HomeMy WebLinkAboutAttachmt 2 Reso CC Adopt MitNegDeclr for Bikeways MP
RESOLUTION NO. 07-XX
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
RECOMMENDING CITY COUNCIL APPROVAL OF A GENERAL PLAN
AMENDMENT, EASTERN DUBLIN SPECIFIC PLAN AMENDMENT, WEST DUBLIN
BART SPECIFIC PLAN AMENDMENT AND VILLAGE PARKWAY SPECIFIC PLAN
AMENDMENT TO INCORPORATE CHANGES RELATED TO
BICYCLE CIRCULATION AND MAKING A DETERMINATION OF GENERAL PLAN
CONFORMITY FOR THE PROPOSED BIKEWAYS MASTER PLAN
P A 06-032
WHEREAS, the Dublin General Plan was originally adopted on February 11, 1985, and has been
amended a number of times since that date; and
WHEREAS, the Environmental Impact Report for the original General Plan was prepared and
adopted in 1984 and subsequent environmental reviews have been undertaken in accordance with the
California Environmental Quality Act (CEQA) for the various General Plan Amendments which have
been approved over the years; and
WHEREAS, the City adopted the Eastern Dublin General Plan Amendment and Specific Plan to
provide a comprehensive planning framework for future development of the eastern Dublin area. In
connection with this approval, the City certified a Program Environmental Impact Report ("Program
EIR") pursuant to CEQA Guidelines section 15168 (SCH No. 91103064). The Program EIR was integral
to the planning process and examined the direct and indirect effects, cumulative impacts, broad policy
alternatives and area-wide mitigation measures for development within eastern Dublin; and
WHEREAS, the Circulation and Scenic Highways Element of the General Plan currently includes
text related to bicycle circulation, and the "West and Central Dublin Bicycle Circulation System" map
(Figure 5-3a) and the "East Dublin Bicycle Circulation System" map (Figure 5-3b) which together show
the location of existing and proposed bike routes within the City of Dublin and the Sphere of Influence;
and
WHEREAS, the Resource Management section of the Eastern Dublin Specific Plan currently
includes text related to bicycle circulation, and the "Pedestrian and Bicycle System" map (Figure 5.3)
which was amended on June 17, 1997 (Resolution 77-97) and the "East Dublin Bicycle Circulation
System" map (Figure 5-3b) which together show the location of pedestrian baths and bike routes within
the Eastern Dublin Specific Plan area; and
WHEREAS, the West Dublin BART Specific Plan was adopted on December 19,2000 (Resolution
227-00) and has been amended a number oftimes since that date; and
WHEREAS, a Negative Declaration for the original West Dublin BART Specific Plan was
prepared and adopted in 2000 and subsequent environmental reviews have been undertaken in accordance
with the California Environmental Quality Act (CEQA) for the various West Dublin BART Specific Plan
Amendments which have been approved over the years; and
WHEREAS, the West Dublin BART Specific Plan currently includes text related to bicycle
circulation, and the "West Dublin BART Specific Plan Circulation System" map (Exhibit 7 of the
Attachment 2
Specific Plan) that shows the location of roadways and bicycle trails within the West Dublin BART
Specific Plan area.
WHEREAS, the Village Parkway Specific Plan was also adopted on December 19, 2000 (Resolution
231-00) and has also been amended a number of times since that date; and
WHEREAS, a Negative Declaration for the original Village Parkway Specific Plan was prepared
and adopted in 2000 and subsequent environmental reviews have been undertaken in accordance with the
California Environmental Quality Act (CEQA) for the various Village Parkway Specific Plan
Amendments which have been approved over the years; and
WHEREAS, the Village Parkway Specific Plan currently includes text regarding bicycle
circulation as well as the "Village Parkway Specific Plan Circulation System" map (Exhibit 7 of the
Specific Plan) that shows the location of roadways and bicycle trails within the West Dublin BART
Specific Plan area.
