Loading...
HomeMy WebLinkAboutReso 109-07 CIP 2007-2008 Update RESOLUTION NO. 109 - 07 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********* ADOPTING THE 2007-2008 UPDATE TO THE FIVE YEAR CAPITAL IMPROVEMENT PROGRAM 2006-2011 WHEREAS, each year the City Council adopts or updates the Five- Year Capital Improvement Program, which addresses the City's public infrastructure and facility needs in the following areas: General, Community Improvements, Parks and Streets; and WHEREAS, the City Manager has presented the Proposed 2007-2008 Update to the Five-Year Capital Improvement Program 2006-2011 to the City Council; and WHEREAS, the Planning Commission has reviewed the proposed projects included in the Proposed 2007-2008 Update to the Five-Year Capital Improvement Program 2006-2011 and has determined that the public works projects to be constructed are in conformance with the City of Dublin General Plan; and WHEREAS, the Parks and Community Services Commission has reviewed the Proposed 2007- 2008 Update to the Five-Year Capital Improvement Program 2006-2011 and provided input regarding the parks and recreation projects included therein. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby take the following actions: 1. The City Council of the City of Dublin does hereby adopt the Proposed 2007-2008 Update to the Five-Year Capital Improvement Program 2006-2011, which is attached to and made a part hereof; and 2. The items scheduled for implementation in Fiscal Year 2007-2008 shall be included in the Capital Budget of the Annual City Budget and Financial Plan for Fiscal Year 2007-2008. PASSED, APPROVED AND ADOPTED this 28th day of June, 2007, by the following vote: AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None ATTEST: (~[jJW City Clerk Depvt'l ,1 Reso No. 109-07, Adopted 6/28/07, Item 6.1 Page 1 of 1 . .~~+ 19~ 1 ~ CITY ~F D B I L~ L N Pro osed Five~Year Ca ital p p Im rovement Pro ram 2 0 0 6~ 2 4 I 1 p g Fiscal Year 200 7~ 20~8 U date p June, 2~07 Janet Lockhart, Mayor Kasie Hildenbrand, Vice Mayor Tony Oravetz, Councilmember Tim Sbranti, Councilmember Ka.te Ann Scholz, Councilmember SUBMITTED BY Richard C. Ambrose City Manager ,~ AD~PTED .. CITY OF DUBLIN Proposed Five-Year Capital Improvement Prog~am 2006-2011 Fiscal Year 2007 - 2008 Update TABLE OF CONTENTS CITY MANAGER'S LEITER OF TRANSMITIAL CAPITAL IMPROVEMENT PROGRAM SUMMARIES All Programs... ............................................................................................................................................................i GeneraL................................................................................................................................................................ ......ii Community Improvements...................................... ........................................................................ ............ .......... iii Parks................................................................................................................................................................. ......... iv Streets.................................................................................................................. ...................................................... vi Overview of 5 Year Capital Improvement Plan Funded Projects ....................................................................... ix GENERAL IMPROVEMENTS TV30 Studio Remodel (93135) ........ ....................... ....................................................................... .......... ...............1 Network System Upgrade (931 50) ............................................. ............................................ ..... ......... ................. 2 Accounting System (93191) ............................ ............................................................ ................................... ..... .... 3 Geographic Information System (93192). ................................................ .............................. ................................4 Building Permit System (93200)... ...................................................... .................................... ............................... 5 Telecommunications Plan (93320) ............... .......... ..............................................................................................6 Maintenance Facility Study (93402) ... ............... ................................................................................................... 7 Civic Center Library (93450) ...... ....... ........................................................ ................................................ ........ ....8 Library Repairs (93451) ............................................................................ ..............................................................9 Inspector Trailers (93462) ........,.......................................................................................................................... 10 Building Management Study (93900) ................... ......................................... .............................. ............. ......... .11 . Civic Center Modification Design Services & Construction (93910) ................................... ............................. 12 ADA Transition Plan (9$917) ................................................ .................................................. ..............................13 Civic Center Window Sealing (93923) ........ ......................................................................... ............................. 14 Civic Center Generator (93933) ........... .................................................................................. ............................. 15 Automated Document Storage & Retrieval System (93970) ................................................. ............................. 16 Public Facility Fee Study Update (94500) ............... ................................................................... .......................... 17 City Facility Energy Efficient Window Treatment (New) ...................................................................................18 Civic Center Roof Maintenance (New) ........ .................................. ......................................... ..............................19 < COMMUNITY IMPROVEMENTS Iron Horse Trail- Wildflower Planting (94052) .................................................................... ............................20 Sidewalk Safety Repair Program (94250) .......................... ................................................................................. 21 Bus Shelters (94252) . ................................................ ......................................... ........................... ..,..................... 22 San Ramon Road Concrete Sound Wall Maintenance (94601) ....................................................................... .23 Seasonal Street Banners (94942).................. ................................... ..................................................................... .24 City Entrance Sign Modifications (Not Yet Assigned) ........................................................................................ 25 San Ramon Road Landscape Renovation (Not Yet Assigned)..............................................................................26 San Ramon Road Wooden Sound Wall Maintenance (Not Yet Assigned) ........................................................27 Transit Center Art (New) ................................................................... .............................................. .................. ...28 Village Parkway Soundwall Painting (New) .................. ....... ........................................................................... ...29 PARKS Parks & Community Services Needs Assessment (95010) ................................................................................. 30 Stagecoach Park Assessment District Water Meter (95210) ................................................. .............................31 Shannon Community Center Reconstruction (95465) ... .................................................................................. 32 Dublin Historic Park Master Plan (9555 5) ......................................................................................................... 33 Dublin Historic Park Acquisition (95556).. ........................................................................................................ 34 Emerald Glen Park (95600).................................................................................................................................. 35 Emerald Glen Park Recreation and Aquatic Complex (95602)......................................................................... 36 Dougherty Hills Park - Dog Park (95625) .............................................................................. .............................37 Park Furniture Replacement (95631)... ................................. .............................................................................. 38 Park Play Area Renovations (95635) ............. ..................................... ............................................. .................... 39 Dublin Ranch Neighborhood Parks (95640) ....... ........................................ .......................... ............................. 40 Dublin Sports Grounds Renovation (95830) .................. ......... ............... ............................ .................... ............ 41 Fallon Sports Park (95851) ....... .................................................................................... ................ ........................ 42 Cultural Arts Center (95935) .............. ........................................... ..... ..:.............................................................. 43 Eastern Dublin Parks (Not Yet Assigned) .......... ............ ........ ................................... .......... .................................. 44 Emerald Glen Park Community Center (Not Yet Assigned) ............................................................................... 45 Schaefer Ranch Neighborhood Park (Not Yet Assigned) .................................................................................... 46 Transit Center Park (Not Yet Assigned) ............................................................................................................... 47 Wallis Ranch Neighborhood Parks (Not Yet Assigned) .... ..................................................... .............................48 Dublin Historic Park Development (New) ................................................................................................. .........4 9 STREETS Tri - Valley Triangle Study (94520).................................... ...................................... ............ ....... .............. ............ 50 Tri - Valley Transportation Development Fee Regional Transportation Projects (96001)... ............................ 51 Dublin Boulevard Improvements - Silvergate Drive to Hansen Drive (96010) .............................................. 52 West Dublin BART Station Corridor Enhancement - Dublin Boulevard - Hansen Drive to Clark Avenue (96011) ................................................................ .................................................................................. .................53 East Dublin BART Station Corridor Enhancement - Dublin Boulevard - Tassajara Road to Clark Avenue (96012) ................................................ ............................................................. ...................................................... 54 Dublin Boulevard Bridge Resurfacing at Alamo Canal (96022)....................................................................... 55 Underground Utilities - Dublin Boulevard/Dougherty Road Intersection and Vicinity (96082) .................56 Eastern Dublin Arterial Street and Freeway Improvements (96400) ...............................................................57 1-580 & Fallon Road Freeway Interchange Improvements - Phase I (96430)................................................. 58 Downtown Traffic Signal Equipment Replacement (96452) ............................................................................ 59 Downtown Dublin Roadway Improvements (96480) ......... .................................................. .............. ............... 60 Annual Street Overlay Program (96580) ......... ............ ..... ................ ....................................... ...........................61 Annual Slurry Seal Program (96585) ...................................................................:.............................................. 62 Alamo Canal Trail Under 1-580 (96773) ................................................................... ........... ........................... ...63 Citywide Bicycle/Pedestrian Plan (96775) ... .................................... .................................... ............................. 64 'STREETS (Continued) Crossridge Road Trail Connection Improvements (96776)... .................................................. .......................... 65 Scarlett Drive Iron Horse Trail Extension (96840) ............................................................................................ 66 Dougherty Road Improvements - North of Amador Valley Boulev~rd to North of Houston Place (96850) ..................................:......................... .................................................. ............................................. ........ 67 Dougherty Road Improvements - Houston Place to 1-580 (96852) ................................................................. 68 Saint Patrick Way - Regional Street to Golden Gate Drive (96870) .................................................................69 Dublin Boulevard Improvements - Village Parkway to Sierra Court (96920) ................................................70 Dublin Boulevard Improvements - Sierra Court to Dublin Court (96930) ..................................................... 71 Bike Lane - Amador Valley Boulevard Stagecoach Road to Dougherty Road (Not Yet Assigned) .................. 72 Dougherty Road Improvements - Amador Valley Boulevard North to City Limits (Not Yet Assigned) .........73 Dublin Boulevard - Right Turn at Village Parkway (Not Yet Assigned) ...........................................................74 Citywide Signal Communications Upgrade (New) ...................... .............................................. ........................ 7 5 Citywide Street Storm Drain Condition Assessment (New) ............................................................................ ...76 Dublin Boulevard/Amador Plaza Road Intersection Improvements (New) .....................................................77 San Ramon Road Trail Improvements (New) ............ .................... ...................................................................... 78 /--fJT1'5!)' /;""~..~'~~ !. I II ,~. (!ll (0) oJ \ \~ ~1<(~:~~2CITY OF DUBLIN \'>~~)- 100 Civic Plaza, Dubiin, Califoml8 94568 ',i1LllO?