Loading...
HomeMy WebLinkAboutItem 6.1 Attach 2cI=� M-Ou DUBLIN of 19 � 1 � 82 ��LIFOR�1� Five Year Capital Improvement .Program 1994 - 1999 M�� C I T Y O F D U B L I N FIVE -YEAR CAPITAL IMPROVEMENT PROGRAM 1994 -99 JUNE 1994 Peter W. Snyder, Mayor David Burton, Vice Mayor Guy S. Houston, Councilmember Lisbeth Howard, Councilmember Paul C. Moffatt, Councilmember SUBMITTED BY Richard C. Ambrose City Manager 1 1 it 1 1994 -99 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS PAGE CITY MANAGER'S LETTER OF TRANSMITTAL CAPITAL IMPROVEMENT PROGRAM SUMMARIES AllPrograms ................................. ............................... i General..................................... ............................... Community Improvements ..................... ............................... iii Parks....................................... ............................... iv Streets..................................... ............................... vi GENERAL IMPROVEMENTS Data Processing System Upgrade ............... ............................... 1 Police Evidence Records Automation ........... ............................... 2 Automated Document Storage & Retrieval System ............................... 3 ICOMMUNITY IMPROVEMENTS Sidewalk Safety Repair /Handicap Ramps ........ ............................... ' Kaleidoscope Activity Center Improvements .... .............. Tri- Valley Haven for Women, Inc Community Service Building .................. Business Enhancement Sign Program ............ ............................... ' Widen Village Parkway Sidewalks Dublin •Blvd .to •Amador •Valley •Blvd .......... Downtown Identity Theme Program. Street Name Identification Sign Replacement Program ........................ PARKS �I ILi 4 5 6 7 8 10 Dublin Sports Grounds Renovation ............ ............................... 11 Heritage Center Acquisition / Renovation ...... ............................... 12 Murray School Athletic Field Renovation ..... ............................... 13 Frederiksen School Athletic Field Renovation ............................... 14 Dublin Swim Center Deck Repair .............. ............................... 15 Shannon Center Social Hall Floor Replacement... .......................... 16 Dublin School Athletic Field & Play Area Renovation ........................ 17 Nielsen School Athletic Field & Play Area Renovation ....................... 18 Wells- Cronin Athletic Field & Play Area Renovation ......................... 19 Mape Park Renovation ........................ ............................... 20 Dublin Swim Center Boiler Replacement ....... ............................... 21 1 1 1 1 0 1 1994 --99 CAPITAL ---- VEMEN'P PROGRAM TABLE OF CONTENTS STREETS PAGE Annual Street Overlay Program ............... ............................... 22 Dougherty,Road Improvements South of SPRR Right -of- Way ..................... 23 Dublin Boulevard Improvements Donlon Way to village Parkway ................ 24 Downtown Traffic Impact Fee Study ........... ............................... 25 Survey& Monuments .......................... ............................... 26 Street Light Acquisition Program ............ ............................... 27 Traffic Signal Safety upgrade Conflict Monitors ............................ 28 Dougherty Road Improvements From SPRR Right -of -Way to Amador Valley Blvd... 29 Alamo Channel Bike Path Dublin Blvd to Amador Valley Blvd .................. 30 Dublin Blvd Improvements Clark Avenue to Sierra Court ...................... 31 Dublin Blvd improvements Silvergate to Hansen .............................. 32 Traffic Signals - village Pkwy at Brighton Dr, Tamarack Dr, and Davona Dr.. 33 New Street Parallel to and South of Dublin Blvd ............................ 34 Dublin Blvd Bridge Over Alamo Creek Repair .. ............................... 35 Dublin Blvd Improvements Sierra Ct to Dougherty Rd ......................... 36 1-580 Offramp Improvements at San Ramon Rd .. ............................... 37 Bike Path - Iron Horse Trail Dougherty Rd to I- 580 ......................... 38 Downtown Street Light Additions ............. ............................... 39 San Ramon Rd Slope Stabilization Between Vomac Rd and Alcosta Blvd......... 40 Landscaping Silvergate Medians .............................................. 41 Road Parallel to SPRR Right -of -Way - Dougherty Rd to Dublin Blvd........... 42 Bike Lane Project - Amador Valley Blvd Stagecoach to Dougherty Rd.......... 43 Bike Path - Alamo Creek North of Amador Valley Blvd ........................ 44 Dougherty Rd Improvements SPRR Right -of -Way North to City Limits........... 45 1 1� 1 1 CITY OF DUBLIN P.Q. Box 2340, Dublin, California 94568 0 City Offices, 100 Civic Plaza, Dublin, California 94568 June 2, 1994 Honorable Mayor and City Councilmembers: Transmitted herewith is the Proposed Five Year Capital Improvement Program for Fiscal Year 1994 -95 through Fiscal Year 1998 -99. The City's Five Year Capital improvement Program (CIP) is developed for the purpose of identifying the City's capital facility needs and resources available to meet those needs. This program does n2t include any significant infrastructure specifically related to the development of those areas that are part of the City's recently adopted Eastern Dublin General Plan and Specific Plan. However, Staff anticipates that it is likely that some infrastructure planning for this area will take place during Fiscal Year 1994 -95, once the City has received a firm development application. This may require a mid -year adjustment in this year's Capital Budget. The total estimated cost for those Capital Projects proposed for Fiscal Years 1994 -95 through 1998 -99 is $9,050,820. Of this amount, $176,284 is allocated for General Improvements, $383,393 is allocated for Community Improvements, $1,361,967 is allocated Parks and $7,129,176 is allocated for Street Improvements. In addition to those projects identified for funding in the Five Year CIP, there are additional projects which are unfunded or partially funded. The total cost of these projects is $11,981,789, of which the City has or will receive approximately $749,078 in funding. Fis al Year 1994 -95 Those projects which are recommended for Fiscal Year 1994 -95 in the CIP are also included and funded in the Fiscal Year 1994 -95 Preliminary Budget. Both the CIP and the Preliminary 1994 -95 Budget are proposed for consideration by the City Council during the City's annual budget hearings. The first year of the CIP includes funding for a variety of projects ' totalling $3,636,679. Of this amount approximately $107,015 or 3% is to be funded by the General Fund; $400,000 or 11% is proposed as a loan from the General Fund to the Street Lighting Assessment District Fund; ' and $3,129,664 or 86% is proposed to be funded from restricted funds. The most significant source of funding is $2,261,831 in ISTEA Grants for two City Street Projects. Described below are highlights in each CIP Program Area for the next five years. ' Administration (510) 833 -6650 • City Council (510) 833-6605 • Finance (510) 833 -6640 • Building Inspection (510) 833 -662.0 Code Enforcement (510) 833 -6620 • Engineering (510) 833 -6630 • Planning (510) 833 -6610 Police (510) 833 -6670 • Pohlir, Works (510) 833.6630 • Recreation (510) 833 -6645 1 1 General (5176,284) ' Those projects included in this category include significant additions to the City's Data Processing System which are the result of a comprehensive review of the data processing needs of all City Departments for the next five years. These expenditures will allow for the installation of a Local Area Network to improve the ability of all system users to access available software, the addition of an automated permit system and geographic information system to continue the City's ' progress toward permit streamlining, automated computer design to reduce the cost of capital project design and additional hardware for those Departments which are yet to be fully automated. ' This program category also includes an evidence tracking system for the Police Department and an Automated Document Storage and Retrieval System for all City Departments. ' Community Imvrovements ($383,393), As in past years, the Sidewalk Repair Program is one of the most prominent projects in this program category. To the extent that General Fund Revenues are available, the General Fund has been identified as a funding source for this project. However, should State reductions in ' revenue to local government occur, the City may need to once again consider property owner funding of these repairs. ' This program category also includes City contributions of Community Development Block Grant Funds to the Tri- Valley Haven Community Service Building and Kaleidoscope Center improvements. ' Also recommended for consideration is funding for a business enhancement sign program which is one of the recommendations of the City's Business Task Force. Parks ,($1,361,967) The Parks and Recreation Commission annually reviews the Park and Recreation facility needs and makes recommendations to the Staff and the City Council with respect to the Commission's priorities for spending on ' the Park Capital Improvement Program. As has been the case for the past several years, the Parks & Recreation ' Commission was faced with many more park and facility needs than available funding. The projects identified for funding generally reflect the priorities of the Parks and Recreation Commission. Two ' exceptions