Loading...
HomeMy WebLinkAbout6.2 GPA Corrie Center CITY CLERK File # 0420-30 AGENDA STATEMENT CITY COUNCIL MEETING DATE: March 7, 2000 SUBJECT: PUBLIC HEARING PA 99-010 Corrie Center Phase II Office Development, General Plan Amendment and Planned Development Rezone / Development Plan (Report Prepared by: Anne Kinney, Assistant Planner) ATTACHMENTS: 1. City Council Resolution adopting a Negative Declaration 2. City Council Draft Resolution approving a General Plan Amendment 3. City Council Ordinance adopting a Planned Development (PD) Rezone/Development Plan (with Development Plan attached as Exhibits A-1 and A-2) 4. Initial Study/Negative Declaration 5. Planning Commission Staff Report dated February 22, 2000, incorporated herein by reference* * Not attached, but available at the Planning Department, City Hall RECOMMENDATION: o 2. 3. 4. 5. 6. 7. o . 10. Hear Staff Presentation Open Public Hearing Hear Applicant's Presentation Question Staff, Applicant and the Public Close Public Hearing Deliberate Adopt (Attachment 1) City Council Resolution adopting a Negative Declaration Indicate intent to approve the proposed General Plan Amendment at the City Council meeting on June 20th, 2000 Waive reading and introduce Ordinance (Attachment 3) amending the Dublin Zoning Ordinance to approve a Planned Development (PD) Rezone/Development Plan (with Development Plan attached as Exhibits A-1 and A-2), and Schedule the second reading of the Ordinance for June 20, 2000 PROJECT DESCRIPTION: This application includes an amendment to the General Plan, a Planned Development (PD) Rezone / Development Plan for a new 46, 110 square foot office building with a sub-grade parking level and a two- level (one-sub-grade) parking structure at 7950 Dublin Boulevard. A model of the proposed development will be presented at ~the City Council meeting. G:\pa99010\ccsr. doc COPIES TO: The Applicant/Property Owner PA File ITEM NO. ANALYSIS The project site is located within Dublin's downtown area at the southeast intersection of Dublin Boulevard and San Ramon Road. The site area consists of approximately 4.5 acres and is currently developed with a three-story L-shaped office building (70,790 square feet), surface parking and landscaped areas. The proposed four-story office building (46, 110 square feet) and parking structure would be located to the rear of the existing building and would be connected to it via a one-story glass enclosed foyer. The property is surrounded by commercial development including Coco's restaurant to the north, the Monarch Hotel to the south and Earl Anthony's bowl to the east and is bounded by San Ramon Road and the 1-580 off-ramp to the west and southwest. The existing General Plan land use designation for the project site is "Retail/Office". The project site is located within "Zone 2: General Commercial" of the Downtown Dublin Specific Plan and the proposed project complies with this designation. The current zoning for the site is C-1 Retail Commercial Zoning District. General Plan Amendment: Processing: Under State Law, the City can only make four changes to the land use element of the General Plan during any calendar year. However, each change may include several amendments. To date, the City has received four requests to amend the land use element of the General Plan which includes the following projects: Dublin Ranch, Areas F, G and H, Greenbriar Homes, Sybase Development and the Corrie Center project. The City would like to group actions taken to amend the General Plan, in order to preserve the right to make a fourth change to the Plan later in the year. Staff recommends that the City Council consider the proposed General Plan' Amendment for the Corrie Center project and indicate its intent to approve the Amendment. The final resolution to approve this General Plan Amendment will be presented to the City Council in conjUnction with the Sybase project in June, 2000. Analysis: The proposed project meets the intent of the Retail/Office designation of the General Plan which allows business and office uses. However, the project currently conflicts with the maximum floor area ratio requirement of the General Plan which is .5. The project site plans indicate a site coverage of .59. The General Plan Amendment proposes to increase the maximum floor area ratio for the Retail/Office land use to .6. Retail/Office designated property within the city exists within the downtown area and on the west side of San Ramon Road. The Dublin General Plan contains policies which encourage the intensification of the downtown area through the development of mixed use, pedestrian-orientated development. It is city policy to require all developers to finance the cost of a traffic study to evaluate traffic and circulation impacts of a proposed project. This will ensure that any traffic impacts generated by a project will be adequately identified and mitigated to eliminate impacts to city roadways. The City Site Development Review process will ensure that the site has adequate parking, landscaping and access to accommodate the proposed building floor area. The increase in the maximum floor area ratio for the Retail/Office land use category is appropriate, as it is consistent with General Plan policies which encourage the intensification of downtown retail and office uses. This FAR is also appropriate for Retail/Office areas located on the edge of the downtown area as city policy requires projects to be reviewed on an individual basis to ensure that the density of the proposed development will be compatible with the site, traffic patterns and surrounding uses. Planned Development Rezone The Dublin Zoning Ordinance establishes the intent, purpose and requirements of the Planned Development District and requires that a Development Plan be adopted to establish regulations for the use, development, improvement and maintenance of the property within the requested Planned Development Zoning District. A Development Plan has been prepared for the Corrie Center, depicting development concept and addressing the requirements of the Zoning Ordinance. The proposed Development Plan is attached and consists of: Exhibit A-1, the Planned Development Provisions (including permitted and conditional uses and development regulations) and Exhibit A-2, the applicants proposed site, architectural, landscape and other plans. The approval of this Development Plan will complete the two-stage PD zoning process, in accordance with the City's Zoning Ordinance. Permitted uses and Development Regulat ions: The proposed uses and setbacks outlined in the Development Plan are consistent with the City's Zoning Ordinance. The Development Plan as proposed would allow a maximum building height of 53' 3" in this district, which is approximately 8 feet higher that that allowable in the C-1 Retail Commercial Zoning District. This increase in building height is appropriate as the project is located within an urbanized area, there are no adjacent residences that would be affected and quality views of Dublin would not be impacted. The site plan has adequate access and parking to accommodate the existing and proposed building floor area of the project. The traffic study prepared for the project (Omni Means, August, 1999) concludes that the proposed project would not negatively impact the traffic capacity of San Ramon Road and Dublin Boulevard intersection which would continue to operate at a level-of-service C or better. However, the proposed project will generate additional vehicular trips in the area which will impact city roadways. The apPlicant has agreed to contribute traffic mitigation funds which will assist in offsetting costs of public roadway maintenance and planned roadway .improvements in the area. Site Plan: The property is currently developed with an existing L-shaped three-story office building, located in the northern portion of the site. The remainder of the site is developed with parking and landscaped areas. The site is accessed off of Dublin Boulevard and Regional Street via two 2-lane 40-foot wide access driveways. The proposed four-stow office building would be located to the rear of the existing building and would be connected to it via a one-stow glass enclosed foyer. The new building would include a sub-grade parking level. A two-level (one sub-grade level) parking structure would be constructed to the south of the proposed building. The office building and the parking structure would be connected via a vehicular driveway and a second level pedestrian pathway Architecture: The Corrie Center project has been designed to create a cohesive office development and maintain the existing building fabric of the area. The existing building facade will be remodeled (new windows, parapet and paint) to match the new building's architecture. Building elevations will incorporate pop-out columns, parapet wall and glass window system. Both buildings will incorporate neutral colors of creamy beige and light gray contrasted by blue/gray windows set in black aluminum frames. The one-stow glass enclosed foyer which connects the two buildings will serve as the primary building entrance. Landscaping: Site landscape features inclUde a decorative central courtyard area between the two buildings with ornamental tree planting, seating areas, decorative paving and water features. In addition, building entry areas have embellished landscaping and decorative paving. Additional landscaping will be required along the sites northern boundary and within the parking lot areas to provide additional shade and to enhance the aesthetic appearance of the project. Pedestrian Access: The subject project is located within a half mile of the proposed West Dublin BART Station at Golden Gate Drive. A planned roadway 'St. Patrick Way' when completed would connect Golden Gate Drive to Regional Street. The property owner has agreed to construct (prior to 2006) a pedestrian pathway from the proposed project through the adjacent parcel to Regional Street, to provide future office employees a direct pedestrian link to the future West Dublin BART Station. OTHER APPROVALS REQUIRED The Corrie Center Phase II Office project also includes applications for a Conditional Use Permit, and Site Development Review. The Staff Report to the Planning Commission recommended approval of the project subject to conditions. The Planning Commission at a public hearing on February 22, 2000, adopted a Resolution approving the Conditional Use Permit and Site Development Review (subject to City Council approval of the General Plan Amendment and Planned Development). ENVIRONMENTAL REVIEW A Negative Declaration has been prepared for the project pursuant to the California Environmental Quality Act (CEQA), State CEQA Guidelines and the City of Dublin Environmental Guidelines. The 20- day review period began on February 1, 2000 and ended on February 21, 2000. A Negative Declaration has been prepared because the project will not have a significant effect on the environment. To date, no comment letters were received on the project. A copy of the Initial Study/Negative Declaration is attached as Attachment 4 to this staff report. CONCLUSIONS The project, as conditioned including the Planned Development Rezone / Development Plan is consistent with the Dublin General Plan as amended, the Downtown Dublin Specific Plan and Dublin Zoning Ordinance. RECOMMENDATION: Staff recommends the City Council open the Public Hearing, deliberate and adopt the following resolutions: 1. Adopt City Council Resolution (Attachment 1) adopting a Negative Declaration 2. Indicate intent to approve the proposed General Plan Amendment at a later date o Waive reading and introduce the Ordinance (Attachment 3) amending the Dublin Zoning Ordnance to approve a Planned Development (PD) Rezone/Development Plan Stage 1 and 2 with Development Plan attached as Exhibits A-1 and A-2 4. Schedule the second reading of the