~V ~-~ "Celebrating 25 Years Of City hood 1982-2007" Website: http://www.ci.dublin.ca.us June 8, 2007 Honorable Mayor and Members of the City Council: Presented herein is the Proposed 2007-2008 Update to the Five-Year Capital Improvement Program (CIP) for the period covering Fiscal Year 2006-200Tthrough Fiscal Year 2010-2011. This CIP includes seventy-three (73) projects costing a total of approximately $271,094,854. Of this amount, approximately $133,781,078 will have 'been spent by the end of Fiscal Year 2006-2007. A total of fifty-seven (57) projects costing a total of $137,313,776 are proposed to be undertaken in the next four years. The CIP also identifies nineteen (19) projects that are wholly or partially unfunded during the five-year time frame in the amount of $192,692,117. Of this unfunded/future amount, $26,148,292 in restricted funds has been collected or obligated to date by the City or other agencies, leaving a current net shortfall of$166,543,825. For the most part, the projects that are identified as unfunded will be funded beyond the scope of this CIP through development impact fees or constructed directly by the development community. Many of these projects are included in the CIP to ensure that the City meets the requirements of State Law necessary to collect development impact fees and to position the City to actively compete for available grant funding. Funding for the projects identified during the remaining four years of the CIP comes from a variety of sources. The largest single source of funding is development impact fees ($112.5 million or 81.9%). The next largest funding source is the General Fund ($15.4 million or 11.2%). The balance of the funding ($9.4 million or 6.9%) comes from other agencies in the form of grants or subventions. Projects Completed During Fiscal Year 2006-2007 During Fiscal Year 2006-2007, the City has completed or expects to closeout twenty (20) CIP projects valued at an estimated cost of $2.6 million. These completed projects are listed in the summary table that follows: Area Code (925) . City Manager 833-6650 . City Council 833-6650 . Personnel 833-6605 . Economic Development 833-6650 Finance 833-6640 . Public Works/Engineering 833-6630 . Parks & Community Services 833-6645 . Police 833-6670 Planning/Code Enforcement 833-6610 . Building Inspection b3,j-6620 . Fire Prevention Bureau 833-6606 Printed on Recycled Paper Capital Improvement Projects Closed Out Durine Fiscal Year 2006-2007 General Habitat Monitoring Camera Maintenance Facility Study Building Management Study . Civic Center Window Sealing Library Repairs SUBTOTAL Community Improvements Sidewalk Safety Repairs Seasonal Street Banners SUBTOTAL Parks Dublin Historic Park Master Plan Dougherty Hills Dog Park Senior Center Park Furniture Replacement (Alamo Creek and Stage Coach Parks Park Play Area Renovations (Alamo Creek Park) SUBTOTAL Streets Dublin Blvd. Bridge Resurfacing at Alamo Canal Underground Utilities -: Dublin Blvd./Dougherty Road Intersection and Vicinity Downtown Traffic Signal Equipment Replacement Annual Street Overlay Program Tri- Valley Triangle Study Citywide Bicyc1elPedestrian Plan Crossridge Road Trail Connection Improvements Dublin Blvd. Improvements - Village Parkway to Sierra Court SUBTOTAL GRAND TOTAL Page Two Total 2006-2007 Project Cost $ 660 35,000 137,890 49,383 32,744 $255,677 $ 80,373 37,356 $117,729 $ 4,505 560,952 8,041 75,526 136,441 $785,465 $ 29,009 271,771 24,057 597,358 2,000 21 , 162 24,456 $557,767 $1,527,580 $2.686.451 .. Projects Recommended for Fiscal Year 2007-2008 The proposed CIP Update includes recommended appropriations for Fiscal Year 2007-2008 in the amount of $48,330,281. Of this amount, approximately $8,072,487 (16.7%) is proposed to be funded by 2007-2008 General Fund Revenues or previously designated Capital Project Reserves. The balance of $40,257,794 (83.3%) is proposed to be funded from restricted funds. The restricted fund amount includes approximately $38.3 million in development impact fees, which are collected by the City to finance the infrastructure needed to support growth. It is possible that the development community may choose to build some of the needed projects directly rather than paying the fees. In that event, the cost for developer built projects would not be reflected in the City's future financial reports. The proiects proposed for Fiscal Year 2007-2008 utilize all available capacity of existing Staff proiect managers. Process for Review and Adoption of the Five-Year CIP Update The Proposed CIP Update will be considered by the City Council at its Budget Hearing on June 28, 2007. Prior to the Hearing, the Planning Commission will review the CIP Update on June 26, 2007, to determine its conformity with the General Plan. In addition, the Parks and Community Services Commission will review the CIP Update on June 18, 2007, for input regarding park and recreation facility related projects and the Heritage and Cultural Arts Commission will review the proposed CIP Update on June 14,2007, to provide input on heritage and cultural art related projects. The recommendations of the City's Commissions will be presented to the City Council at the Budget Hearing. Highlights and Changes by CIP Category As in the past, the proposed CIP projects are presented in four categories: General, Community Improvements, Parks and Streets. Of the total estimated Five Year CIP. cost of $163.1 million, approximately $14.0 million (8.6%) is allocated to General projects, $1.4 million (0.8%) is allocated to Community Improvements, $68.3 million (41.9%) is allocated to Park projects, and $79.4 million (48.7%) is allocated to Street projects. Highlights and changes in each of these major categories are discussed in detail in the following section of this transmittal letter. General Proiects The General Project category includes a variety of projects which enhance or improve the functioning of City facilities and/or technology in order to better serve the community. Significant projects included in this category include the following: 1. Funding is recommended for Fiscal Year 2007-2008 for the remodeling of the TV30 Studio. This project will be jointly funded by the Cities of Dublin, Livermore, Pleasanton and San Ramon. 2. Replacement of the City's Accounting and Building Permit Systems is proposed for Fiscal Year 2007- 2008. During Fiscal Year 2006-2007, the City retained the services of a consultant to assist the City in the replacement of these outdated systems. Page Three 3. The process to expand and renovate the Civic Center needs to continue in order for the City to be able to hire additional Staff to serve a growing City. In Fiscal Year 2006-2007, the City Council adopted a programming report which included the projected staffing and space needs until buildout. 4. The Civic Center Library Expansion project is scheduled for Fiscal Year 2010-2011. The County Library Staff has indicated that the expansion space will not be needed uIitil that time. New projects in this year's CIP include a project to enhance the City's ability to maintain the Civic Center roof and energy efficiency measures to increase the comfort of the City Center Offices and the Senior Center, while at the same time reducing the energy consumption of these buildings. Community Improvements The Community Improvement Project category includes those projects which enhance the functionality and ~ppearance of the City's streetscape. Significant projects in this category include the following: 1. The City's Sidewalk Safety Repair Program. 2. Fence and wall maintenance projects on San Ramon Road. 3. . Replacement of the City's entrance monuments. 4. New bus shelters incorporating public art. New projects in this year's CIP include the Transit Center Art project at the eastern Dublin Transit Center and painting the Village Parkway soundwall north of Amador Valley Boulevard. . Parks The Parks category reflects the City's priorities with respect to creating and enhancing park, recreation and cultural facilities for current Dublin residents and for future residents as the City grows. Two community buildings have been included in the CIP Update: the Shannon Community Center Reconstruction and the Emerald Glen Park Recreation and Aquatic Complex. The Shannon Community Center will be rebuilt in the same location as the former Center but will be enlarged to 19,760 square feet in order to accommodate a larger social hall. Construction of the Center began in Fiscal Year 2006-2007 and it is anticipated that the Center will reopen in fall 2008. The estimated cost is $11,159,653 (not including the use of an additional $366,328 from the Building Replacement Internal Service Fund). The Emerald Glen Park Recreation and Aquatic Complex included in the CIP Update is similar to the Recreation and Aquatic Center as envisioned in the Parks and Recreation Master Plan. As proposed, design is scheduled to begin in Fiscal Year 2008-2009 and completion of construction is beyond the CIP timeframe in fall 2012: The larger state-of-the-art Complex preferred by the Council exceeds the available Public Facility Fee revenue by $24.6 million. Options for developing the state-of-the-art Page Four Complex have been identified in a separate report for City Council consideration at its June 28, 2007 Budget Hearing. The CIP Update includes several projectsrelated to the Dublin Historic Park. The Dublin Historic Park Master Plan was adopted by the City Council in Fiscal Year 2006-2007. The Master Plan identifies the ultimate boundaries and the preferred alternative design for the Historic Park. In Fiscal Year 2006-2007, the City acquired the Dublin Square Shopping Center for the purpose of expanding the Dublin Historic Park. In Fiscal Year 2007-2008, design and construction documents for Phase I of the Dublin Historic Park will be completed with construction to follow in Fiscal Year 2008-2009. The estimated cost for Phase I is $2,238,600 and will be funded from the General Fund. Additional phases for the Dublin Historic Park development are currently scheduled beyond the time frame of this CIP. Community Park projects in the CIP Update include Emerald Glen Park, Fallon Sports Park and Dougherty Hills Dog Park. Phase III of Emerald Glen Park was completed in Fiscal Year 2005-2006 and one additional phase of the park remains which is beyond the CIP time frame. The Dougherty Hills Dog Park was completed in Fiscal Year 2006-2007 and includes separate areas for both large dogs and small dogs. The Fallon Sports Park Master Plan was completed in Fiscal Year 2004-2005 and mass grading of the site was completed in Fiscal Year 2005-2006. Phase I is schedule to begin in Fiscal Year 2007-2008 and be complete in Fiscal Year 2009-20 10. Phase I improvements include: 2 little league fields; 2 lighted softball fields; 4 lighted tennis courts; 4 lighted basketball courts; 2 lighted soccer fields; parking; rails; and restrooms. Additionally, use of artificial turf will be evaluated for the two lighted soccer fields. Subsequent phases are currently scheduled beyond the time frame of this CIP. Neighborhood Park projects included in the CIP Update are related to the following development projects: Dublin Ranch, Schaefer Ranch, Wallis Ranch, and Fallon Villages (Eastern Dublin Parks). Dublin Ranch projects include three Neighborhood Squares and one Neighborhood Park. The Neighborhood Square in Area F (within the Toll Bros. Sorrento project) is under construction and will be complete in late fall 2007. Design of the Neighborhood Square in Area G (within the Toll Bros. Villages project) was approved in Fiscal Year 2006-2007 and construction will be complete in spring 2008. Design ofthe Neighborhood Park in Area F will begin in Fiscal Year 2007-2008 and construction will be complete in spring 2009. One additional Neighborhood Square is currently scheduled beyond the time frame of this CIP. The Schaefer Ranch project includes one Neighborhood Park that will be constructed by the developer of Schaefer Ranch, therefore no constrl,Jction costs have been included in this CIP. It is anticipated that construction of the park by the developer will begin in Fiscal Year 2009-2010 and be complete in Fiscal Year 2010-2011. The Wallis Ranch project includes two Neighborhood Parks totaling 7.9+/- acres. Design will begin in Fiscal Year 2009-20 10 and construction will be complete in Fiscal Year 20 10-'-2011. Construction of one 4.9 acre Neighborhood Park in the Fallon Villages project (Eastern Dublin Parks) is anticipated during the CIP time frame. Design will begin in Fiscal Year 2009-20 I 0 and construction will be complete in Fiscal Year 2010-2011. The balance of the parks in Eastern Dublin are currently scheduled beyond the time frame of this CIP. Page Five Park renovation projects included in the CIP Update include Park Play Area Renovations, Park Furniture Replacement and Dublin Sports Grounds Renovation. Play Area Renovations have been completed for Kolb, Shannon and Dolan Parks; Alamo Creek Park will be completed in Fiscal Year 2006-2007 and Stagecoach will be undertaken in Fiscal Year 2007-2008. Park Furniture has been replaced at Dolan, Alamo Creek and Stagecoach Parks; Shannon Park is schedule for Fiscal Year 2007-2008 and Kolb Park is scheduled for Fiscal Year 2008-2009. The City intends to use annual grant funds from the Alameda County Waste Management Authority to fund replacement of the park furniture. The Dublin Sport Grounds Renovation includes the following upcoming renovation projects: remodeling of the restrooms and snack bar in Fiscal Year 2007-2008, and a turf renovation project for the area east of Soccer Field #3 to begin in Fiscal Year 2009-2010 and to be completed in Fiscal Year 2010-2011. One additional turf renovation project for the area west of Soccer Field #3 is beyond the time frame of this CIP. Other projects include installation of an additional water meter at Stagecoach Park to separate the water usage of the park from the assessment district; and conducting an in-depth Community Needs Assessment to identify needs and opportunities for Recreation Services. This information will be used to develop a Strategic Plan for the Parks & Community Services Department. This CIP update includes approximately $111,130,072 in Park projects that are unfunded or partially unfunded during the remaining four years of this CIP. Streets The Streets project category includes a variety of projects which maintain local roads and trails, expands intersections, roadways and freeway interchanges to accommodate growth from within the City and neighboring communities. The Streets project category also provides new bike and pedestrian trails to promote healthy lifestyles and positively impact the environment. Approximately 84% of the funding for the Street projects identified in the remaining four years of the CIP will come from Traffic Impact Fees and development. The two most significant projects on which the City will commence construction in Fiscal Year 2007-2008 are the 1-580 Fallon Interchange and the Dougherty Road Improvements- Houston Place to 1- 580. The completion of these two projects will significantly increase the ability of the City to accommodate local and regional traffic. The Eastern Dublin Annual Street and Freeway Improvement projects provide for the construction of the backbone infrastructure for eastern Dublin over the next four years. This project also provides for the repayment of loans to the City of Pleasanton, Alameda County and BART related to the construction of various segments of Dublin Boulevard between Dougherty Road and Tassajara Road. In Fiscal Year 2007-2008, the City will commence design on the East and West Dublin BART Corridor Enhancement projects which are primarily funded with an MTC grant. These improvements will be completed in Fiscal Year 2008-2009 and will improve the walkability and appearance of Dublin Boulevard. Page Six It is anticipated that work will commence on St. Patrick Way in Fiscal Year 2007-2008, with right-of-way acquisition. Another Downtown improvement scheduled to commence in Fiscal Year 2008-2009 is the addition of an eastbound right turn lane on Dublin Boulevard at Village Parkway. In Fiscal Year 2008-2009, the City will be required to contribute the last payment to BART to finance the West Dublin BART Station. New projects proposed in the Streets Project category include: I. Citywide Signal Communications Upgrade. 