are the Dublin Swim Center Deck Repair and the Shannon Center Social Hall Floor Replacement. Staff has recommended these projects for funding as both projects present potential safety hazards due to uneven 1 1 1 1 L, 1 surfacing and the cost for each project will escalate if the surfaces are allowed to deteriorate further. For Fiscal Year 1995 -96 and beyond, the ability of the City to undertake the Dublin Sports Grounds Renovation, the Murray and Frederiksen Schools Athletic Field Renovations, and the Shannon Center Social Hall Floor Replacement will depend upon the Donlan Canyon Development and Phase II of the Hansen Hill Ranch Development proceeding and requesting final map approval from the City. If these developments do not proceed, the associated Park Dedication In -Lieu funds will not be available for use by the City. Additional park projects for which there is insufficient funding have been prioritized by the Parks and Recreation Commission. The total cost of the unfunded projects in the area of Parks is $1,813,150. Detailed backup on all projects both funded and unfunded is included in the Five Year Capital Improvement Project in order that the Council may have the information necessary to reprioritize any project it so chooses. It should be noted that due to the successful passage of the Dublin Unified School District's $36,000,000 General Obligation Bond in June of 1993, the following three projects which were included in the 1992 --97 Capital Improvement Program will be undertaken by the District: 1) Dublin High School Athletic Field Renovation; 2) Dublin High School Tennis Court Renovation; and 3) Dublin High School Outdoor Lighting. Consequently, these projects have been deleted from the City's Proposed 1994 -99 Capital Improvement Program. Streets 7 129 176 In the proposed CIP, a significant emphasis is placed upon improving the City's circulation system in order to maintain good access to the City's business and retail centers. Funding has been identified and secured for approximately $7.1 million in Street Projects for the next five years. Many of these projects have been carried over from last year's CIP. However, three new projects have been added. These projects are: ' 1) Street Light Acquisition Program 2) Traffic Signal Safety Upgrade Conflict Monitors 3) Dublin Blvd Improvements - Clark Avenue to Sierra Court ' Those projects of significance which have been carried over included: 1) Dublin Blvd Improvements - Donlon way to 1 2) Dublin Blvd Improvements - Silvergate to 3) Dougherty Road Improvements - South of Amador Valley Boulevard Village Parkway Hansen SPRR and north of SPRR to 1 . . I Upon completion of the Five Year Program, Dublin Boulevard will be widened from two to four lanes from Hansen to Silvergate and from four to six lanes from Donlon Way to Sierra Court. This will substantially improve current and anticipated congestion in the Downtown area. Those street projects included in the Five Year CIP are recommended for the following reasons. 1) The City hasisecured significant grant funding and other restricted funding for several projects. 2) The project improves circulation and safety of City streets. i 3) Anticipated development either within the City or adjacent to the ' City (i.e. Alcosta Mall area) will accelerate the need for certain improvements. I 4) The project will result in significant operational cost savings (i.e. Street Light Acquisition Program) There are a number of projects for which there is insufficient funding to recommend at this time. These projects total $9,778,639. However, the City has received or obligated $749,078 for these projects. Given the past success of the City's Public Work's Department Staff in securing grant funds, it is possible that some of these projects could be advanced if additional grant funding is secured. Conclusion The proposed CIP for 1994 -1999 provides a wide variety of projects to address the City's infrastructure needs, and certainly enhance the quality of life for our residents, businesses, and visitors. I would like to express my appreciation to those individuals who assisted in the development of the 1994 -99 CIP and its implementation. Respectfully submitted, C:C-4.� C. Richard C. Ambrose City Manager m o o to o In 0 co ul o N O ul CI M 01 0 C1 O O C% O ai O d1 C1 O LO W al in In I o O ut o ul o In co O1 • • • MONC11 • It M M N 11'1 01 tl� tn d' 0 M 1n M M ul co ON I"I N O O O rl V' In O M d' ri r4 H .�. fA VY VY 4J U 4) H ri O 000)0 1n O O 0 InO M M O 0 000 a Q N Ori a O rn Or IC M O M 0• nM MO A C1 In Cl in O Ill W t0 0) N M M O rl N 01 M '-I l0 N rl a� r O O P rl r1 0 Co 0 00 M O rl N rI N O U 01 1 O O N O 00r•IN N M a O m O N O W O rir ct M M �p m . . . . 0 0 r+ c0 . O • . . r o In 0 �C o %0 O rn r•1 ul �a w w o �o N �n r w N N N P O r♦ N w O r1 U ri N N y .rl a .-. W a a 0000 0 0 0 0 0 0 00 H 0 o 00 0 m 0 0) O N a 1 00rn0 v0rio 0) I O ll O C r1M ri U 0� fT O M W 0 O d' 0 In M C0 r a% 0 0 •n r. a+ r! In Ul 0% V H ri 10 In O 0 N N M r-I rl M ri r1 O 0 M r I r1 VY 4 L4 N Q 40 V> t/r a to 0) i'pJ+,I 4J .4 LL'1 d' M r In ON In 0) 0 r rl 01 in O %0 rn O 01 m O N V> O Ch co C% N n r rl 0 Ch M M 0% n O d' 0 O In O r w r a ai 1 N M O O1 �D a N a0 u1 w w N w O �, 0 W a Ot sN M d d t0 r r 0 r rl r M %0 M rl 0 O Rf m H r Go r 0 r•1 M M W O rl r1 M In %0 %0 M r1 r1 M 0 ri N b' 'd' M M r-I .Y. to 1 M M N M v 44 M irr Pk I 4 C1 N '`I 0 0 rl W r m v to r v N 101 O Q• rn p Ol 9 N 0 rl W r ri Gp M O M N N ra ul m m r~ N ON � to ul lC M 0 O N r tl' rI N N 0 111 >4 N N eN PMl �' d' C.1 M Fi V' d' v W (11 V>• V> A W to Hj v M CO N r rl 01 0 n rl 0A In O M %0 00 O M r r P �Ci �j W �y` [W co O� r �0 r•{ %0 W In M M 01 In O N d' %D O O N r 1n N ll d' r GD O N O In rI h rl l al C/j N M It M r M U t0 M co N 0 0% r N r 0% N ul r r M In O N O O U m •rl l7 r CO N 'p M ul r1 co 1n M qp .r W In A 0 0 M In M u1 i� H cn d' In to In v In H N .0 rl If b' o 0 rl r rn ri M ri '� % CA V> rl 01 01 V> w W. O M ul to A y m H 4J H W F3 ul P' d r + ul 0 rti W O N C1 N 01 O 01 4J m' aril r.—uuli wn Ch ..�rq 'U`'' P4— Q)N 111NN p.-.0 1, Ur U rq -P A'd ~VNV4J qO•,,4 N•iO p'- ' O• P4 A ri ►� �+ > `-' N N O O '0 N U 9 A 0 U) •rl N U •rl 'd V 0) ++ A •r1 t7 4J 7 — 0 7• 4 ro 9 rq p d 01 r1 W i1 A ^.1' I -� 4J n 'd ri 44 O 4J 0 FFpai, a U s A '0 -- 4J 0 17 W 'd 0 0 .d -- a V N p+ p rd *1 0) A ro IO V p 4 O d q 0 Id +1 U w ,y M •P. W. N ul C7 W O W ?Y d ri V q •ri M RC G4 � � 01 0! �l 0 x ri N +J W M b 'd 'a' r� U 0 a N rI 0 JQ 0 CUB r 1 •rl N U N ri (d 10 r. .N.. `� X •rqi O M 0) 0) 01 Ol r•I ri N M7W 04UCl -HW ab�+JM�y Id U d 00 A N q N rl 7 O 4J •rl 01 V N ri rµi W a UIN gg y� ri H Nm b0CM7u (a C1fA•IO -4JAro4 0 ►�u+ aagloldF 0 Im, E yN V) d •0 •• r7UWm E u UV ME W �"U to N I•a I .r4 m cN 0 0 0 0 0 0 0 0 0 0 0 1 O O O O O M N1 M M C1 �ry F1 M M M i y} �/} V► t1t V!• yr O O O n rn rn q o o O o O 0 °0 00 0 °o I O m p1 O 0 0 0 0 �4 1-1 y 0 0 O 0 0 0 0 0 0 0 0 0 0 1 b b O O O b [7 a01 N r Ln Qt Ln Ln WE+ y} Nf !h t!} N NY d' O d' IA C+ d' t O ao O co .i m eo op I n u1 N O N N N ' to n •r' n n +r m n In r4 t- r% N {n. th. t? [h S!} W U q O O M C% C% RS LLL777���NNN P7 rl � ' v O O v N r u1 O N O N N N 00 i r n m m e+ %D m H ,i r In A n n � 'i r1 ri w N tN _ Ip O qj m 114 � a r. >, 41 t a •N go p to O H U V 9:a 0 7 rq w U > � 'd w 'd P r-I A $4 '0 td � m +j � 1 ed U r-4 0 V V C U .d q U ;3 g�r (d 0 qG4 � U•� Ny Q k av 3 trl ri H 0 CJ N N d N W x x z I .r4 m O F� C7 ri m 71 1 to 0 0O 3 E4-1 w a m �4 -4 :3 to � a a •,4 a a b a a w H r%1 m M a .ro A 0 Z '0 0tVpONmr. a Fa- 3 14 i4•4 U N •r, In 0aVa rq o a V a 1 A 1 a o 0 0 o a o b o 0 0 1 0 o a a o a 0 0 x 0 0 0 0 °a In In Ln Ln w a 0 0 0 � it t/} l? cn , R/Y V), M� or Ole V). co 0 0 o a o 0 C), o a 0 0 0 1 a n o 0 0 m 0 0 0 0 0 U) in in Ln In n o o a a a o rn o o a a o 1 0 a 0 0 0 0 0 0 0 0 Ln In Ln in Lo �o o a a 0 a o 0 /1 O a a a b b 0 n o Ln Li ko o Lo n Ln A r4 r•1 ri ri x �x E V)- t* v1• a s V1, d a L' r. a% M o o M o en m m o > 1 cri o o 0% o m m m 0 M o 0 M o M M M H M a a M a M M M 10 ri 'i cc Ln M m v E+ H w� V). Ole N 6H O1 In 02I r•1 ro 0 0 0 0 0 ,U � +It tf>• yr yr 'n M 0 0 0 a1 o M M m o N M C o O l b M M M EE U fn 0 0 o m o M M M co H .-1 0 0 Ln M co 00 N rl M M M M fh tl> •ri i � •r�i {J I 0 o, M a a urra V a N- rt 71m chi U .. .-. q V a u > ro a 14 $4 .. aEi mro 4Lnon 000 cL 4-1 I 44 ro a }L x M4 o O r 1 N q •01 I wa o a wa `•>`. H I ro l ama a�om r.0 ro a Iy�+0 aar•c0W0% +J o to +L a ro•4'd o 10.4 a ro m U w? $4 rL N i •a 4 $4� o+ U H -r1 [7 b r-1 m I �p IC ri r l a m •+ R- U to C: ?C u 0 M H m to OW ri 14 V ri 1-1 I H w p V z F4 r H V N a .. O H a o W O a d I a r� N M v E Pr4l 0U H a N 3 3 3 a a1 a x x z O F� C7 ri m 71 1 to 0 0O 3 E4-1 w a m �4 -4 :3 to � a a •,4 a a b a a w H r%1 m M a .ro A 0 Z '0 0tVpONmr. a Fa- 3 14 i4•4 U N •r, In 0aVa rq o a V a 1 A 1 N a 7 1d a to a x 0 0 0 0 °a ao ao o° a 0 0 0 � it t/} l? S/1• R/Y O F� C7 ri m 71 1 to 0 0O 3 E4-1 w a m �4 -4 :3 to � a a •,4 a a b a a w H r%1 m M a .ro A 0 Z '0 0tVpONmr. a Fa- 3 14 i4•4 U N •r, In 0aVa rq o a V a 1 A 1 1 t 0 to d t n co to to 1 uti 4) 0 r, N N N W -4 v aaa u o a) U) o u1 0 o u1 o Ln Ln A 1 CA 0 0 0 0 0 a y 0) e M o m v o a 0 +� o, U-) N N N v NOW N 4.1 .,q r1 A '0 GO+ 0 m t N . '•1 r O O 0 O 00 O O O rtn4 x 0�) N N � � x rn Ot tci �p ui W t0 tD W U r4 N N N N p N 0) d +) tll ur 4/Y b w a m w 9 to >1g� UQI O O O O •4 M 0 0 c rl 0% U 'q )4 Ln R1 0 •� co m ON 0 N w M FV %0 N rl 01 rl m r4 01 rl v C. 44 ,a roo .. Abu O a' tn to N 0 d M u) n 04 o d• u1 CO d r 0 r N r N O $4 .4 0 14 4 9 44 w �E 1 r4 '4 r o r4 N W o o ..4 3 O H N d• n d' d' M w d' 40 a to 0 A G) O� rt N .