WHEREAS, in 2005, as part of the Dublin City CounCil's Goals and Objectives the City Council
adopted as a high priority the development of a City-wide Bikeways Master Plan; and
WHEREAS, in response to this high priority goal, the Public Works Department initiated a
Capital Improvement Program project to develop a Bikeways Master Plan and to evaluate existing bicycle
conditions and access to parks and open space areas throughout the City; and
WHEREAS, amendments are proposed to the Bicycle Circulation System maps of the General Plan,
Eastern Dublin Specific Plan and Western Dublin BART Specific Plan for consistency with the proposed
Bikeways Master Plan; and
WHEREAS, in addition to amendments to the Bicycle Circulation System maps, text
amendments to the General Plan, Eastern Dublin Specific Plan and Village Parkway Specific Plan are also
proposed for consistency with the proposed Bikeways Master Plan; and
WHEREAS, the City of Dublin Planning Commission ("Planning Commission") held a public
hearing on said application on June 12,2007; and
WHEREAS, the Planning Commission did hear and consider all said reports, recommendations
and testimony herein above set forth and used its independent judgment to evaluate the project; and
WHEREAS, the staff report was submitted recommending that the Planning Commission
recommend approval of a General Plan Amendment, Eastern Dublin Specific Plan Amendment, West
Dublin BART Specific Plan Amendment, and Village Parkway Specific Plan Amendment for the
Bikeways Master Plan; and
WHEREAS, Section 65401 of the Government Code requires planning agencies to make a
determination of General Plan conformity for public works Capital Improvement Program projects, such
as the Bikeways Master Plan.
NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and
made a part of this resolution.
2
BE IT FURTHER RESOLVED that the City of Dublin Planning Commission does hereby
recommend City Council approval of the following amendments to the General Plan, Eastern Dublin
Specific Plan, West Dublin BART Specific Plan and Village Parkway Specific Plan based on findings
that the amendments are in the public interest and will not have an adverse affect on health or safety or be
detrimental to the public welfare or be injurious to property or public improvement and that the General
Plan, Eastern Dublin Specific Plan, West Dublin BART Specific Plan and Village Parkway Specific Plan
as so amended will remain internally consistent.
Section I.
General Plan Amendments.
Subsection i. Replace Figure 5-3a, West and Central Dublin Bicycle Circulation
System map and Figure 5-3b, East Dublin Bicycle Circulation System map with
Figure 4, Existing and Proposed Bikeways of the Bicycle Master Plan and shall
be renamed "Figure 5-3 City of Dublin Bicycle Circulation System" as included
as Exhibit A.
Subsection ii.
Revise Section 5.4 of the General Plan to read as follows:
"The City has adopted a Bikeways Master Plan that encompasses the Primary
Planning Area, Western Extended Planning Area, and the Eastern Extended
Planning Area. The Bikeways Master Plan contains goals and policies for
developing and implementing a bikeway system that will provide a viable
transportation alternative to the automobile, improve safety for bicyclists, and
provide residents with access to parks, open space, trails, and other recreational
opportunities. This Plan identifies existing and proposed bicycle routes and
bicycle support facilities throughout the planning areas. Readers should refer to
this plan for additional information regarding existing and proposed bicycle
routes and support facilities."
Guiding Policy
A. Provide safe bikeways along arterials (See Figure 5-3).
B. Improve and maintain bicycle routes and support facilities in
conformance with the recommendations of the City's Bikeways Master
Plan.
Implementing Policy
C. Complete the bikeway systems illustrated on Figure 5-3.
D. Improve bicycle routes and support facilities in accordance with the
Bikeways Master Plan in conjunction with development proposals.
E. Ensure on-going maintenance of bicycle routes and support facilities
that are intended for public use and located on private property in
conjunction with development proposals.
Section II.
Eastern Dublin Specific Plan Amendment.