2. Citywide Storm Drain Condition Assessment. 3. Design of the intersection improvements at Dublin Boulevard and Amador Plaza Road. 4. San Ramon Road Trail Improvements between West Vomac Road and Alcosta Boulevard. This CIP Update includes approximately $81.6 million in Streets projects that are unfunded or partially unfunded during the remaining four years of this CIP. The preponderance ofthese projects will be funded by Traffic Impact fees collected by future development. OutstandiDl! Capital Issues As was discussed in last year's Capital Improvement Program, the City has identified several capital projects which are currently unfunded or under funded at this time. A brief description of each project is provided below. Civic Center Expansion During 2006-2007 a space programming study which included a proposal to build additions and renovate the Civic Center was approved by the City Council. It is critical to commence the more detailed engineering studies to complete this project by 20 I 0-20 II, especially the portion of the project which expands the Police Facility. The cost of this project exceeds $10 million. Although the primary funding service for this project could come from Public Facility Fees, the Public Facility Fee Study needs to be updated to include the increased cost. Depending upon the outcome of that study the General Fund may need to contribute some of the funding to this project. Emerald Glen Park Recreation and Aquatics Complex The City has sufficient funding and project management Staff to initiate this project in Fiscal Year 2008- 2009, if the City were to construct only those facilities identified in the City's adopted Emerald Glen Park Master Plan. If the City were to pursue the State-of-the-Art Recreation Complex identified in the City's Strategic Plan, significant additional funds would be required. Page Seven Staff has prepared a report under separate cover which outlines various projects and funding alternatives for the City Council to consider if the Council wishes to pursue a Recreation! Aquatic Complex which differs from the adopted Master Plan. City Maintenance/Emere:encv Operations Center The City's current maintenance facility at the end of Scarlett Court is inadequate to meet the City's future maintenance needs. The City's current Emergency Operations Center located in the Police Department is too small, and is vulnerable under certain types of disaster. This past year Staff held a disaster exercise at Fire Station #17. The results of that exercise proved that the facility did not function well as an alternate EOC. Staff is still working to identify a site that would accommodate both of these facilities. There is currently no designated funding source for this project. Dublin Historic Park In Fiscal Year 2006-2007, the City acquired the Dublin Square Shopping Center (approximately 4.2 acres) in order to expand the Dublin Historic Park. The cost for relocating the tenants is yet to be determined. The cost for development of the park is estimated at $11.8 million. Currently there is no designated funding source beyond Phase I improvements. The cost of constructing the other phases ofthe park is currently estimated at $9.5 million. Summary and Conclusion The 2007-2008 update is an ambitious plan to undertake a variety of capital projects that will enable the City to keep pace with a growing population, as well as, enhance the quality of life for people who live, work and play in the City of Dublin. Although funding is not currently available to address all of the funding needs identified in the "Outstanding Capital Issues" paragraph above, it is possible in future years to make measured progress toward completing some of these projects with careful financial planning. This year, I would like to take the opportunity to thank the many Staff members who plan, inspect and maintain the City's infrastructure, as well as those individuals who were instrumental in developing this year's update to 2006-2011 Five Year Capital Improvement Program. Respectfully Submitted, Richard C. Ambrose City Manager Page Eight SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - ALL PROGRAMS PROJECT TOTALS PRIOR YEARS 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 General $ 34,231,442 $ 20,197,657 $ 429,392 $ 1,542,833 $ 2,160,026 $ 4,885,062 $ 5,016,472 Community Improvements 1,513,807 140,976 121,641 561,335 228,587 379,556 81,712 Parks 95,600,358 27,249,217 11,468,796 13,278,632 14,142,291 18,992,564 10,468,858 Streets 139,749,247 60,372,608 13,800,791 32,947,481 16,809,479 13,450,007 2,368,881 TOTAL COST(a) $ 271,094,854 $ 107,960,458 $ 25,820,620 $ 48,330,281 $ 33,340,383 $ 37,707,189 $ 17,935,923 FINANCING General Fund (001) $ 28,921,572 $ 9,708,758 $ 3,803,021 $ 8,072,487 $ 4,875,860 $ 1,735,941 $ 725,505 Criminal Activity Fund (200) 17,266 17,266 State Gas Tax (206) 4,246,356 560,821 106,991 689,600 1,170,144 859,400 859,400 CDBG Fund (209) 85,147 74,294 10,853 ISTEA (210) 3,661,044 285,044 100,000 389,000 2,887,000 Transp. Development Act (211) 45,144 45,144 State Park Bond Act (213) 701,037 701,037 I Measure B Sales Tax (217) 1,794,659 62,269 404,970 151,220 408,400 382,400 385,400 ,. State Transportation Improvements (219) 3,080,268 3,080,268 SB300 Grant (220) 69,340 69,340 Measure D Fund (224) 340,892 122,070 75,526 62,050 81 ,246 Measure B - Bike/Pedestrian (227) 351,702 18,426 45,928 56,630 230,718 CMA TIP funds (228) 906,000 400,000 289,000 217,000 Traffic Congestion Relief Fund (240) 456,531 182,292 274,239 Traffic Impact Fee Fund (300) 122,471,228 54,986,078 12,638,326 30,104,449 11,654,382 12,086,247 1,001,746 Public Facility Impact Fee (310) 96,739,261 30,946,530 8,389,272 7,980,753 11,815,633 22,643,201 14,963,872 Public Arts Fund (311) 250,000 250,000 Park Dedication In-Lieu Fund (315) 6,957,407 6,957,407 TOTAL $ 271,094,854 $ 107,960,458 $ 25,820,620 $ 48,330,281 $ 33,340,383 $ 37,707,189 $ 17,935,923 (a) Does not include $192,692,117 in unfunded Community Improvements, Parks and Street Projects for which $26,148,292 in restricted funds has been collected or obligated by the City or other agencies, leaving a net shortfall of $166,543,825. SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - GENERAL PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 93135 TV30 Studio Remodel $ 430,000 $ 87,223 $ 17,500 $ 325,277 93150 Network System Upgrade 413,780 295,280 38,500 80,000 93191 Accounting System 412,000 26,570 385,430 93192 Geographic Information System 332,658 224,598 30,860 17,200 $ 30,000 $ 30,000 93200 Building Permit System 256,488 5,375 251,113 93320 Telecommunications Plan 168,581 13,581 155,000 93402 Maintenance Facility Study 35,000 35,000 93450 Civic Center Library 18,614,342 17,218,852 $ 1,395,490 93451 Library Repairs 32,744 32,744 93462 Inspector Trailers 164,380 3,800 160,580 93900 Building Management Study 137,890 137,890 93910 Civic Center Modification Design Services & 12,417,793 2,197,158 15,180 120,000 1,955,026 4,529,447 3,600,982 Construction 93917 ADA Transition Plan 108,533 17,680 30,853 20,000 20,000 20,000 93923 Civic Center Window Sealing 49,383 49,383 93933 Civic Center Generator 344,385 38,770 305,615 93970 Automated Document Storage & Retrieval System 123,588 101,538 4,250 17,800 94500 Public Facility Fee Study Update 50,622 20,657 14,660 15,305 .!... New City Facility Energy Efficient Window Treatment 113,575 113,575 T' New Civic Center Roof Maintenance 25,700 25,700 TOTAL COST $ 34,231,442 $ 20,197,657 $ 429,392 $ 1,542,833 $ 2,160,026 $ 4,885,062 $ 5,016,472 FINANCING General Fund (001) $ 9,944,602 $ 7,274,705 $ 399,552 $ 1,396,675 $ 205,000 $ 355,615 $ 313,055 Criminal Activity Fund (200) 17,266 17,266 CDBG Fund (209) 10,853 10,853 Public Facility Impact Fee (310) 24,258,721 12,905,686 29,84Q 135,305 1,955,026 4,529,447 4,703,417 TOTAL FINANCING $ 34,231,442 $ 20,197,657 $ 429,392 $ 1,542,833 $ 2,160,026 $ 4,885,062 $ 5,016,472 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - COMMUNITY IMPROVEMENTS PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 94052 Iron Horse Trail - Wildflower Planting $ 72,231 $ 24,876 $ 22,885 $ 24,470 94250 Sidewalk Safety Repair Program 407,221 $ 80,373 81,712 $ 81,712 81,712 $ 81,712 94252 Bus Shelters 156,788 116,100 40,688 94601 San Ramon Road Concrete Sound Wall Maintenance 80,362 3,912 76,450 94942 Seasonal Street Banners 37,356 37,356 N/A San Ramon Road Landscape Renovation 146,875 146,875 N/A San Ramon Road Wooden Sound Wall Maintenance 60,180 60,180 N/A City Entrance Sign Modifications 273,374 273,374 New Transit Center Art 250,000 250,000 New Village Parkway Soundwall Paihting 29,420 29,420 TOTAL COST $ 1,513,807 $ 140,976 $ 121,641 $ 561,335 $ 228,587 $ 379,556 $ 81,712 FINANCING General Fund (001) $ 1,246,226 $ 140,976 $ 104,060 $ 311,335 $ 228,587 $ 379,556 $ 81,712 Community Development Block Grant (209) 17,581 17,581 ..L. Public Arts Fund (311) 250,000 250,000 ," TOTAL FINANCING $ 1,513,807 $ 140,976 $ 121,641 $ 561,335 $ 228,587 $ 379,556 $ 81,712 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - PARKS PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 95010 Parks & Community Services Needs $ 62,000 $ 25,515 $ 36,485 Assessment 47,~00 p 95210 Stagecoach Park Assessment District Water 61,980 Meter 95465 Shannon Community Center Reconstruction 11,159,653 $ 371,286 1,594,603 6,927,121 $ 2,266,643 95555 Dublin Historic Park Master Plan 152,756 148,251 4,505 95556 Dublin Historic Park Acquisition --- 10,455,900 8,038,735 2,417,165 95600 Emerald Glen Park 17,441,654 17,441,654 95602 Emerald Glen Park Recreation and Aquatic 7,546,376 64,976 475,485 $ 946,400 $ 6,059,515 Complex 95625 Dougherty Hills Park - Dog Park 578,713 17,761 560,952 95631 Park Furniture Replacement 269,172 50,350 75,526 62,050 81,246 95635 Park Play Area Renovations 627,223 363,732 136,441 127,050 95640 Dublin Ranch Neighborhood Parks 5,871,821 1,522,481 798,474 1,664,491 1,886,375 95830 Dublin Sports Grounds Renovation 2,825,585 1,670,762 4,835 62,775 878,810 208,403 95851 Fallon Sports Park 19,826,891 5,597,964 181,230 1,662,690 7,498,747 4,886,260 N/A Eastern Dublin Parks 6,309,529 4,691,089 1,618,440 N/A Schaefer Ranch Neighborhood Park ** ** I <" N/A Wallis Ranch Neighborhood Parks 10,172,505 7,590,005 2,582,500 I New Dublin Historic Park Development 2,238,600 304,805 1,933,795 TOTAL COST $ 95,600,358 $ 27,249,217 $ 11,468,796 $ 13,278,632 $ 14,142,291 $ 18,992,564 $ 10,468,858 FINANCING General Fund (001) $ 14,772,869 $ 1,136,959 $ 2,977,125 $ 5,371,134 $ 4,200,438 878,810 208,403 Community Development Block Grant (209) 56,713 56,713 FEMA Fund (212) State Park Bond Act (213) 701,037 701,037 Measure D Fund (224) 340,892 122,070 75,526 62,050 81,246 Traffic Impact Fee Fund (300) 290,900 290,900 Public Facility Impact Fee (310) 72,480,540 18,040,844 8,359,432 7,845,448 9,860,607 $ 18,113,754 $ 10,260,455 Park Dedication In-Lieu Fund (315) 6,957,407 6,957,407 TOTAL FINANCING $ 95,600,358 $ 27,249,217 $ 11,468,796 $ 13,278,632 $ 14,142,291 $ 18,992,564 $ .10,468,858 ** Schaefer Ranch Neighborhood Park will be dedicated and constructed by the Developer of Schaefer Ranch SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - PARKS PROJECTS UNFUNDED DURING THE FIVE YEAR TIME FRAME PROJECT NUMBER AND NAME I < I 95600 95602 * 95603 95640 95830 95851 95935 N/A N/A * N/A N/A N/A New Emerald Glen Park Emerald Glen Park Recreation and Aquatic Complex Emerald Glen Park Recreation Center Dublin Ranch Neighborhood Parks Dublin Sports Grounds Renovation Fallon Sports Park Cultural Arts Center Eastern Dublin Parks Emerald Glen Park Community Center Schaefer Ranch Neighborhood Park Transit Center Park Wallis Ranch Neighborhood Parks Dublin Historic Park Development TOTALS LESS AVAILABLE PARK DEDICATION AND PUBLIC FACILITY FEES FUNDING SHORTFALL UNFUNDED PORTION OF ESTIMATED COST $ 912,025 10,375,788 1,139,231 859,509 15,968,181 8,754,330 43,741,508 8,992,600 10,863,800 9,523,100 $111,130,072 $ 18,635,570 $ 92,494,502 SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - STREETS PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 94520 Tri-Valley Triangle Study $ 60,500 $ 58,500 2,000 96001 Tri-Valley Transportation Development Fee Regional 1,250,000 $ 1,250,000 Transportation Projects 96010 Dublin Boulevard Improvements - Silvergate Drive to Hansen 3,686,425 719,976 2,966,449 Drive 96011 West Dublin BART Station Corridor Enhancement - Dublin 1,502,522 $ 63,844 $ 199,150 1,239,528 Boulevard - Hansen Drive to Clark Avenue 96012 East Dublin BART Station Corridor Enhancement - Dublin 2,543,328 84,962 260,150 2,198,216 Boulevard - Tassaiara Road to Clark Avenue 96022 Dublin Boulevard Bridge Resurfacing at Alamo Canal 29,009 29,009 96082 Underground Utilities - Dublin Boulevard/ Dougherty Road 694,978 423,207 271,771 Intersection and Vicinity 96400 Eastern Dublin Arterial Street and Freeway Improvements 81,091,544 45,091,029 8,820,889 7,536,428 * 7,166,019 $ 11,598,499 $ 878,680 96430 1-580 & Fallon Road Freeway Interchange Improvements - 16,562,268 2,771,687 105,634 13,684,947 Phase I 96452 Downtown Traffic Signal Equipment Replacement 130,000 105,943 24,057 96480 Downtown Dublin Roadway Improvements 34,097 30,065 1,992 2,040 96580 Annual Street Overlay Program 3,185,017 597,358 714,459 625,400 622,400 625,400 96585 Annual Slurry Seal Program 2,529,580 19,080 652,300 619,400 619,400 619,400 96773 Alamo Canal Trail Under 1-580 85,509 4,113 24,766 56,630 96775 Citywide Bicycle / Pedestrian Plan 80,619 59,457 21 ,162 f 96776 Crossridge Road Trail Connection Improvements 24,456 24,456 < 96840 Scarlett Drive Iron Horse Trail Extension 234,731 134,436 100,295 T" 96850 Dougherty Road Improvements - North of Amador Valley 570,269 570,269 Boulevard to North of Houston Place 96852 Dougherty Road Improvements - Houston Place to 1-580 16,958,708 4,771,909 3,040,749 9,146,050 96870 Saint Patrick Way - Regional Street to Golden Gate Drive 