- N M A .r-1 N Poo a w E t0 0) H N 4A or or U rom d O 0 0) p N •.4 ri 4-) U N Ot Ch L>+ to O rt '4 1n O d0 N rl r4 O F4 01 0 ••�4 1 t O n R N N N R r '"t WO WN tD N d to %0 tJ t(d tv to � •M ro o Or +J EE dd O M O M 0 O L,, u*, M u1 in co n O d' u1 (n LL1 d n N CO N a) r O r♦ p 0 3 0) d COQ I d r Ln w co ao r ao w N r1 d CO It It q�� N to A 0) O ro $4 H- U v m M t• t� d N 00 tb OD rt N 00 N r1 er V) N N d' u1 CD N 00 N 0 d r. M r r! M d N .•1 v -T 010 'O w u} rn Vi 4? a W i >~ 0 �4 0 to :t td 0 o ,1 b to ° -44 � � m -4 4 —1 0, +� .U4 V g by °4 a0i a a0 3a► .'d4� a s m 0 0 •mot a 0 0 A � 01% 0 0 0 �4 0 0 0 +t to r, co m 1 •� 'a k '0 O m 0 m 0) rL' •.4 .0 to CI 04 �► F• w id1 W U Q� Q1 09 1.t U ri 01 N 0) m *tart fdm mu 0) 0; rl Od—H O 0 C a 04 . "� 4-t .ci to 7 4.3 t7 t; 0 > •e4 N V )4�.00009wM"4p}) o r4 O � 10 --0)N0 p � H •.� U to 'i•,4a 34 N ?Ap W 0 00-144 go -.4 0 0 0 M -H V0 N1403kQU0 A 7"� d row V w ri .4 w to a 9 _ a to v 01 ••4 N a x ••4 m Ot H td b+ N •.4 � a 0 w 4•) �+ r~ A 'd td •-• d p 0 in ro +) O A U� w p) 044 •n A O 7 to ••4 9 V $4 01 q O •,.4 O W d td r4 01 r4 "A � 9 r4 N O W 74 .4 '4 i) b N •i a •t'•^••4 b w ri L'. -H tJt $4 0) 'O .0 r4 U G rt U H rt •.4 to p 0 to N P. r. A Q k •4 0 e to O r4 to � � $4 � d r-1 134 4 0) 0 A x A to o x aO�$4 tqO1 w4 Or- o E4 x r, E4 6. try U a x E t l to E4 U U 3 1 t SUMMARY 1994 -99 CAPITAL IMPROVEMENT PROGRAM PARKS PROJECTS PRIORITIZED BY PARKS & RECREATION COMMISSION Iron Horse Trail (See Bike Path Projects -- Streets) Dublin School Athletic Field & May Area Renovation Nielsen School Athletic Field Renovation Wells -- Cronin Athletic Field Renovation Mape Park Renovation Dublin Swim Center Boiler Replacement Total Cost �t� INSUFFICIENT FUNDING (unknown) $ 914,205 337,970 298,115 220,610 42.250 $1,813,150 O CO O N O 0 O I O C p 0A O O 0 0 O P p IA b C0 O O 01 01 M lA C1 Q1 01 0 M M / 01 N W M rh O M b M .b... N y lD- W O 0 O O O O O 0 O p O r N W O O 1 O r M� M b b M O LA in b b N IA IA O n OI 1-1 b -1 N y} N N Vi p 0 p 010 O 0 O O 1 P O N N w m n 0 N N ' w Lt -Z I+ a o .i . i .i D 0 r to N d iD � r. N t'1 'i IO •r1 W v � W V O O 0 p coo O O O O O G p o O 4 0 t C O l0'1 O C` U Q O b 1% CO CO Kr 0 ICI CO CO 0 •,� r. .4 �' � w aN b N M W M N � y or V!• � W a In o O Oo 0 0 0 n °mom 0 o o n n D a v 0 0 01 a o O C 0 O C b O L 0 0. 01 d I n o IA N N O N O 1"1 N O '•1 OI r W O rl n y 1 CW' co co %n r1 N O N N O r) b %0 H N 1 d' M A .� H H N M N M v U I V► a''.. b $ 1.1 'i tT N O M 01 M b b M 0 d' M b ID 4 O OI � N [0 W 01 b r u1 D m 0 W 1 O '� er IA O O H O W o O M '•1 u1 W .i W Ch a C ICI 0 to N .•i 01 M 0% N tr- M N W fn wi U N A .� d' M rr v M >4 at V} Vl V} 1 W _ a a in 01 N O M o 0 O 0 O O M N b 01 .4 CI O b CD O M N V) a a 0 0 0%0 O 0 0 0 O M OD b O r N b n 0 N o 0 M PI W 0 t• V' 0 N M 0' N 0 O O M O M r. y y.. . � . a H O b o 01 M O W N IA O b CD N 01 N Ot N r M ICl O N N N yJ C0 a n N N O N n r M m a a w 0 v Co W O O V' r G roC1 b M b d� M W N M IC1 d� IA W O tl' v b IA ••�� . (+1 W erg W n v N 0 V). W ta W A W ; 0 V 0 7. km 1+ to o 9: y 7g :a0Id 4u4jC: 4 a � G aN W W 0 m {: g4100,4akGAGar114a a a 'i V � g A O •o oo a �- -N - .a . w .m -. r w UG , Y N 7 /d axari 0 41W0)0 o W kw OAOV1$4 r> A. m W 0 p be � �x 0 0 o k Q) 9 11 y a > al voa a 1 0 NO U U +1 W A -40u C om a A!_ 0 o PHakoawya N -IW0 k k0-4 vA H k 4) 0 w aJ m w to V A w -0 .• o 0,0 -W A rn - a V k a 00tiaA kA G+19GGbamV941 C4k a 1.l 19 to H >1 A k a M H a tT k 0 ONO '{y N .N 4J tT W 9 ••'I 0 '0 hId i �G� Oa +0 OaxO•'rypI+�^1 U IRP: r- -1 a V � '4 b�N0C� Gtl.1 H U W .0 . W 14 04 daEw •.IvN N Amm aW ow N 09 a a•.+ AA m W ­W I V :)94k rl ' C 0I aV0A m01 i1 .0b•- m HV rl W to N0m 9 a+ a to W C 0+3N W 01014V U G $4 r-1W aAGOAPUN�••1•WAm- H9.kGa"1k P V 04 9 k0CT C > �mC �w 7m0wDfia �wyO 5 w Gmwa�v00 A�A�3 A0)c0wN a00A14A'AJId 0 k to 0 UN 0 "% �1d Iat tu to COOA0O70NyNsCEO VEaH e 1W AG.+Ga O0 0 zE 00%.H a11 14 a 9 G W +O U O G 1 41 N en •'1 Gi a N N 1d N CL N 4J 9 HAC)A L4aik•'1CW L 41 1.} a a rl N n 1n lc r m of H ..4 rl E �aHE'c mCAu 440 104 F A Ina N p z x x v A SUMMARY 1994 -99 CAPITAL IMPROVEMENT PROGRAM STREETS PROJECTS Dougherty Road Improvements South of Southern Pacific Right -Of -Way - Phase II New Street Parallel to and South of Dublin Boulevard (a) Dublin Boulevard Bridge over Alamo Creek Repair (New) Dublin Boulevard Improvements - Sierra Ct to Dougherty Road I -580 Offramp Improvements at San Ramon Road (New) Bike Path - Iron Horse Trail (Dougherty Road to I -580) Downtown Street Light Additions San Ramon Road Slope Stabilization Between Vomac Road and Alcosta Road Landscaping Silvergate Medians Road Parallel to Southern Pacific Right -of -Way (Dougherty Road to Dublin Blvd) (b) (New) Bike Lane Project - Amador Valley Blvd (Stagecoach Road to Dougherty Road) (New) Bike Path - Alamo Creek North of Amador Valley Boulevard (New) Dougherty Road Improvements - SPRR Right -Of -Way North to City Limit (c) Total Cost Less Traffic Impact Fees Collected or Obligated FUNDING SHORTFALL INSUFFICIENT FUNDING $1,075,339 2,240,000 194,700 1,560,000 845,000 534,000 66,000 400,000 152,600 1,838,500 121,500 30,000 721,000 $9,778,639 (749.0781 $9,029,561 (a,) This amount includes $27,810 in Traffic Impact Fees which have been collected to date and $699,540 in mitigation funds which BART is required to contribute to this project. (b) This amount includes $12,400 in Traffic Impact Fees which have been collected to date. (c) This amount includes $9,328 in Traffic Impact Fees which have been collected to date. - vii - 1 1994 -99 CAPITAL IMPROVEMENT PROGRAM 771 PROJECT NO. New PROJECT DESCRIPTION DATA PROCESSING SYSTEM UPGRADE ACTIVITY GENERAL DESCRIPTION - LOCATION This item provides for additions and upgrades to the data processing system. The system components include a personal computer (PC) based network and implementation of new applications for use by all departments. 1 COMMENTS 1 1] 1 1 The current system provides a limited number of individual PC's for day to day operating requirements. Some of the workstations have access to the IBM System 36 mini computer in order to gain information related to financial systems, business licenses and recreation scheduling. The proposed project involves a phased approach to expanding access to computer workstations and installing new systems to address activities which are not currently automated. In Fiscal Year 1994 -95, a citywide local area network (LAN) will be implemented. The LAN will provide for standardization of system software and allow for the sharing of system resources. The amount identified in this project only reflects the cost of additional system components. The first phase in 1994/95 will also include the replacement of 24 workstations, which have been fully depreciated in the Internal Service Fund. The estimated replacement cost is $83,000, which is not shown as part of this project. In 1993/94 $67,000 will be necessary for the network server, system software and 7 new workstations for Public Works, Building and Police. It is proposed that $17,240 of the 1993/94 expenditures be funded from the Criminal Activity Fund for Police related equipment. Future year projects are proposed for implementation as follows: Fiscal Year 1995 -96: Automated Permit Tracking System - $25,000 To improve permit streamlining Auto CAD - $17,000 - To reduce engineering design costs Fiscal Year 1996 -97: Geographic Information System (GIS) - $10,000 Fiscal Year 1997 --98: Migration from System 36 - ISF Funds - Improves finance system Fiscal Year 1998 -99:, Network System software /hardware Upgrades - $33,000 - Updates processors for improved speed and implements software improvements ESTIMATED COSTS FINANCING/YEARS SCHEDULE Operating Supplies $ 43,588 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Contract Services 22,000 001 $ 49,515 $42,000 $10.000 $33,000 $134,515 March /Equipment 86.196 200 17.269 17,269 TOTAL - -> $151,784 TOTALS - -a $ 66,784 $42,000 $10,000 $33,000 $151,784 1 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. New PROJECT Police Evidence DESCRIPTION Records Automation ACTIVITY GENERAL DESCRIPTION -- LOCATION This system will automate evidence tracking within the Police Department. IKO P, The evidence tracking system will allow the Police Department to identify and store evidence using a bar coding system. Each item will receive a tag that is identified using pen - -based hardware. The system then inventories all items and attaches the necessary attributes of the evidence. The cost of the system includes the system software, a personal computer and dot matrix printer. ESTIMATED COSTS Equipment /Software $7,500 Fund 001 N TOTAL - -a $7,500 I TOTALS w FINANCING /YEARS_SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS $7,500 $7,500 $7.500 $7.5001 - 2 -- CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Automated Document GENERAL Storage & Retrieval System DESCRIPTION - LOCATION This item provides for an automated document storage system. The intent of the system is to reduce record storage demands for file space and.automate access to records in the Police Department COMMENTS The system will consist of a document imaging and indexing system which records on CD -ROM style media. It is estimated the system will cost approximately $17,000, which includes only costs of hardware and software. Further analysis is required related to the impact and costs necessary to convert all records and operate the system. The system consists of imaging/ indexing software, a CD recorder, a scanner and CD media. ESTIMATED COSTS FINANCING /YEARS_SCHEDULE Hardware /Software $17,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS 001 $17,000 $17,000 TOTAL - -a $17,000 TOTALS - -a $17,000 $17,000 3 _ CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9425 Sidewalk Safety Repair/ COMMUNITY IMPROVEMENTS 15.000 Handicap Ramps Inspection DESCRIPTION - LOCATION This project provides for the replacement of damaged curb, gutter and sidewalks at various locations. The sidewalk repairs are made by either removing and replacing concrete or by grinding the high side of the offset sidewalk. The method is determined by the severity of the damage. Approximately 18 handicap ramps are being placed on curb returns at various intersections. State Law provides that sidewalk repair is the responsibility of the property owner, yet cities are also held liable for hazards associated with sidewalks in need of repair. This program reduces the property owners', as well as the City's, liability exposure. Dublin's program has, been funded by the City on a year to year basis. Community Development Block grant monies have became available in the amount of $13,393 to aid Dublin in meeting its Americans with Disabilities Act (ADA) requirements. These funds have been set aside to construct handicap ramps at intersections. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TO1 annual $50,000 $50,000 $50,000 $50,000 $50,000 $250, 13,393 13, annual $63,393 $50,000 $50,000 $50,000 $50,000 $263, 4 — CITY OF DUBLIN, CALIFORNIA Fund Design $ 5,000 001 Survey 15.000 Inspection 30,000 209 (CDBG) Improvements 213,393 TOTAL --r $263,393 TOTALS - -n FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TO1 annual $50,000 $50,000 $50,000 $50,000 $50,000 $250, 13,393 13, annual $63,393 $50,000 $50,000 $50,000 $50,000 $263, 4 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Kaleidoscope Activity Center COMMUNITY IMPROVEMENTS Improvements DESCRIPTION.. LOCATION The Kaleidoscope Activity Center in Dublin is a day care facility serving developmentally disabled youth. This project, funded through a Community Development Block Grant, provides funding to assist Kaleidoscope with various activity center improvements. COMMENTS This project provides funding to assist. Kaleidoscope with the following activities: 1) help "buy down" or pay off some of the fixed rate mortgage associated with their recent site acquisition; 2) renovate the learning area; and 3) purchase adaptive, programmatic equipment for programs serving the physically and developmentally challenged youth. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Improvements $10,000 Fund Prior Years 1994-95 1995 -96 1996-97 1997 -98 1998 -99 TOTALS 209 $10,000 $10,000 TOTAL - -> $10,000 TOTALS --> $10,000 510,000 "-.5 -- CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTIOq ACTIVITY New Tri- Valley Haven for Women, Inc. COMMUNITY IMPROVEMENTS Community Service Building DESCRIPTION - LOCATION The Tri- Valley Haven for Women, Inc. is located in the City of Livermore. The agency, serving the Tri - Valley cities of Dublin, Livermore and Pleasanton, provides shelter and support services for women and childr4n who are victims of domestic violence, rape and other crisis situations. This project, funded through a Community Development Block Grant, provid�s funding to assist the Haven with the construction of a community service building. COMMENTS This project provides funding to assist the Tri- Valley Haven for Women, Inc. in the construction of a community service building that will house the Valley Rape Crisis ' Center and all of the Tri - Valley Haven's domestic violence services for persons not living in Tri - Valley Haven shelters. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Construction $10,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS 209 $10,000 $10,000 TOTAL - -a $10,000 1 TOTALS - -a $10,000 $10,000 - 6 " CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. New PROJECT DESCRIPTION Business Enhancement Sign'Program ACTIVITY COMMUNITY IMPROVEMENT DESCRIPTION - LOCATION This project would provide signage which would identify the City of Dublin from the Freeway(s) for the purpose of attracting additional business to the Dublin community. COMMENTS This project is a recommendation of the City's Business Task Force. Sign locations are yet to be identified and secured. Sign content and location would have to be approved by Caltrans and the Federal Highway Administration. ESTIMATED COSTS FINANCINGREARS SCHEDULE Fund prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Improvements $100,000 General $100,000 $100,000 TOTAL $100,000 TOTALS - -a $100,000 $100,000 - 7 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Widen Village Parkway Sidewalks COMMUNITY IMPROVEMENTS Assigned Dublin Boulevard to Amador Valley Boulevard DESCRIPTION -LOCAT This project would widen the sidewalk a both sides of Village Parkway betwee: Dublin Boulevard and Amador Valle Boulevard from its present 5 feet to feet. COMMENTS Most of the sidewalks in the downtown area are presently 8 feet wide. The 5 foot sidewalk is a residential standard for areas where a high volume of pedestrian use is not expected. This segment of Village Parkway allows parking directly in front of a large number of small retail businesses. Pedestrian use of this sidewalk is made more difficult because of obstructions typically found in a downtown area such as bus benches, sign posts, and fire hydrants. The City presently has 8 feet of right -of -way from the curb face on both sides of the street. ESTIMATED COSTS FINANCING /YEARS SCHF�DYLE, Prel Engr $ 4,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 8,500 Improvements 120,000 Inspection 7,000 Insufficient funding within the CIP timeframe. $140,000 Miscellaneous 500 TOTAL. $140,000 TOTALS $140,000 - 8 - CITY OF DUBLIN, CALIFORNIA M 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. Not Yet Assigned PROJECT DESCRIPTION Downtown Identity Theme Program ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION- LOCATION This project would 1) establish and ca=, out a public sign support and framini program; 2) prepare a design for private shopping center identification pylon, consistent with other theme elements ii the downtown area; and '3) design ani construct district identificatioi improvements at the four majo: intersections in the downtown area. COMMENTS These improvements were identified in the Dublin Downtown Improvement Plan approved by the City Council in 1986. This project would implement some of the larger improvements from that study. 1) Public Signing Program $ 50,000 2) Study for design of center entry pylons 10,000 3) Downtown entries identification 100,000 TOTAL $160,000 ESTIMATED COSTS FINANCING[YEARS SCHEDULE Prelim Engr $ 20,000 Fund Prior Years 1994.95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 15,000 Inspection 4,500 Insufficient funding within the CIP timeframe $160,000 Improvements 120,000 Miscellaneous 500 TOTAL $160,000 TOTALS - -a $160,000 - 9 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTIQN ACTIVITY Not Yet Street Name Identification COMMUNITY IMPROVEMENTS Assigned Sign Replacement Program This project would replace the existing black lettering on white background street name identification signs at approximately 400 intersections throughout the City with distinctive, reflectorized green - and -white name signs with the City's logo, as well as block numbers, as adopted by the City Council during Fiscal Year 1985 -86. 1 COMMENTS The new signs will be easier to read because the faces are reflectorized. These signs are presently being installed on all new subdivision streets. ESTIMATED COSTS FINANCING/YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997.98 1998 -99 TOTALS Prelim Engr $ 2,000 Design 3,000 Insufficient funding within the CIP timeframe. 190,000 Improvements 75,000 Inspection 9,500 Miscellaneous 500 TOTAL --> $90,000 I TOTALS - -> $90,000 - 10 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 9583 PROJECT Dublin Sports DESCRIPTION Grounds Renovation ACTIVITY PARKS DESCRIPTION -LO ATI N The project provides for the renovation o: the Dublin Sports Grounds which is locateq at Dublin Boulevard and Civic Plaza. COMMENTS The Dublin Sports Grounds Master Plan was adopted in May of 1990. The recommended improvements have been divided into phases as follows: Phase I includes construction of a new 60' baseball field, purchase and installation of bleachers at all fields, installation of drinking fountains at Fields 4, 5, & 6, fencing modifications to Fields 5 & 6, and addition of a windbreak for Field 4. The design work for Phase I is proposed for Fiscal Year 1994 -95. Phase II includes reorientation of baseball field #3 and renovation of the drainage and sprinkler system for the west half of the Sports Grounds. Phase III includes softball field lighting, safety modifications, and renovation of the drainage and sprinkler system for the east half of the Sports Grounds. Phase I Phase II Phase III $141,595 $295,480 $287,475 ESTIMATED COSTS FINANCING YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOT Improvements $601,461 Design 72,035 215 $21,000 $12,145 $168,340 $265,120 $257,945 $724, Inspection 24,015 Mach & Equip 21,039 Miscellaneous 6,000 TOTAL - -a $724,550 TOTALS $21,000 $12,145 $168,340 $265,120 $257,945 $724, - 11 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9401 Heritage Center PARKS Fund Acquisition /Renovation 1994 -95 1995 -96 1996 -97 This project provides for the acquisitioi and renovation of the Dublin Cemetery, 014 St. Raymond's Church, and Original Murra; Schoolhouse, located on Donlon Way. COMMENTS Acquisition of the Heritage Center was completed in October of 1993. An architect has been retained by the City to prepare the schematic design and construction documents for the renovation of the Schoolhouse and Church. Renovation to the buildings will begin by September of 1994 and includes handicapped modifications and structural repairs. Grounds improvements are underway and include installation of a water meter, lighting repairs, tree removal /pruning, and fence repair/ replacement. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Design $ 22,395 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Inspection 7,500 001 $ 1,250 $ 0 $ 1,250 Acquisition 23,981 209 0 24,144 24.144 Improvements 131,037 215 3,240 3,380 6,620 Mach I Equip 800 218 41,221 116,608 157,829 Miscellaneous 4,130 TOTAL $189,843 TOTALS _ -a s745.711 $144,132 $189.843 CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Murray School I PARKS Assigned Athletic Field Renovation DESCRIPTION - LOCATION This project provides for the renovatioi of the athletic fields at Murray Elementary School located at 8435 Davon; Drive. This project was conceived by the Dublin Schools Facilities Improvement Task Force. Field renovation includes extensive grading and reseeding, the addition of an irrigation system and paved walk and renovation of playfield backstops. ESTIMATED COSTS FINANCING /YEARS §OEDVLE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOT $39,090 $344,760 $383, $39,090 $344,760 $383,850 — 13 — CITY OF DUBLIN, CALIFORNIA Fund Improvements $325,730 215 Design 39;090 Prelim Engr 4,000 Inspection 13,030 Miscellaneous 2,000 TOTAL - -a $383,850 TOTALS - -� FINANCING /YEARS §OEDVLE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOT $39,090 $344,760 $383, $39,090 $344,760 $383,850 — 13 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY' Not Yet Frederiksen School PARKS Assigned Athletic Field Renovation DESCRIPTION - LOCATION This project provides for the renovatio of the athletic fields at Frederikse School, located at 7243 Tamarack Drive. This project was identified by the Dublin Schools Facilities Improvement Task Force and includes filling and reseeding of low spots in the athletic fields and irrigation system repair. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS $87,835 $87,835 $87,835 $87, — 14 — CITY OF DUBLIN, CALIFORNIA Fund Prelim Engr $ 4,000 Improvements 70,550 215 Design 8,465 Inspection 2,820 Misoellansous 2,000 TOTAL $87,835 TOTALS FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS $87,835 $87,835 $87,835 $87, — 14 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Dublin Swim Centex' Dock Repair PARKS DESCRIPTION - LOCATION This project provides for the repair an refurbishment of the deck at the Dubli Swim Center located at 8157 Villag Parkway. COMMENTS The Dublin Swim Center Pool Deck was repaired and resurfaced in 1990 at a cost of $89,375. Due to earth movement and ponding water, the deck has cracked and failed in several areas. This project includes chemical cleaning of deck, repair of bond failures and surface cracks, and application of finish coat and sealer throughout. If this work is not undertaken in 1994 -95, it is likely that the pool deck failures will spread resulting in greater costs in the future. ESTIMATED COSTS Impravements $17,750 Fund 215 I TOTAL - -y $17,750 I TOTALS - -a FINANCING YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 199899 TO7 $17,750 $17. $17,750 $17. - 15 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Shannon Center Social Hall PARKS Assigned Floor Replacement DESCRIPTION-LOCPLTIQN This project provides for replacement o the social hall floor in the Shannoi Community Centex, 11600 Shannon Avenue. Due to underfloor excessive moisture and improper underlayment, the vinyl the floor in the social hall is experiencing failures and requires replacement. This project includes replacement of the underlayment and installation of new vinyl tile. ESTIMATED COSTS Fund Inspection $ 1,500 215 Improvements 23,000 Miscellaneous 350 I TOTAL - -> $24,850 I TOTALS - -a FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS $24,850 $24,850 $24,850 $24, - 16 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Dublin School Athletic Field and PARKS Assigned Play Area Renovation DESCRIPTION - LOCATI This project provides for the arenovatioi of the athletic fields at Dublii Elementary School and development of mini -park on the former pool site. Th4 project is located at 7997.Vomac Road. COMMENTS This project was developed by the Dublin Schools Facilities Improvement Task Force and will be undertaken in two phases. Phase I: Renovation of athletic fields includes complete regrading, reseeding, and new irrigation of fields; and replacement of the back stops. Phase II entails converting the site of a former pool into a mini -park. The scope of the project could be impacted by the reopening of Dublin Elementary by the Dublin Unified School District. Phase_I Phase II $576,240 $337,965 ESTIMATED COSTS FINANCING /YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Improvements $782,070 Design 93,850 Insufficient funding within the CIP timeframe $914,205 Prelim Engr 4,000 Inspection 31,285 Miscellaneous 3,000 TOTAL - -s $914,205 TOTALS - -r $914,205 -- 17 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9501 Nielsen School Athletic'Field PARKS Prior Years 1994 -95 1995 -96 1996 -97 and Play Area Renovation Improvements DESCRIPTION - LOCATION This project provides for the renovatio of athletic fields and the play area a Nielsen School, located at 7500 Amarill Road. I COMMENTS This project was identified by the Dublin Schools Facilities Improvement Task Force. Recommended improvements include connecting the school yard to Mape Park by removing a drainage swale. Additional improvements include regrading and reseeding of turf, irrigation installation, play area reconstruction and capping of an abandoned well. Phase I was completed during Fiscal Year 1991 -92 and included construction of a new play area. Phase II will include renovation of the athletic field. ESTIMATED COSTS FINANCING YEARS SCH WLE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Improvements $309,797 Phase I Design 42,370 215 $13,848 $ 13,848 Prelim Engr 5,729 300 21,000 21,000 Inspection 12,470 TOTAL Phase I $34,848 $ 34.8Q Miscellaneous 2,452 Phase It Insufficient funding within the CIP timeframe. 337,970 TOTAL -_a $372,818 TOTALS - -a $372,818 - 18 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9502 Wells- Cronin Athletic Field PARKS Improvements and Play Area Renovation Phase I DESCRIPTION - LOCATION This project provides for the renovatio of the former Cronin Park Play Area, a well as the renovation of the athleti fields between Cronin and Wells School located between Penn and York Drives. COMMENTS This project was recommended by the Dublin School Facilities Improvement Task Force. It provides for regrading and reseeding of turf areas; replacement of approximately one -third of the irrigation system, backstop repair; and renovation of the play area (formerly Cronin Park). Phase I was completed during Fiscal Year 1991 --92 and included installation of new play equipment and surfacing. Phase lI will include the renovation of the athletic fields. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Improvements $285,916 Phase I Design 38,250 215 $45,252 $ 45,252 Prelim Engr 5,627 Phase II Inspection 11,100 Insufficient funding within the CIP timeframe 298,115 Miscellaneous 2,474 TOTAL - -> $343,367 TOTALS - -a $343,367 19 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Mape Park Renovation PARKS Assigned DESCRIPTION - LOCATION This project provides for the renovatio. of Mape Park which is located on Plat, Way. � Major improvements identified for Mape Park include removal of existing play equipment and installation of a new accessible tot and children's play area; replacement of worn park furniture including benches, drinking fountains, and trash receptacles; and installation of additional park lighting. The fitness course, walkway and portable restrooms identified in the original master plan adopted in 1986 have not been included. ESTIMATED CASTS FINANCING YEARS SCH LE Fund Prior Years 1994 -95 1995-96 1996 -97 1997 -98 1998 -99 TOTALS Prel Engr $ 4,000 Improvements 185,010 Insufficient funding within the CIP timeframe $220,610 Design 22,200 Inspection 7,400 Miscellaneous 2,000 TOTAL --a $220,610 TOTALS _ -> $220,610 - 20 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Dublin Swim Center' PARKS Assigned Boiler Replacement DE CRIPTI;ON- LOCATION This project provides for the replacemen of the boiler at the Dublin Swim Centex 8157 Village Parkway. COMMENTS Although the Swim Center was renovated during Fiscal Year 1989 -90, the boiler was not replaced. The boiler has exceeded its usable life, thus it is recommended that it be replaced with a more energy efficient unit. The proposed replacement is 97% efficient and the cost savings through reduced fuel costs will be realized upon replacement. ESTIMATED COSTS FINANCING/YEARS SCHEDULE Machinery /equip $42,150 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Miscellaneous 100 Insufficient funding within the CIP timeframe $42,250 TOTAL - -- $42,250 I TOTALS - -a $42, " 21 - CITY OF DUBLIN, CALIFORNIA � I 1I 1] � I 1994-99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 