RESOLUTION NO. 51-07
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
**********
AWARDING CONTRACT NO. 07-04
ALAMO CREEK PARK PLAYGROUND RENOVATION
TO M.A.K ASSOCIATES INCORPORATED
WHEREAS, the City of Dublin did, on April 20th, 2007, publicly open, examine and declare all
sealed bids for doing the work described in the approved Plans and Specifications for Contract No. 07-04,
which Plans and Specifications are hereby expressly referred to for a description of said work and for all
particulars relative to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to
determine the lowest bid which was responsive to the requirements of the bid documents.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby award Contract No. 07-04 to the lowest responsible bidder therefor, to wit, M.A.K. Associates
Incorporated, at a bid of forty-nine thousand two hundred and twenty dollars ($49,220) the particulars of
which bid are on file in the office of the City Engineer.
PASSED, APPROVED AND ADOPTED this 1st day of May, 2007, by the following vote: .
AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
~t-j2~
City Clerk
ATTEST:
Reso No. 51-07, Adopted 5/1/07, Item 4.8
Page 1 of 1
< .
CITY OF DUBLIN
City Hall, 100 Civic Plaza
Dublin, California 94568
CoV\trac..J No. 07-04
AGREEMENT
The City of Dublin, ("City") enters into this agreement, dated May 1,2007 for reference purposes
only, with M.A.K. Associates, Incorporated ("Contractor").
BACKGROUND
1. NOTICE INVITING BIDS. The City gave notice inviting bids to be submitted by April 20, 2007
at 2:00 p.m. for the Alamo Creek Park - Playground Renovation project by published
notice and/or posting in accordance with California Public Contract Code Section 20164
and other applicable law.
2. BID OPENING. On Tuesday, March 20, 2007 at 10:00 a.m., City representatives opened the
bids for the Alamo Creek Park - Playaround Renovation project and read the bids aloud.
3. PROJECT AWARD. On May 1, 2007 the City Council awarded the Alamo Creek Park-
Playground Renovation project to the Contractor and directed City staff to send the
Contractor written notice of award of the project. The City Council conditioned award of
the project on the Contractor's providing executed copies of all documents specified in
the contract check list included in the bid package within ten (10) calendar days of
receiving written notice of award of the project.
4. REQUIRED DOCUMENTS. The Contractor has provided the City executed copies of all
documents specified in the contract checklist included in the bid package within ten (10)
calendar days of receiving written notice of award.
AGREEMENT TERMS
The City and the Contractor agree as follows:
1. THE WORK. The Contractor shall furnish all equipment. tools, apparatus, facilities, material
labor, and skill necessary to perform and complete in a good and workmanlike manner
the Alamo Creek Park - Playground Renovation project ("Work") as shown in the
Technical Specifications and Project Plans in accordance with the Contract Documents
and applicable law.
2. LOCA nON OF WORK.
The Work will be performed at the following location: Willow Creek Drive and Shady Creek
Road, Dublin, CA.
3. TIME FOR COMPLETION. The Contractor must complete the Work in accordance with the
Contract Documents within thirty (30) consecutive calendar days from the date specified
in the City's Notice to Proceed ("Time for Completion").
4. REMEDIES FOR FAILURE TO TIMELY COMPLETE THE WORK. If the Contractor fails to fully
perform the Work in accordance with the Contract Documents within the Time for
Completion, as such time may be amended by change order or other modification to this
agreement in accordance with its terms, and/or if the Contractor fails, by the Time for
Completion, to fully perform all of the Contractor's obligations under this agreement that
have accrued by the Time for Completion, the Contractor shall become liable to the City
for all resulting loss and damage in accordance with the Contract Documents and
applicable law. The City's remedies for the Contractor's failure to perform include, but are
not limited to, assessment of liquidated damages of $300 per day in accordance with
California Government Code Section 53069.85 and the Contract Documents, and/or
obtaining or providing for substitute performance in accordance with the Contract
Documents.
5. CONTRACT PRICE AND PAYMENT. As full compensation in consideration of completion of
the Work in accordance with the Contract Documents and in consideration of the
fulfillment of all of the Contractor's obligations under the Contract Documents, the City will
pay the Contractor in lawful money of the United States the total price of $ 49,220 (forty-
nine thousand two hundred and twenty dollars even) (the "Contract Price") as specified in
the Contractor's com~leted Bid Schedule dated April 20, 2007, and attached to and
incorporated in this agreement. Payment to the Contractor under this agreement will be
for Work actually performed in accordance with the Contract Documents and will be
made in accordance with the requirements of the Contract Documents and applicable
law. The City will have no obligation to pay the Contractor any amount in excess of the
Contract Price unless this agreement is first modified in accordance with its terms. The
City's obligation to pay the Contractor under this agreement is subject to and may be
offset by charges that may apply to the Contractor under this agreement. Such charges
include, but are not limited to, charges for liquidated damages and/or substitute
performance in accordance with the Contract Documents.