472,279 6,942 11,000 454,337 96920 Dublin Boulevard Improvements - Village Parkway to Sierra 6,182,842 5,625,075 557,767 Court 96930 Dublin Boulevard Improvements - Sierra Court to Dublin 123,066 123,066 Court N/A Bike Lane - Amador Valley Boulevard Stagecoach Road to 295,699 295,699 DouQherty Road N/A Dublin Boulevard - Right Turn at Village Parkway 694,681 206,933 487,748 New Citywide Signal Communications Upgrade 71,530 17,580 17,775 17,900 18,275 New Citywide Street Storm Drain Condition Assessment 416,240 104,060 104,060 104,060 104,060 New Dublin Boulevard/Amador Plaza Road Intersection 94,350 94,350 New San Ramon Road Trail Improvements 145,000 25,000 120,000 TOTAL COST $139,749,247 $60,372,608 $13,800,791 $32,947,481 $16,809,479 $ 13,450,007 $ 2,368,881 * It is estimated that approximately $6.9 million of the Fiscal Year 2007-2008 budgeted expenditures for this project will be built by the development community. SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - STREETS PRIOR PROJECT NUMBER AND NAME TOTALS YEARS 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 FINANCING General Fund (001) $ 2,957,875 $ 1,156,118 $ 322,284 $ 993,343 $ 241,835 121,960 122,335 St.ate Gas Tax (206) 4,246,356 560,821 106,991 689,600 1,170,144 $ 859,400 $ 859,400 ISTEA (210) 3,661,044 285,044 100,000 389,000 2,887,000 Transp. Development Act (211) 45,144 45,144 Measure B Sales Tax (217) 1,794,659 62,269 404,970 151,220 408,400 382,400 385,400 State Transportation Improvements (219) 3,080,268 3,080,268 SB300 Grant (220) 69,340 69,340 Measure B - Bike/Pedestrian (227) 351,702 18,426 45,928 56,630 230,718 CMA TIP Funds (228) 906,000 400,000 289,000 217,000 Traffic Congestion Relief Fund (240) 456,531 182,292 274,239 Traffic Impact Fee Fund (300) 122,180,328 54,695,178 12,638,326 30,104,449 11 ,654,382 12,086,247 1,001,746 TOTAL FINANCING $ 139,749,247 $ 60,372,608 $ 13,800,791 $32,947,481 $ 16,809,479 $ 13,450,007 $ 2,368,881 I :S. T SUMMARY 2006-2011 CAPITAL IMPROVEMENT PROGRAM - STREETS PROJECTS UNFUNDED DURING THE FIVE YEAR TIME FRAME UNFUNDED PORTION OF ESTIMATED FEES NET PROJECT NUMBER AND NAME COST AVAILABLE SHORTFALL 96001 Tri-Valley Transportation Development Fee Regional Transportation Projects $ 15,059,923 $ 15,059,923 96400 Eastern Dublin Arterial Street and Freeway Improvements 38,364,338 38,364,338 96480 Downtown Dublin Roadway Improvements 5,569,915 $ 1,368,722 4,201,193 96840 Scarlett Drive Iron Horse Trail Extension 10,716,789 10,716,789 Dougherty Road Improvements - North of Amador Valley Boulevard to 96850 North of Houston Place 3,776,426 3,776,426 96930 Dublin BOulevard Improvements - Sierra Court to Dublin Court 2,758,115 2,758,115 N/A Dougherty Road Improvements - Amador Valley Boulevard North to 4,210,489 4,210,489 City Limits I New Citywide Signal Communications Upgrade 18,400 18,400 S. T' New Dublin Boulevard/Amador Plaza Road Intersection Improvements 1,087,650 1,087,650 TOTALS $ 81,562,045 $ 1,368,722 $ 80,193,323 Plus Available Measure B Sales Tax (96840) $ 6,144,000 FUNDING SHORTFALL $ 81,562,045 $ 7,512,722 $ 74,049,323 CITY OF DUBLIN OVERVIEW OF 5 YEAR CAPITAL IMPROVEMENT PLAN FUNDED PROJECTS (In Millions of Dollars) APPROPRIA TIONS TOTAL $163.1 MilliON $13.9 $1.4 $68.4~ II Streets ~ Parks ~ General ,~$79.4 . Community CITY OF DUBLIN OVERVIEW OF 5 YEAR CAPITAL IMPROVEMENT PLAN FUNDED PROJECTS (In Percent by Funding Source) REVENUE SOURCES TOTAL $163.1 MilliON 40k . Private Development IBl General Fund Grants ~ Other City Resources ~ 820k -ix- 2006-2011. CAPITAL IMPROVEMENT PROGRAM -;- PROJECT NUMBER 93135 PROJECT DESCRIPTION TV30 Studio Remodel ACTIVITY GENERAL DESCRIPTION - LOCA nON The Tri-Valley Community Television (TV30) Board, in cooperation with the cities of Dublin, Livermore, Pleasanton and San Ramon, has initiated a project to relocate and expand the current TV30 studio and upgrade much of the existing equipment with new digital technologies. It is estimated that the project will cost approximately $1.8 million. The cost of the project will be divided equally among the four cities, resulting in a total City contribution of $450,000. To date, the City has contributed approximately $104,723; ($20,000 of which was previously accounted for in the City's Community Cable Television Operating Budget), for its share of the design phase of the project, thereby reducing the Fiscal Year 2007-2008 contribution to $325,277. COMMENTS As part of the City's Cable Television Franchise Agreement, the City received a $200,000 capital grant from AT&T, which can be used for the purchase of video production equipment and associated facility modifications for the City and/or Tri-Valley Community Television (TV30). The City used approximately $120,000 of this grant to purchase and install video production equipment in the Council Chamber. The remaining $80,000 will be used to partially offset the cost of the TV30 studio project. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design {Inspection 001 $ 87,223 $ 17,500 $ 325,277 Other Contract Services $ 430,000 Land { Right of Way Improvemeflts Machinery { Equipment Miscellaneous $ 430,000 TOTAL $ 430,000 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 87,223 $ 17,500 $ 325,277 $ 430,000 -1- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93150 PROJECT DESCRIPTION Network System Upgrade ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for additions and upgrades to the City data processing network. This includes the basic infrastructure necessary to access centralized computer servers as well as the accompanying data . storage and support for changes in technology. COMMENTS In Fiscal Year 2006-2007 development ofan Information Technology Assessment and Mater Plan was commissioned. This project is underway and will assess the City's current and future technology needs and present recommendations on the City's future technology path. The completion of the Master Plan is anticipated to carryover into the first quarter 2007/2008. The Master Plan will identify priorities and a sequencing of recommended improvements. In order to be in a position to address the implementation of the Master Plan certain key needs have been identified as being necessary to complete in Fiscal Year 2007-2008. The following Network Improvements are proposed for Fiscal Year 2007-2008: 1) Contract Services necessary for the completion of the Master Plan ($25,000); 2) Contract services to address development of improved network programming for each device attached to the network and an assessment of network website conflicts ($15,000); 3) Interim Computer Room improvements and IT Staff workspace modifications ($25,000); Acquisition of a computer server and software to be used by Information Services Staff to manage help desk requests and workstation tools ($12,000); and access to voice mail for Patrol Officers via e-mail ($3,000). The work proposed for Fiscal Year 2007-2008 will accomplish the following High Priority City Council Goal: 2007/2008 Goals 1. Develop Technology Master Plan for City of Dublin organization (Carryover 2006). ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 278,014 $ 38,500 $ 80,000 144,370 200 17,266 $ 396,514 17 ,266 14,815 251,204 3,391 TOTAL $ 413,780 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 295,280 $ 38,500 $ 80,000 $ 413,780 -2- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93191 PROJECT DESCRIPTION Accounting System . ACTIVITY GENERAL DESCRIPll0N - tOCA 110N The City currently operates several centralized accounting functions on an IBM AS/400. The initial hardware and software were purchased in 1988, with some additional enhancements and replacement of the hardware server taking place subsequent to that purchase. The City's current accounting software has an outdated user interface, making it difficult to use for other departments, and the vendor has made few si9nificant enhancements to the accounting package. Meanwhile, significant advancements have been made in technology and financial software offerings since the original purchase. This item would provide for replacement of the IBM AS/400 and all associated software. COMMENTS In 2006/2007 the City selected a third party consultant who specializes in the purchase of new accounting systems. The Consultant will assist with the development of a Request for Proposal (RFP) , evaluation of accounting systems offered by vendors who specialize in providing solutions specifically for cities; and the completion of a contract for a new system. The report from this phase of the project is expected to be presented in July 2007. The Consultant is also assisting with a similar scope of work associated with the Permit System described in Project 93200.. The total cost of the accounting system, including contractor assistance with the RFP, evaluation and contract for the system as well as with the training and implementation of the system, is projected to be $537,000 with $125,000 funded from reserves previously established for replacement of the system in the City's Equipment Replacement Internal Service Fund. The Financial Software will include: General Ledger, Accounts Payable, Accounts Receivable, Budget Preparation, Purchasing, Fixed Assets, Cash Receipts, Bank Reconciliation, Project Cost Accounting and Payroll 1 Human Resources. Among the benefits anticipated from this project are: a. Improved integration of systems with real time reporting in a user friendly environment. b. Regular updates to the software provided by the vendor, which allows the City to establish strong financial internal controls and safeguards over the financial data and maintain compliance with the latest Governmental Accounting Standards Board (GAS B) pronouncements c. Streamlined business processes which draw upon best practices d. Improved reporting capabilities. e. Improved customer service for both internal and external customers. This CIP would accomplish the following High Priority City Council Goals: 2006-2007 GOAL 1. Evaluate the need to replace the City's accounting system. 2007-2008 GOAL 1. Replace financial accounting system. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design / Inspection 001 Other Contract Services $ 330,500 Land / Right of Way Improvements Machinery / Equipment 81,500 Miscellaneous $ 26,570 $ 385,430 $ 412,000 TOTAL $ 412,000 PROJECT I STAFF MANAGEMENT (FTEI CONTRACT $ 26,570 $ 385,430 $ 412,000 -3- 2006-2011 CAPIT ALIMPROVEMENT PROGRAM PROJECT NUMBER 93192 PROJECT DESCRIPTION Geographic Information System . ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for the implementation of an integrated Geographic Information System (GIS). This type of system incorporates various data related to geographic locations and visually displays it on a map. The data includes foundation layers of engineering and planning mapping, including aerial photographs of the City. The remaining elements of this project build additional layers of information that are more function specific. COMMENTS Since 2002, the City has made progress in the development of an Geographic Information System. Initial phases produced a system that has increased the productivity of City Staff and enhanced customer service. In Fiscal Year 2006-2007 the project added two specific elements: 1) The provision of key public maps and related information on the City website; and 2) data collection and an inventory of street lights that can be used by Public Works to more efficiently manage the maintenance function. In Fiscal Year 2007-2008, consultant services are proposed for two enhancements to the Geographic Information System. 1) Conversion assistance to update and standardize the internal GIS used by City staff with the version used with for the City's public website. The cost of consulting services for this conversion project is $7,200. 2) Contract services to digitize building footprints throughout the City. Staff proposes a two year approach to imagery collection for updates to the aerial photography, starting in Fiscal Year 2008-2009, The cost shown is the projected Dublin share based on past efforts by several local agencies to jointly pursue a regional project to update current information. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection 001 $ 224,598 $ 30,860 $ 17,200 $ 30,000 $ 30,000 Other Contract Services $ 259,752 Land I Right of Way Improvements Machinery I Equipment 72,797 Miscellaneous 109 $ 332,658 TOTAL $ 332,658 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 224,598 $ 30,860 $ 17,200 $ 30,000 $ 30,000 $ 332,658 -4- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93200 PROJECT DESCRIP110N Building Permit System ACTIVITY GENERAL DESCRIP110N - LOCA 11 ON This project would install a new Building Permit System to handle building permit issuance, building inspection requests, field inspections and necessary state and local required building reports. An important feature of the new software would allow customers to request and track inspections on-line. Additional software for future traCking systems (code enforcement, grading and encroachment permits) would also be purchased as part of this project. COMMENTS The present system, initiated in Fiscal Year 1999-2000, is unable to handle the City's increased permit workload. Severe limitations of the present system have resulted in data loss requiring re-entry, causing frequent software breakdowns, and resulting in the inability to complete building inspection requests. Additionally, field records must be entered manually, resulting in lost productivity and additional work for Building Division Staff. The new system would improve productivity, minimize lost time! enhance customer service and create a more reliable and efficient way of transferring information among City DE;lpartments. This project was delayed to allow a close association with the Accounting System (93191) CIP to allow a more comprehensive review of City-wide requirements in selecting a new system. This CIP is expected to be completed in the 2007-2008 fiscal year. This CIP would accomplish the following High Priority City Council Goal: 2007-2008 GOAL 1. Implement real-time electronic field inspection system ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 5,375 $ 251,113 $ 256,488 74,488 182,000 TOTAL $ 256,488 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 5,375 $ 251,113 $ 256,488 -5- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93320 PROJECT DESCRIPllON Telecommunications Plan ACTIVITY GENERAL DESCRIPTION - LOCA llON This project would define the role the City should take inthe provision of telecommunication facilities to the community. COMMENTS The Plan is composed of two parts: Phase I - Develop Zoning Regulations for wireless communications (completed in 2000) Phase" - Feasibility study, community outreach, financial analysis This project has been ranked as a medium priority by the City Council. Phase II is proposed to be completed in Fiscal Year 2008-2009, utilizing consultant services. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 724 001$ 13,581 Other Contract Services 167,857 Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 155,000 $ 168,581 TOTAL $ 168,581 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 13,581 $ 155,000 $ 168,581 -6- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93402 PROJECT DESCRIPTION Maintenance Facility Study ACTIVITY GENERAL DESCRIPTION - LOCATION This project performed a programming study to examine personnel needs, functions, and infrastructure demands for a maintenance yard and office/storage facility, including an Emergency Operations Center (EOC), in keeping with the City's growth and long-range infrastructure plans. COMMENTS The existing City Corporation Yard, located at the east end of Scarlett Court, contains minimal outdoor space and a two-room metal building which was erected in 1985 when the City's maintenance needs were based on a four-square mile area and a population of less than 15,000. The facility is now undersized for the existing infrastructure, and it is important to begin planning for its replacement. This project evaluated the needs of various functions of the Public Works Department and made recommendations for yard and building dimensions and features to satisfy those needs. This CIP provided substantial progress towards the following City Council High Priority Goal: 2006-2007 Goal Examine potential funding sources for design and construction of a maintenance yard and secure a site if funding becomes available. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Desigl1/lnspection Other Contract Services $ Land / Right of Way Improvements Machinery / Equipment Miscellaneous 001 $ 35,000 $ 35,000 35,000 TOTAL $ 35,000 PROJECT I STAFF. MANAGEMENT (FTE) CONTRACT $ 35,000 $ 35,000 -7- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93450 PROJECT DESCRIPTION" Civic Center Library ACTIVITY GENERAL DESCRIPTION - LOCATION e COMMENTS The project provided for the design and construction of a 37,000 square foot library. The new library is located adjacent to the Civic Center. MJIes 1 In September, 1998, the City Council approved the Library Planning Task Fqrce Report. In the Report, the Task Force recommended that a 37,000 square foot library be built at the Civic Center. The City's plan was to construct the entire 37,000 square feet building initially, and phase the furnishing of the library to occupy 30,000 square feet in Fiscal Year 2002-2003. The remainder of the library would be furnished in the year 2010, at which time the City will be able to afford the annual operating expense of a larger library. The Friends of the Library and meeting room spaces would be furnished and occupied during the initial stage. A breakdown of the project costs are shown as follows: Library Task Force Report Phase I Design & Construction Phase II Design & Construction TOTAL $ 20,860 17,197,992 1 ,395.490 $ 18,614,342 The new library was funded by Public Facility Fees ($12,193,436) and Private Development ($2,000,000); the balance of $4,420,906 was funded from the General Fund. Phase I construction was completed in spring 2003, and the Dublin Public Library opened to the public on April 12, 2003. Phase II is scheduled for Fiscal Year 2010-2011. ESTIMATED COSTS Fund Prior Years FINANCINGNEARS SCHEDULE 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design Ilnspeclion Other Contract Services Land I Right of Way Improvements Machinery I Equipment Books Miscellaneous $ 224,997 1,759,161 001 310 $ 6,127,851 11,091,001 $ 293,055 $ 6,420,906 1,102.,435 12,193,436 TOTAL PROJECT MANAGEMENT (FTE) 13,771,585 662,300 2,092,720 103,579 $ 18,614,342 STAFF CONTRACT $ 17,218,852 $ 1,395,490 $ 18,614,342 0.36 -8- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93451 PROJECT DESCRIPTION Library Repairs ACTIVITY GENERAL DESCRIPTION - LOCATION e This project repaired accident damage to the rear of the library building. The work included framing, stucco, and drywall repair. Miea 1 COMMENTS The entire cost of the work is expected to be reimbursed through insurance claims. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 5,781 001 360 $ 32,744 $ 32,744 26,508 95 TOTAL PROJECT MANAGEMENT (FTE) $ 32,744 STAFF CONTRACT $ 32,744 $ 32,744 -9- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93462 PROJECT DESCRIPTION Inspector Trailers ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for the relocation of the temporary inspector trailers from the site of the future Area G Neighborhood Square to the site of the future Fallon Sports Park, Phase III. COMMENTS e --- -- -- -- -- -- --- MRes ....._"",,- 1 .,.--', . \ "( .,.....-..... \, \. \ "" ---- ) \"'i ..".........-. \ .' ~ .~ 1,1 ~, '-/ \ \, / y f ~', Temporary Trailers to house Building Inspectors were placed on the site of the Area G Neighborhood Square in Fiscal Year 2004-2005. In order to proceed with construction of the Area G Neighborhood Square, the trailers need to be relocated to the future Fallon Sports Park in the proposed location of Phase III. This project includes the cost to relocate the trailers, excluding electrical transformer and water connections. These services will be oversized to accomodate the third phase of Fallon Sports Park and therefore have been shown as Fiscal Year 2006-2007 expenditures in the Fallon Sports Park Project # 95851. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 5,720 001 10,600 138,275 9,585 200 TOTAL PROJECT MANAGEMENT (FTE) $ 164,380 STAFF CONTRACT $ 3,800 $ 160,580 $ 164,380 $ 3,800 $ 160,580 0.05 $ 164,380 -10- PROJECT NUMBER 93900 DESCRIPTION - LOCATION 2006-2011 -CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION . Building Management Study ACTIVITY GENERAL The City of Dublin operates and maintains three fire stations,the Library, the Civic Center, the new Senior Center, the Corporation Yard, the Swim Center, the Heritage Center, and many public restrooms in its parks; Future building projects include a replacement for the Shannon Center, and future Community Center and Aquatic Center in Emerald Glen Park. This project would conduct a building management study to ensure that City buildings and their building systems were adequately assessed for condition, and a group of Capital Improvement Projects to bring all buildings up to performance standards would be developed. In addition, as part of the study, the maintenance and inspection schedule would be revised to ensure the sustainability of the City's facilities in the future. COMMENTS This study will establish building standards, measure the City's facilities by those standards, and recommend needed improvements, revise maintenance and inspection schedules to ensure sustainability, revise maintenance documentation to track trends and issues, and revise the Internal Service Fund to ensure necessary funding for replacement of building systems. This CIP will allow completion of the following City Council High Priority Goal: 2006-2007 GOAL Complete Building Management Study ESTIMATED COSTS Design I Inspection 001 Other Contract Services $ 137,890 Land I Right of Way Improvements Machinery I Equipment Miscellaneous TOTAL $ 137,890 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT FiNANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 $ 137,890 $ 137,890 -11- Totals $ 137,890 $ 137,890 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93910 PROJECT DESCRIPTION Civic Center Modification Design Services & Construction ACTIVITY GENERAL DESCRIPTION - LOCATION e This project provides for the completion of the Dublin Civic Center renovation, in order to accommodate the additional City Staff and police personnel required to serve the City in the next three-five years (Phase I), and at build-out of the City (Phase II). 'Design, engineering and all consulting services needed for the modifications at the Civic Center are included in the CIP. Phase II includes a 5,000 square foot addition to the police wing to accommodate the anticipated growth in the Police Department to serve the City at build-out. M'" 1 \II ,1............-...- \. '..........-- c \ ,. ~.....-.".- COMMENTS As the City grows, it has become necessary to increase personnel to adequately serve the community. During Fiscal Year 1997-1998, the City conducted a Civic Center Space Planning Study, which identified the number of personnel in each City Department that would occupy space in the Civic Center in the Year 2002, and at build-out of the City's General Plan. The proposed modifications as a result of the Study were divided into two phases. The first phase was completed in Fiscal Year 2000-2001 at an approximate cost of $2.1 million. Improvements included the completion of 4,500 square feet of unimproved space, expansion of the police parking lot, and construction of a 494 square foot evidence garage, a 470 square foot bike storage building and a 1,026 square foot maintenance building. Prior to moving forward with the second phase which provided for construction of a 5,000 square foot addition, a Programming Study was commissioned during Fiscal Year 2005-2006 to re-evaluate the space needs for build-out of the City. The Study was completed in Fiscal Year 2006-2007 and recommended a 12,120 square foot renovation and 8,040 square foot addition to the Police wing (Phase II); and an 8,880 square foot renovation and 5,253 addition to the City Hall Vl(ing (Phase III). Both phases will be designed simultaneously beginning in Fiscal Year 2007-2008 and Phase II will be complete in Fiscal Year 2009-2010 and Phase III will be complete in Fiscal Year 2010-2011. This Capital Improvement Project will accomplish the following High Priority City Council Goal: 2007/2008 Goals 1. Implement recommendations from the Civic Center Workspace Program Study ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 1,077,171 001 $ 403,130 $ 403,130 Other Contract Services 562,795 310 1,794,028 $ 15,180 $ 120,000 $ 1,955,026 $ 4,529,447 $ 3,600,982 12,014,663 Land I Right of Way Improvements 10,473,706 Machinery I Equipment 217,112 Miscellaneous 87,009 TOTAL $ 12,417,793 $ 2,197,158 $ 15,180 $ 120,000 $ 1,955,026 $ 4,529,447 $ 3,600,982 $ 12,417,793 PROJECT STAFF 0.49 0.54 0.72 0.63 MANAGEMENT (FTE) CONTRACT -12- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93917 PROJECT DESCRIPTION ADA Transition Plan ACTIVITY GENERAL DESCRIPTION - LOCATION This project will implement recommended Americans with Disabilities Act (ADA) improvements of City streets and civic buildings, as listed in the ADA Transition Plan 2006 Update COMMENTS In 1993, in response to the enactment of the Americans with Disabilities Act, the City of Dublin adopted a Title I Compliance Plan, a Title II Transition Plan, and a complaint procedure. In FY 2006-2007, the City completed an update of the Title II Transition Plan. This project will implement the recommended improvements listed in the City's ADA Transition Plan 2006-2007 update. Improvements may included pedestrian curb ramps, park access, or public building access, The scope of work will be determined on a year-by-year basis. This project is funded through General Fund (001) and the Community Development Block Grant program. The FY 2007 -2008 program proposes the construction of 10 pedestrian curbs ramps. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 13,560 001 15,000 209 $ 17,680 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 97,680 10,853 10,853 79,973 TOTAL $ 108,533 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 17,680 $ 30,853 $ 20,000 $ 20,000 $ 20,000 $ 108,533 0.02 0.03 0.02 0.02 0.02 -13- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93923 PROJECT DESCRIPTION Civic Center Window Sealing ACTIVITY GENERAL DESCRIPTION. - LOCA nON 6) This project replaced the caulking and gaskets for the hallway atrium windows at the Civic Center. COMMENTS Re-sealing of the upper atrium windows was not included as part of the water intrusion repair project that was accomplished in Fiscal Year 2003-2004. This project replaced the atrium window seals and caulking with material that has a 50-year lifespan. Replacement of window seals is a normal and expected part of building maintenance. The Building Management Study Capital Improvement Project (93900) will include development of a maintenance program and assignment of frequencies for periodic activities such as this. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design/Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 49,383 $ 49,383 49,279 104 TOTAL PROJECT MANAGEMENT (FTE) $ 49,383 STAFF CONTRACT $ 49,383 $ 49,383 -14- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 93933 Civic Center Generator GENERAL DESCRIPTION - LOCATION e This project would replace the existing Civic Center emergency generator with a larger unit capable of powering the entire building. The project includes modification of the existing enclosure to accept the larger generator and construction of a new trash enclosure. M... 1 \ '\ .--,- \ "^ ...,......- '< \..~_...-.... C \ \_--~ '--.... " .---------- "\ \ COMMENTS The existing generator is sized to power only certain elements of the Civic Center which were determined to be critical functions at the time the building was originally constructed; however, it may be of benefit to both Staff and the public that the entire facility remain operational during a power failure or emergency situation. The City is currently exempt from blackouts, but the exemption status could change. This project is proposed to be deferred until Fiscal Year 2009~2010 in order to coincide with the proposed Phase 2 Civic Center modifications. The future design and use of the police facility, as well as a pending decision on the location of the Emergency Operations Center, would directly affect the size and configuration of the emergency power system. An additional $135,510 from the Internal Service Fund would be required to fund this project. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 10,800 001 $ 38,770 $ 305,615 $ 344,385 Other Contract Services 47,793 Land I Right of Way Improvements 280,591 Machinery I Equipment Miscellaneous 5,201 TOTAL $ 344,385 $ 38,770 $ 305,615 $ 344,385 PROJECT I STAFF MANAGEMENT (FTE) . CONTRACT -15- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 93970 PROJECT DESCRIPTION Automated Document Storage & Retrieval System ACTIVITY GENERAL DESCRIPTION - LOCATION This project provides for the purchase and phased implementation of an electronic' automated document imaging storage system for all City Departments. This system provides an efficient method to index, store, and retrieve records in the City. COMMENTS The current system was purchased in 1999 and has allowed the City to establish electronic copies of documents, that can be easily retrieved. In Fiscal Year 2006-2007, system assessment and planning activities were conducted in order to ensure that the version of the technology employed represents best practices and is capable of supporting continued growth. The assessment helped Staff ascertain whether there would be benefits from implementing additional modules such as an agenda management system. In Fiscal Year 2007/08 the project funding includes $15,000 for the City to engage a Consultant to assist with developing standards and policie~ for the efficient management and retention of electronic records. This will include development of a process to determine how documents are selected for imaging and how they will be catalogued. This will be valuable in order to more efficiently respond to requests for records and to reduce research time when . locating information. The funding for Fiscal Year 2007-2008 also includes $2,800 for an enhancement to the current Laserfiche system, to enable scanned City plans and drawings to be more easily filed in the Laserfiche system. ESTIMA TED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection Other Contract Services $ Land! Right of Way Improvements Machinery! Equipment Miscellaneous 001 $ 101,538 $ 4,250 $ 17,800 $ 123,588 39,319 84,269 TOTAL $ 123,588 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 101,538 $ 4,250 $ 17,800 $ 123,588 -16- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94500 PROJECT DESCRIPTION Public Facility Fee Study Update ACTIVITY GENERAL DESCRIPTION - LOCATION This project finances the Fiscal Year 2007-2008 update to the City's Public Facility Fee. COMMENTS The City Council adopted Resolution No. 32-96 on March 26, 1996, establishing a Public Facilities Fee for development within Dublin. The Public Facilities Fee was based on the Public Facilities Fee' Justification Study prepared by a private consultant. The purpose of the fee is to finance municipal public facilities to reduce the impacts caused by future development in the City of Dublin. These facilities include: community and neighborhood parks; community buildings; library; civic center modifications; and aquatic center. The City COllncil directed Staff to update the Public Facilities Fee periodically. Two subsequent updates have been done in 1999 and 2002. The proposed update is needed to revise population projections based on recently approved development proposals and to conduct an appraisal of land values for parkland acquisition. Additionally, the update will include the revised costs for the Civic Center modifications based on the 2006-2007 Workspace Programming Study and the costs associated with new development's share of a Corporation Yard. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous 310 $ 20,657 $ 14,660 $ 15,305 $ 50,622 49,952 670 TOTAL $ 50,622 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 20,657 $ 14,660 $ 15,305 $ 50,622 -17- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New City Facility Energy Efficient Window Treatment GENERAL DESCRIPTION - LOCATION e This project would place reflective window film and window tinting at the Civic Center andthe Senior Center. MBes 1 tit \ \. ...".'- ...J \.. \ ........--- \' \ .,..- C \ -...-~-~ f ~ . '\ COMMENTS Placing reflective window film on the Civic Center windows would greatly increase the energy efficiency of the building. PG&E predicts a 11.52 kWh/yr savings per square foot of window film; this translates to an annual energy savings of $18,870. The project would also increase employee comfort by reducing the glare and heat caused by summer weather. Window film has been successfully installed for staff comfort reasons in some locations; this project would provide the film for the remainder of the building. PG&E off.ers a rebate on the installation of reflective window film for windows facing .east, west, and south, valued at approximately $11,220. The effect on the building's overall appearance will be minimal. This project will also provide funds to put window tinting on many of the exterior doors at the Senior Center to reduce glare in the activity rooms at the facility. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection 001 $ 113,575 $ 113,575 Other Contract Services 500 Land! Right of Way Improvements 112,825 Machinery! Equipment Miscellaneous 250 TOTAL $ 113,575 $ 113,575 $ 113,575 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT -18- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New Civic Center Roof Maintenance GENERAL DESCRIPTION - LOCATION fa This project would install walk pads on the roof of the Civic Center and accomplish certain repair and maintenance activities that are not covered by the warranty on the roof. Miles 1 lrA. \ .,. ....-,...- '< \.. \ .....,.... C \ '..",.....< COMMENTS Walk pads are recommenqed by the roof manufacturer and would protect the surface of the foam roof that was installed on the Civic Center in 1999 and 2000. While the roof has a 20-year warranty, some wear has occurred that is not covered under the warranty and requires repair. It is further proposed to institute a .semi- annual preventive maintenance roof inspection program which would be included in the Building Management Operating Budget in order to prolong the life of the roof. FINANCINGIYEARS SCHEDULE ESTIMA TED COSTS Fund Prior Years 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection 001 $ 25,700 $ 25,700 Other Contract Services 2,000 Land I Right of Way Improvements 23,400 Machinery I Equipment Miscellaneous 300 TOTAL $ 25,700 $ 25,700 $ 25,700 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT -19 - 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94052 PROJECT DESCRIPTION Iron Horse Trail - Wildflower Planting ACTIVITY . COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION 9 This project provides for planting a 30 foot strip of wildflowers along the Iron Horse Trail, from the northerly City limit south to the East Dublin BART Station. MIea 1 COMMENTS The Dublin City Council designated this project as a High Priority Goal for Fiscal Year 2002-2003, and has indicated that the planting should take place in alternating years. In Fiscal Year 2005-2006, a wildflower seed mix was hydroseeded along the Iron Horse Trail in bands up to 30 feet in width. The intent is to perform the hydroseeding in alternating years. The next hydroseeding would be performed in 2007-2008. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection 001 $ 24,876 $ 22,885 $ 24,470 $ 72,231 Other Contract Services $ 15,603 Land I Right of Way Improvements 55,798 Machinery I Equipment Miscellaneous 830 TOTAL $ 72,231 $ 24,876 $ 22,885 $ 24,470 $ 72,231 PROJECT STAFF MANAGEMENT (FTE) CONTRACT -20- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94250 PROJECT DESCRIPTION Sidewalk Safety Repair Program ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This program provides for the replacement of damaged curbs,gutters and sidewalks at various locations. The sidewalk repairs are made by either removing and replacing concrete or by grinding the high side of the offset sidewalk. The method is determined by the severity of the damage. COMMENTS State Law provides that sidewalk repair is the responsibility of the property owner, yet cities are also held liable for hazards associated with sidewalks in need of repair. This program reduces liability exposure for property owners, as well as for the City. Dublin's program is funded by the City on a year-to-year basis. This program is funded through General Fund (001). ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 78,140 001 Other Contract Services 209 Land I Right of Way Improvements 327,581 Machinery I Equipment Miscellaneous 1,500 Annual $ 62,792 $ 81,712 $ 81,712 $ 81,712 $ 81,712 $ 389,640 Annual 17,581 17,581 TOTAL $ 407,221 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 80,373 $ 81,712 $ 81,712 $ 81,712 $ 81,712 $ 407,221 0.11 0.14 0.13 0.13 0.13 -21- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94252 PROJECT DESCRIPTION Bus Shelters ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project provides for the replacement of existing LA VT A standard bus shelters in the downtown area with artist inspired bus shelters. COMMENTS e .... \ l' ....-,. \. \ \'II' .,._,--- 'I .,......- C \ l' .,..... Mies 1 Phase I During Fiscal Year 2001-2002, five artists were selected to develop models of bus shelter designs. In Fiscal Year 2002-2003, the preferred design was selected and the artist prepared plans and specifications for the bus shelters. During Fiscal Year 2003-2004, two bus shelters at Dublin Boulevard and Golden Gate Drive and one bus shelter at Dublin Boulevard and Village Parkway were fabricated and installed. LAVTA contributed $6,000 towards the cost of each shelter, for a total of $18,000. Phase II Originally, Phase II included plans to replace six additional bus shelters with a new artist or artists being selected to commission additional bus shelters. In February 2007, the City Council requested Staff to instead, collaborate with the Dublin Unified School District to create student art which would be installed on the back of the identified bus shelters, similar to projects completed in the cities of Livermore and Pleasanton. In Fiscal Year 2007-2008, five bus shelters will be replaced along Dublin Boulevard as part of CIP project #96011 and #96012, and an additional replacement shelter for Amador Valley Boulevard will also be purchased. Staff will work with the School District, LAVTA, and a professional art consultant to create art murals for the six bus shelters at; Dublin Boulevard at Village Parkway, Dublin Boulevard at Civic Plaza, Dublin Boulevard at Sierra Court, the shelters at Dublin Court north and south and Amador Valley Boulevard at Donohue Drive. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ Other Contract Services Land! Right of Way Improvements Machinery! Equipment Miscellaneous 148 001 $ 116,100 55,723 100,688 229 TOTAL PROJECT MANAGEMENT (FTE) $ 156,788 STAFF CONTRACT $ 116,100 $ 40,688 $ 156,788 $ $ 156,788 40,688 -22- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94601 PROJECT DESCRIPTION San Ramon Road Concrete Sound Wall Maintenance ACTIVITY COMMUNITY IMPROYEMENTS DESCRIPTION - LOCATION e This project would provide maintenance for the westerly face of a concrete soundwall that was built in 1990 as part of the San Ramon Road Widening project. This soundwall is the short wall adjacent to the northbound lanes on San Ramon Road between Shannon Avenue and Silvergate Drive. M'" 1 \ l' .............. \.. \ "'............. \ l' '<_.....~-_.. -.....~~J \ \" COMMENTS The lower portion of the soundwall is cast-in-place concrete and serves as a barrier for off-the-road accidents. The top portion of the wall is split-face concrete block and is in good condition. The lower portion of the wall has weathered, and cracks have formed where the vertical reinforcing bars are located inside the wall. This project would repair the cracks and seal the surface of the wall with a waterproof treatment to protect the reinforcing steel from rust damage. The concrete surface would also be restored to a more uniform color. Bids Were received in April 2007 and were higher than budgeted. Staff will revise the scope of work and re-bid the project in early FY 2007-2008. FINANCINGNEARS SCHEDULE ESTlMA TED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 10,112 001 $ 3.912 $ 76,450 $ 80,362 Other Contract Services Land I Right of Way Improvements 70,000 Machinery I Equipment Miscellaneous 250 TOTAL $ 80,362 $ 3,912 $ 76,450 $ 80,362 PROJECT STAFF 0.03 0.06 MANAGEMENT (FTE) CONTRACT -23- 2006-2011. CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94942 PROJECT DESCRIPTION Seasonal Street Banners ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION This project provided for the replacement of the seasonal winter holiday banners and Dublin Pride Week banners, and the addition of new banners for the summer season and Red Ribbon week. The project provided extra banners for future expansion of the program when Dublin Boulevard is extended east. COMMENTS This project was completed during Fiscal Year 2006-2007. ESTlMA TED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 37,356 $ 37,356 1,800 35,556 TOTAL $ 37,356 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 37,356 $ 37,356 -24- 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION City Entrance Sign Modifications ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION e 1) San Ramon Road at Alcosta Boulevard 2) Village Parkway at Kimball Avenue 3) Dougherty Road at Fall Creek Road Miles 0.6 .. \ ~-- \ W' ..._ '( \.. ,.'- C \"'t ..--.-'- This project would construct three City entrance signs located at the following entry points to the City: 1-580 COMMENTS The City currently has five existing entrance signs located on San Ramon Road, Village Parkway and Dougherty Road with the concrete facades. In order to be consistent with the new granite finish sign proposed at Hacienda Drive, this project would replace three existing signs with the new granite-faced signs. The two other existing signs along Dublin Boulevard (at San Ramon Road and at Dougherty Road) will be replaced as part of the West Dublin BART Station Corridor Enhancements and East Dublin BART Station Corridor Enhancements capital projects. For the purpose of this capital project, it is assumed City entrance signs at the remaining City entry points will be constructed as part of the adjacent development improvements. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006.2007 2007.2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 31,620 001 $ 273,374 $ 273,374 241,254 500 TOTAL PROJECT MANAGEMENT (FTE) $ 273,374 STAFF CONTRACT $ 273,374 0.09 $ 273,374 -25- PROJECT NUMBER Not Yet Assigned DESCRIPTION - LOCATION 2006-2011 CAPITAL ,IMPROVEMENT PROGRAM PROJECT DESCRIPTION San Ramon Road Landscape Renovation ACTIVITY COMMUNITY IMPROVEMENTS This project would renovate the landscaping along the San Ramon Road bike path, from West Vomac Road to Alcosta Boulevard, removing the existing Baccharis and soil and installing new topsoil and plant material. COMMENTS e Miles , Most of the landscaping in this area was installed 13 to 15 years ago, and has reached the end of its life expectancy, This project will be funded through General Fund. ESTlMA TED COSTS Design {Inspection $ 15,865 001 Other Contract Services Land { Right of Way Improvements 130,800 Machinery { Equipment Miscellaneous 210 TOTAL PROJECT MANAGEMENT (FTE) $ 146,875 STAFF CONTRACT FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals $ 146,875 $ 146,875 $ 146,875 0.08 $ 146,875 -26- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION San Ramon Road Wooden Sound Wall Maintenance ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION e This project provides maintenance for the wooden soundwall along the residential backyards on the western side of San Ramon Road between Alcosta Boulevard and Silvergate Drive. The project would repaint the fence facing San Ramon Road. MH.. 1 COMMENTS This soundwall was constructed in 1988 as a noise mitigation for the widening of San Ramon Road from two lanes to four. When the City built the fence, easements were obtained to construct the fence, and the City retained the right, but not the responsibility, to maintain the road side of the fence. At the time of construction, the fence was painted with two shades of brown wood stain. Over the years, the color has faded and the wood has weathered. This project would repair the damaged fence panels, then repaint the fence to bring back the color and extend the life of the wood. ESTlMA TED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 10,530 001 $ 60,180 $ 60,180 49,000 650 TOTAL PROJECT MANAGEMENT (FTE) $ 60,180 STAFF CONTRACT $ 60,180 0.08 $ 60,180 -27- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Transit Center Art ACTIVITY COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION e This project provides for the placement of public art at two locations within the Dublin Transit Center, at the Cambell Green area and the Iron Horse (BART) Plaza. MHos D.' \II \ -r__ \.. \ _.......