9658 PROJECT DESCRIPTION Annual Street Overlay Program ACTIVITY STREETS DESCRIPTION - LOCATIQN This project provides for the placement of a 1 -1/2 inch asphalt overlay on streets that are presently in a deteriorated condition at various locations. I As streets begin showing major structural failures, it is important to reinforce these streets with repairs and overlay to reduce the need for more costly reconstruction at a later date. The City's Pavement Management System Program has given the City funding guidelines, as well as, priorities for maintaining the City streets. The Street Maintenance Account in the Operating Budget includes funding for preparatory patching for this project, for the slurry seal project, and for the restriping of those streets to be overlaid. Design and inspection is budgeted in this project for both this overlay project and the repair and striping work from the Operating Budget. This program will protect the substantial investment the City has in its streets. The 1994 -95 project has been cut back from the normal level of effort as some of the funds were borrowed to complete the Village Parkway reconstruction in 1993 -94. ESTIMATED COSTS Prelim Engr $ 23,300 Fund Design 13,400 Improvements 751.045 206 Inspection 90,000 217 (Measure B) Miscellaneous 3,000 220 (SB300) TOTAL - -> $880,745 TOTALS - -a FINANCING YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 annual $ 81,700 $ 79,300 $ 76,900 $ 74,400 $312,300 $67,699 118,300 120,700 123,100 125,6D0 555,399 13,046 13,046 $90,745 $200,000 $200,000 $200,000 $200,000 $880,745 1 - 22 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9655 Dougherty Road Improvements STREETS Prior Years South of Southern Pacific Right -of -Way Design ' DESCRIPTION- LOCATION This project provides for the acquisition ' of right -of -way and the widening of Dougherty Road, primarily on the east side of the street, between Dublin Boulevard, ' and the Southern Pacific right -of -way and installation of a traffic signal at Sierra Lane and Dougherty Road. This widening ' would provide six travel lanes, bike lanes, landscaped medians, street trees, and street lights. 1 I 1 There are older sections of the street on the east side that have not been widened. Some right -of -way will need to be acquired to complete this project. Redevelopment of existing uses in the future may require dedication of right -of -way and installation of improvements, which will reduce the costs of the City project. The City presently has $46,439 in developer traffic impact fees. Also, the City has been granted $183,291 in Federal Highway (ISTEA) Funds. Work completed through 1994 -95 (Phase I) will include the design and installation of a traffic signal at Sierra Court and Dougherty Road and some related road improvements. Beyond 1994»95, there are insufficient funds to acquire right -of -way and construct the widening of Dougherty Road and a landscaped median north of Sierra Lane (Phase II) improvements. The balance of the project costs ($1,075,339) will have to be funded by additional developer dedications /contributions and /or outside grants. ESTIMATED COSTS FINANCING EARS SCHEDUL Prelim Engineer $ 97,500 Fund Prior Years 1994 -95 1995 -96 1996 -97 Design 86,700 Phase I Inspection 43,500 001 $ 4,642 Improvements 751,548 206 $ 85,360 Right- of-way 432,000 210 27,370 155,921 Permits 10,500 300 33.397 39.719 Total Phase I $65,409 $281,000 Phase II Insufficient Funding within CIP timeframe. TOTAL $1,421,748 TOTALS - -a 1997 -98 1998 -99 TOTALS1 $ 4,642 85,360 183,291 $ 346. $1,421, — 23 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTIO�i ACTIVITY 9696 Dublin Boulevard Improvements STREETS Prior Years Donlon Way to Village Parkway 1997 -98 1998 -99 TOTALS 9ZSCR_IPTION,- LOCATION This project will implement those improvements identified in the Dublir Boulevard Traffic Study, which was approved by the City Council in 1983 -84 and as amended in 1987 -88 in the plan line update. These improvements include the development of Dublin Boulevard to a full six lane street between Donlon Way anc Village Parkway. It will provide additional right -turn lanes where needed and extra turning lanes at San Raman Road. COMMENTS To date, the City has received or expects to receive $550,128 in developer contributions including BART. The balance of the future project costs ($2,082,000) will be funded by a Federal ISTEA Grant. ESTIMATED COSTS FINANCIbWYEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Prelim Engineering $ 43,150 001 $ 35,371 $ 35,371 Design 145,986 210 $2,082,000 2,082,000 Inspection 113,500 300 172,628 377.500 550,128 Right -of -way 510,161 712 2,503 2,503 Improvements 1,850,000 Miscellaneous 7,205 TOTAL - -a $2,670,002 TOTALS - -s $210,502 $2,459,500 $2,670,002 24 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 9648 PROJECT DESCRIPTION Downtown Traffic Impact Fee Study ACTIVITY STREETS ESCRIPTION-LOCATIO This project consists computer traffic model Downtown Street network intensified land uses. identify needed street handle the new traffic establish a traffic commensurate with the demand. COMMENT of running a of the Dublin using projected This would improvements to as well as impact fee added traffic This study would establish a uniform impact fee based on the type of new land use. It would eliminate the need and cost associated with performing traffic studies for each individual development project and would enable developers to know their impact fee before they committed to a project. ESTIMATED COSTS I Study T0 Fund $29,290 1 300 $29,290 1 TOTALS - -� FINANCILGlYgARS SCHEDU Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOT $15,000 $14,290 $29, $15,000 $14,290 $29, - 25 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9650 Survey & Monuments STREETS DESCRIPTION- LOCATION Several of the City's monuments on major thoroughfares have been destroyed or paved over during construction. This project will reestablish survey monuments on major arterial streets and recover 40 monuments that have been paved �ver under , old overlay projects. COMMENTS Monuments are critical to the definition of property lines and rights of way for Capital Improvement projects. This project will result in savings to the City in future Capital Improvements Projects, as well as property owners who will require property surveys. ESTIMATED COSTS Prelim Engr $ 2,063 Fund Design 220 206 Survey & Inspection 11,020 Improvements 10,000 TOTAL $23,303 TOTALS - -� FINANCING YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1999 -99 TOT $2,063 $21,240 $23, $2,063 $21,240 $23, - 26 - CITY OF DUBLIN, CALIFORNIA 1994.99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. New PROJECT DESCRIPTION Street Light Acquisition Program ACTIVITY STREETS DESCRIPTION-LOCATION This project would purchase approximately 1,350 existing street lights throughout Dublin from Pacific Gas and Electric Company. COMMENTS The City has determined through a feasibility study that it would be cost effective over the long terra to purchase the PG&E owned street lights and maintain them through an outside contract. This will result in lower street lighting assessments to property owners throughout the City once the acquisition costs are recovered. The County of Alameda and all the Cities within the Alameda County are jointly pursuing this purchase program. The purchase would be made from General Fund reserves and paid back through savings in energy and maintenance of street lights realized by the Street Lighting Assessment District. It is anticipated that the cost recovery period would be approximately 6 to 7 years. ESTIMATED COSTS FINANCING YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Acquisition $400,000 710 $400,000 $400,000 TOTAL $400,000 TOTALS $400,000 $400,000 27 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Traffic Signal Safety'Upgrade STREETS Conflict Monitors DESCRIPTION-LOCATION A conflict monitor is an electronic component which senses potentially hazardous traffic signal timing or cycling errors and prevents the error by causing the signal to enter a flashing red mode. This project would replace the older, less sophisticated conflict monitors in the City's signal system with state of the art equipment that detects numerous types of errors, advises the signal technician of the type of error that occurred, and can be tested regularly for integrity of operation. •Cl1 ice+ Use of this equipment will reduce the City's liability exposure by providing an advanced level of safety for the traffic signal system. The project proposes to provide new monitors for 19 of the 20 existing intersections; this type of monitor is already installed at the Dublin Boulevard /Dougherty Road intersection. Maintenance costs may actually be reduced by this equipment due to its diagnostic features. ESTIMATED COSTS FIN-ANCING/YEARS--SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998-99 TOTALS Equipment $21,200 206 $21,200 $21,200 TOTAL --> $21,200 I TOTALS - -a 521,200 $21,200 — 28 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Dougherty Rd Improvements S'T'REETS Assigned From SPRR Right -Of -Flay to 1997 -98 1998 -99 TOTALS Design Amador-Valley Blvd DESCRIPTION - LOCATION This project consists of removing existinc dirt medians on Dougherty Rd and replacinc them with new pavement. It would also overlay the existing north bound lanes du( to grade differences and an uneven pavement surface. This would complete th( ultimate improvements for southbounc traffic. The new paving would allow the