Subsection i. Revise the "NOTE" in Figure 5.3, Pedestrian and Bicycle System
map of the Eastern Dublin Specific Plan to read as follows:
3
"NOTE: Bicycle Circulation System has been amended. Please refer to Figure
5-3b for the current bicycle circulation system. Please refer to the Bikeways
Master Plan for additional information."
[The revised Figure 5.3, Pedestrian and Bicycle System map is included as
Exhibit B.]
Subsection ii. Replace Figure 5-3b, East Dublin Bicycle Circulation System map
with Figure 4, Existing and Proposed Bikeways from the Bicycle Master Plan,
which shall be modified to show only the current Eastern Dublin Specific Plan
boundary, and shall be named Figure 5-3b, East Dublin Bicycle Circulation
System as included as Exhibit C.
Subsection iii. Add the following paragraph to Section 5.5 of the Eastern Dublin
Specific Plan related to Bicycle Circulation, after the existing first paragraph of
that same section.
"The City has adopted a Bikeways Master Plan that encompasses the Eastern
Dublin Specific Plan area. The Bikeways Master Plan contains goals and
policies for developing and implementing a bikeway system that will provide a
viable transportation alternative to the automobile, improve safety for
bicyclists, and provide residents with access to parks, open space, trails, and
other recreational opportunities. This Plan identifies existing and proposed
bicycle routes and bicycle support facilities throughout the Specific Plan area.
Readers should refer to the Bikeways Master Plan for additional information
regarding existing and proposed bicycle routes and support facilities."
Subsection iv.
Revise Policy 5-17 of the Eastern Dublin Specific Plan to read:
"Policy 5-17: Establish a bicycle circulation system which helps to serve the
need for non-motorized transportation and recreation in eastern Dublin that is
consistent with the Bikeways Master Plan."
Subsection v. Revise the first sentence of Program 5D of the Eastern Dublin
Specific Plan to read:
"The City shall require development projects in eastern Dublin to include
provisions for bicycle circulation that are consistent with the Bikeways Master
Plan, and as follows:"
Section III. West Dublin BART Specific Plan Amendments. Modify Exhibit 7, West
Dublin BART Specific Plan Circulation System map, to be consistent with Figure
4, Existing and Proposed Bikeways from the Bicycle Master Plan, as included as
Exhibit D.
Section IV. Village Parkway Specific Plan Amendment. Revise the second sentence of
the fifth paragraph on page 20 of the Village Parkways Specific Plan to read as
follows:
4
"Village Parkway is designated as a Class III Bikeway Route, which provides for
shared use of a bikeway with either pedestrians on a sidewalk or motor vehicles on
a street."
Section V. All provisions of the General Plan Eastern Dublin Specific Plan, West
Dublin BART Specific Plan, and Village Parkway Specific Plan not amended by
this resolution shall remain in full force and effect.
BE IT FURTHER RESOLVED that the proposed amendments to the Bicycle Circulation
System maps and text amendments in the General Plan, Eastern Dublin Specific Plan, West Dublin BART
Specific Plan and Village Parkway Specific Plan are consistent with all other goals, policies and
implementing programs set forth in the General Plan, Eastern Dublin Specific Plan, West Dublin BART
Specific Plan and Village Parkway Specific Plan.
BE IT FURTHER RESOLVED that, based on the foregoing findings and recommendations, the
City of Dublin Planning Commission does hereby find that the proposed Bikeways Master Plan is in
conformity with the General Plan, as amended.
PASSED, APPROVED AND ADOPTED this _ day of
2007 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Planning Commission Chair
ATTEST:
Planning Manager
5
/i
/
Coll'l'lp ".u"~
Ileserve rorn:s
Tr.l."lrH;J A,<I!J
- - ~
~..!.
l)\
{ ~xhj---'~'
.. ~~. I
.: :~:. .-,'.... I
..!..f 4t....tIlI..~# lu_______ -----
: : ~"'..