Ordinance for the June 20, 2000 City Council meeting RESOLUTION NO. 2000- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ADOPTING A NEGATIVE DECLARATION FOR PA 99-010, CORRIE CENTER PHASE II OFFICE DEVELOPMENT WHEREAS, Sid Corrie of the Corrie Development Corporation (Applicant/Property Owner) has requested approval of a General Plan Amendment to allow an increase in the maximum Floor Area Ratio from .5 to .6 for the 'Retail/Office' land use category, a Planned Development Rezone Stage 1 & 2 / Development Plan and Site Development Review to allow the construction of a 46,110 square foot, four- story, 53 foot high office building, with sub-grade parking and a two level (one sub-grade) parking structure and retailed improvements and Conditional Use Permit to allow a portion of the required parking for the office project to be located on the adjacent property; on 4.5 acres of land currently developed with a three- story office building, surface parking and landscaped areas at the southeast quadrant of Dublin Boulevard and San Ramon Road, 7950 Dublin Boulevard (APN 941-1500-037-00) within the Downtown Dublin Specific Plan; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) and implementing Guidelines, an Initial Study has been prepared to assess the proposed project. Based on the Initial Study, a Negative Declaration has been prepared and is on file with the Dublin Planning Department. The project as proposed will not have a significant impact on the environment; and WHEREAS, a completed application for each of the requested actions is available and on file in the Dublin Planning Department; and WHEREAS, a 20 day public review period was held for the Negative Declaration from February 1 through February 21, 2000; and WHEREAS, no letters commenting on the Negative Declaration was received during the comment period; and WHEREAS, the Planning Commission did hold a properly noticed public hearing on said application on February 22, 2000 and did adopt a Resolution recommending that the City Council adopt a Negative Declaration for PA 99-010; and WHEREAS, a properly noticed public hearing was held by the City Council on March 7, 2000; and WHEREAS, a Staff Report was submitted recommending that the City Council adopt a Negative Declaration for PA 99-010; and ATTACHMENT 1 WHEREAS, the City Council did hear and use their independent judgment and considered all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin City Council does hereby make the following findings and determinations regarding said Negative Declaration: 1. The Corrie Center Phase II Office project application will not have a significant effect on the environment based on a review of the Initial Study and public testimony. 2. The Negative Declaration has been prepared in accordance with State and local environmental laws and guideline regulations. 3. The Negative Declaration is complete and adequate. BE IT FURTHER RESOLVED THAT THE Dublin City Council does hereby adopt a Negative Declaration attached as Attachment 4 to the Staff Report for PA 99-010, Corrie Center Phase II Office Project. PASSED, APPROVED AND ADOPTED this 7th day of March, 2000 AYES: NOES: ABSENT: Mayor ATTEST: City Clerk g:\99-010\CCRESOGP RESOLUTION NO. 2000- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING A GENERAL PLAN AMENDMENT FOR PA 99-010, CORRIE CENTER PHASE II OFFICE DEVELOPMENT WHEREAS, Sid Corrie of the Corrie Development Corporation (Applicant/Property Owner) has requested approval of a General Plan Amendment to allow an increase in the maximum Floor Area Ratio from .5 to .6 for the 'Retail/Office' land use category; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) and implementing Guidelines, an Initial Study has been prepared to assess the proposed project. Based on the Initial Study, a Negative Declaration has been prepared and is on file with the Dublin Planning Department. The project as proposed will not have a significant impact on the environment; and WHEREAS, a completed application for each of the requested actions is available and on file in the Dublin Planning Department; and WHEREAS, a 20 day public review period was held for the Negative Declaration from February 1 through February 21, 2000; and WHEREAS, no letters commenting on the Negative Declaration was received during the comment period; and WHEREAS, the Planning Commission did hold a properly noticed public hearing on said application on February 22, 2000 and did adopt a Resolution recommending that the City Council approve a General Plan Amendment for PA 99-010; and WHEREAS, a properly noticed public hearing was held by the City Council on March 7, 2000; and WHEREAS, a Staff Report was submitted recommending that the City Council approve a General Plan Amendment PA 99-010; and WHEREAS, the City Council did hear and use their independent judgment and considered all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT the Dublin City Council does hereby make the following findings and determinations with regard to the proposed General Plan Amendment: The proposed Amendment is in the public interest and is consistent with the goals, policies, general provisions and purpose of the Dublin General Plan which contains policies which ATTACHMENT 2 . o encourage the intensification of the downtown area through the development of mixed-use pedestrian-orientated development. The proposed Amendment is appropriate for the 'Retail/Office' land use category because city policies require that a traffic study be prepared for all new development projects to evaluate the project's impact on city roadways and recommends mitigation measures to reduce any potential impacts to a level of insignificance; the city Site Development Review process will ensure that the proposed project has adequate parking, access, and will be compatible with surrounding land uses, thereby ensuring that the density of future development will not overburden public services and would complement surrounding development. The Amendment will not have a substantial adverse effect on public health or safety, or be substantially detrimental to the public welfare, to be injurious to property or public improvements. BE IT FURTHER RESOLVED THAT THE Dublin City Council does hereby approve an Amendment to the Dublin General Plan, increasing the floor area ratio to .6 for 'Retail/Office' land use category for PA 99-010, Corrie Center Phase II Office Project. PASSED, APPROVED AND ADOPTED this th day of__ ,2000 AYES: NOES: ABSENT: ATTEST: Mayor City Clerk g:\99-010\CCRESOGP ORDINANCE NO. - 00 AN ORDINANCE OF THE CITY OF DUBLIN AMENDING THE ZONING MAP TO REZONE PROPERTY LOCATED AT THE SOUTHEAST QUADRANT OF SAN RAMON ROAD AND DUBLIN BOULEVARD (APN 941-1500-037-00) TO A PLANNED DEVELOPMENT ZONING DISTRICT AND ADOPTING A DEVELOPMENT PLAN FOR PA 99-010 WHEREAS, Sid Corrie of the Corrie Development Corporation (Applicant/Property Owner) has requested approval of a General Plan Amendment to allow an increase in the maximum Floor Area Ratio from .5 to .6 for the 'Retail/Office' land use category, a Planned Development Rezone / Development Plan and Site Development Review to allow the construction of a 46,110 square foot, four-story, 53 foot high office building, with sub-grade parking and a two level (one sub-grade) parking structure and retailed improvements and Conditional Use Permit to allow a portion of the required parking for the office project to be located on the adjacent property; on 4.5 acres of land currently developed with a three-story office building, surface parking and landscaped areas at the southeast quadrant of Dublin Boulevard and San Ramon Road, 7950 Dublin Boulevard (APN 941-1500~037-00) within the Downtown Dublin Specific Plan; and WHEREAS, the Applicant has submitted a complete application for a Planned Development Rezone, including a DeVelopment Plan as required by Chapter 8.32 Of Title 8 of the Dublin Municipal Code which meets the requirements of said Chapter; and WHEREAS, the site will be rezoned from "Retail Commercial" to "Planned Development"; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) and implementing Guidelines, an Initial Study has been prepared to assess the proposed project. Based on the Initial Study, a Negative Declaration has been prepared and is on file with the Dublin Planning Department. The project as proposed will not have a significant effect on the environment; and WHEREAS, the Downtown Dublin Specific Plan which was adopted in 1987 designates the property within Zone 2: General Commercial, which states that this area is constrained from substantial development intensification due to the traffic capacity of the San Ramon Road and Dublin Boulevard Intersection which at that time operated at a level-of-service E; and WHEREAS, sinCe the adoption of the Downtown Dublin Specific Plan in 1987, both Dublin Boulevard and San Ramon Road have been widened to six-lane roadways to improve downtown circulation and the traffic study prepared to evaluate the projects' impact on the circulation pattern of the city determined that the project would not have a significant impact on ATTACHMENT 3 the traffic capacity of San Ramon Road and Dublin Boulevard intersection which would continue to operate at a level-of-service C or better; and WHEREAS, the project will generate additional vehicular trips which will impact city roadways, the applicant has agreed to contribute traffic mitigation funds to offset the costs of roadway maintenance and improvement; and WHEREAS, the Planning Commission did hold a properly noticed public hearing on said applications on February 22, 2000, and did adopt a Resolution recommending that the City Council approve the Planned Development Rezoning and Development Plan for PA 99-010; and WHEREAS, a properly noticed public hearing was held by the City Council on March 7, 2000; and ???, 2000; and WHEREAS, a Staff Report was submitted recommending that the City Council approve the application; and WHEREAS, on March 7, 2000 the City Council adopted a Negative Declaration and on ??, 2000 the City Council approved a General Plan Amendment for the project; and WHEREAS, pursuant to Section 8.32.070 and 8.120.050 of the Dublin Municipal Code, the City Council makes the following findings: The Planned Development Rezone Stage 1 & 2 are consistent with the general provisions, intent, and purpose of the General Plan (as amended) and the Downtown Dublin Specific Plan, in that the project would result in development with the land uses allowed by said designation, and will contribute towards implementation of said Plan; and o The Planned Development rezone Stage 1 & 2, are consistent with the general provisions, intent and purpose of the PD Zoning District of the Zoning Ordinance. The Planned Development Rezone will be appropriate for the subject property in terms of setting forth the purpose, applicable provisions of the Dublin Zoning Ordinance, range of permitted and conditionally permitted uses and Development Standards, which will be compatible with existing retail commercial and recreational uses in the immediate vicinity; and o The Planned Development rezone Stage 1 & 2, are consistent with the general provisions, intent, and purpose of the PD Zoning District of the Zoning Ordinance in that it contains all information required by Section 8.32 of the Zoning Ordinance and accomplishes the objectives of Section 8.32.010, A through H, of the Zoning Ordinance; and . The Planned Development Rezone Stage 1 & 2, will not have a substantial adverse effect on health or safety or be substantially detrimental to the public welfare or be injurious to property or public improvement, as all applicable regulations will be met; and 2 o The Planned Development Rezone Stage 1 & 2, will not overburden public services or facilities as all agencies must commit to the availability of Public Services prior to the issuance of any building permits as required by City