Loading...
HomeMy WebLinkAboutReso 50-07 Dougherty Rd Improv RESOLUTION NO. 50 - 07 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********* APPROVING AMENDMENT NO.2 TO THE CONSULTING SERVICES AGREEMENT WITH BKF ENGINEERS FOR ADDITIONAL DESIGN, CONSTRUCTION ADMINISTRATION AND CONSTRUCTION STAKING PHASES FOR DOUGHERTY ROAD IMPROVEMENTS- HOUSTON PLACE TO 1-580 PROJECT WHEREAS, on September 7, 2004, the City Council of the City of Dublin approved an agreement for engineering services with BKF Engineers to perform design, surveying and construction consulting work for the Dougherty Road Improvements - Houston Place to 1-580 Project (Project); and WHEREAS, additional work in the Design Phase is necessary to revise plans and specifications and provide assistance in right of way acquisitions; and WHEREAS, Construction Administration and Construction Staking services during construction is necessary; and WHEREAS, the work to complete the Design, Construction Administration and Construction Staking Phases exceeds the current contract amount ($483,763) by $78,186; and WHEREAS, the services will be funded by Traffic Impact Fees; and WHEREAS, BKF Engineers has submitted a fee estimate for the remammg tasks to be accomplished in the Design, Construction Administration and Construction Staking Phases, and the not- to-exceed amount to perform these tasks is $78,186. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve Amendment No.2 to the agreement with BKF Engineers, hereto attached as Exhibit "A." for consulting services. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Amendment. PASSED, APPROVED AND ADOPTED this 1 st day of May, 2007, by the following vote: AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None ATTEST: l p~ ~~ City Clerk Reso No. 50-07, Adopted 5/1/07, Item 4.7 Page 1 of 1 EXHIBIT "A" OF RESOLUTION 1:)0 -07 AMENDMENT NO.2 TO THE CONSULTING SERVICES AGREEMENT WITH BKF ENGINEERS FOR ADDITIONAL DESIGN, CONSTRUCTION ADMINISTRATION AND CONSTRUCTION STAKING PHASES FOR DOUGHERTY ROAD IMPROVEMENTS- HOUSTON PLACE TO 1-580 PROJECT WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and BKF Engineers (hereinafter referred to as "CONSULTANT"), entered into an agreement on September 7,2004, to provide design and construction engineering services to CITY for the Dougherty Road Improvements - Houston Place to 1-580 Project (Project); and WHEREAS, the City approved Amendment No. 1 on May 16, 2006, to provide additional design within the public right of way for an adjacent development project; and WHEREAS, due to changes in the Project plans and specifications and additional work required to complete the Project design phase; and WHEREAS, these revisions and additional work necessitate an amendment to the original Scope of Services in order to complete the design ofthe City of Dublin's Project; and WHEREAS, the not-to-exceed contract amount is proposed to be increased to cover the cost of additional work for the amended Scope of Services; NOW, THEREFORE, the parties hereto agree as follows: Amended Scope of Services The Scope of Services shall be modified as described in Consultant's Summary of Fee & Hours by Task, for the Dougherty Road Improvements - Houston Place Project, attached hereto as Exhibit "A" to the Amendment. Not-To-Exceed The total cost for work under this amendment shall not exceed an additional $78,186, bringing the total contract amount to $561,949. ATTEST: Cvvv [. p~ Depll~ City Clerk BKF E~EER~ ~ \ ( ./ \ /) ~te: iI/I'//)7 G:\CIP\Dougherty Rd Imp - Houston to 1-580\BKF\Amend2 budget change\Exhibit A to Reso.DOC SUMMARY OF FEES & HOURS BY TASK BKF Engineers 4780 Chabot Drive; Suite 104 Pleasanton, CA 94588 (925) 396-7700, Fax (925) 396-7799 Engineering Services for Dublin Blvd I Dougherty Road Intersection Realignment