\ ~ ~
it ,"~, I/:.':.'.~.:'.::J
~. '.I~" or ~Il) .\/ ....
~ : Njd:tho ~~. ~. ~:. ,,_:._ .:
'\" : L . ...... '.5::-;:;', 'i.- ::." ~
'" .... '"'~. : ~ \ .. ':~
fm.r"klCI.n: ..i......S;C10'/. ,.:!_ ~~
".uk . .....: :. ...... '!!i;i;ii:::::i;iti: I
; l:-'t:~""1'~ ./ ,-'
. -k :CfJ~..':t"\ ~DlH"'8lI/0: ~TO"'Ol1h I
'\l.i.........~........... !.. ........ ...:f~~~~.1:.':d:1...
,,~,-
; ~ .
l'
'to "
\\.3l"0
~" -
:'-' ~ "')...
/ ....
/
/"
I
I
I
~
~
=-
..,.
0-
..,.
~
>
'.
'.
..... StuctyArea
- Class III Blk. AoutellClaS8 II Bike lanea
. Proposed R081 Area
m Proposed Trailhead
! Schools
III Pul)I~ Buildings
aI BART 51stion
III Proposocl BART Station
- BART Un.
- ~ghw.y.
Stre,tl
c::;3 P.r1<I
Water
i -.:: City Boundary
N
A
Nol 10 Stale
~
~
Figure 5-3
City of Dublin Bicycle Circul!ation System
- Existing Class I Bike Path.
..... Pf1lllOoed Cis.., Bit. Palhs
c-....k.l.AnM
- - Exladng Clas II B~e Lanes - One S~8
- EXisting Clua II Bit<1 Lanes. Two SideS
et.. 119lk. n~..
- Extatng OUI III Bike Routes
. .. .. Proposed Clan III Bike Routes
ap.n 8p601 r'....
- Exlsring Unpaved Trail
..... Planned Unpaved Trail
01"" e.... Pfopollll
I) F......y Crossing SIUdy
o ln1ersecllOn ImprovementlConnection Study
).'- 0
., 0 .
.~_....tl . ~
....~, ~ ~ .;-r,
.., .e!'lo.O'. <. '
..... . _.\.00;. .-/ ...................
.... .. 00'" :,
: .' o. 'I
\ _, 00.:,
~ ./ 0
~ . 0
.. _I 0
'. -I
., .
". ./ 00
.'. -/ 00
+. .'J 0
.. · J'
· ./0
. : :1 8
: ., g /~
. .~ 0 /
:. g--I I
.. 0 fJ: i'
· .\ 0 C/) ,
: . g lU ..-_"
: .\ 0 --.",- __
'.0 ......--
: .0 /~
~ ....:~ :n I
'...( .~ p. I
. ........;~ g \
: e\ g
. .) 0
: . g
. . 0
: .., g
: -, g
: :, g
.., 0
Specific Plan Area :., 8
...... :... ............... ....... ..........~. 0
. " ~ 0
: ~ g
: Gleason Ad. e; 8
:~oooo 0000 0 .~ 0
,. 000 0
:: ~~. ooo~/
:, ' ~/&i)ct · ./ g
: <1 ./ g
: ~ g
l Transit Sfjine g
6iJ;J'OO'Oi 00000 000000000 000
. 0
: :'
.
~,
.
.
.
.
.
.
.
---=-
--
.~
-~
Dublin BIVd~)
:,
r
Ie ,
. I
:~.................:
/:' .
. .
. .
.
.' :
I :
.
.
.
t'J1
;>0:
::1'"
.....
Ci'
.....
....
8
Note: Bicycle Circulation System has been amended. Please refer to Figure 5-3b for the current bicycle
circulation system. Please refer to the Bikeways Master Plan for additional information.