laws and regulations; and ~ o The Planned Development Rezone Stage 1 & 2, will be consistent with the policies of the Dublin General Plan and the Downtown Dublin Specific Plan; and o The Planned Development rezone Stage 1 & 2, will create an attractive, efficient and safe environment though development standards contained in the Development Plan; and o The Planned Development Rezone Stage 1 & 2, will benefit the public necessity, convenience and general welfare; and o The Planned Development Rezone Stage 1 & 2, will be compatible with and enhance the general development of the area because it will be developed pursuant to a : comprehensive Development Plan. WHEREAS, the City Council did hear and use their independent judgment and considered all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, the Dublin City Council does ordain as follows: Section 1: Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning Map is amended to rezone the following property (" the Property") to a Planned Development Zoning District: Approximately 4.5 acres of land generally located at the southeast quadrant of San Ramon Road and Dublin Boulevard; 7950 Dublin Boulevard, more specifically described as Assessor's Parcel Numbers: 941-1500-037-00. A map of the rezoning area is shown below: SECTION 2. The regulations of the use, development, improvement, and maintenance of the Property are set forth in the Stage 1 and 2 Development Plans (Exhibits A-1 & A-2, hereto) which are hereby approved. Any amendments to the Stage 1 and 2 Development Plans shall be in accordance with section 8.32.080 of the Dublin Municipal Code or its successors. SECTION 3. Except as provided in the Stage 1 and 2 Development Plans, the use, development, improvement and maintenance of the Property shall be governed by the provisions of the Dublin Zoning Ordinance. SECTION 4. This Ordinance shall take effect and be enforced thirty (30) days from and after the date of its passage. The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California. PASSED AND ADOPTED BY the City Council of the City of Dublin, on this th day of ., 2000, by the following votes: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk Approved as to form: City Attorney g:\PA99-010\reord.doc DEVELOPMENT PLAN This is a Development Plan pursuant to Chapter 8.32 of the Dublin Zoning Ordinance for · the Corrie Center Phase II Office project, located on the southeast quadrant of Dublin Boulevard and San Ramon Road; 7950 Dublin Boulevard (APN 941-1500-037-00). This Development Plan meets all of the requirements for Stage 1 and Stage 2 review of the project. This Development Plan is also represented by the, Site, Landscape and Architectural (flOor and. elevations) Plans, sheets dated received December 28, 1999 labeled Exhibit A-2 to the Ordinance approving this Development Plan (City Council Ordinance No. O0- ), and on file in the Planning Department. The Planned Development District allows the flexibility needed to encourage innovative development while ensuring that the goals, policies, and · action programs of the General Plan, Downtown Dublin Specific Plan, and provisions of Section 8.32 of the Zoning Ordinance are satisfied. . . . . . Permitted Uses: All permitted uses in the Dublin Zoning Ordinance for the C-1 Retail Commercial Zoning District are permitted uses in this PD / C-1 (Planned Development Retail Commercial) Zoning District. Conditional Uses: All conditional uses in the Dublin Zoning Ordinance for the C-1 Retail Commercial Zoning District are conditional uses in this PD / C-! (Planned Development Retail Commercial) Zoning District. Dublin Zoning Ordinance - Applicable Requirements: Except as specifically modified by the provisions of this PD District Rezone/Development Plan, all applicable general requirements and procedures of the Dublin Zoning Ordinance shall be applied to the land uses designated in this PD District Rezone. Site Plan & Architecture: See attached site and elevation plans contained in Exhibit A- 2, Development Plan. This Development Plan applies to approximately 4.5 acre site shown on this plan on the southeast quadrant of San Ramon Road and Dublin Boulevard; 7950 Dublin Boulevard. Any modifications to the project shall be substantially consistent with these plans and of equal or superior materials and design quality. Density: The maximum square footage of the proposed development under this Development Plan (as shown on the site plan) is as follows: 4.5 acres, 116, 900 square feet total building area in two buildings of 70, 790 square feet (existing)and 46, 110 square feet (proposed). EXHIBIT A-1 G :\pa99010\devplan 1 . . . o Phasing Plan. The project will be constructed in one phase. Landscaping Plan. Refer to attached landscaping plan included in EXhibit A-2, Development Plan, Sheet 7. Development Standards Lot Dimensions: See the C-l, Retail Commercial Zoning District development regulations, Chapter 8.36.030 of the Zoning Ordinance. Lot Size: See the C-1, Retail Commercial Zoning District development regulations, Chapter 8.36.030 of the Zoning Ordinance. Front, Rear, and Side yard Setbacks: See the C-I, Retail Commercial Zoning District setback regulations, Chapter 8.36.030 of the Zoning Ordinance. Building Height: 53' 3" maximum Floor Area Ratio: The FAR within this district shall not exceed .59 Parking/Garages: Parking shall be provided as shown on the site plan in Exhibit A-2, Development Plan, Sheet 2, as approved through the related Site Development Review and Conditional Use Permit for PA 99-010. Compliance with related Planning Approvals: The Applicant/Developer shall comply with all the related Site Development Review and Conditional Use Permit conditions of approval for PA 99-010. G:\pa99010\devplan 2 1310iN .... TIT4 / / // '(lA'IS NFIgflll Ill', J¥ lll~l Il:l Illil,,i}, liil,'h:i{, il~ 'l,' J 1' PRELIMINARY GRADING AND UTILITY PLAN - / VICINITY MAP FOR CORRIE CENTER CITY OF DUBUN CAUFORNIA DECEMBER 23, 1999 i 17 CGI~~. $TALL~ s4~ PaXox ~04D LEGEND ~S~G [~M~T UNE ~C M~T ~ ~c / / / ~ ~ ~smlc~ ~IT~Y ~R UNE  WA~R UNE sm. LO~R LEaL PARKINC S~UC~RE DETAIL ~o WA~ V~ (~.) ~ t'.~ TC T~ FA~ EO~ ~ PA~M~T CATCH BA~IN/~RAJNAG~ UClNT SA~qTARY STORM B~a.mNG DO$11NG ~NOT~S UN~G~C~JNO LINCr~ COM~*CT · I ~ ASSOCM TE$ ~ L~. I Al cwL~,~a~a~.eu~a~.sum~m 1440 Marlo Lone. Suite 200, Wolnut Cre~. Colifornio 94596 Ph~e: (925) 932--6868 Fox: (925) 932-0910 ® ® PARTIAL BLDG-2 FF~ST FLOOR PLAN (EXIS'rI~IG) · i,.:l -.'. SEGOND FLOOR PLAN (EXISt) II DIrNNI$ KOBZA & ASSOClAI'E.S. INC. Il A.I.A. AI~CHITECI' TI-IRD FLOOR PLAN (EXlSTldG) ! NG BUILT-UP ROOF--''''~ ROOF PLAN II DENNIS KOI~.A & ASSOCIATES. INC.. A.I.A. ARCHITECT ',ti 33 PARKING StLLS PARKING S ~LLS BASEMENT GARAGE FLOOR PLAN SC*LC !?::::'::?.i:.:: :: :::'-'.'...' i?i'"i-' " -:-'.::" -'. '~- . :.! .' ..... ::.':' "~ '.:...:' .::... · . · .. :........ .... :..~ ....... .:... .::,.'...,.:....-..::!i~.. .... . .. ?.:.: . :'... '.: .'.:.'..?i: ~.:.i?."-:- .~. .- ..~ · :'.i....':': i' .... ,:.. · ~ :2: . ':..:i:; ' ' ' .' ' ....~.. - · :-2':?:"~..':: - i.:·'(:. ·.:.. ~ -.. // \~, FirST I=LOOR PLAN ----~--- P~ ~1 DENNIS KOB7.A & ASSO~TES, INC C.-4505 £.~.. -- _ - , f:;..'.:: -'.'.....'...:.-...'.-...: ~';}:::.:!-:"ii:.: ...:. '.'.- .' ...:.-- ......:.-. .-:-... · :-::.'.ii-..'.":. .'.': ' :..~ .~ ~.-.' :.?:'.. ::::::.::,': ..:: ::~. '.:'.': .'.. ::, .' ::. ::.::...-: . .. ..:::.-- :'.: .- . · ....:..,. . :..' ... ':.:: .' .- .... .,.... :.:.: :.:..-.. ;..:'.:. :::. · :.:.? '. ':'-~'i: FOLJRTH FLOOR PLAN ® ® TYP. SECOND & TI-IRD FLOOR PLAN i/5o.~'-o· DENNIS KOIE. A & ASSOCI~TES. INC. ROOF PLAN . .. :-:. k'. :i.. 'l : .'.. :1:2. ;-'ii' .-:' }i:.'"1'.12:, 2 {ii .. ';:."'.:'ii .r :;i'{:' :.::.?:'!' :': :.:.p..... :. ':'.': .! .-': .'.' ..;.i- .':i..': · .::.i ': 2P'-':' ... :: - ..ill' i- . . ':: ' ')'.-i -. ... .. . -'" .'i:.:.::'... . . ?. , .',.1:i' .; ': .'....11 '~ :l.. ::~- DENNIS KOBT. A & ASSOCIATES,. INC. ARCHITECT NORTH-EAST ELEVATION SOUTH-WEST ELEVA'I]ON (WITH BLDG-2 ELEVATION) J z_ sOUTH-EAST ELEVATION NORTH-WEST ELEVATION L EAST ELEVATION STORY BLDG. NORTH-WEST ELEVATION · ~ .. i DENNIS KOBZA & ~IA'lrES. INC. £OURTyAR D ENLAR§MENI' . '.~s~?~?' EXISTING 3 STORY OFFIgE BUILDI~IG sim I I : PLANTING DETAILS -=. t ~--~~.~- · STORAGE NO FOUNDATION :..:- :-..:....:.;:y:.: . ..:.: - .. _.....:. CORRIE CENTER PHASE II INITIAL STUDY File No. PA 99-010 Lead Agency: City of Dublin Prepared: January 2000 ATTACHMENT 4 INTRODUCTION This initial study has been prepared by the City of Dublin to assess the potential environmental effects of the proposed General Plan Amendment, Planned Development (PD) District Rezone, Conditional Use Permit and Site Development Review for the Corrie Center Phase II project. The analysis is intended to satisfy the requirements of the California Environmental Quality Act (CEQA), and provide the City with adequate information for project review. This initial study includes a project description, environmental checklist and discussion focused upon issues identified in the checklist. In summary, this Initial Study concludes that the project will not pose any significant adverse environmental impacts. The Initial Study was prepared based upon the location of the project, staff office review, field review, comments from City, County and local agencies, use of City Planning Documents, the CEQA Law and Guidelines, and City of Dublin CEQA Guidelines. PROJECT DESCRIPTION The proposed project, located at the south-east comer of San Ramon Road and Dublin Boulevard, consists of constructing a new four-story office building (46, 110 square feet) with one sub-grade parking level and a two- level (one sub-grade level) parking structure. The site area totals approximately 4.5 acres and is currently developed with a three-story (70,790 square feet) L-shaped office building, surface parking and landscaped areas. The proposed four-story office building would be located to the rear of the existing building and would be connected to it via a one-story glass enclosed foyer. The existing building fafade will be remodeled (new windows, parapet and paint) to complement the new buildings architecture. Refer to Vicinity Map and Project Plans attached as Figure 1 and Figure 2, respectively. The existing General Plan land use designation for the project site is Retail/Office. The project is located within "Zone 2: General Commercial" of the Downtown Dublin Specific Plan and the proposed project complies with this designation. The existing zoning is C-l, Retail Commercial Zoning District. The project requires the following planning permit approvals: 1) an amendment to the General Plan to allow an increase in the Floor Area Ratio for Retail/Office designated land from a range of .25 -.5 to .25 - .6; 2) a Planned Development (PD) District Rezone that includes a Stage 1 and Stage 2 Development Plan to allow an increase in building height of S' 3" from 45 feet (as allowed in the C-1 Zoning District regulations) to 53' 3"; 3) a Conditional Use Permit to allow a portion of the required parking to be located on the adjacent parcel and 4) a Site Development Review for the construction of a 46, 100 square foot office building, two-level parking structure and installation of surface parking, landscaping and signage. Environmental Checklist Form Initial Study le Project title: PA 99.010, Corrie Center Phase II General Plan Amendment, Stage 1 and 2 Planned Development (PD) Rezoning, Conditional Use Permit and Site Development Review. 