drain pipe, effectively reducing the pipe diameter. This project would divert this mineralized water to an open earthen channel. If this project is not undertaken, the parking lot at Shannon Park in the vicinity of the subdrain will eventually fail. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1998-17 1997.98 1998-99 1999.2000 2000-01 Totals Prelim Engineering $ 1,500 Design & Inspection 2,100 Professional Services Right-of-Way Improvements 6,900 Machinery/Equipment Miscellaneous 400 001 TAL · $ 10,900 $ 10,900 -(.., I~_:'/", S10tfQO -52- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Valle HI h School Communi G mnaslum ACTIVITY PARKS DESCRIPTION ~ LOCATION This project provides for the construction of a 10,000 square toot gymnasium at Valley High School located at 6901 York Drive. COMMENTS The City of Dublin and the Dublin Unified School District have entered into an agreement regarding the joint use of a gymnasium at Valley High School. The District will be responsible tor funding the initial construction of the gymnasium and the City will pay back the District over the course of two to three years beginning in Fiscal Year 1998-99. The actual cost of the City's participation in this project as proposed is unknown until the District receives the bids for the project during July 1997. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Years 1996-97 1997.98 1998.99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements Machinery/Equipment Miscellaneous Cost undetermined TOTAL.",'. ": =".: I:~. ::.. -53- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned PROJECT DESCRIPTION Frederiksen School Athletic Field and Pia Area Renovation ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the renovation of the athletic fields at Frederiksen School, located at 7243 Tamarack Drive. COMMENTS This project was identified by the Dublin School Facilities Improvement Task Force and includes filling and reseeding of low spots in the athletic fields as well as irrigation system repair. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Vears 1898-87 1887-'8 1998.99 1888-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional SelVices Right-ot-Way Improvements Machinery/Equipment Miscellaneous $ 4,000 11,285 Insufficient funding within the CIP time frame $ 87,835 70.550 2,000 TOTAL IT.PI,TQTAts,;, $87,836 -54- I- I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9668 PROJECT DESCRIPTION Annual Street Overla P ram ACTIVITY STREETS DESCRIPTION - LOCATION This project provides for the placement of a 1-1/2 inch asphalt overlay on streets that are presently in a deteriorated condition at various locations. COMMENTS As streets begin showing major structural failures, it is important to reintorce these streets with repairs and overlay to reduce the need for more costly reconstruction at a later date. The City's Pavement Management System Program has given the City funding guidelines, as well as priorities, for maintaining the City streets. The Street Maintenance Account in the Operating Budget includes funding tor preparatory patching for this project, patching for the slurry seal project, and for the restriping of those streets to be overlaid. Design and inspection is budgeted in this project for both this overlay project and the repair and striping work from the Operating Budget. The 1996-97 Overlay Program was much smaller than normal due to the transfer of most of the funds to the Dublin Boulevard Widening project to overlay that segment of Dublin Boulevard. The 1997-98 Overlay Program is also smaller than normal due to funds from this project being used to overlay Dougherty Road as part of that widening project. This program will protect the substantial investment the City has in its street system. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PrlorVears 1896-97 1997-98 1'98-9' 199'.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 42,456 Professional SelVices Right-of-Way Improvements 808,822 Machinery/Equipment Miscellaneous 2,400 001 217 220 Annual $ 48,841 $ 57,700 $ 42,900 $ 36,300 $ 29,400 $ 215,141 3,238 85,200 165,700 172,300 179,200 605,638 9,199 23,700 32,899 ~,<,> .878 -55- I I I I I I I I I I I, I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9696 Dublin Boulevard Improvements STREETS Donlon Wav to Village Parkway DESCRIPTION - LOCATION This project implemented those improvements identified in the Dublin Boulevard Traffic Study, which was approved by the City Council in 1983-84 and as amended in 1987-88 in the plan line update. These improvements include the development of Dublin Boulevard to a full six lane street between Donlon Way and Village Parkway. It provided additional right-turn lanes where needed and extra turning lanes at San Ramon Road. During the course of the project, an underground utility project, from Village Parkway to Clark Avenue, was incorporated. In addition, a large portion of the 1996 97 Overlay Program funds were used to overlay Dublin Boulevard between the limits of the project. COMMENTS To date, the City has received or expects to receive $1,428,745 in developer contributions, including BART. The largest share of the project costs ($2,082.000) has been funded by a FederallSTEA Grant. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Vears 1898-97 1987.88 1'98.98 1889-2000 2000-01 Totals Prelim Engineering $ 20,648 001 $ 35,371 $ 311,164 $ 346,535 Design & Inspection 467,653 210 2,075,716 6,284 2,082,000 Professional SelVices 266,694 217 136,000 136,000 Right-of-Way 702,692 220 35,253 35,253 Improvements 2,525,695 300 999,163 429,582 1.428,745 Machinery/Equipment 712 2,502 2,502 Miscellaneous 47,653 TOTAL ..itotOSiiOlI' . TOT"'>I'S~'1'12.1'2" 1:l8.2d ' . .>, >:'" ",,$ 4;031;011 " )<'~ < ,.' -56- I I I I I I I I I I I I I I I I I I I 1996.2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9606 PROJECT DESCRIPTION Street LI ht Ac ulsltlon Pro ram ACTIVITY STREETS DESCRIPTION . LOCATION This project would purchase approximately 1,350 existing street lights throughout Dublin from Pacific Gas and Electric Company. COMMENTS The City has determined through a feasibility study that it would be cost effective over the long term to purchase the PG&E owned street lights and maintain them through an outside contract. This will give Dublin better control over the level of maintenance for the lights and will result in lower street lighting assessments to property owners throughout the City. The County of Alameda and all the cities within Alameda County have pursued this purchase program. The purchase is being made from Street Light Assessment District reserves and from General Fund reserves. The City acquired the lights through eminent domain in 1996; however, the actual purchase price is yet to be determined. The final cost will be made through settlement or trial. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Priory..... 1996.97 1997-98 1998.99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection $ 153 Professional Services 30,991 Land/Right-of-Way Acquisition 418,500 Machinery/Equipment Miscellaneous 001 $ 34.689 $ 254.861 710 $ 12,019 103,075 45.000 $ 289,550 160,094 TOTAL ':M9,644 -57- I I' I I I I I I I I I I t I I I I I I 1996~2001 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NUMBER Dougherty Road Improvements ACTIVITY 9685 North of Amador Valley Boulevard STREETS to North of Houston Place DESCRIPTION - LOCATION This project consists of two phases. The first phase will widen the travel lanes by removing existing dirt medians on Dougherty Road and replacing them with new pavement. This would complete the ultimate pavement improvements for soutl:1bound traffic. The second phase of this project will widen Dougherty Road from four to six lanes and will include landscaped medians. COMMENTS The first phase of this project will allow the two southbound lanes to move away from the curb, thus improving intersection sight distance and allow an area along the curb for bus stops, emergency parking and on-street bicyclists. The City has received an Intermodal Surface Transportation Efficiency Act (ISTEA) Grant to fund the bulk of this project. The City will also overlay this segment of Dougherty Road, including a part of Dougherty Road north of Amador Valley Boulevard. A total of $12,730 has been collected for Dougherty Road north of Amador Valley Boulevard from Developer Traffic impact Fees. The second phase of this project is anticipated to be funded by Traffic Impact Fees including contributions from the Dougherty Valley (Contra Costa County) projects. FINANCINGlYEARS SCHEDULE ESTlMATED COSTS Fund Prior Vears 1116-17 1"7-98 1198." 