6. PREY AILING WAGES. In accordance with California Labor Code Section 1771, not less
than the general prevailing rate of per diem wages for work of a similar character in the
locality in which the Work is to be performed, and not less than the general prevailing rate
of per diem wages for holiday and overtime work fixed as provided in the California Labor
Code must be paid to all workers engaged in performing the Work. In accordance with
California Labor Code Section 1770 and following, the Director of Industrial Relations has
determined the general prevailing wage per diem rates for the locality in which the Work is
to be performed. In accordance with California Labor Code Section 1773, the City has
obtained the general prevailing rate of per diem wages and the general rate for holiday
and overtime work in the locality in which the Work is to be performed for each craft.
classification or type of worker needed to perform the project. In accordance with
California Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are
on file at the City Public Works Department and will be made available on request.
Throughout the performance of the Work the Contractor must comply with all provisions of
the Contract Documents and all applicable laws and regulations that apply to wages
earned in performance of the Work.
7. THE CONTRACT DOCUMENTS. This agreement consists of the following documents
("Contract Documents"). all of which are incorporated into and made a part of this
agreement as if set forth in full. In the event of a conflict between or among the Contract
Documents, precedence will be in the following order:
7.1 This agreement and change orders and other amendments to this agreement
signed by authorized representatives of the City and the Contractor.
7.2 The General Conditions and change orders and other amendments to the
General Conditions signed by authorized representatives of the City and the
Contractor.
7.3 The Technical Specifications, addenda to the Technical Specifications signed by
authorized representatives of the City and issued prior to bid opening, Equal
Product Proposals accepted by the City and signed by authorized City
representatives prior to bid opening, and change orders and other amendments
to the Technical Specifications signed by authorized representatives of the City
and the Contractor.
7.4 The Project Plans, addenda to the Project Plans signed by authorized
representatives of the City and issued prior to bid opening, Equal Product
Proposals accepted by the City and signed by authorized City representatives
prior to bid opening, and change orders and other amendments to the Project
Plans signed by authorized representatives of the City and the Contractor.
7.5 Notice Inviting Bids
7.6 Instructions to Bidders
7.7 The successful bidder's completed Proposal Cover Page and Bid Schedule
7.8 The successful bidder's completed Contractor License Information
7.9 The successful bidder's completed List of Proposed Subcontractors
7.10 The successful bidder's completed Workers Compensation Insurance Certification
7.11 The successful bidder's completed Non-collusion Affidavit
7.12 The successful bidder's completed Debarment Certification
7.13 The successful bidder's completed Certificates of Insurance and Endorsements
7.14 The successful bidder's executed Performance Bond
7.15 The successful bidder's executed Payment Bond
7.16 The Maintenance Bond form included in the bid package that the Contractor
must execute prior to release of final payment under the Contract
7.17 The successful bidder's Qualification Statement
7.18 The successful bidder's signed Signature Form
8. INTERPRETATION OF CONTRACT DOCUMENTS. Any question concerning the intent or
meaning of any provision of the Contract Documents, including, but not limited to, the
Technical Specifications or Project Plans, must be submitted to the Project Manager for
issuance of an interpretation and/or decision by the authorized City representative in
accordance with the requirements of the Contract Documents. Interpretations or
decisions by any other person concerning the Contract Documents will not be binding on
the City.
9. ASSIGNMENT PROHIBITED. The Contractor may not assign part or all of this agreement. or
any moneys due or to become under this agreement, or any other right or interest of the
Contractor under this agreement, or delegate any obligation or duty of the Contractor
under this agreement without the prior written approval of an official authorized to bind
the City and an authorized representative of Contractor's surety or sureties. Any such
purported assignment or delegation without such written approval on behalf of the City
and the Contractor's sureties will be void and a material breach of this agreement subject
to all available remedies under this agreement and at law and equity.
10. CERTIFICATION RE CONTRACTOR'S LICENSE. By signing this Agreement the Contractor
certifies that the Contractor holds a valid Type A.. license issued by the California State
Contractors Licensing Board, and that the Contractor understands that failure to maintain
its license in good standing throughout the performance of the Work may result in
discipline and/or other penalties pursuant to the California Business and Professions Code,
and may constitute a material breach of this agreement subject to all available remedies
under this agreement and at law and equity.