2. Lead agency name and address: City of Dublin, 100 Civic Plaza, Dublin CA 94568 3. Contact person and phone number: Anne Kinney, Assistant Planner (925) 833-6610 4. Project location: Southeast comer of Dublin Blvd and San Ramon Road (7950 Dublin Boulevard) 5. Assessors Parcel Number(s): 941-1500-037-00 6. Project sponsor's name and address: Sid Corrie, Corrie Development Corporation, 7950 Dublin Blvd., Ste. 111, Dublin, CA 94568 7. General Plan designation: Retail/Office 8. Zoning: C-1 Retail Commercial Zoning District 9. Specific Plan designation: Zone 2: General Commercial 10. Description of project: (see previous page) 11. Surrounding land uses and setting: Briefly describe the project's surroundings: The property is located within Dublin's downtown area and is surrounded by commercial development. Surrounding land uses include Coco's restaurant built to the immediate north of the site. To the south and south east of the site lies the Monarch Hotel. Earl Anthony's Bowl has been built to the east of the project site. West of the property, San Ramon Road has been built. A gas station and other commercial development exists west of San Ramon Road. 12. Other public agencies whose approval is required: (e.g., permits, financing approval, or participation agreement.) - Building permits (City of Dublin) - Utility connection and permits (Dublin San Ramon Services District) ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmemal factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. ~-~ Aesthetics [-~ Agriculture Resources ~-~ Air Quality ~-~ Biological Resources ~-~ Cultural Resources ~-~ Geology/Soils ~-~ Hazards & Hazardous Materials ~-~ Hydrology / Water Quality Use / Planning ~-~ Mineral Resources ~-~ Noise ~--~ Population/Housing ~-~ Public Services ~-~ Recreation [--~ Transportation/Traffic ~-~ Utilities / Service Systems ~ Mandatory Findings of significance DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: ~ I find that the proposed project COULD NOT have a signifiicant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. ~-~ I fiind that the proposed project MAY have a signifiicant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. ~'~ I fiind that the proposed project MAY'have a "Potentially signifiicant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. b~ I find that although the proposed project could have a significant on environment, effect the ecause all potentially significant effects (a) have been analyzed adequately in an earlier EIR or 'NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Signature Date Printed name: Anne Kinney, Assistant Planner For: PA 99-010 Corrie Center Phase II project, GPA, PD Rezone, CUP & SDR EVALUATION OF ENVIRONMENTAL IMPACTS: 1) A brief eXplanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant .with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). s) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) The significance criteria or threshold, if any, used to evaluate each question; and b) The mitigation measure identified, if any, to reduce the impact to less .than significance Environmental Impacts. The source of determination is,listed in parenthesis. See listing of sources used to determine each potential impact at the end of the checklist. A full discussion of each item is found following the checklist I. AESTHETICS-- Would the project: a) Have a substantial adverse effect on a scenic vista? (Source: 1, 2, 3 ) b) Substantially damage scenic resources, including, but no limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? (Source:l, 2, 3 ) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (Source:l, 2, 3) d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? (Source: 1, 2, 3, ) II. AGRICULTURE RESOURCES -- In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? (Source:l, 2, 3, 4, 5 ) b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? (Source:2, 4, 6 ) Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X x X x X X ,, c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? (Source:l, 2, 3 ) III. AIR QUALITY-- Where available, the significance Criteria established by the applicable air quality Management or air pollution control district may be .Relied upon to make the following determinations. Would The project: a) Conflict with or obstruct implementation of the applicable air quality plan?(Source: 1,2 ) b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? (Source: 1, 2 ) c) P(esult in a cumulatively considerable net increase of any criteria pollutant for which the project region is non- attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? (Source: 1, 2 ) d) Expose sensitive receptors to substantial pollutant' concentrations?(Source: 1, 2 ) e) Create objectionable odors affecting a substantial number of people?(Source: 1, 2 ) IV. BIOLOGICAL RESOURCES --Would the project: Potentially Less Than Less Than N° Significant Significant Significant Impact Impact with Impact Mitigation Incorporation x , X X X X X a) Have a substantial adverse effect, either directly or 'through habitat modifications, on any species identified as candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? (Source: 1, 2, 3) b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? (Source: 1, 2, 3). c) Have a sUbstantial adverse effect on federally protected Wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? (Source: 1, 2 ) d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? (Source:l, 2) e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? (Source: 1, 2 ) f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan or other approved local, regional, or state habitat conservation plan? (Source: 1, 2 ) V. CULTURAL RESOURCES -- Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in § 15064.5? (Source: 1, 2,) Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X X x X x X X b) of an archaeological resource pursuant to § 15064.5? (Source: 1, 2) Cause a substantial adverse change in the significance c) Directly or indirectly destroy a unique paleontolOgical resource or site or unique geologic feature? (Source:l, 2) d) Disturb any human remains, including those interred outside of formal cemeteries? (Source: 1, 2) VI. GEOLOGY AND SOILS -- Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. (Source: 1,2,7 ) ii) Strong seismic ground shaking? (Source: 1, 2, 7 ) iii) Seismic-related ground failure, including liquefaction? (Source: 1, 2, 7 ) iv) Landslides? (Source:l, 2, 7 ) b) Result in substantial soil erosion or the loss of topsoil? (Source:l, 2, 7 ) c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? (Source:l, 2, 7 ) Potentially Less Than Less Than No SignifiCant Significant Significant Impact Impact i with Impact 1 i Mitigation I Incorporation i X X X X X X X X X l0 Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X X ,, x x x x d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? (Source:l, 2, 7 ) e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems. where sewers are not available for the disposal of waste water? (Source: 1, 2) VII. HAZARDS AND HAZARDOUS MATERIALS -- Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? (Source: 1, 2 ) b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? (Source: 1, 2 ) c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one- quarter mile of an existing or proposed school? (Source:l, 2 ) d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (Source: 1, 2 ) Poter~tially Less Than Less Than No Significant Significant Significant Impact ImpaCt with Impact Mitigation Incorporation X x x x X x I I i x i e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? (Source: 1, 2 ) f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? (Source: 1, 2 ) g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? (Source: 1, 2 ) h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (Source: 1, 2 ) VIII. HYDROLOGY AND WATER QUALITY- Would the project: a) Violate any water quality standards or waste discharge requirements? (Source: 1, 2 ) b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local gro ~undwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? (Source: 1, 2 ) c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? (Source:l, 2 ) 12 Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X x x X X X X X d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? (Source: 1, 2 ) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? (Source: 1, 2 ) f) Otherwise substantially degrade water quality? (Source:l, 2 ) g) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? (Source: 1, 2 ) h) Place within a 100-year flood hazard area structures which would impede or redirect flood flows? (Source:l, 2 i) Ex~oose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? (Source: 1, 2 ) j) Expose people or structures to a significant risk of loss, i involving inundation by seiche, tsunami, or mudflow? (Source: 1, 2 ) IX. LAND USE AND PLANNING - Would the project: a) Physically divide an established community? (Source:l, 2, 3 ) 13 b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? (Source: 1, 2, 4, 5, 6) c) Conflict with any applicable habitat conservation plan or natural community conservation plan? (Source: 1, 2, 3 ) X. MINERAL RESOURCES -- Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? (Source: 1, 2) b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? (Source: 1, 2, 4) XI. NOISE - Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? (Source: 1, 2, 4) b) Exposure of persons to or generation of excessive groundborne vibration or groundbome noise levels? (Source: 1, 2) c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? (Source:l, 2) d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? (Source: 1, 2) 14 Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X X X X X X X X e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? (Source: 1, 2) f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? (Source: 1, 2, ) XII. POPULATION AND HOUSING- Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? (Source: 1, 2, 3 ) b) Displace substantial nUmbers of existing housing, necessitating the construction of replacement housing elsewhere? (Source: 1, 2., 3 ) c) Displace substantial nUmbers of people, necessitating the construction of replacement housing elsewhere? (Source: 1, 2, 3 ) XIII. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: 3.5 Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation x X x X X ,, Fire Protection? (Source: 1, 2) Police Protection? (Source: 1, 2) Schools? (Source: 1, 2) Parks? (Source: 1, 2 ) Other Public Facilities? (Source: 1, 2 ) XIV. RECREATION-- a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? (Source: 1, 2 ) b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Source: 1, 2) XV. TRANSPORTATION/TRAFFIC- Would the project: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? (Source: 1, 2, 8) b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? (Source: 1, 2, 8 ) Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X X X X X X X X X 3.6 c) Result in a change in air traffic pattems, including either an increase in traffic levels or a change in location that results in substantialsafety risks? (Source: 1, 2) d) Substantially increase hazards due to a design feature (e.g., sharp cmwes or dangerous intersections) or incompatible uses (e.g., farm equipment)? (Source: 1, 2 ) e) Result in inadequate emergency access? (Source: 1, 2 ) f) Result in inadequate parking capacity? (Source: 1, 2 ) g) Conflict with adoPted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? (Source: 1, 2, ) XVI. UTILITIES AND SERVICE SYSTEMS-- Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (Source:l, 2 ) b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (Source: 1, 2 ) Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X X X X X X X 17 c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (Source:l, 2 ) d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? (Source: 1, 2 ) e) ResUlt in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? (Source: 1, 2 ) f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (Source: 1, 2 ) g) Comply with federal, state, and local statutes and regulations related to solid waste? (Source: 1, 2 ) XVII. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or Wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict rare or endangered plant or animal or eliminate important e major periods of California history or prehistory? (Source: 1 Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact b) Does the project have impacts that are individually limit but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable projects)? (Source:l, 2) c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? (Source: 1, 2, ) Potentially Less Than Less Than No Significant Significant Significant Impact Impact with Impact Mitigation Incorporation X X Sources used to determine potential environmental impacts: o 2. 3. 4. 5. 6. 7. 8. Determination based on location of project. Determination based on staff office review. Determination based on field review. Determination based on the City of Dublin General Plan Determination based on the City of Dublin Downtown Dublin Specific Plan Determination based on the City of Dublin Zoning Ordinance. Geotechnical Exploration, Corrie Center Phase II, 7950 Dublin Blvd., ENGEO Inc., Dated 12/13/99 Traffic Study, Corrie Center Phase II, Omni-Means, dated' August, 1999 3_9 EVALUATION OF ENVIRONMENTAL IMPACTS · 1. Aesthetics. Environmental Setting: The proposed project is located within Dublin's downtown area. The property is currently developed with a three-story office building, surface parking and landscaped areas and is surrounded by commercial development. There are no features of aeSthetic significance in the immediate vicinity of the site. The proposed project would be visible from 1-580, a designated scenic highway. Project Impacts: There are no impacts to Items 1 a through 1 d. This determination is based on the sources referenced in the Initial Study. The City's Zoning Ordinance requires that any new structure to go through the Site Development Review permit process. The project proponents are applying for a Site Development Review planning permit. As part of that process, architectural compatibility and aesthetic elements are considered. The project proponents will be required to incorporate architectural design and elements that are compatible with the architecture of surrounding uses, and the project will be conditioned to screen all unattractive uses, such as roof-top air conditioning equipment, from public view. The project proponents are applying for a Planned Development Rezone to increase the allowable building height limit for the property. An increase in the building height by 8' 3" from 45 feet (as allowed in the C-1 Zoning District regulations) to 53' 3" is appropriate as the project is located in an urbanized area, there are no adjacent residences that would be affected and quality views of Dublin will not be negatively impacted. The proposed project will not result in the obstruction of any scenic vista or view open to the public from 1-580 Freeway or other adjacent roadways. The project will not create a new source of substantial light or glare, as the project will be conditioned to meet all City building and planning standards. 2. Agricultural Resources Environmental setting: The proposed project is located within Dublin's downtown area. The property is currently developed with a three-story office building, surface parking and landscaped areas. Project Impacts: There are no impacts to Items 2a through 2c. This determination is based on the sources referenced in the Initial Study. The property is currently developed with commercial uses, and there is no recent history of agricultural production on the 'site. The property is not designated as prime or unique farmland and is not under Williamson Act Contact. 2. Air Quality Environmental Setting: The project site is located within what the Bay Area Air Quality Management District defines as the Livermore-Diablo Valley, a sheltered inland area surrounded by hills to the west, south and east. Most 20 of the airflow into the southern portions of the Valley is accomplished through only two gaps in the hills: the Hayward and Niles canyons. Local wind data show the frequent occurrence of low wind speed and calm conditions (the latter approximately 23 percent of the time). These local limitations on the capacity for horizontal dispersion of air pollutants combined with the regional characteristic of restricted vertical dispersion give the area a high potential for regional air quality problems. Project Impacts: There are no significant impacts to Items 3a through 3e. This determination is based on the sources referenced in the Initial Study. Although the proposed project will generate additional new traffic (see Section 15 Transportation/Traffic), the increase in air emissions as a result of this new traffic is not substantial, or significant enough to result in the deterioration of ambient air quality. These additional vehicles will generate quantities of carbon monoxide, reactive organic gasses, nitrous oxide, sulfur dioxide and particulate matter (PM10). However, the location of the proposed project would be adjacent to on and off ramps to the 1-580 Freeway and would be in close proximity to the proposed West Dublin BART station. The location of the project would limit the amount of travel' to and from the highway and the proposed rapid transit station, thereby minimizing vehicle trips and associated air quality impacts in conformity with the Bay Area Air Quality Management District's Clean Air Plan. In addition, the proposed project will not expose sensitive receptors to substantial pollutants or create objectionable odors. Construction of the site may generate an increase in dust and particulate matter caused by site excavation and grading activities. The City's standard grading ordinance requirements require measures to ensure that these types of short-term construction impacts are minimized. 4, Biological Resources Environmental Setting~ The site is currently developed with a three-story office building, surface parking and landscaped areas. Dense vegetation occurs along the site's southern and southwestern boundary. A significant stand of Redwood and Eucalyptus Trees exists along the site's western property line. The site contains a mature Black Walnut Tree with a 52" mink diameter that would be removed as part of the development of the site. Project Impacts: There are no impacts to Items 4a through 4f. This determination is based on the sources referenced in the Initial Study. The project will be located on an already developed site. The project proposes to retain all vegetation along the site's southern and western perimeter. An aborists report has been prepared to evaluate the health of the Black Walnut Tree. This report, prepared by Robert B. Hoffmann, Certified Arborist, determined that the root and branch structure of the tree has been irreversible damaged by construction of the parking lot and by radical pruning. The tree is in poor health and the report recommends that the Walnut Tree be removed. The landscape plan for the project proposes the planting of several new trees on-site. The City of Dublin Heritage Tree Ordinance which becomes effective on January 21, 2000 does not protect non-native trees, such as Black Walnuts. Field visits to the site have not identified any endangered, threatened or rare species of animals. 23. 5, 10 Cultural and Mineral Resources Environmental Setting: The site is currently developed with a three-story office building, surface parking and landscaped areas. The project site is located within an urbanized area. Project Impacts: There are no imPacts to Items 5a through 5d and 10a through 1 Ob. This determination is based on the sources referenced in the Initial Study. The project site is currently developed. There are no known cultural or mineral resources existing on the property. 6. Geology and Soils Environmental Setting: The general city of Dublin and the Tri-Valley area lie on the east side of the Calaveras Fault within the San Ramon Valley basin. According to the Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist (1982), the majority of the western portion of the site is located within a "Special Study Zone" for the Calaveras fault. The Calaveras fault zone is a seismically active member of a family of fight-lateral strike-slip faults, including the San Andreas and Hayward faults. According to the Geotechnical Investigation prepared for the property by ENGEO, dated December 13, 1999, the active trace of the Calaveras fault lies approximately 300 feet west of the project site. There are no known active faults crossing the site. 'The project site consists of approximately 4.5 acres and is irregular in shape. The property is developed with an L-shaped office'building and surface parking. The site is relatively flat, with elevations ranging between 360 and 365 feet. Subsurface soils on site have been characterized as deposits of clay, silt and sand. There are no unique or geologic or physical features on site. Project Impacts: There are no impacts to Items 6d and 6e and less than significant impacts to Items 6a, 6b and 6c. This determination is based on the sources referenced in the Initial Study. The Calaveras Fault is capable of generating a significant level of ground shaking in the event of a seismic occurrence. All structures shall be developed in compliance with the Uniform Building Code (UBC) requirements to reduce the impact of shaking on the project to less than significant. The probability of seismic related hazards, such as liquefaction, or landslides is considered low due to the composition of the soil and location of the site. On site soils consist of medium dense clayey sand which are not considered liquefiable. However, medium dense clay soils are relatively weak and potentially compressible. The site shall be developed in accord with the recommendations of the geotechnical report to reduce the impact of these soils on the project to less than significant. All earthwork shall be in accordance with the City of Dublin Grading Ordinance and to Public Works Department standards and regulations. The project site is currently developed and relatively level with no unique geologic or physical features. 22 7. Hazards and Hazardous Materials Environmental Setting: The site is currently developed with a three-story office building, surface parking and landscaped areas. The project proposes to develop a second office building and parking structure on site. Office uses generally do not create hazardous environments. Project Impacts: There are no impacts to Items 7a- 7h. This determination is based on the sources referenced in the Initial Study. The types of uses proposed and existing generally do not create hazardous environments. As part of the Site Development Review process, proposals for new construction will be conditioned, as necessary, by the Fire Police, and other agencies for emergency access requirements and other concerns. 