1189-2000 2000-01 Total. Prelim Engineering $ 175,515 Phase I Design & Inspection 591,236 206 $ 1,083 $ 24,869 $ 93,170 $ 119,122 Professional SelVices 210 294,000 294,000 Right-of-Way 533,088 217 $109,100 109,100 Improvements 2,828,600 220 $36,300 36,300 MachinerylEquipment 300 $12,730 12,730 Miscellaneous 3,825 Phase II Insufficient funding within CIP time frame 3,561,012 TOTALh"h' , """"'" 'TOTALS ' "1> ,: ,...:-,.:.....r:,. '/' ;, :~;;:,;:\,>, $ 4.112;284 ~58- I I I I I I I I I I I I I, I I I I I II 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9645 Traffic Signal Coordination Project STREETS DESCRIPTION - LOCATION This project studied and developed revised coordination for 19 traffic signals on Amador Valley Blvd., Village Parkway, San Ramon Road and Dublin Blvd. This project included upgraded traffic signal controller hardware, master computer, computer software and handicapped pedestrian push buttons. COMMENTS In 1986, the City's traffic consultant undertook a signal timing study on Dublin Blvd. Since then, traffic volumes and patterns have changed, giving cause for a new study to be undertaken. This project was funded by a $44,000 ISTEA grant, a Traffic Systems Management grant ($5,701) and an AB434 grant ($22,011 ). FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Vears 1198-97 1187.98 1188-88 1'''.2000 2000-01 Totals Prelim EngineerinQ $ 22,011 001 $ 22,011 $ 22,011 Design & Inspection 210 49,701 49,701 Professional SelVices Right-of.Way Improvements Machinery/Equipment 49,400 Miscellaneous 301 ~ ",,' '" , . 71.112, TOTALS,:> . " , " '. 11.111 ',< ','. $ 71.712 .. ..... -59- I I I I I I , I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9640 Eastern Dublin Arterial Street STREETS Improvements DESCRIPTION - LOCATION r................~~::: \........;/..............7...... ..........i t... ! Ut 1 .... f I4qfm ; .... . i .... \ . .....i ...... L~ ! 1 i : I . ) ~ \..1 r "r> :.....~.,.':':.~.~..~:.............! i2.\......u.............!) i ~~::~'"' .It' : ~ ........".......... I'" ~ ...""*~/.. nn ,..rnnf'f1t4 ! ',iIfttoIc.-.. 1..................: ;__ _. v i j ~ . l ~ pnftn ....rnntnnl'ftln ........In.''nll..'.I.,I.'''pnnnl~' CI l:,!.- i ,.. This project will establish official Plan Lines for major arterials in Eastern Dublin, as well as construct improvements to those streets for the portion being funded by the Eastern Dublin Traffic Impact Fee. This project also includes engineering studies to update the traffic impact fees as development occurs. COMMENTS The construction of this major roadway infrastructure will allow proposed developments in the Eastern Dublin Planning Area to develop as per the Eastern Dublin Specific Plan. The cost for these studies and improvements will be paid for through Traffic Impact Fees collected in Eastern Dublin. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Y..... 1116-87 1"7-98 1"8-89 1"'-2000 2000-01 Total. Prelim Engineering Design & Inspection professional Services Right-of-Way Improvements MachlnerylEqulpment Miscellaneous $ 251,000 1,251,016 262,369 1,554,000 5,840,000 300 $ 53,262 $ 12,559 $ 1,789,000 $ 2,525,000 $ 1,880,000 $ 2,926,000 $ 9,165,821 7,436 TOTAL" .... \ Iii:,) 2;.,000 . ."';1....21.. -60- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9661 PROJECT DESCRIPTION San Ramon Road Drainage Repair at Shannon Park ACTIVITY STREETS DESCRIPTION - LOCATION This project provides for the repair of the drainage channel on the northeast corner of Shannon Park along San Ramon Road. COMMENTS Heavy rains during the winter of 1994-95 overflowed the bank of this drainage channel, flooded southbound San Ramon Road, and caused damage to the roadside landscaping. This project implemented measures to reduce the risk of flood damage in the future. Work included the placement of rock riprap facing along a raised earthen berm to help contain storm water runoff. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PrlorVears 1996.97 1997-98 1998-99 1999-2000 2000.01 Totals Prelim Engineering Design & Inspection $ 8,171 Protessional SelVices Right-of-Way Improvements 21,734 Machinery/Equipment Miscellaneous 132 206 $ 30,037 $ 30,037 !OA .'30.037 -61- I I I I I I I I I I I, I I I I I I, I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NUMBER San Ramon Road Drainage ACTIVITY 9662 Improvements at Caroline Court STREETS DESCRIPTION - LOCATION This project provides for a retaining wall and reshaping of the City's service road on the east side of San Ramon Road above Caroline Court to prevent flooding of the service road. Holanda Lane and Caroline Court. COMMENTS Damage to the service road located on the east side of San Ramon Road has been caused by the failure of the dirt berm to adequately contain storm water runoff. This project reshaped the earthen vee ditches on either side of the existing maintenance road. In addition, the road itself was graded to slope away from the private properties to the east and a short retaining wall was constructed along the back of the private properties for added safety against flooding. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Vears 1896-87 1897.'8 1898-89 199'.2000 2000-01 Totals Prelim Engineering 206 $ 40,557 $ 40,557 Design & Inspection $ 8,725 Professional SelVices Right-ot-Way Improvements 31,797 Machinery/Equipment Miscellaneous 35 TOTAL "'" 'm " ,,5k'."I,..o;A7 lTelL ." '.:La~II7;~~;h;;t;~sijffiil~;\~8;;H;~I~::'I",:'" .,>( :"),o, '. :40;117 -62- I I I I I I I- I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not et assigned PROJECT DESCRIPTION 1-68011-680 Direct Connector Project ACTIVITY STREETS DESCRIPTION - LOCATION This project represents the City of Dublin's share of the local match requirement for the 1-580/1-680 Direct Connector Project, which provides for the replacement of the existing southbound 1-680 to eastbound 1-580 loop with a f1yover ramp connecting 1-680 southbound directly to 1-580 eastbound. This project also includes hookramp access from 1-680 into Downtown Dublin. The funding shown below only represents the money that will be collected by Dublin and passed onto ACTA. It does not include credits for which no money will change hands. COMMENTS This project was approved by the voters of Alameda County with the passage of the Measure B sales tax in 1986. The total project cost is estimated at $120 million. Measure B required a local match ot $10 million, of which $5.6 million remains to be paid. The Alameda County Transportation Authority (ACTA) has calculated Dublin's fair share ot the remaining local match to be $2,155,260. The City's local match is to be financed from the following sources: 1) $111,700 previously paid for a portion of the widening of the westbound to northbound ramp 2) BART mitigation funds in the amount of $271,637 3) Previously acquired property assumed to be valued at $503,153 4) Credit in the amount ot $150,000 for the City to improve the Amador Plaza Road/Dublin Blvd. intersection at a future date 5) Traffic Impact Fees in the amount of $1,118,770 Traffic Impact Fees in the amount of $74,215 have been collected to date from the downtown area, and Traffic Impact Fees in the amount of $227,373 have either been collected or Obligated in the Eastem Dublin area for the Opus industrial site, Kaufman & Broad residential development and Autonation. It is anticipated that there will be insufficient funds collected from Eastem Dublin Traffic Impact Fees to meet the project matching requirement deadline; therefore, it will be necessary for the City to advance funds from the City's General Fund in Fiscal Year 1999-2000 and 2000-2001. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1998-97 1997-'8 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right-of-Way Improvements $ 1,502,107 MachinerylEquipment Miscellaneous 001 $ 55,834 206 55,866 300 TOTAL $ 271,637 $ 55,834 55,866 $ 559,385 $ 559,385 1,390,407 1.so2.107 ~63~ I I I I I I I I I I I I I I . w I"' ... ..- 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9601 Dublin Boulevard Improvements STREETS SlIvergate Drive to Hansen Drive DESCRIPTION - LOCATION This project would widen Dublin Boulevard between Silvergate Drive and Hansen Drive from two to four lanes and has realigned the Dublin Boulevard/Silvergate intersection into a standard 'T' intersection. This widening would take place on the south side of the street where there is sufficient right-of-way to make these improvements. In addition, the project would repair the existing roadway section, as the roadway fill is undergoing creeping soil instability. Traffic signals will be installed at the intersections of Dublin Boulevard and Silvergate Drive and at Dublin Boulevard and Hansen Drive. COMMENTS The addition of new residential projects proposed to be constructed to the west of this intersection along Dublin Boulevard will require the widening of Dublin Boulevard from two to four lanes between Silvergate Drive and Hansen Drive. Those new projects will pay their share of the project. In 1992, the first phase of the work realigned the Dublin Boulevard/Silvergate Drive intersection through restriping and pavement modifications. It is anticipated that the addition of major new traffic will magnify the pavement distress, requiring repairs simultaneous with the widening. The developers of the Hansen, Donlon and Schaefer projects are obligated to share the costs of this project based on their proportionate generation of traffic. The sum of $456,992 has been collected to date from developer fees, $111,129 of which was used to construct Phase I of this project. In 1997-98, a traffic signal at the intersection of Dublin Boulevard and Hansen Drive will be installed and part of Dublin Boulevard west of Hansen Drive will be widened. The private driveway south of the intersection will be modified to align with Hansen Drive due to the signalization. EsnMA TED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 1886-87 1887-88 1888-88 1888-2000 2000-01 Prelim Engineering $ 20,000 Phase I Design & Inspection 162,541 300 $ 111,129 Professional Services Right-of-Way Phase II Improvements 1,633,475 300 MachinerylEquipment Miscellaneous 2,413 206 $ 345,800 $ 1,264,054 Totals S 111,129 1,609,854 97,446 $ "'t" 8 28 97,446 TOt '1 . . ..