11. AUTHORIZATION TO EXECUTE AGREEMENT. If the Contractor is a corporation, a certified
copy of the by laws authorizing the official signing below to execute this agreement and
the bonds required pursuant to this agreement on behalf of the corporation must be
annexed to and is hereby made a part of this agreement. An attested copy of the
resolution or other authorization of the City Council authorizing execution of this
agreement on behalf of the City is annexed to and is hereby made a part of this
agreement.
12. SEVERABILITY. If any term or provision or portion of a term or provision of this Agreement is
declared invalid or unenforceable by any court of lawful jurisdiction, then the remaining
terms and provisions or portions of terms or provisions will not be affected thereby and will
remain in full force and effect.
Executed on 1'1'1,;12- ,;;007 , by
CONTRACTOR f'/l.,a,. E::.-. ~ sou~ k ~ CITY OF DU BLlN
'DlS,A- "?lC>--J)ro~) U,,-{,:""(A1:..2.( I
~e ~;;-------- W
Title: /}.,y/~ J /J~Q~M..~
.
Attest: /l /. ~
By: ~ i..' P
City Clerk) Oepv+-.J
Approved as to Form:
B~~-Z
-f~./ Att~;ney' .
RESOLUTION NO. 51-07
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
**********
AWARDING CONTRACT NO. 07-04
ALAMO CREEK PARK PLAYGROUND RENOVATION
TO M.A.K ASSOCIATES INCORPORATED
WHEREAS, the City of Dublin did, on April 20th, 2007, publicly open, examine and declare all
sealed bids for doing the work described in the approved Plans and Specifications for Contract No. 07-04,
which Plans and Specifications are hereby expressly referred to for a description of said work and for all
particulars relative to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to
determine the lowest bid which was responsive to the requirements of the bid documents.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby award Contract No. 07-04 to the lowest responsible bidder therefor, to wit, M.A.K. Associates
Incorporated, at a bid of forty-nine thousand two hundred and twenty dollars ($49,220) the particulars of
which bid are on file in the office of the City Engineer.
PASSED, APPROVED AND ADOPTED this 1st day of May, 2007, by the following vote:
AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
~t-j2~
City Clerk
ATTEST:
Reso No. 51-07, Adopted 5/1/07, Item 4.8
Page 1 of 1
----
PROPOSAL TO THE CITY OF DUBLIN
FOR THE CONSTRUCTION PROJECT ENTITLED
ALAMO CREEK PARK PLAYGROUND RENOVATION
CONTRACT NO. 07-04
NAME OF BIDDER: M <,
1</
t ......... ~
;1 .'-r-
Hssoc.A~+e.s" ...!-IIK
BUSINESS ADDRESS: 11"'EfS"" LS ,'ll OL-v [Av.e..... 'Sv--.....{\''1uaj-(~" t-A- Q4080
i t
TELEPHONE NO. Yo f) - L '-{ L{ -<:1BL(f)
The work for which this proposal is submitted is for construction in accordance with the special
provisions (including the payment of not less than the minimum wage rates) and the contract annexed
hereto, the project specifications described below, and also in accordance with the Department of
Industrial Relations - General Prevailing Wage Rates in effect on the date the work is accomplished.
Price shall be a lump sum for the project as identified in the specification, appendix, and plan
sheets. The price bid shall include all material and labor needed to provide a complete and
functional installation as provided in the Specification.
The undersigned, as Bidder, declares that the only persons or parties interested in this proposal as
principals are those named herein; that this proposal is made without collusion with any other person,
firm, or corporation; that he has carefully examined the location of the proposed work, the annexed
proposed form of contract, and the plans therein referred to; and he proposes and agrees if this
proposal is accepted that he will contract with the City of Dublin in the form of the scope of the contract
annexed hereto, to provide all necessary machinery, tools, apparatus, and other means of construction,
and to do all the work and furnish all the materials specified in the contract, in the manner and time
therein prescribed, and according to the requirements of the Engineer as therein set forth, and that he
will take in full payment therefor the following lump sum price, to wit:
Total Base Bid: ~'-1
($ Lr1: d-J-o- )'
r'\ i N!. ~ot...{<::ad.fwo "~dl'(.c! ~~-r~ollars
I
d7' " -
/~~~/~J~~~-
Signature of Bidder
~{L~a~Q(I? 1~~0d~~Qfl
Name and Title
<
i/J-esr ~ I'bp~+'
Page P-1