8. Hydrology and Water Quality Environmental Setting: No surface water exists on site. An improved flood control facility is located adjacent to the southwestern comer of the property. The majority of the site is relatively level, surface runoff and storm water drains into several catch basins located on the project site and surrounding roadways. The catch basins are drained by the Alameda County Zone 7 Water Agency Canal and eventually drain to the San Francisco Bay. Local waterways or tributaries in the area include Dublin Creek, the Alamo Creek and Canal, and the Martin Canal (or Martin Canyon Creek). According to the Geotechnical Investigation prepared for the property by ENGEO, dated December 13, 1999, groundwater was encountered in several of the on-site borings, ranging in depth from 26 to 31 feet. A portion of the project site is located within an area designated as Zone X on the FIRM (Flood Insurance Rate Map) Flood Map, which is an area of between the identified 100 year and 500 year base flood elevations. Project Impacts: There are no impacts to Items 8a through 8j. This determination is based on the sources referenced in the Initial Study. The project is not located within a 100-year flood hazard area and will not expose peoPle of property to flooding or other water-related hazards. The proposed building will have one-level of sub- grade basement parking and a two-level (one-level sub-grade) parking structure. The proposed parking structure will be founded approximately 11 feet below the ground surface, refer to Figure 2 Site Plans. According to the Geotechnical report, groundwater was detected between 26 and 31 feet below grade. The construction of the site including sub-level parking will not have a significant effect on groundwater levels in the area. There are no water supply lines or wells on the proposed site. 23 9. Land Use and Planning Environmental Setting: The project site consists of 4.5 acres of developed land located in Dublin's downtown area. The property is located on the southeast quadrant of the intersection of Dublin Blvd and San Ramon Road. The site is located adjacent to the 1-580 on/off-ramps and approximately .5 miles west of 1-680. The site is currently developed with an L-shaped three-story office building, surface parking and landscaped areas and is surrounded by commercial development. The General Plan designation for the site is Retail/Office and the zoning designation for the site is C-1, Retail Commercial Zoning District. The property is also located within Zone 2: General Commercial of the Downtown Dublin Specific Plan and the proposed project complies with this designation. The Downtown Dublin Specific Plan was adopted in 1987 for the purposes of enhancing the appearance and economical vitality of the downtown portion of Dublin. Pro|ect Impacts: There are nO impacts to Items 9a, 9b and 9c. This determination is based on the sources referenced in the Initial Study. The project would not physically divide an established community. The project is located within the downtown area of Dublin, an area of commercial and retail development, bordered by 1-580 to the south, Amador Valley Blvd. to the north, San Ramon Road to the west andVillage Parkway to the east. The proposed project would be compatible with the surrounding office uses and retail developments. The City of Dublin has no adopted habitat conservation plan or natural community conservation plan which would conflict with this application. The proposed project is consistent with the Zoning Ordinance designation of C-1 Retail Commercial in which office and profesSional uses are permitted. The project proponents are applying for a Planned Development Rezone to increase the allowable building height limit for the property. An increase in the building height by 8' 3" from 45 feet (as allowed in the C-1 Zoning District regulations) to 53' 3" is appropriate as the project is located in an urbanized area and there are no adjacent residences that would be affected. The proposed project meets the intent of the Retail/Office land use designation of the Dublin General Plan which allows business and professional office uses. However, the project currently conflicts with the floor area ratio requirement of the General Plan which ranges from .25 to .5. The project site plans indicate a site coverage of.59. The General Plan Amendment proposes to increase the floor area ratio for Retail/Office land use designations to allow a range of.25 to .6. Retail/Office designated property within the city exists within the downtown area and on the west side of San Ramon Road. The Dublin General Plan contains policies which encourage the intensification of the downtown area through the development of mixed use, pedestrian-orientated development. It is city policy to require all developers to finance the cost of a traffic study to evaluate traffic and circulation impacts of a proposed project. This will ensure that any traffic impacts generated by a project will be adequately identified and mitigated to eliminate impacts to city roadways. The City Site Development Review process will ensure that the site has adequate parking, landscaping and access to accommodate the proposed building floor area. The increase in allowable floor area ratio range for Retail/Office uses is appropriate, as it is consistent with General Plan policies which 24 /Office areas located on the edge of the downtown area as city policy requires projects to be reviewed on an individual basis to identify and reduce any potential traffic or other project impacts to a level of insignificance. This project level review will ensure that the density of the proposed development will be compatible with the site, traffic patterns and surrounding uses. The project proposes a new four-story building to be constructed to the rear of the existing building on site and would be connected to it via a single-story enclosed foyer. The project site is located within .5 miles of the proposed West Dublin BART Station at Golden Gate Drive adjacent to 1-580. Planned roadway improvements in the area (see Section 15 Transportation/Traffic) include the construction of a new roadway parallel to Dublin Boulevard connecting Amador Plaza Road through Golden Gate Drive to Regional Street. The property is separated from Regional Street by Earl Anthony's Bowl (this property is under the same ownership as the subject parcel). The property owner has agreed to construct a pedestrian pathway from the proposed project through the adjacent parcel to Regional Street, providing furore office employees a direct pedestrian link to the future West Dublin BART Station. A condition of project approval will require that this pedestrian pathway be constructed prior to 2006. The project as proposed is consistent with the Downtown Dublin Specific Plan which designates the property within Zone 2: General Commercial. The Specific Plan was adopted in 1987 and states that the project area is constrained from substantial development intensification due to the traffic capacity of the San Ramon Road and Dublin Boulevard intersection which at that time operated at a level-of-service E. Since 1987, both Dublin Boulevard and San Ramon Road have been widened to six-lane roadways to improve downtown circulation. A traffic study has been prepared by Omni Means to evaluate the projects' impact on the circulation pattern of the city. The study determined that the project would not have a significant impact on the traffic capacity of San Ramon Road and Dublin Boulevard intersection which would continue to operate at a level-of-service C or better. (Refer to Section 15 Transportation/Traffic). However, the proposed project will generate additional vehicular trips in the area which will impact city roadways. The applicant will be contributing traffic funds which will assist in offsetting costs of public roadway maintenance and planned roadway improvements, thereby reducing impacts to no impact. The Site Development Review process has determined that the project site has adequate access and landscaping. Conditional Use Permit approval is required to allow a portion of the required parking (approximately 17 parking spaces) to be located "off-site" along the major north-south access easement to the east of the proposed building on the adjacent parcel. Refer to Figure 2, Site Plans. In conclusion, the development of this project at a floor area ratio of .59 would not have a significant effect on the environment. 25 11. Noise Environmental Setting: The project is located in Dublin's downtown area. The site is currently developed with office uses and is surrounded by commerCial development. The site is adjacent to San Ramon Road (a six-lane arterial) to the west, Dublin Boulevard (a six-lane arterial) to the north and 1-580 off-ramps to the southwest. Project Impacts: There are no impacts to Items 1 la through 1 lf. This determination is based on the sources referenced in the Initial Study. The proposed office development will not result in the exposure of people to severe noise levels, groundbourne vibration and will not result in significant permanent or temporary increase in ambient noise levels. The project is not located within an airport land use plan or within the vicinity of a private airstrip. The project shall be conditioned to comply with Title 24 of the State Uniform Building Code, interior noise levels to ensure that office employees will not be adversely impacted by traffic noise. 12. Population and Housing Environmental Setting: The City of Dublin's population, as of January 1, 1998, was estimated by the State Department of Finance to be 27,750. Significant population growth is anticipated for the City based on planned residential growth in Eastern Dublin and Western Dublin (Schaefer Ranch). Project Impacts: There are no impacts to Items 12a. through 12c. This determination is based on the sources referenced in the Initial Study. Since 'the project involves the rezoning and construction of commercial property, the proposed project will not impact housing or population within'the City or the Tri-Valley region. The project will result in increases in'employment opportunities, but on a minor scale. As a result, the project will not induce substantial population growth in the area or displaCe existing housing or people. 13. Public Services Environmental Setting: The project site is served by the following service providers: Fire Protection. Fire protection is provided by the Alameda County Fire Department which provides structural fire suppression, rescue, hazardous materials control and public education services. Police Protection. Police protection is provided by the Dublin Police Department which is headquartered in the Civic Center. The Department, which maintains a sworn staff of 31 officers, performs a range of public safety services including patrol, investigation, traffic safety and public education. 26 Schools. Educational facilities are provided by the Dublin Unified School District which operates kindergarten through high school services within the community. Maintenance. The City of Dublin provides public facility maintenance, including roads, parks, street trees and other public facilities. Dublin's Civic Center is located at 100 Civic Plaza. Other Governmental Services. Other governmental services are provided by the City of Dublin including community development and building services and related governmental services. Library service is provided by the Alameda County Library with supplemental funding by the City of Dublin. Project Impacts: There are no impacts to Item 13a. This determination is based on the sources referenced in the Initial Study Fire Protection. According to representatives of the Alameda County Fire Department, the proposed project lies within a one-mile radius of a fire station located on Donahue Drive in Dublin. A typical response time of less than 5 minutes is anticipated. As part of the Site Development Review process, specific fire protection requirements will be imposed on the development to ensure compliance with applicable provisions of the Uniform Fire Code. Police Protection. According to representatives of the Police Department, adequate resources presently exist to serve the proposed development. Schools. This project is for office uses. School fees in accordance to State law would be charged at building permit issuance. Maintenance of public facilities including roads. The project has access from two existing streets, Dublin Boulevard and Regional Street. Additionally, a new roadway 'St. Patrick's Way' is planned south of Dublin Boulevard (see Transportation/Traffic section). The project applicants will be contributing a traffic improvement fund, which will assist in offsetting costs of public roadway maintenance. This fund will be collected at building permit issuance. Other governmental services. The City of Dublin charges a public facilities fee for all new development in the community for the purpose of financing new municipal public facilities needed by such development. The applicants will be required to pay a public facilities fee prior to issuance of building permits. 