two southbound lanes to move away from the curb thus improving intersection site distance and allow an area along the curb for bus stops, emergency parking and on street bicyclists. The City has received an ISTEA Grant to fund the bulk of this project. ESTIMATED COSTS FINANCING YEARS SCHEDULE Prelim Engr $ 12,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 15,000 Inspection /Survey 20,100 206 $ 3,090 $ 34,910 $ 38,000 Improvements 284,000 Miscellaneous 900 210 23,910 270,090 294,000 TOTAL - -a $332,000 TOTALS -a $27,000 $305,000 $332,000 - 29 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9605 Alamo Channel Bike Path STREETS Dublin Blvd to Amador Valley Blvd DESCRIPTION - LOCATION This project would construct a bicycle path along the Alamo Channel right- of -wa; from Dublin Boulevard to Amador Valle; Boulevard. This path would connect to and a portion will become part of the Iron Horse Trail which runs along the Southern Pacific Railroad right -of -way. The project will be designed and constructed by the City of Pleasanton as this Transportation Development Act Grant is being used as matching funds for a longer ISTEA bike path project which will extend from San Ramon through Dublin and into Pleasanton. EE§TIMATED COSTS FINANCING /YEARS SCHEDI,ILE Construction $75,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS 211 $75,000 $75.000 TOTAL $75,000 TOTALS $75,000 $75,000 — 30 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Dublin Boulevard Improvements STREETS Clark Avenue to Sierra Court DESCRIPTION - LOCATION This project would widen and overla, Dublin Boulevard, including the bridge over the Alamo Canal from Clark Avenue ti Sierra Court. This project would increase the capacity of this segment of Dublii Boulevard from 4 lanes to 6 lanes plu, bike lanes. COMMENTS This is the second phase of Dublin Boulevard widening. The first phase widened Dublin Boulevard from Donlon Way to east of Village Parkway. Recent traffic model studies have indicated the need for Dublin Boulevard to become six lanes wide to avoid heavy congestion at intersections in the future. The City has received a $1,000,000 ISTEA grant for this project. ESTIMATED COSTS Environment & $ 67,000 Fund Prelim Engr. 206 Design 71,000 210 R. 0. W. 240,000 300 Improvements 700,000 Inspection 50,000 Miscellaneous 2,000 TOTAL _ -a $1,130,000 TOTALS - -a FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS $ 8,000 $ 34,190 $ 86,800 $ 128,990 60,000 270,800 669,200 1,000,000 1,010 1,010 $ 68,000 $306,000 $756,000 $1,130, - 31 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION] ACTIVITY 9601 Dublin Boulevard Improvements STREETS Prior Years 1994 -95 1995 -96 1996 -97 Silvergate to Hansen Design DESCRIPTION- LOCATION This project would widen Dublin Boulevard between Silvergate Drive and Hansen Drive from two to four lanes and realign the Dublin Boulevard /Silvergate intersection into a standard "Tee" intersection. This widening would take place on the southside of the street where there is sufficient right -of -way to make these improvements. In addition, the project would repair the existing roadway section as the roadway fill is undergoing creeping soil instability. COMMENTS The addition of new residential projects proposed to be constructed to the west of this intersection along Dublin Boulevard will require the widening of Dublin Boulevard from two to four lanes between Silvergate Drive and Hansen Drive. Those new projects will pay for this portion of the project if and when they proceed. in 1992, the first phase of the work realigned the Dublin Boulevard /Silvergate intersection through restriping and pavement modifications. It is anticipated that the addition of major new traffic will magnify the distress requiring repairs simultaneous with the widening. To date, developers of the Hansen and Donlon projects are obligated to contribute $731,922 in reimbursements for this project. The balance of the project costs ($554,40$) will have to be funded or partially funded by new Western Dublin development. if further development in Western Dublin does not occur, the balance of this project would have to be funded by Gas Tax which won't be in sufficient amount until Fiscal Year 1996 -97. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Prelim Engr $ 26,200 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 41,650 Phase I Inspection 39,800 300 $ 111,129 $ 111,129 Improvements 1,164,720 Phase II Miscellaneous 13,960 206 $ 554,408 554,408 300 _ 620,793 620.793 TOTAL $1,286,330 TOTALS - -a $ 111,129 $1,175,201 $1,286,330 - 32 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9656 Traffic Signals - Village Parkway at S'T'REETS 300 Brighton Dative, Tamarack Drive and Davona Drive DESCRIPTION - LOCATION This project would provide for thi installation of three traffic signals a- the intersections of Village Parkway wit] Brighton Drive, Tamarack Drive and Dav= Drive. These signals would bi interconnected to the other existini traffic signals on Village Parkway lout] of this project. Also, Village Parkwa,, would be widened in front of the Dublii High School to provide student drop of and bus turnout. COMMENTS A traffic study conducted during Fiscal Year 1983 --84 found that these signals were marginally warranted. A total of $19,202 in developer traffic impact fees have been collected to date. The City has applied for outside funding for this project, but has not as yet been successful in obtaining these funds. The street widening in front of the High School will provide bus and vehicle drop off and pick up for students. Each of the traffic signal projects and road widening can be done together or separately. Annual maintenance and electricity costs are estimated at $10,000. ESTIMATED ODSTS TOTAL - -> $348,083 I TOTALS - FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 $ 9,083 $ 9,083 1997 -98 1998 -99 TO1 $ 9. $319,198 319, 19,802 19, $339,000 $348,083 — 33 — CITY OF DUBLIN, CALIFORNIA Fund Design $ 19,083 001 Inspection 10,000 206 Improvements 318,000 300 Miscellaneous 11000 TOTAL - -> $348,083 I TOTALS - FINANCING /YEARS SCHEDULE Prior Years 1994 -95 1995 -96 1996 -97 $ 9,083 $ 9,083 1997 -98 1998 -99 TO1 $ 9. $319,198 319, 19,802 19, $339,000 $348,083 — 33 — CITY OF DUBLIN, CALIFORNIA 1994--99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9687 New Street Parallel to and STREETS Right- of-way South of Dublin Boulevard Improvements ' DESCRIPTION - LOCATION This project will construct a 2 lane roadway between Golden Gate Drive and Regional Street south of and parallel to Dublin Boulevard. 1 1 L COMMENTS I The need for a connector road for three long commercial cul -de -sacs was identified in the City's Downtown Study. The need will become more apparent as this portion of the Central Business District develops further and the proposed BART parking lot is constructed along Golden Gate Drive. It now appears that the section of this parallel road between Amador Plaza Road and Golden Gate Drive will be constructed through the Alameda County Transportation Authority as part of the I -580/I -680 Measure B Interchange Improvements. It is expected that the City's project, between Golden Gate Drive and Regional Street, would be funded through private contributions in the form of a downtown traffic development impact fee and /or as offsite environmental mitigation improvements. A total of $27,810 in reimbursements have been collected to date for this project. In addition, BART has committed up to $699,540 for the project as part of its environmental mitigation for the West Dublin Station traffic. ESTIMATED COSTS Prelim Engr $ 40,000 Design 60,000 Inspection 62,000 Right- of-way 1,325,000 Improvements 752,000 Miscellaneous 1,000 TOTAL - -a $2,240,000 FINANCING/YEARS-SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 Insufficient funding within CIP timeframe. TOTALS - -> 1997 -98 1998 -99 $2,240, $2,240, ' - 34 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9603 Dublin Boulevard Bridge over STREETS Alamo Creek Repair DESCRIPTION-LOCATIDN This project will repair the foundation of the concrete bridge on Dublin Boulevarc over the Alamo Creek channel. COMMENTS Through the performance of maintenance checks, it was discovered that the pile foundations have become exposed due to the erosion of storm waters running beneath the bridge. This project will key in and rip -rap the slopes under the bridge to protect the piling and abutments.. