Loading...
HomeMy WebLinkAboutItem 4.06 EDublnStreetImprove t-.>- ~.. e e CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: June 13, 1995 SUBJECT: Budget Change: Engineering for Eastern Dublin Traffic Impact Fee Street Improvement Estimates Report by: Lee S. Thompson, Public Works Director EXHffiITS ATTACHED: Budget Change Form RECOMMENDATIONV Approve additional appropriation/interfund loan in the amount of $11,294 from General Fund to Capital Projects Fund (Traffic Impact Fee Project #9649) FINANCIAL STATEMENT: T-his transfer will allow recovery of $11 ,294 in engineering cost through future Traffic Impact Fees in the Eastern Dublin Specific Plan and General Plan areas. DESCRIPTION: The Eastern Dublin Traffic Impact Fee CIP was originally set up to cover the traffic engineering study necessary to establish the Fee. However, as part of the study, it was necessary to perform quantity take-offs and cost estimates for all the major road improvements as well as for the associated rights of way. These engineering costs were charged to the City's General Engineering account. In order to properly account for and assign the total cost of the TIP study to the future fees to be collected, a budget change is needed. Staff recommends that the City Council approve the budget change. g:\agenmiscltifbudgt ---------.------------------------------------------------------------------------------------------------------------------- ITEMNO.~ CITY CLERK F!LE L-,~19Io~ol -=__ ~.. - ~_ 'L 'I':. ~ __.~_..:.. I!'I'" COPIES TO: ,.. ..ITY OF DUBLIN BaET CHANGE FORM e ....- ,. CHANGE FORM # New ApprOllriations (City COIUlcil Approval RL"luirc<l): Bud~et Transfers: From Unappropriatcd Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Departmcnt Activity From New Rcvenues Between Departments (City COilllCil Approval Require<l) X Other Additional aoorooriation/intcrfnnd loan riEcREASEBUDGETACtOtlNT'" "AMOUNT"" '", INCRtASEBUDGETACCOUNT ,,': ""AMOUNT Name: Name: Capital ProjL'Ct Fund - E. Dublin Trallic Impact Fee. Engineering Services $11,29~.00 AccOUlIl #: Name: AcCOIUlt #.300-9649-740.070 Name: ACCOilllt #: ACCOlUlt #: Name: Name: Account #: AccOlmt #: Name: NlUllC: ACCOilllt #: Account #: Name: Name; Account #: ACCOlUlt #: REASON FOR BUDGET CHANGE ENTRY: Preparation of the East Dublin Traffic Impact Fee (TIF) included contract engineering services to estimate the cost of the improvements to be covered by the TlF. Accounting for all related costs in the Capital Project Fund will allow the City to recover the cost once fees are collected. Due to the fact that funds are not currently available in Fund 300 for this purpose, the City Council shall also approve an operating transfer from the General Fund (001) to the Capital Project Fund (300). Said transfer shall be repaid to the General Fund at such time as adequate TIF are collected. City Manager: Date: Signature As Approved at the City Council Meeting on: Date: Mayor: Date: Signature Posted By: Date: Signature /QnfU~Jifhn2