13. Recreation Environmental Setting: The project is located within Dublin's downtown area. The project proposes the development of new office uses and is surrounded by commercial development. 27 Proiect Impacts: There are no impacts to Items 14a through 14b. This determination is based on the sources referenced in the Initial Study The City has in place a Public Facilities Fee which is charged to all developments in the City. The fee pays for improvements to and the provision of park facilities as well as other public facilities in the City. 15. Transportation/Traffic Environmental Setting: The project is located on the southeast quadrant of the intersection of Dublin Boulevard and San Ramon Road. Major regional access to the site is provided by 1-580 an east-west freeway directly to the south. and 1-680 a north-south freeway, located approximately .5 miles to the east. Local access to the site is provided by San Ramon Road, a major north-south six-lane arterial street that lies immediately west of the site and Dublin Boulevard, a major east-west six-lane arterial located immediately north of the site. The project will have its primary access off of Dublin Boulevard via a two- lane 40' wide access driveway and off of Regional Street via a two-lane 40' wide access driveway. Regional Street is a two-lane north-south roadway providing connection to Dublin Boulevard east of the site. Planned circulation improvements in the area include new 1-680 southbound on/off ramps which are currently under construction. A new roadway 'St. Patrick's Way' parallel and south of Dublin Boulevard has been approved and partly constructed. This roadway will be a continuation of the 1-680 off ramp and would travel west intersecting Amador Plaza Road, Golden Gate Drive and eventually ending at Regional Street. The section of roadway between Amador Plaza Road and Golden Gate Drive has been completed. It is not know at this time when the roadway will be completed to Regional Street. Table 1 summarizes existing traffic conditions at key intersections near the proposed project site. This information is based on a Traffic Study prepared to analyze potential traffic and parking impacts associated with the project completed by Omni Means, dated August 1999. Table 1.: Existing Intersection Level-of Service (without project) Existing Intersection Control V/C LOS Amador Valley Blvd./San Ramon Road Signal A.M .48 A P.M. .67 B San Ramon Road/Dublin Blvd. Signal A.M. .70 B P.M. .72 C Regional Street/Dublin Blvd. Signal A.M. .46 A P.M. .45 A 28 Existing conditions are expressed in terms of volume of capacity on adjacent roadways using the Level- of-Service concept. LOS ratings are qualitative descriptions of intersection operations reported using an A through F ranking system to describe travel demand, delays and congestion. LOS A represents free- flow conditions with little or no delay at signalized intersections and LOS F indicates jammed conditions with excessive delay and long back-ups. The Dublin General Plan identifies LOS D (volume to capacity ratio of .90) as the minimum acceptable level-of-service in the community. Table 1 indicates that all intersections are functioning at LOS C or better during a.m. and p.m. peak hours. Project Impacts: There are no impacts to Items 15a through 15g. This determination is based on the sources referenced in the Initial Study. The project would add additional vehicles to local and regional roadways. Table 2 summarizes furore traffic conditions of all three intersections including the proposed project and other approved projects in the area (Schaefer Ranch, residential development, Hansen Hill, residential project, Dublin Chrysler and Rite Aid/Kinder care, commercial projects, refer to Traffic Study for more details). Table 2.: Existing and Proposed Intersection Level-of Service (with project) Existing & Proposed Intersection Control V/C LOS Amador Valley Blvd./San Ramon Road Signal A.M .53 A P.M. .72 C San Ramon Road/Dublin Blvd. Signal A.M. .77 C P.M. .79 C Regional Street/Dublin Blvd. ' Signal A.M. .49 A P.M. .49 A Based on a comparison of Table 1 and 2, the intersection of Amador Valley Blvd and San Ramon Road. will change from LOS 'B' to LOS 'C' during p.m. peak hours. The intersection of San Ramon Road and Dublin Blvd will change from LOS'B' to LOS 'C' during a.m. peak hours. The Regional Street and Dublin Blvd intersection will remain unchanged from existing conditions. Based on the above analysis, the construction of this proposed office project would not result in significant traffic impacts at major intersections near the project site. However, the proposed project will generate additional vehicular trips in the area which will impact city roadways. The applicant will be contributing traffic funds as part of their project. These funds will assist in offsetting costs of public roadway maintenance and planned roadway improvements, thereby reducing impacts to no impact. The traffic study prepared by Omni-Means analyzed the Corrie Center office project in relation to cumulative traffic volumes identified in the Tri-Valley 2010 Model Update. It was determined that the 29 project would not be expected to increase volumes beyond acceptable levels. Refer to Traffic Study for additional analysis. The Site Development Review process has determined that the project site has adequate parking and access. The majority of the site's parking would be located along the site's western and southern frontages. In addition to surface parking spaces, a below and above level parking structure would be built underneath the new office building and on its southern flank. Conditional Use Permit approval is required to allow a portion of the required parking (approximately 17 parking spaces) to be located "off- site" along the major north-south access easement to the east of the proposed building on the adjacent parcel. The project would not conflict with adopted policies supporting alternative transportation. The project will provide direct access to the public sidewalk on San Ramon Road and would be within walking distance to the future West Dublin BART Station. Bike racks will be required as standard conditions of approval. Due to the design and location of the project, it would not result in a change in air traffic patterns, would not increase hazards due to a design feature and would not result in inadequate emergencY access. 16. Utilities and Service Systems Environmental Setting: The project site is serviced by the following service providers: · Electrical and natural gas power: Pacific, Gas and Electric · Communications: Pacific Bell · Water supply and sewage treatment: Dublin San Ramon Services District (DSRSD) · Storm Drainage: Alameda County Flood Control District, Zone 7 (Zone 7) · Solid Waste Disposal: Dublin-Livermore Disposal Company Project Impacts: There are no impacts associated with Items 16a through 16g. This determination is based on the sources referenced in the Initial Study. Utility providers have reviewed the project and have determined that either the infrastructure exists or a method to fund the infrastructure has been provided for. DSRSD and Zone 7 will charge standard impact fees. 3O AGENDA STATEMENT PLANNING COMMISSION MEETING DATE: February 22, 2000 SUBJECT: PUBLIC HEARING PA 99-010 Corrie Center Phase II Office Development, General Plan Amendment, Planned Development Rezone / Development Plan, Conditional Use Permit and Site Development Review (Report Prepared by: Anne Kinney, Assistant Planner) ATTACHMENTS: . , . o Draft Resolution recommending City Council adopt a Negative Declaration and approve a General Plan Amendment Draft Resolution recommending City Council approve a Planned Development (PD) Rezone/Development Plan (with Development Plan attached as Exhibits A-1 and A-2) Draft Resolution approving the Site Development Review and Conditional Use Permit Proposed Ordinance approving a Planned Development Rezone and Development Plan Initial Study/Negative Declaration RECOMMENDATION: lo 2. 3. 4. 5. 6. 7. o . Hear Staff Presentation Open Public Hearing Hear Applicant's Presentation Question Staff, Applicant and the Public Close Public Hearing Deliberate Adopt Resolution (Attachment 1) recommending City Council adopt a Negative Declaration and approve a General Plan Amendment Adopt Resolution (Attachment 2) recommending City Council approve a Planned Development (PD) Rezone/Development Plan (with Development Plan attached as Exhibits A-1 and A-2), and Adopt Resolution (Attachment 3) approving the Site Development Review and Conditional Use Permit PROJECT DESCRIPTION: This application includes an amendment to the General Plan, a Planned Development (PD) Rezone / Development Plan, Conditional Use Permit and Site Development Review for a new 46, 110 square foot office building with a sub-grade parking level and a two-level (one-sub-grade) parking structure at 7950 Dublin Boulevard. A model of the proposed development, material and color boards will be presented at the Planning Commission meeting. ITEM NO. COPIES TO: The Applicant The Property Owner PA file ANALYSIS The project site is located within Dublin's downtown area at the southeast intersection of Dublin Boulevard and San Ramon Road. The site area consists of approximately 4.5 acres and is currently develOped with a three-story L-shaped office building (70,790 square feet), surface parking and landscaped areas. The proposed four-story office building (46, 110 square feet) and parking structure would be located to the rear of the existing building and woUld be connected to it via a one-story glass enclosed foyer. The existing General Plan land use designation for the project site is "Retail/Office". The project site is located within "Zone 2: General Commercial" of the Downtown Dublin Specific Plan and the proposed project complies with this designation. The current zoning for the site is C-1 Retail Commercial Zoning District. The project requires the following planning permit approvals: 1) an amendment to the General Plan to allow an increase in the maximum Floor Area Ratio from .5 to .6 for the Retail/Office land use category; 2) a Planned Development (PD) District Rezone that includes a Stage 1 and Stage 2 Development Plan to allow a maximum building height of 53' 3"; 3) a Site Development Review for the construction of a 46, 110 square foot office building, two-level parking structure and installation of surface parking, landscaping and signage. 