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design $ 12,000 Inspection /Testing 3.000 Insufficient Funding within CIP timeframe. $194,700 Improvement 179,200 Miscellaneous 500 TOTAL $194,700 TOTALS - -a $194,700 - 35 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Dublin Boulevard Improvements STREETS Sierra Ct to Dougherty Rd DESCRIPTION - LOCATION This project will widen and overlay Dublii Boulevard from east of Sierra Court tc Dougherty Road. This project wil: increase the roadway capacity from four tc six lanes and add bicycle lanes. • i This is the third phase of the Dublin Boulevard widening. The widening of this segment of Dublin Boulevard will complete the improvements from San Ramon Road to Dougherty Road. Recent traffic studies have shown that six lanes of traffic will be needed as Dublin expands to the east. ESTIMATED COSTS FNANCINGIYEARS SCHEDULE Prel Engr $ 67,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 85,000 Inspection 65,000 Insufficient funding in CIP timeframe. $1,560,000 ROW 540,000 Improvement 800,000 Miscellaneous 3,000 TOTAL - -a $1,560,000 TOTALS - -a $1,560,000 - 36 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet I -580 Offramp improvements STREETS Assigned at San Ramon Road DESCRIPTION - LOCATION This project would provide modifications to the 1--580 westbound offramp including a traffic signal to control the conflict between the northbound traffic from Pleasanton and the westbound --to- northbound off-ramp traffic. COMMENTS This improvement was identified as being a necessary traffic improvement through the City's Downtown Improvement Study. It is anticipated to be funded through a traffic mitigation fee for the Dublin Downtown Commercial area or as a portion of the longer range Caltrans I -580/I -680 interchange improvements. As it is on the State right -of -way, coordination and permits would be required from Caltrans. ESTIMATED COSTS FINANCING YEARS §0FDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Prelim Engr $ 70,000 Design 70,000 Inspection 56,000 Insufficient funding within CIP timeframe. $845. Improvements 647,500 Miscellaneous 1,500 TOTAL $845,000 TOTALS - -a — 37 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Bike Path - Iron Horse Trail STREETS Dougherty Rd to I -580 DESCRIPTION - LOCATION This project would construct a bicycl, path along the Southern Pacific Railroai Right -of -Way on Alameda County land an include two traffic signals, one a Dougherty Road ands one at the Dubli; Boulevard /Scarlett Road intersection. COMMENTS This Bike Path is a portion of the Iron Horse Trail that will connect the BART Station to San Ramon, Danville, and Pleasanton. The project is assumed to be in the Alameda County Right -Of -Way with no cost for use of the right -of -way. It is hoped to fund this segment of the trail through outside grants and /or developer contributions. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Prel Engr $13,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 35,000 Inspections 35,000 Insufficient funding within the CIP timefrw*. $534,000 Improvements 450,000 Miscellaneous 1,000 TOTAL - -a $534,000 TOTALS - -a $534,000 - 38 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 9604 PROJECT DESCRIPTION, Downtown Street Light Additions ACTIVITY STREETS DESCRIPTION-LOCATION This project will complete th( installation of street lights in thf downtown area including Sierra Court (4), Sierra Lane (6), and Amador Valley Boulevard east of Village Parkway (4). COMMENTS A number of street lights have been installed in the downtown area in past years, together with other street and traffic signal projects. This project will complete the lighting of the remaining streets in the downtown commercial areas. These lights will be City owned and the annual energy costs are estimated to be $1,000. ESTIMATED COSTS FINANCING/YEARS SCHEDULE= Improvements $60,000 Fund Prior Years 1994 -95 1995.96 1996 -97 1997 -98 1998 -99 TOTALS Design 1,700 Inspection 3,500 Insufficient Funds within CIP timeframe $66,000 Miscellaneous 800 TOTAL - -> $66,000 TOTALS - -> $66,000 - 39 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet San Ramon Rd Slope Stabilization STREETS Assigned Between Vomac Rd and Alcosta Blvd This project would stabilize the hilisidi slope on the west side of San Ramon Roar between Vomac Road and Alcosta Boulevard The slope repair would consist of removing the existing slope, installing an inslopi drainage system, and providing engineerei backfill. COMMENTS An engineering soil investigation has indicated that the slope on the western side of San Ramon Road between Vomac Road and Alcosta Boulevard could become unstable under saturated or seismic conditions. By implementing this project the slope would become stable, thus protecting the roadway improvements as well as the private properties above the slope. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design $ 39,500 Inspection 15,000 Insufficient funding within CIP timeframe. $400,000 Topography 5,000 Improvements 340,000 Miscellaneous 500 TOTAL $400,000 1 TOTALS $400,000 - 40 - CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY Not Yet Landscaping Silvergate Medians STREETS Assigned DESCRIPTION - LOCATIO This project would upgrade the landscapin that exists in the medians at the sout end of Silvergate Drive and install ne landscaping in the medians at the east en of the street. Both areas would be full irrigated. The plant materials would b primarily trees and shrubs irrigated wit drip irrigation systems. Extensive bric areas would be added to reduce futur landscaping and irrigation costs. COMMENTS The landscaping on the south end of Silvergate Drive has never reached its potential, basically due to lack of irrigation, plus the need for a more integrated design for the plant materials. The medians at the east end of the street have never been landscaped and have been left as bare soil. The annual irrigation and maintenance costs are estimated at $7,000. ESTIMATED COSTS FINANCING YEARS SCHEDULE Prelim Engr $ 2,000 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 10,000 Inspection 6,000 Insufficient Funds within CIP timeframe. $152,600 Improvements 114,200 Miscellaneous 20,400 TOTAL - -a $152,600 TOTALS - -a $152,600 — 41 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY 9686 Road Parallel to Southern Pacific STREETS Right -of -Way - Dougherty Road to Dublin Boulevard DESCRIPTION - LOCATION This project would provide a 4 -lan roadway connection between Dougherty Roa and Dublin Boulevard (parallel to th Southern Pacific Railroad Right -o� -Way). COMMENTS This road is included in the Dublin General Plan and would serve to relieve the Dougherty Road /Dublin Boulevard intersection of much of the southbound to eastbound turning traffic, especially for the future BART Station bound traffic. At this time, it is assumed that right -of -way could be obtained from the U. S. Army (Camp Parks) and /or Alameda County at no cost. A total of $12,400 in reimbursements has been collected for this project. The balance of the project costs ($1,,826,100) will have to be funded by additional developer dedications /contributions and /or outside grants. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Fund Prior Years 1994 -95 1995.96 1996 -97 1997 -98 1998 -99 TOTALS Prelim Engr $ 21,000 Design 126,000 Inspection 109,500 Insufficient funding within CIP timeframe. $1,838,500 Improvements 1,575,000 Permit 7,000 TOTAL $1,838,500 TOTALS - -a $1,838,500 — 42 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION- ACTIVITY New Bike Lane Project - Amador Valley Blvd STREETS Stagecoach to Dougherty Road DESCRIPTION- LOCATION This project would widen part of Amado, Valley Boulevard between Stagecoach Roal and Dougherty Road to allow for bik lanes. This Bike Lane Project will connect the Iron Horse Trail, the proposed Alamo Creek Bike Path, and the Dougherty Road Bicycle Path. A portion of Amador Valley Boulevard is now striped for four lanes which does not allow for on street bike lanes. This project would move the sidewalk back in the landscaped easement area and widen the pavement in the existing street right -of -way. ESTIMATED COSTS FINANCING /YEARS SCHEDULE Prel Engr $ 4,000 Fund Prior Years 1994 -95 1995 -96 1996-97 1997 -98 1998 -99 TOTALS Design 26,000 Inspection 20,000 Insufficient funding in CIP timeframe. $121,500 Improvements 70,000 Miscellaneous 1,500 TOTAL $121,500 TOTALS $121.500 — 43 — CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Hike Path - Alamo Creek STREETS North of Amador Valley Boulevard DESCRIPTION- LOCATI This project would construct a bicycl path along the Alamo Creek channel fro Amador Valley Boulevard north to the Cit Limits. This Bike Path will b constructed by placing an, asphalt surfac on top of the existing Zone 7 maintenanc road gravel base. The Dublin Meadow Project will be constructing a bicycle path along Alamo Creek between Amador Valley Boulevard and the Southern Pacific Railroad Right -Of- Way. This Bike Path would tie into the Dublin Meadows Hike Path and onto the Iron Horse Trail. It would also provide neighborhood bike and walking access to the Alamo Creek Park. ESTIMATED COSTS FINANCING/YEA S SCHEDULE Design $ 1,OD0 Fund Prior Years 1994 -95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Inspection 28,500 Miscellaneous 500 Insufficient funding in CIP timeframe. $30,000 TOTAL $30,000 TOTALS $30+000 - 44 -- CITY OF DUBLIN, CALIFORNIA 1994 -99 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. PROJECT DESCRIPTION ACTIVITY New Dougherty Road Improvements STREETS SPRR Right -Of -Way North to City Limits DESCRIPTION- LOCATION This project consists of constructing th ultimate northbound lanes and median fro the Southern Pacific Railroad Right -Of -Wa north to the Dublin City Limits. COMMENTS The present configuration of the road is now four lanes; however, the easterly lane between Amador Valley Boulevard and the City Limit and the northbound lanes between the Southern Pacific Railroad Right -Of -Way are either in the future median or in need of reconstruction. This project would complete the entire length of Dougherty Road to a six lane divided roadway with landscaped medians. This project will not be needed until development in the Dougherty Valley occurs. ESTIMATED COSTS FINANCING /YEARS_ SCHEDULE Prel Engr 5 12,000 Fund Prior Years 1994-95 1995 -96 1996 -97 1997 -98 1998 -99 TOTALS Design 30,000 Inspection 30,400 Insufficient funding in CIP timeframe. $721,000 Improvements 647,000 Miscellaneous 1,600 TOTAL $721,000 I TOTALS --� 1721,000 - 45 - CITY OF DUBLIN, CALIFORNIA