-...- . ....... . ""- -64- - . ,- ~-- m~_ ---v.r---- ,---- -"-1 1 I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9692 PROJECT DESCRIPTION Dublin Boulevard Improvements Villa e Parkwa to Sierra Court ACTIVITY STREETS DESCRIPTION - LOCATION This project would widen and overlay Dublin Boulevard, including the bridge over the Alamo Canal from Village Parkway to Sierra Court. This project would increase the capacity of this segment of Dublin Boulevard from 4 lanes to 6 lanes plus bike lanes. It will also improve the Alamo Canal lining under the existing Dublin Boulevard bridge to protect the bridge piers. COMMENTS This is the second phase of Dublin Boulevard widening. The first phase widened Dublin Boulevard from Donlon Way to east of Village Parkway. Recent traffic model studies have indicated the need for Dublin Boulevard to become six lanes wide to avoid heavy congestion at intersections in the future. The City will receive $2.492,696 in Measure "B" pass-through funds for this project when ACTA receives State administered Federal Flexible Congestion Relief Funds. If this funding is not reauthorized by Congress and the California Transportation Commission for 1998-99, the City will have to delay this project. The City has collected $7,304 in Developer Fees to date. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Vears 1898.17 1997-98 1998-99 1888-2000 2000-01 Totals Prelim Engineering Design & Inspection Professional SelVices Right-of-Way Improvements Machinery/Equipment Miscellaneous $ 141,275 316,500 30,000 460,000 1,551,000 206 $ 217 300 2,000 TOTAL ;; " , "1' ,77aTOTAL'.,.. 'ft, 775 $ 775 2,492,696 7,304 $ 2,492,696 7,304 $ 2;100,775 -65- I I .1 I I I I I I I I I I- I I I ( r I- 1996.2001 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NUMBER Traffic Signals. Village Parkway at ACTIVITY 9656 Brighton Drive, Tamarack Drive STREETS and Davona Drive DESCRIPTION. LOCATION This project would provide for the installation of three traffic signals at the intersections of Village Parkway with Brighton Drive, Tamarack Drive and Davona Drive. These signals would be interconnected to the other existing traffic signals on Village Parkway south of this project. Also, Village Parkway would be widened in front of Dublin High School to provide student drop off and bus turnout. COMMENTS A traffic study conducted during Fiscal Year 1983-84 found that these signals were marginally warranted. A total of $73,687 in developer traffic impact fees has been collected to date. The City has applied for outside funding for this project, but has not been successful as yet in obtaining these funds. The street widening in front of the High School will provide bus and vehicle drop-off and pick-up for students. Each of the traffic signal projects and road widening can be done together or separately. Annual maintenance and electricity costs are estimated at $15,000. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1996-97 1997.98 1998.99 1999.2000 2000-01 Totals Prelim Engineering 001 $ 9,083 $ 9,083 Design & Inspection $ 52,083 206 $ 306,313 306,313 Professional Services 300 73,687 73,687 Right-of-Way Improvements 335,000 Machinery/Equipment Miscellaneous 2,000 TOTAL",;;"". . .. ....$ _- TOTAL \$ .'.:. :',013 . ....... .... <".:. · ....!..lIilIII..lh-...I,>:. I. . ..<:'.:.. .$ .389.083 -66- -- -- .-. --- --'- .-. --- --- .--..---- --I I I I I I I I I I I I 'I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9687 ACTIVITY STREETS PROJECT DESCRIPTION New Street Parallel and South of Dublin Boulevard DESCRIPTION - LOCATION This project will construct a 2-lane roadway between Golden Gate Drive and Regional Street south of and parallel to Dublin Boulevard COMMENTS The need for a connector road for three long commercial cul-de-sacs was identified in the City's Downtown Study. This need will become more apparent as this portion of the Central Business District develops further and the proposed BART parking lot is constructed along Golden Gate Drive. The section of this parallel road between Amador Plaza Road and Golden Gate Drive will be constructed by the Alameda County Transportation Authority as part of the 1-580/1-680 Measure B Interchange Improvements. It is expected that the City's project, between Golden Gate Drive and Regional Street, would be funded through private contributions in the form of a downtown traffic development impact fee and as developer mitigation improvements. To date, the City has incurred costs for the roadway alignment study and for the acquisition of a parcel of land just west of Amador Plaza Road. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1998-97 1997-98 1898-99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection Professional Services Right.of-Way Improvements Machinery/Equipment Miscellaneous $ 42,124 122,000 47,663 1,281,932 752,000 300 $ 6,719 $ 67 Insufficient funding within CIP time frame $ 6,786 2,240,000 1,067 TOTAL., ' 'S ~248;786 18e'TOTM. ' ';< ")";.. :. ..;: -67- I I I I I I I I I I I I I I I I I I I 1996.2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned DESCRIPTION. LOCATION PROJECT DESCRIPTION Bike Lane ProJect. Amador Valley Blvd. Sta ecoach Road to Dou he Road ACTIVITY STREETS This project would widen part of Amador Valley Boulevard between Stagecoach Road and Dougherty Road to allow for bike lanes. COMMENTS This Bike Lane Project will connect the Iron Horse Trail, the proposed Alamo Creek Bike Path, and the Dougherty Road Bike Path. A portion of Amador Valley Boulevard is now striped for four lanes, which does not allow for on-street bike lanes. This project would move the sidewalk back into the landscaped easement area and widen the pavement in the existing street right-of-way. ESTIMATED COSTS Prelim Engineering $ 5,000 Design & Inspection 33,200 Professional Services Right-of.Way Improvements 82,800 Machinery/Equipment Miscellaneous 500 FINANCINGIYEARS SCHEDULE Fund Prior Years 1896.97 1997-98 1998.99 1999.2000 2000-01 206 TOTAL':ii,'Il':Ii,<' ,I'" ,', ,,:'.111', .' TOTAUl/Yi,,:;,i<f:i;;, ,,' Totals $121,500 $ 121,500 ;::121'-;:,/';>:+: $ 121.100 -68- I I I I I I I I I I I I I I I I I I I 1996.2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9427 Unde ACTIVITY STREETS DESCRIPTION . LOCATION This project provided for installation of two street lights on Dublin Boulevard between Village Parkway and Clark Avenue. The cost included 25% of the joint utility trench that was installed between the transformer and the lights. COMMENTS Undergrounding of utilities between the 1--680 overcrossing and a point 600 feet west of Clark Avenue resulted in the removal of two street lights on wood utility poles. This project replaced those lights with two new lights on steel poles. No increase in annual energy or maintenance costs is anticipated. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 1996.97 1997-98 1998.99 1999.2000 2000-01 Totals Design & Inspection Improvements $ 14,852 Miscellaneous 710 ,0 AoL $ 14,852 $ 14,852 i$, 1itU2 ,.:t 14,852 -69- I I I I I I I I I I I I ,I I I I I I I 1996M2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9663 PROJECT DESCRIPTION Serra Court Subdraln ACTIVITY STREETS DESCRIPTION - LOCATION This project installed a subdrain along and under Serra Court and Peppertree Road and tied the subdrain into a City storm drain catch basin at the corner of Peppertree Road and Solana Drive. COMMENTS An underground spring was following the subgrade of Serra Court to its intersection with Peppertree Road causing the pavement to break up. The subdrain intercepted and removed the water from the street subgrade to stabilize the pavement structural section. In Fiscal Year 1997M98, it is proposed to repair the surface of Serra Court. Funds for this repair are included in the Street Maintenance budget. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1998.99 1999.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 1,978 Professional Services landlRight-of-Way Improvements 12,734 Machinery/Equipment Miscellaneous 260 206 $ 14,972 $ 14,972 ",,"I:;:,::iy' '2/- TOr__ --, . ...... .....:.:..<...... '.' /.,~ . ; ~,~ . S 14;st72.' nj~:.' -70- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER .9604 PROJECT DESCRIPTION Downtown Street LI ht Additions ACTIVITY STREETS DESCRIPTION ~ LOCATION This project will complete the installation of street lights in the downtown area including Sierra Court (4), Sierra Lane (6), and Amador Valley Boulevard east of Village Parkway (4). COMMENTS A number of street lights have been installed in the downtown area in past years, together with other street and traffic signal projects. This project will complete the lighting of the remaining streets in the downtown commercial areas. These lights will be City-owned and the annual energy and maintenance costs are estimated to be $1,000. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996-97 1997-98 1998.99 1899.2000 2000-01 Totals Prelim Engineering Design & Inspection $ 9,650 Professional Services Land/Right-of-Way Improvements 67,900 Machinery/Equipment Miscellaneous 2,450 206 T TAL ,:.1 ':000' TOt, $ 80,000 $ 80,000 80,000 -71- I I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9605 PROJECT DESCRIPTION Alamo Canal Bike Path Project 1--580 to North CI Limit ACTIVITY STREETS DESCRIPTION - LOCATION This project would construct a bicycle path along the Alamo Canal and San Ramon Creek from 1-580 north to the northerly City limit of Dublin. The bike path will be constructed on Zone 7 Flood Control right-of-way. COMMENTS Zone 7 Flood Control is allowing this bike path to be placed on their maintenance road, and Zone 7 is responsible for the rock base for the proposed asphalt path, and will be contributing $66,000 for that purpose. In addition, the City will receive a contribution of $50,000 from East Bay Regional Parks District, a $67,840 TDA grant, and a $57,300 ISTEA grant to fund this project. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1996.97 1997.98 1998-99 1999-2000 2000-01 Totals Prelim Engineering Design & Inspection Improvements Machinery/Equipment Miscellaneous $ 10,000 45,340 185,000 800 210 211 300 TOTAL $ 57,300 67,840 116.000 $ 57,300 67,840 116,000 :;:j 2rl1.140 *72- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet As.1 ned PROJECT DESCRIPTION Bike Path - Alamo Creek North of Amador Valle Boulevard ACTIVITY STREETS DESCRIPTION - LOCATION This project would construct a bicycle path along the Alamo Creek channel from Amador Valley Boulevard north to the City Limits. This Bike Path will be constructed by placing an asphalt surface on top of the existing Zone 7 maintenance road gravel base. COMMENTS The Dublin Meadows Development has constructed a bicycle path along Alamo Creek between Amador Valley Boulevard and the Southern Pacific Railroad Right-Of.Way. This Bike Path would tie into the Dublin Meadows Bike Path which, in turn, ties to the Iron Horse Trail. It would also provide neighborhood bike and walking access to Alamo Creek Park. ESTIMATED COSTS FINANCINGJYEARS SCHEDULE Fund Prior Years 1991-97 1n7-98 1n8.n 1999-2000 2000-01 Totals $ 75,000 Design & Inspection $ 14,500 Insufficient funding within CIP time frame Improvements 60,000 Machinery/Equipment Miscellaneous 500 TOTAL $ ,'71;000' TOTALS > ;"" ./$ 71000 -73- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 9655 PROJECT DESCRIPTION Dougherty Road Improvements Houston Place to 1-580 ACTIVITY STREETS DESCRIPTION ~ LOCATION This project provides for the acquisition of right-of- way and the widening of Dougherty Road, primarily on the east side of the street, between 1- 580 and Houston Place. This widening would provide six travel lanes, additional turn lanes, decorative medians and street lights. COMMENTS There are older sections of the street on the east side between 1.580 and Dublin Boulevard that have not been widened, and some right-of-way in this area will need to be acquired. The right-of-way on the west side of Dougherty Road, both north and south of Dublin Boulevard, has already been dedicated. The project cost ($1,771,432) is proposed to be funded by developer dedications/contributions, Traffic Impact fees, and/or outside grants. ESTIMATED COSTS FINANCINGJYEARS SCHEDULE Fund Prior Ye.... 19H.97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering $ Design & Inspection Professional SVC8 Right-of-Way Improvements Machinery/Equipment Miscellaneous $ 1,771,432 90,000 Insufficient funding within CIP time frame 199,137 50,160 970,000 445,224 16,911 roT~>:~>t~lti~:(~;~:;~~:f:fi~f~~:<::~i. ;j(;~., -74- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned PROJECT DESCRIPTION Dublin Boulevard Improvements Sierra Court to Dou he Road ACTIVITY STREETS DESCRIPTION - LOCATION This project will widen and overlay Dublin Boulevard from Sierra Court to Dougherty Road. This project will increase the roadway capacity from four to six lanes and add bicycle lanes. COMMENTS This is the third phase of the Dublin Boulevard widening. The widening of this segment of Dublin Boulevard will complete the improvements from San Ramon Road to Dougherty Road. Recent traffic studies have shown that six lanes of traffic will be needed as Dublin expands to the east. It is anticipated that this project will be funded through Traffic Impact Fees and outside grants. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior yea... 1996-97 1997...8 1998-99 1119-2000 2000-01 Totals $ 2,625,220 Prelim Engineering $ 154,000 Insufficient funding in CIP time frame Design & Inspection 448,434 Professional Services Right-of-Way 392,320 Improvements 1,627,080 Machinery/Equipment Miscellaneous 3,386 TOTAL'I,' ,'"., $ ,'~' ~" .".:.'i "..: :"u" 2,821220 -75- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet As.1 ned DESCRIPTION - LOCATION PROJECT DESCRIPTION Dougherty Road Improvements Amador Valle Blvd North to C Limits ACTIVITY STREETS This project consists of constructing the ultimate northbound lanes from Amador Valley Boulevard north to the Dublin City Limits. This would make Dougherty Road a six-lane facility. It would also construct landscaped medians and a traffic signal at the Willow Creek Drive intersection. COMMENTS The present configuration of the road is now four lanes; however, the easterly lane is in the future median. This project would widen Dougherty Road to a six-lane divided roadway with landscaped medians within the limits of the project. This project will not be needed until development in the Dougherty Valley occurs. It is anticipated that developers' Traffic Impact Fees, including Contra Costs County's Dougherty Valley fees, will fund the project. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Yeart 1198.17 1117.18 1918-99 1999-2000 2000-01 Totals $ 3,538,600 Prelim Engineering $ 151,000 Insufficient funding in CIP time frame Design & Inspection 390,000 Professional Services Right-of.Way Improvements 2,994,200 Machinery/Equipment Miscellaneous 3,400 TOTAl. ; TOTAL , ".1. $ 30&38.800 ~76- I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 9686 Scarlett Drive Extension STREETS Dougherty Road to Dublin Boulevard DESCRIPTION - LOCATION This project would provide a 4-lane roadway connection between Dougherty Road and Dublin Boulevard (parallel to the Southern Pacific Railroad Right-of-Way). COMMENTS This road is included in the Dublin General Plan and would serve to relieve the Dougherty Road/Dublin Boulevard intersection of much of the southbound to eastbound turning traffic, especially for the future BART Station-bound traffic. A total of $16,563 in traffic mitigation fees has been collected for this project. The balance of the project costs ($8,297,270) will have to be funded by additional developer dedications/contributions, Traffic Impact Fees and/or outside grants. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 1998-97 1997.98 1998-99 1999.2000 2000-01 Total. Prelim Engineering $ 518,577 Insufficient funding within CIP time frame $ 8,313,833 Design & Inspection 1,200,000 Improvements 5,188,596 Permit 200,000 Right-of.Way 1,206,660 !'fOTAL i :~$ : 011;833 TOTAL , --.:'-';.; .>,...',...'-. :"" "<<:::::::,,,1.,;: '>1 .. 3t833 ','...' , "';':'':::'" 31 . ~77- I I I I I I I I I I I . . . . . . I . I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New 1-580 Offramp Improvements at STREETS San Ramon Road DESCRIPTION - LOCATION This project would provide modifications to the 1-580 westbound offramp, including a traffic signal to control the conflict between the northbound traffic from Pleasanton and the westbound-to-northbound off-ramp traffic. COMMENTS This improvement was identified through the City's Downtown Improvement Study as being a necessary traffic improvement. It is hoped to be funded through an outside transportation grant or as a portion of the longer range Caltrans 1-580/1-680 interchange improvements. As it is on the State right-of-way, coordination and permits would be required from Caltrans. ESTIMATED COSTS FINANCINGlYEARS SCHEDULE Fund Prior Years 1996.97 1897-98 1998-99 1999.2000 2000.01 Totals Prelim Engineering Design & Inspection Improvements Miscellaneous $ 50,000 Insufficient funding within CIP time frame 120,000 669,400 5,600 $ 845,000 TOTAL . ,', ',' 845;000 -78- ~ I I I I I I I I I I I I I I I I I I I 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assl ned PROJECT DESCRIPTION San Ramon Road Slope Stabilization Between Vomac Road & Alcosta Blvd. ACTIVITY STREETS DESCRIPTION - LOCATION This project would stabilize the hillside slope on the west side of San Ramon Road between Vomac Road and Alcosta Boulevard. The slope repair would consist of removing the existing slope, installing an inslope drainage system, and providing engineered backfill. COMMENTS An engineering soil investigation has indicated that the slope on the western side of San Ramon Road between Vomac Road and Alcosta Boulevard could become unstable under saturated or seismic conditions. By implementing this project, the slope would become stable. thus protecting the roadway improvements as well as the private properties above the slope. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 1898-97 1997-98 1998-99 1999-2000 2000-01 Totals Prelim Engineering $ 6,000 Insufficient funding within CIP time frame Design & Inspection 65,000 Professional Services Right-of-Way Improvements 368,600 Machinery/Equipment Miscellaneous 400 TOTAL ' '",/;-:,--,.; ,; " __>_>. _ $ 440,000 iIWC);OOO -79-