HomeMy WebLinkAboutReso 34-07 Shannon Center Contract 07-02
RESOLUTION NO. 34 - 07
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
**********
AWARDING CONTRACT NO. 07-02
SHANNON COMMUNITY CENTER TO
SIERRA BAY CONTRACTORS, INCORPORATED.
WHEREAS, the City of Dublin did, on March 5th, 2007, publicly open, examine and declare all
sealed bids for doing the work described in the approved Plans and Specifications for Contract No. 07-02,
which Plans and Specifications are hereby expressly referred to for a description of said work and for all
particulars relative to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to
determine the lowest bid which was responsive to the requirements of the bid documents; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby award Contract No. 07-02 to the lowest responsible bidder therefor, to wit, Sierra Bay Contractors,
Incorporated, at a base bid of Eight million two hundred fifty-nine thousand, nine hundred and thirty
seven dollars ($8,259,937) and alternates 1-3 (restroom buildings, temporary generator, and LEED
processing), at Three hundred thousand twelve, three hundred ninety-five dollars ($312,395) the
particulars of which bid are on file in the office ofthe City Engineer.
PASSED, APPROVED AND ADOPTED this 20th day of March, 2007, by the following vote:
AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
AT;t ~
ll.~ lerk
--
Reso No. 34-07, Adopted 3/20/07, Item 6.1
Page 1 of 1