4) a Conditional Use Permit to allow a portion of the required parking {:or the development to be located on an adjacent parcel; and The property is surrounded by commercial development including Coco's restaurant to the north, the Monarch Hotel to the south and Earl Anthony's bowl to the east and is bounded by San Ramon Road and the 1-580 off-ramp to the west and southwest. General Plan Amendment: The proposed project meets the intent of the Retail/Office designation of the General Plan which allows business and office uses. However, the project currently conflicts with the maximum floor area ratio requirement of the General'Plan which is .5. The project site plans indicate a site coverage of.59. The General Plan Amendment proposes to increase the maximum floor area ratio for the Retail/Office land use to .6. Retail/Office designated property within the city exists within the downtown area and on the west side of San Ramon Road. The Dublin General Plan contains policies which encourage the intensification of the downtown area through the development of mixed use, pedestrian-orientated development. It is city policy to require all developers to finance the cost of a traffic study to evaluate traffic and circulation impacts of a proposed project. This will ensure that any traffic impacts generated by a project will be adequately identified and mitigated to eliminate impacts to city roadways. The City Site DeVelopment Review process will ensure that the site has adequate parking, landscaping and access to accommodate the proposed building floor area. The increase in the maximum floor area ratio for the Retail/Office land use category is appropriate, as it is consistent with General Plan policies which encourage the intensification of downtown retail and office uses. This FAR is also appropriate for Retail/Office areas located on the edge of the downtown area as city policy requires projects to be reviewed on an individual basis to ensure that the density of the proposed development will be compatible with the site, traffic patterns and surrounding uses. Planned Development Rezone Chapter 8.32 of the Dublin Zoning Ordinance establishes the intent, purpose and requirements of the Planned Development District. The intent of the Planned Development Zoning District is to create a more desirable use of land, a more coherent and coordinated development and a better physical environment than would otherwise be possible under a single zoning district or combination of zoning districts. The Zoning Ordinance requires that a Development Plan shall be adopted to establish regulations for the use, development, improvement, and maintenance of the property within the requested Planned Development Zoning District. The Zoning Ordinance further requires the adoption of both a Stage 1 and Stage 2 Development Plan with the reclassification of the property in question to the Planned Development Zoning District. The applicant is applying for a Stage 1 and 2 Development Plan for the subject site. A Development Plan has been prepared for the Corrie Center, depicting development concept and addressing the requirements of the Zoning Ordinance. The proposed Development Plan is attached and consists of: Exhibit A-I, the Planned Development Provisions (including permitted and conditional uses and development regulations) and Exhibit A-2, the applicants proposed site, architectural, landscape and other plans. The Development Plan as proposed would allow a maximum building height of 53' 3" in this district, which is approximately 8 feet higher that that allowable in the C-1 Retail Commercial Zoning District. This increase is consistent with policies of the Downtown Dublin Specific Plan which encourage the consideration of building height increases through a Planned Development Rezone / Development Plan application. This increase in building height is appropriate as the project is located within an urbanized area, there are no adjacent residences that would be affected and quality views of Dublin would not be impacted. Site Development Review Site Development Review is required for the proposed 46, 110 square foot office building. The purpose of the Site Development Review process is to promote orderly, attractive, and harmonious site and structural development. It addresses building location, architectural and landscape design and theme, vehicular and pedestrian access, on-site circulation, parking, and traffic impacts. A project site plan, floor plan, landscape plan, and building elevations are located in Exhibit A-2. Site Plan: The site is irregular in shape and consists of approximately 4.5 acres of relatively flat land. The property is currently developed with an existing L-shaped three-story office building, locatedin the northern portion of the site. The remainder of the site is developed with parking and landscaped areas. There are no proposed changes to the existing vehicular access to the site. The site is accessed off of Dublin Boulevard and Regional Street via two 2-lane 40-foot wide access driveways. The proposed four-story office building would be located to the rear of the existing building and would be connected to it via a one-story glass enclosed foyer. The new building would include a sub-grade parking level. A two-level (one sub-grade level) parking structure would be constructed to the south of the proposed building, The office building and the parking structure would be connected via a vehicular driveway and a second level pedestrian pathway. The foundation of the parking and building structures would be located at approximately 11 feet below the ground surface. A geotechnical report prepared for the project identified ground water between 26 and 31 feet below ground level. The new structures would therefore, not impact ground water in the area. Architecture: The existing three-story office building was constructed in the late 1970's. In order to create a cohesive office development and maintain the existing building fabric of the area, the new building was designed to compliment the existing office structure. The Corrie Center building elevations will incorporate pop- out columns, parapet wall and glass window system. The existing building faCade will be remodeled (new windows, parapet and paint) to match the new building's architecture. Both buildings will inCorporate neutral colors of creamy beige and light gray contrasted by blue/gray windows set in black aluminum frames. The one-story glass enclosed foyer which connects the two buildings will serve as the primary building entrance. Landscaping: The landscaping for the office development has been well planned and designed to create an attractive environment. Landscape features include a decorative central courtyard area between the two buildings with ornamental tree planting, seating areas, decorative paving and water features. In addition, building entry areas have embellished landscaping and decOrative paving. A condition of project approval will require additional landscaping along the sites northern boundary and within the parking lot areas to provide additional shade and to enhance the aesthetic appearance of the project. A significant stand of redwood and eucalyptus trees exists along the site's western property line which will be retained as part of the project. Pedestrian Access: The subject project is located within a half mile of the proposed West Dublin BART Station at Golden Gate Drive. A planned roadway 'St. Patrick Way' when completed would connect Golden Gate Drive to Regional Street. The property owner has agreed to construct a pedestrian pathway from the proposed project through the adjacent parcel to Regional Street, to provide future office employees a direct pedestrian link to the future West Dublin BART Station. A condition of project approval will require that this pedestrian pathway be constructed prior to 2006. Traffic Issues: The Downtown Dublin Specific Plan was adopted in 1987. The Specific Plan states that the project area is constrained from substantial development intensification due to the traffic capacity of the San Ramon Road and Dublin Boulevard intersection which at that time operated at a level-of-service E. Since 1987, both Dublin Boulevard and San Ramon Road have been widened to six-lane roadways to improve downtown circulation. A traffic study has been prepared by Omni Means to evaluate the projects' impact on the circulation pattern of the city. The study determined that the project would not negatively impact the traffic capacity of San Ramon Road and Dublin BouleVard intersection which would continue to operate at a level-of-service C or better. However, the proposed project will generate additional vehicular trips in the area which will impact city roadways. The applicant has agreed to contribute traffic funds which will assist in offsetting costs of public roadway maintenance and planned roadway improvements in the area. Parking Issues: The site plan provides adequate parking for future employees and visitors of the development. The majority of the site's parking would be located along the site's western and southern frontages. In addition to surface parking, the applicant is proposing a sub-grade parking level underneath the office structure and a two-level parking structure to the south of the proposed building. An additional seventeen parking spaces are located off-site on the adjacent parcel. On-site circulation allows for adequate turning movements and loading. Conditional Use Permit Chapter 8.76.050 C of the parking regulations of the Dublin Zoning Ordinance states where required parking for a use type can not be feasibly provided on the same site as an approved use, the required parking may be allowed on an adjacent parcel pursuant to a Conditional Use Permit. Seventeen of the required parking spaces for the development are located within a north-south utility and access easement along the site's eastern boundary. The location of this off-site parking is appropriate as it is adjacent to the office use, it would .not impede vehicular or pedestrian access to the property or surrounding properties. A condition of project approval would require that the existing easement be amended to state that seventeen parking spaces within this easement will be attributed to the required parking for the office building. Thereby, preserving in perpetuity these parking spaces for the development. ENVIRONMENTAL REVIEW A Negative Declaration has been prepared for the project pursuant to the California Environmental Quality Act (CEQA), State CEQA Guidelines and the City of Dublin Environmental Guidelines. The 20-day review period began on February 1, 2000 and ended February 21, 2000. A Negative Declaration has been prepared because the project will not have a significant effect on the environment. To date, no comment letters were received on the project. A copy of the Initial Study/Negative Declaration is attached as Attachment 5 to this staff report. OTHER AGENCY/DEPARTMENT REVIEW The proposed project have been reviewed by the Building Department, the Public Works Department, Police Services and Alameda County Fire Department. The concerns raised are addressed in the conditions of approval for the Conditional Use and Site Development Review permits as outlined in the draft resolution (Attachment 3). Draft Resolution (Attachment 3) consists of certain conditions of approval that Staff is recommending for this project to ensure that (1) City standards are maintained; (2) Policies and standards by certain outside agencies are met; and (3) Site specific compatibility and design issues are addressed. CONCLUSIONS The project as conditioned, including the Planned Development Rezone / Development Plan is consistent with the Dublin General Plan as amended, the Downtown Dublin Specific Plan and Dublin Zoning Ordinance. The proposed office development has adequate access, parking and is compatible with other land uses (retail commercial and recreational), transportation and service facilities in the vicinity. RECOMMENDATION: Staff recommends the Planning Commission open the Public Hearing, deliberate and adopt the following resolutions: Adopt Resolution (Attachment 1) recommending City Council adopt a Negative Declaration and approve a General Plan Amendment 2. Adopt Resolution (Attachment 2) approve a Planned Development (PD) Rezone/Development Plan (with Development Plans attached as Exhibits A-1 and A-2), and 3. Adopt Resolution (Attachment 3) approving the Site Development Review and Conditional Use Permit GENERAL INFORMATION: APPLICANT/PROPERTY OWNER: Sid Corrie Corrie Development Corporation 7950 Dublin Boulevard Dublin, CA 94568 LOCATION: Southeast comer of Dublin Boulevard and San Ramon Road; 7950 Dublin Boulevard. APN: 941-1500-037-00 EXISTING ZONING: GENERAL PLAN DESIGNATION: C-1 Retail Commercial Zoning District Retail/Office -DOWNTOWN DUBLIN SPECIFIC PLAN: Zone 2: General Commercial PUBLIC NOTIFICATION: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project, to advertise the project and the upcoming public hearing. A public notice was also published in the Tri-Valley Herald and posted at several locations throughout the City. To date, the City has received no contact or objections from surrounding property owners regarding the current proposal.