Task 1 Task 2 Construction Administration Construction Staking TASK Ratelhr Task 1 Task 2 BKF Subtotal PIC PM Eng III Eng II Eng I Tech $182 $ 148 $ 125 $ 111 $ 97 $ 109 $ 4 23 33 24 50 42 0 10 0 28 0 0 4 33 33 52 50 42 $728 $4,884 $4,125 $5,772 $4,850 $4,578 Draft Surv Total Cost 84 $ 220 Hours 0 0 176 $ 20,349 0 72 110 $ 20,428 0 72 286 $0 $15840 $ 40,777 Reimbursable Expenses: PrintinglDelivery ComputerlPlotter 4.0% of professional1ees 4.0% of professional fees $ $ 1$ 1,631 1,631 Iota Reimbursab e Expenses 3,262 Additiona Work related to the Design Phase 1$ 34,147 Total Budget :Ii 78,186 leaend PIC PM Eng 111 Eng II Principal in Charge Project Manager Engineer III Engineer II Eng I Draft Tech Surv Engineer I Drafter Technician (Engineering or Survey) Survey Field Crew Notes: 1. It is assumed that there are no utility construction staking. 2. Staking of Striping, Lighting and Signals is excluded. 3. It is assumed that rediine mark-up for as-built incorporation will be provided by the Contractor 4. It is assumed that one original Mylar set of as-built will prepared and provided to the City. 5. It is assumed one set of staking will be provided. Re-staking will be Time and Materials. 6. Additional work related to complete the Design Phase includes the following. - Project Management (Includes meeting attendance and team coordination) - Review and address Vali Cooper comments & Coordinate design comments with City - Perform supplemental field verification and investigation inciuding underground utility, sidewalk, & driveway locations - Update the utiiity files based on fieid investigation & verification wI Undergrounding Plans - Check for utility confiicts and potential redesign of Storm Drain iine - Modify Aerial Mapping to reflect onsite conditions - Revise Geometry per Tralee Project and new City Comments - Revise Signal Plans based on revised improvements - Revise Staging Plans based on revised improvements - Revise Signing and Striping Plans based on revised improvements (Includes incorporating Bike Lane Class 2 on Dubiin Bivd & North Leg of Dougherty Rd) - Revise Civil Project Sheets to reflect revised improvements & Update City Construction Details - Address Restoration on Private Property - Prepare fuel tank alternatives and exhibits at Singh property - Update Project Specifications to reflect the revised improvements - Update Project Cost Estimate to reflect the revised improvements - Field SUNeyalong Lip of Gutter at 25' inteNal around Tralee's Improvements - Striping Revision on Northbound Dougherty Rd north of Sierra Lane - Deposition for Singh Property K:lengOO\o6007\(l.41507 Ertra..conslrutUDn Support and Stllklflg.XlS Page 1 Prinled4/18120Q7 EiHIB\T A Task 1 Construction Administration Task 1.1 Provide Design Clarifications of Plans and Specs Task 1.2 Review Shop Drawings for Conformance Task 1.3 Attend Meeting as Requested during Construction (Assume 3) Task 1.4 Provide Design Revisions to Existing Design Task 1.5 Update Drawings for Asbuilt Submission TASK PIC PM Eng III Eng II Eng I Tech Draft Surv Tot Hrs Cost Task 1.1 6 12 8 27 $ 3,346 Task 1.2 4 8 8 10 31 $ 3,632 Task 1,3 6 3 9 $ 1,263 Task 1.4 1 3 6 8 12 10 40 $ 4,518 Task 1.5 1 4 4 8 20 32 69 $ 7,590 Subtotal 4 23 33 24 50 42 0 0 176 $ 20,349 Task 2 Construction Staking Task 2.1 Rough Grade Staking Task 2.2 Stake Storm Drain Task 2.3 Stake Utility surface structures (includes City Monuments) Task 2.4 Stake Retaining Walls Task 2.5 Stake Curb Gutter & Median Curb TASK PIC PM Eng III Eng II Eng I Tech Draft Surv TotHrs Cost Task 2.1 2 2 4 8 $ 1,398 Task 2.2 2 4 12 18 $ 3,380 Task 2.3 2 8 20 30 $ 5,584 Task 2.4 2 2 4 8 $ 1,398 Task 2.5 2 12 32 46 $ 8,668 Subtotal 10 28 72 110 $ 20,428 K:\engOOI06007\D41 e07 Extra..conslruction Support and Staking.xLS Pagel Prin\ed 411812007