HomeMy WebLinkAboutReso 118-07 BSK Geotech Engineering Svcs
RESOLUTION NO. 118 - 07
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*********
APPROVING AMENDMENT TO AGREEMENT
WITH BSK ASSOCIATES
FOR GEOTECHNICAL ENGINEERING SERVICES
WHEREAS, the City of Dublin, State of California, entered into a two-year agreement with BSK
Associates on July 5, 2005, to perform geotechnical engineering services; and
WHEREAS, the term of the agreement is proposed to be extended an additional two years until
June 30, 2009, allowing BSK Associates to request an adjustment of rates for the second year of the term;
and
WHEREAS, Consultant is requesting an adjustment of rates for Fiscal Year 2007-2008 as
allowed by Section 2 of the Agreement; and
WHEREAS, for future years it would benefit both BSK Associates and the City of Dublin to
utilize the December CPI for Urban Wage Earners.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby approve the Amendment to the Agreement with BSK Associates, which is attached hereto as
"Exhibit A."
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Amendment to the
Agreement.
PASSED, APPROVED AND ADOPTED this 3rd day of July, 2007, by the following vote:
AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST: [
Q{4 ,;?~
Deputy City Clerk
Reso No. 118-07, Adopted 7/3/07, Item 4.7
Page 1 of 1
EXHIBIT" A" OF RESOLUTION ~-07
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND BSK ASSOCIATES
FOR GEOTECHNICAL ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and BSK Associates
(hereinafter referred to as "CONSULTANT"), entered into a two-year agreement on July 19, 2005, to
provide geotechnical engineering services to CITY; and
WHEREAS, CITY and CONSULTANT wish to extend the term of the agreement for an
additional two years, terminating June 30, 2009; and
WHEREAS, CONSULTANT has requested an adjustment of rates for Fiscal Year
2007-2008; and
WHEREAS, for future years it would benefit both Consultant and the City of Dublin to
utilize the December CPI;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1.
Extension of Term
The term of the agreement shall be extended from July 1,2007, to June 30,2009. Should a
new agreement or amendment to agreement to extend the contract not be entered into by June 30, 2009,
then this agreement will automatically extend until a new agreement or amendment to agreement is
entered into or CITY gives written notice of termination.
Section 2.
Adiustment of Rates
The rate schedule attached hereto as Exhibit 1 shall be in effect for Fiscal Year 2007-2008.
Section 3.
Modification of Section 2 of the Agreement
For future years, the CPI index for the month of December shall be utilized to determine
the rate adjustment for the following fiscal year in lieu of the index for the month of February.
CITY OF DUBLIN
BSK ASSOCIATES
J?kJ-{1~
Robert Yuki ari
Acting Geotechnical Services Manager
ATTEST:
C i'
f - ,f}
UM ,A f j;.,d-
I:;ePi-J~ City Clerk
Date:
~ ?,;Jn7
G:\CONSULT ANTS\bsk\amendment 07 -08.doc
PERSONNEL RATES
PROFESSIONAL
Senior Principal .......................................................... (per hour) $155
Principal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " (per hour) 144
Associate Principal ....................................................... (per hour) 134
Senior Professional ....................................................... (per hour) 124
Proj ect Professional II ..................................................... (per hour) 113
Project Professional I ..................................................... (per hour) 103
Staff Professional ........................................................ (per hour) 93
Junior Professional . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. (per hour) 82
FIELD TECHNICAL
Supervisor/Senior Inspector ................................................ (per hour) $ 84
Inspector III/Senior Technician .............................................. (per hour) 78
Inspector II1Technician II/Driller ............................................ (per hour) 72
Inspector I/Technician I ................................................... (per hour) 66
Technical Aide/Swamper . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " (per hour) 54
OFFICE AND LABORATORY TECHNICAL
Supervisor .............................................................. (per hour) $ 93
Technician / Inspector ..................................................... (per hour) 77
Draftsman .............................................................. (per hour) 62
Word Processor .......................................................... (per hour) 41
General Typist/Office Aide ................................................. (per hour) 31
NOTE: Expert witness services, deposition or court testimony will be invoiced at 150% of our fee schedule rates.
A ten percent surcharge will be applied to rates of personnel on projects where 40-Hour OSHA Health and Safety training is
required. Surcharge of Level D personal protection equipment (if required) will be by quotation.
2007-2008 Fee Schedule (Dublin)
&,t-t\B'T I
BSI(