1'-
NORTH
~=-
Figure. 5.3
Pedesti-ian and
Bicycle. System
---- Pedestrian Path
. . . - - ., Class 'I Bicycle, Route
Bike Path
0000000 Class II Bicycle Route,
Bike Lane '
EASTERN DUBLIN
Specific Plan
Wallace RobertI A Tod~
tJlt>oR andfn................ A..........
121 SKon<I Slt..~ ,.. floor
Soft 1,.""IKo. CA It lOJ '.
141)15<<1-0030
SOUROE: OKS Assoclatt1s
I ! Dougherty
~ Elementarv
, ' .t
.
.
.~ ..
---U.
1\..
, . } ..
. .
. \
.. ,.
.
.
-
J, ·
,..
.-J.' -
.-
:..:
. .
.
.
.
.
.
.
.
.
.-
.
:;
I-
.
,
.
~-...
/ ...
.J -:
I
I
I
..#~ 1__-
.. ...~
....
..
..
..
~
.
I
r,
GLEASON-DR
Ci :~
<( .'
~"
Cf.l -Fallon ~
~ · Middle.
}f~r 1
"" . .....
. ..
. ..
. . . ~Yf!..
. .. ... ."'.
. .....:.. ."'.
.. '.. -.. ....
.,.. .. ....
.. . - . . ...
...... ....tC.
~ll .. · ..... ...
"0", .. · · . ....
'JIt].V,JflD .. · .... ...
....~.._ .... .... t."
/... ~~~:. ...:.. ~~
. .... \ Sports \-';. . .. .._
· Park $\. : : ...:.
. Future . .. _..
· SeliOol , .. ..... -::
l"-;' · ~. .. ....I .t I: ~ I I ....
. -. -...................~..
',/',' · · ...... (.:............. ~.
...... . ~..- .,.............::::.,.
,t't ;.: \- . . . It .
r oJ. ~l..._....." ·
...... .r.... .
; e.-,: J. / · I. ·
N ..... -Bray "'. ·
: :--commons: · :
...~. · Park. · · T N h
.....~.. . .DUBLlN BLVD : . 0 ort
................... . . . .. . . . ... . . .. .. . . Canyons Parkwa (
. ................,..
.
Ted
Fairfield
Park
..
, . . .
. .
I . .
. .
..
..
-I
(J
..... SWdy Ar.a
- Oaas III Btke AouleslClaeall Bike Lanea
. Proposed Real Asaa
m Proposed T'alhead
l Schools
tlI. Public Buildings
l:Il BART Station
aJ Proposed BART Stallon
C East Dublin Speclllc Plan
~
Figure 5-3b
East Dublin Bicycle Circullation System
t11
~
P"'
~
-.
~
I) Froeway CroSllng Study
o Imerseellon ImprovemertVConnectiOn Stud)'
- BART UN
- HiQhways
Streets
l!:lZ1 Pa""
Weier
i':-':: City Boundary
N
A
Not 10 Scale
- Existing Clus I BlkO PaN
..... Propoaed Cis" I Bike Palhs
a...81~'l.MIM
- - ExiSting Class II Ske Lanes. One Skje
- Existing Ous II BtJl:e Lanea. Two $Ides
O....,Bi...RoIA..
- Exlotr>g CI..o III Bike Roll,",
.... Proposed Class III BlM:e RoU1es
Open 9IMc. T,"I,
- Existing Unpaved TraH
..... Planned Unpaved Trail
Otll.. e,~,.,opo""
t[j
>~
=~
....
~,..
....
(II'"
~~
:\..:. tt- f-tlj(~
~~
4-1~ "
IY ,-?,I~
~
r:1l! FOR~\.""
Exhibit 7
West Dublin BART
Specific Plan
, System
CirculatIon
<l>
July 2007
NOTE: The ~e;";'1 ~V:~n;:~re
:~~:::~~ only.
100 200
400
600
. Feet
-
0,05
0,1
, Miles
t~
~~
=~
...
~r
...
f".....
t:-J