- "t '! --- C \ .",......- 1~80 COMMENTS In 2003, the Alameda County Surplus Authority (ACSPA) had agreed to contribute $250,000 for construction of public art at the Dublin Transit Center. In 2004-2005, the City Council rated as a high priority goal: work with the developer to locate significant works of art in two key places of the Dublin Transit Center; the Village Green (now called Cambell Green) and the Iron Horse Plaza. In January 2005, the City Council considered art proposals for the first phase of the project, and decided to defer the process to a later date, when 25% occupancy of site B has been accomplished. It is recommended that a new artist selection process commence in Fiscal Year 2007-2008 and that two artist or artist teams be selected to commission public art in the two identified locations. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 311 $ 250,000 $ 250,000 249,500 500 TOTAL PROJECT MANAGEMENT (FTE) $ 250,000 STAFF CONTRACT $ 250,000 $ 250,000 -28- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New Village Parkway Soundwall Painting COMMUNITY IMPROVEMENTS DESCRIPTION - LOCATION e Miles 0.5 "^ \ ""{,,-- \.. \ ---_...- ""{ '{ ,,--" C \ .".-.... This project would repaint the street side of the soundwall along both sides of Village Parkway from Amador Valley Boulevard to the northern City Limit. 1-580 COMMENTS The Village Parkway soundwall was constructed over 20 years ago to replace residential backyard fences, for beautification as well as sound attenuation. Maintenance painting is required on an infrequent basis as a concrete sealer and so that the wall will have a uniform, attractive appearance. The landscaping along the wall will be removed or trimmed back to accomplish the painting. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 29,420 $ 29,420 500 28,920 TOTAL PROJECT MANAGEMENT (FTE) $ 29,420 STAFF CONTRACT $ 29,420 $ 29,420 -29- , . 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95010 PROJECT DESCRIPTION Parks & Community Services Needs Assessment ACTIVITY PARKS DESCRIPTION - LOCATION This Project provides funding to undertake a Parks and Community Services Needs Assessment that will be used to collect information and to specifically develop a Strategic Plan identifying recreation service delivery needs and an implementation plan. COMMENTS It is anticipated that the project will take 9 months to complete. The total project cost is $62,000. The project will utilize Consultant Services to work with Staff and the Community to identify needs and opportunities for Recreation Services. Among the study components are the use of key informant interviews, focus groups and community surveying. This project will assist in the data collection that will also be useful in assessing how services are provided to a diverse community. Funding of this project will support data collection to address the following High Priority City Council Goals: 2007 -2008 GOAL 1. Conduct in-depth community needs assessment and opinion survey of Department programs and services, and develop a Strategic Plan for Department programs and services. 2. Develop a comprehensive community-wide diversity plan. ESTlMA TED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 25,515 $ 36,485 $ 62,000 60,400 1,600 TOTAL $ 62,000 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 25,515 $ 36,485 $ 62,000 -30- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95210 PROJECT DESCRIPTION Stagecoach Park Assessment District Water Meter ACTIVITY PARKS DESCRIPTION - LOCATION e _. 1 "'^ \ ,. .-.,,,,.,,... \.._~_........."" This project provides for the installation of a new water meter at Stagecoach Park, located at Stagecoach Road and Turquoise Street. / ~ ~ '~ l,J ~~. \ ) , ; y COMMENTS The water service for Stagecoach Park and the Stagecoach Assessment District comes from one water meter. In order to adequately water the parks and the landscaping in the assessment district during the warm summer months, two irrigation cycles have to be run. Since there is not enough time during the night to run two cycles, watering has to take place during the day. In order to water these areas more efficiently in the summer, an additional meter to separate the park from the assessment district is recommended. The meter was purchased in Fiscal Year 2006-2007 and will be installed in Fiscal Year 2007-2008. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 001 $ 47,980 $ 14,000 $ 61,980 14,000 47,980 TOTAL PROJECT MANAGEMENT (FTE) $ 61,980 STAFF CONTRACT $ 47,980 $ 14,000 $ 61,980 -31- 2006-2011 CAPIT ALIMPROVEMENT PROGRAM PROJECT NUMBER 95465 PROJECT DESCRIPTION Shannon Community Center Reconstruction ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for the reconstruction of the Shannon Community Center, 11600 Shannon Avenue. Mies 1 "^ \ ,. -~......-"'- " \....,.~--_......... C \ \ _--~" ' ~ rJ .. \ ) 'Y J I COMMENTS During Fiscal Year 2003-2004, the Shannon Community Center was closed dueto extensive damage caused by water intrusion. In July 2004, the City Council determined that the Shannon Community Center should be demolished and rebuilt. In April 2005, the City Council determined that the Shannon Community Center should be enlarged to 19,760 s.f. in order to accommodate a larger social hall, and in March 2006, the City Council approved the Schematic Design for the new Center. Design of the replacement facility began in Fiscal Year 2005-2006, and construction began in Fiscal Year 2006-2007. It is anticipated that the Shannon Community Center will reopen in fall 2008 The General Fund will fund the construction of 12,200 s.f. (based on the original square footage of the Shannon Community Center) and the Public Facilities Fund will fund the balance of 7,560 s.f. An additional $366,328 of the reconstruction is proposed to be funded through the Internal Service Fund and is shown in that budget. For the General Fund portion of this project, $2,963,306 will be funded out of a Capital Project General Fund reserve previously established by Council and $1,127,876 will be funded by three Workforce Housing Grants received as part of the Transit Center project. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 1,118,113 001 $ 371,286 $ 1,594,603 $ 2,502,404 $ 2,266,643 Other Contract Services 380,136 310 4,424,717 Land I Right of Way Improvements 9,063,237 Machinery I Equipment 515,978 Miscellaneous 82,189 TOTAL $ 11,159,653 $ 371,286 $ 1,594,603 $ 6,927,121 $ 2,266,643 PROJECT STAFF 0.72 0.41 MANAGEMENT (FTE) CONTRACT $ 6,734,936 4,424,717 $11,159,653 -32- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95555 PROJECT DESCRIPTION Dublin Historic Park Master Plan ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for a master plan and programming study to determine the ultimate boundaries and uses of the Dublin Historic Park on Donlon Way and the potential expansion of the Pioneer Cemetery. Miles 1 "^ \ "'t ...,...... "{ \.. ....:...........- c \ '1...._'- COMMENTS One of the City Council Strategic Goals is to expand and enhance the Dublin Historic Park. To accomplish this goal, in Fiscal Year 2004-2005, a cOnsultant was contracted to prepare a master plan for the Dublin Historic Park and to study the potential cemetery expansion. The City Council selected a preferred alternative design for the Dublin Historic Park in Fiscal Year 2005-2006 and the Dublin Historic Park Master Plan was adopted by the City Council in Fiscal Year 2006-2007. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 150,320 001 $ 148,251 $ 4,505 Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 2.436 $ 152,756 TOTAL PROJECT MANAGEMENT (FTE) $ 152,756 STAFF CONTRACT $ 148,251 $ 4,505 $ 152,756 -33- 2006-2011 CAPIT ALIMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 95556 Dublin Historic Park Acquisition PARKS DESCRIPTION - LOCATION e This project provides for the acquisition of the Dublin Square Shopping Center (APN 941-1560-007-01) for the purpose of expanding the Dublin Historic Park. Milos 0.5 COMMENTS In August 2006 the City Council adopted a General Plan Amendment and Dublin Village Historic Area Specific Plan. This action changed the General Plan land use designation of the Dublin Square Shopping Genter from Retail/Office to , Parks/Public Recreation. Additionally, the City Council adopted the Parks and Recreation Master Plan May 2006 Update and the Dublin Historic Park Master Plan. The Dublin Historic Park acquisition project provides for the acquisition of the Dublin Square Shopping Center and includes all costs associated with the land acquisition and relocation of the existing tenants. The land was acquired by the City in May 2007. flNANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection 001 $ 738,735 $ 2.417,165 $ 3,155,900 Other Contract Services $ 805,147 310 7,300,000 7,300,000 Land I Right of Way 9,650,753 Improvements Machinery I Equipment Miscellaneous TOTAL $ 10,455,900 $ 8,038,735 $ 2,417,165 $10,455,900 PROJECT I STAFF 0.06 MANAGEMENT (FTE) CONTRACT -34- ' 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95600 PROJECT DESCRIPTION Emerald Glen Park ACTIVITY PARKS DESCRIPTION - LOCATION e COMMENTS .....--; -~~--_... ! .-.-- ~- I ......'1'...... /.--/ '. -- \ I _-r---?f I ....- I" . . \ -{ .....-- ,"'-_ \ I I . I- \ ~----- .', I \ "'i '( ~--- , I . // · C ---"" '-. l.' '--~ '/ ." M... 1 This project provides for the design and construction of the 48.2 acre Emerald Glen Park located on Tassajara Road between Central Parkway and Gleason Drive. Phase I encompassed approximately 26.1 acres of the site and included: 2 - 60' ball fields; 1 - 90' ball field; 2 regulation soccer fields; 2 lighted basketball courts; 4 lighted tennis courts; a skate park; a play area; picnic areas; a plaza and promenade; a restroom/concession building; parking; and street frontage improvements. Phase I was completed in Fiscal Year 2000-2001 at a total cost of $7,389,306, which included $2,066,400 to purchase 4.92 acres. 1-680 Phase II included improvements at Tassajara Road and Central Parkway including a water feature and arbor structure, maintenance storage, temporary play area parking and restroom building, landscaping and park furniture. Phase II was completed in Fiscal Year 2004-2005 at a total cost of $2,664,918. Phase III improvements included two regulation soccer fields with cricket overlays, a restroom building, a group picnic area, a children's play area, mini arboretum, and parking and street frontage improvements. Phase III was completed in late spring of Fiscal Year 2005-2006 at a total cost of $4,418,724. Although the Recreation and Aquatic Complex and Community Center will be located at Emerald Glen Park, separate CIPs have been prepared for those projects which include the building costs as well as the landscape costs associated with the buildings. One additional phase of the park remains which is beyond the time frame of this CIP. This includes the landscape improvements associated with the future Community Center, including a lake and an outdoor amphitheater. As part of the Transit Center Development Agreement, the Alameda County Surplus Property Authority conveyed the remaining park acreage to the City (18.173 acres). The City reimbursed the Alameda County Surplus Property Authority for 4.584 acres of the land in the amount of $2,876,575 in Fiscal Year 2004-2005. ESTIMATED COSTS Fund Prior Years FINANCINGNEARS SCHEDULE 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 563,159 1,006,855 4,942,975 11,453,931 001 $ 78,437 224 25,996 300 290,900 310 14,979,921 315 2,066,400 Insufficient funding within CIP.time frame $ 78,437 25,996 290,900 14,979,921 2,066,400 912,025 TOTAL PROJECT MANAGEMENT (FTE) 386,759 $ 18,353,679 STAFF CONTRACT $ 17,441,654 $ 18,353,679 -35- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95602 PROJECT DESCRIPTION Emerald Glen Park Recreation and Aquatic Complex ACTIVITY . PARKS DESCRIPTION - LOCATION e --.--.'.1 ..._-r,~",-"'-"'-7 ! .......- \ I ."..- "', I .,- , I \.. \ ~~_:-",-",-"':7."" / r l' ~_~_... / "> i -" \ ~, ~ Miles 1 This project provides for construction of a Recreation and Aquatic Complex at Emerald Glen Park, located on Tassajara Road between Central Parkway and Gleason Road. -~------------_.--------- COMMENTS The Parks and Recreation Master Plan identifies the need for a Recreation Center and an Aquatic Center to serve the needs of the growing City. During Fiscal Year 2004-2005, a Feasibility Study was conducted to assess community needs, demographic analysis, space components, construction and project costs. A full financial analysis of the operational costs and funding options for a larger, state-of-the-art, Recreation and Aquatic Complex was completed in Fiscal Year 2005-2006. The preferred option selected by the City Council includes a two-court gymnasium with two high-school regulation courts, fitness center, dance studio, game room, tot-drop room, state-of-the-art recreation pool, and a lazy river. The six-lane fitnesslinstructional pool would be indoors, with a small play feature for toddlers. The estimated cost for the state-of-the-art facility exceeds the available Public Facility Fee revenue. At this time, the City Council is evaluating options for developing a state-of-the-art facility. Once complete, a determination will be made on how the City will move forward to provide a facility to meet the recreation and aquatic needs of the community. For the purposes of this CIP, the project that is budgeted is similar to the Recreation and Aquatic Center as envisioned in the Parks and Recreation Master Plan. It includes a smaller two-court gymnasium, small fitness center, group exercise room, special events room/classroom, a small outdoor recreation pool, deep water competition pool, and six- lane fitness/instructional pool. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 1,635,452 234,330 310 $ 64,976 $ 475,485 $ 946,400 $ 6,059,515 $ 7,546,376 TOTAL PROJECT MANAGEMENT (FTE) 14,880,122 879,000 293,260 $ 17,922,164 STAFF CONTRACT Insufficient funding within CIP time frame $ 64,976 10,375,788 $ 475,485 $ 946,400 $ 6,059,515 $ 17,922,164 0.310.54 0.60 -36- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95625 PROJECT DESCRIPTION Dougherty Hills Park - D99 Park ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for construction of a dog park for both large and small dogs at the base of Dougherty Hills Open Space on Amador Valley Boulevard between Stagecoach Road and Dougherty Road. Milas 1 \ l' ....--.- \ \.. \ tA ......... ,'" .--" :...;~).........~ . \ ......~:(......... (~ ~"'\" ) \j ~ g-- COMMENTS In Fiscal Year 2004-2005, the City Council determined that it was feasible to use Dougherty Hills Open Space for a dog park. Approximately two acres of the site will be used for the dog park and access will be provided from Amador Valley Boulevard. Both small and large dogs would be accommodated in separate fenced areas with double-gated entries. Drinking water, garbage cans, benches, signage, landscaping and a parking lot are included in the project. In Fiscal Year 2005-2006, the City Council approved the conceptual design of the project and authorized production of construction documents for the project. Construction of the project was completed in Fiscal Year 2006-2007. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 26,070 001 $ 17,761 $ 560,952 Other Contract Services 15,564 Land I Right of Way Improvements 486,584 Machinery I Equipment Miscellaneous 50,495 $ 578,713 TOTAL PROJECT MANAGEMENT (FTE) $ 578,713 STAFF CONTRACT $ 17,761 $ 560,952 $ 578,713 -37- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95631 PROJECT DESCRIPTION Park Furniture Replacement ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the replacement of aging wooden park picnic tables and benches with picnic tables and benches made of recycled materials. COMMENTS The wooden picnic tables and benches in most of the City parks are made of wood. Despite annual maintenance (sanding, staining, etc.), the tables and benches are worn and in need of replacement. It is proposed to replace the wooden tables and benches with recycled materials. Tables and benches of recycled materials are already in use at Mape Memorial Park, Emerald Glen Park, Ted Fairfield Park and Bray Commons. The City intends to use annual grant funds from the Alameda County Waste Management Authority and the State of California to fund the replacement. In Fiscal Year 2005-2006, the picnic tables and benches were replaced at Dolan Park and in Fiscal Year 2006-2007 the picnic tables and benches were replaced at Alamo Creek and Stagecoach Parks. Shannon Park is scheduled for Fiscal Year 2007-2008 and Kolb Park is scheduled for Fiscal Year 2008-2009. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection 224 $ 50,350 $ 75,526 $ 62,050 $ 81,246 Other Contract Services Land I Right of Way Improvements $ 267,629 Machinery I Equipment Miscellaneous 1,543 $ 269,172 TOTAL $ 269,172 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 50,350 $ 75,526 $ 62,050 $ 81,246 0.04 0.04 $ 269,172 -38- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95635 PROJECT DESCRIPTION Park Play Area Renovations ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for the renovation of park play areas to bring play equipment into compliance with state and federal safety criteria and ADA accessibility. MIIeo 1 COMMENTS State Law requires that all playground equipment areas accessible to the public be audited for safety. The audit must be completed by a Certified Playground Safety Inspector. The standards for the audits are the current Consumer Product Safety Commission and American Society for Testing and Materials playground guidelines. The evaluation was completed in Fiscal Year 2000-2001. The second phase of the project provides for the replacement of play equipment as recommended by the evaluation. Kolb Park was completed in Fiscal Year 2002-2003. Shannon Park and Dolan Park were completed in Fiscal Year 2005-2006. Alamo Creek was completed in Fiscal Year 2006-2007, and Stagecoach Park will be completed in Fiscal Year 2007-2008. The priority for replacement is based upon the severity of the problem which needs to be corrected. The play equipment at the Dublin Sports Grounds was replaced as part of the Dublin Sports Grounds Renovation Project, and the play equipment at Mape Memorial, Ted Fairfield, Bray Commons and Emerald Glen Parks comply with the standards. An additional park area renovation project was added for Fiscal Year 2007-2008 which is the resurfacing of the basketball court at Alamo Creek Park. The project will be funded through a combination of Park Dedication Fees ($364,516), General Fund monies ($114,585), a Roberti Z'Berg Harris Block Grant ($91,409) and Community Development Block Grant funds ($56,713). FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 201 0-2011 Totals Design I Inspection $ 8,100 001 $ 81,085 $ 33,500 $ 114,585 Other Contract Services 13,458 209 $ 56,713 56,713 Land I Right of Way 213 91,409 91,409 Improvements 601,732 310 79,728 $ 93,550 173,278 Machinery I Equipment 315 191,238 191,238 Miscellaneous 3,933 TOTAL $ 627,223 $ 363,732 $ 136,441 $ 127,050 $ 627,223 PROJECT STAFF 0.09 MANAGEMENT (FTE) CONTRACT -39- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95640 PROJECT DESCRIPTION Dublin Ranch Neighborhood Parks ACTIVITY PARKS This project provides for the design and construction of three neighborhood squares and two neighborhood parks in Areas B, F and G of the Dublin Ranch Development. e ,.~ ..,....... I .--!- , .,.-.~- I Miles .............\ / i , , .,.,-;r. \;; ! \ l' ....- ,', \-l/ I \.. \ ~_............- . i c \ ... .;.."",,:-.' ( · \ .-n I~ l ~ 1r l DESCRIPTION - LOCATION COMMENTS The Dublin Ranch Development Project identifies a total of two neighborhood parks and three neighborhood squares. Bray Commons, the 4.8 acre Neighborhood Park in Area G, was completed during Fiscal Year 2004-2005. The Neighborhood Square in Area F (2.0 acres) is under construction and will be complete in late fall 2007. Design of the Neighborhood Square in Area G began in Fiscal Year 2006-2007, and construction will be complete in spring 2008. Design of the Neighborhood Park in Area F (5.0 acres) will begin in Fiscal Year 2007-2008 and construction will be complete in spring 2009. The Neighborhood Square in Area B (2.0 acres) is beyond the CIP time frame as a development plan for the area has not yet been submitted. The neighborhood squares and neighborhood parks will be designed in accordance with the standards contained in the Parks and Recreation Master Plan. This project assumes that the land for the neighborhood squares and neighborhood parks will be dedicated by the developer in exchange for credit against Public Facility Fees for Neighborhood Park land. If development does not proceed at the pace anticipated, some of these projects will need to be deferred. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 623,238 Other Contract Services 620,763 Land I Right of Way Improvements 5.265,641 Machinery I Equipment Miscellaneous 501 ,41 0 001 $ 65,000 224 21,928 310 1,435,553 $ 798,474 $1,664,491 $ 1,886.375 $ 65.000 21,928 5,784,893 Insufficient funding within CIP time frame 1,139,231 TOTAL PROJECT MANAGEMENT (FTE) $ 7,011,052 STAFF CONTRACT $ 1,522,481 $ 798,474 $ 1,664,491 $ 1,886,375 0.82 0.47 $ 7,011,052 -40- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95830 PROJECT DESCRIPTION Dublin Sports Grounds Renovation ACTIVITY PARKS DESCRIPTION - LOCATION 9 This project provides for the renovation of the Dublin Sports Grounds, which is located at Dublin Boulevard and Civic Plaza. ..... 1 COMMENTS The Dublin Sports Grounds Master Plan was adopted in May of 1990. The recommended improvements were divided into phases: Phase I included construction of a new 60' bas~ball field, installation of bleachers at Fields 2 through 7 and installation of drinking fountains at Fields 4,5 and 6. Phase I was completed in Fiscal Year 1995-1996; the total cost was $215,454. Phase II included renovation of the drainage and irrigation system for Soccer Field #3; drainage improvements to Baseball Fields #3, #4 and #6; underground conduit for future lighting of Soccer Field #3 and Baseball Field #3; drainage and tree replacement along the freeway; and play area renovation. Phase II was completed in Fiscal Year 2002-2003; the total cost was $979,833. Phase III provided for the installation of lighting on Soccer Field #3 and Baseball Field #3, and was completed during Fiscal Year 2004-2005; the total cost was $310,167. Also during Fiscal Year 2004-2005, softball field safety netting was installed ($25,126). The Dublin Boulevard Parking Lot Renovation was completed in Fiscal Year 2005-2006 ($140,182). Remodeling of the restrooms and snack bar will be completed in Fiscal Year 2007-2008. The restroom remodel will include replacement of worn restroom partitions and fixtures; the snack bar remodel is to comply with Alameda County Health Code Requirements. The total estimated cost is $67,610. Two field turf renovation projects have been identified which include installation of a sand channel drainage system, irrigation upgrades and new turf. Area 1 (approximately 247,500sf, east of Soccer Field #3) is scheduled to begin in Fiscal Year 2009-2010 and be completed in Fiscal Year 2010-2011 at a total estimated cost of $1,087,213. Area 2 (approximately 180,OOOsf, west of Soccer Field #3) is beyond the time frame of the CIP. In the interim, a Higher Service Level has been included in the Fiscal Year 2007~2008 Park Maintenance Budget for an increased level of maintenance for Area 2 which includes double pass aeration, turf de-thatching, gypsum application, seeding, and application of sandy loam to help seed germinate and level off the field areas. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 331,369 Other Contract Services 159,559 Land I Right of Way Improvements 3,165,018 Machinery I Equipment Miscellaneous 29,148 001 $ 375,139 $ 4,835 $ 62,775 213 609,628 224 23,796 315 662,199 TOTAL PROJECT MANAGEMENT (FTE) $ 3,685,094 STAFF CONTRACT $ 1,670,762 $ 4,835 $ 62,775 0.06 $ 878,810 $ 208,403 $ 1,529,962 609,628 23,796 662,199 859,509 $ 878,810 $ 208,403 $ 3,685,094 0.36 0.08 Insufficient Funding within CIP Time Frame -41- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95851 PROJECT DESCRIPTION Fallon Sports Park ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for the design and construction of a 60-acre Sports Park located on the Dublin Ranch property in the Eastern Dublin Specific Plan Area. ......--; ,............ I _............:~./ i . _,.r.'.'--.~{ i '\ .... r', / " ~ \ ........ I" \ , \.. ~..........-...... ,/' "-'-" ~ i ""{ "{ -.,..... /' // . C \ .,.",....." / . /- , "'>. ,j ') ) ~. \ Mies 1 COMMENTS The Eastern Dublin Specific Plan provides for a 60-acre Sports Park to serve new development within the City. The Parks and Recreation Master Plan envisions that the Sports Park would accommodate the majority of the competition ballfields in the City. Additionally, the park would have a children's play area, picnic facilities, basketball and volleyball courts, tennis courts, a jogging or walking loop and permanent restroom structures integrated into concession/scoreboard areas. The project costs to date include a biological assessment of the Jordan property ($5,995), as well as an analysis of sports park alternatives on the Un property ($9,157). Both of these assessments were completed in Fiscal Year 2002- 2003. During Fiscal Year 2003-2004, a consultant was selected to develop a master plan for the Sports Park, and a community task force was appointed. The master plan was presented to the City Council in Fiscal Year 2004-2005. Also during Fiscal Year 2004-2005, an agreement with the developer of Dublin Ranch was approved whereby the developer could place excess fill on the sports park site in exchange for mass grading of the site in accordance with City specifications. The grading operation began in Fiscal Year 2004-2005 and was complete in Fiscal Year 2005-2006. The developer of Dublin Ranch dedicated 52 of the 60 acres to the City; the balance of 8 acres was purchased in Fiscal Year 2005-2006. In Fiscal Year 2006-2007, monies were allocated for improvements related to water meters and transformers. Phase I is scheduled to begin in Fiscal Year 2007-2008 and be complete in Fiscal Year 2009-2010. Phase I improvements include: 2 little league fields with associated plaza, picnic, and restroom/concession; 2 lighted softball fields with associated plaza, picnic, and restroom/concession; 4 lighted tennis courts; 4 lighted basketball courts; 2 lighted soccer fields; a parking lot; and a walking trail. Additionally, use of artificial turf will be evaluated for the two lighted soccer fields. Two additional phases of development are planned, but are beyond the time frame of this CIP. Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 2,845,506 1,945,790 28,975,532 FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 310 $1,560,394 $ 181,230 $1,662,690 $ 7,498,747 $ 4,886,260 315 4,037,570 Totals ESTIMATED COSTS $ 15,789,321 4,037,570 TOTAL PROJECT MANAGEMENT (FTE) 2,028,244 $ 35,795,072 STAFF CONTRACT Insufficient funding within CIP time frame $ 5,597,964 $ 181,230 $ 1,662,690 $ 7,498,747 $ 4,886,260 0.27 0.44 0.52 15,968,181 $ 35,795,072 -42- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 95935 PROJECT DESCRIPTION Cultural Arts Center ACTIVITY PARKS DESCRIPTION - LOCATION This project is identified as a desirable facility as part of the Park & Recreation Master Plan. The long term plan suggests that the facility may consist of construction of a 16,000 square foot Cultural Arts Center at a location yet to be determined. COMMENTS The Parks and Recreation Master Plan as adopted identified the need for a 16,000 square foot Cultural Arts Center that will serve as a multi-use facility that affords cultural, educational and social opportunities for the community. A location for the facility has not yet been determined. It is likely that future assessments will be required in light of these changes to refine the ideal scope of such a facility. In any case sufficient funding to pursue this project is not anticipated during the five year Capital Improvement Plan time horizon. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 525,900 336,415 7,055,170 666,570 170,275 Insufficient funding within CIP time frame $ 8,754,330 $ 8,754,330 TOTAL $ 8,754,330 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT -43- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Eastern Dublin Parks ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for the acquisition, design and construction of 25.14 acres of neighborhood parks and 13.8 acres of community parks to serve new development in eastern Dublin, excluding the Dublin Ranch Development. e MOos 0.8 ~~ ...... COMMENTS The parks will be designed in accordance with the Neighborhood and Community Park Standards contained in the Parks and Recreation Master Plan. One 4.9 acre Neighborhood Park in the Fallon Villages project is anticipated for design and construction during the CI P time frame. The balance of the parks are beyond the CI P time frame. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009~2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 1,624,626 148,330 33,898,046 13,971,298 310 $ 4,691 ,089 $ 1,618,440 $ 6,309,529 TOTAL PROJECT MANAGEMENT (FTE) 408,737 $50,051,037 STAFF CONTRACT Insufficient funding within CIP time frame $ 43,741 ,508 $4,691,089 $1,618,440 $ 50,051,037 0.34 0.47 -44- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Emerald Glen Park Community Center ACTIVITY PARKS This project provides for construction of a 16,440 square foot Community Center at Emerald Glen Park, located on Tassajara Road between Central Parkway and Gleason Road in eastern Dublin. e ,-~ .,......../...."... ! ........- .-.// I ~ "...~- / . 1 ."......- \ /' I ..._...-r- 'f' / ! \ l' ...-...- {". , / I \ lA .,.......- / . '/ \.. ...-...- . I ,__C1';: :r:->\)roJ ~o ,// · Q (~tFr~ DESCRIPTION . LOCATION COMMENTS The Parks and Recreation Master Plan identifies the need for 36,200 square feet of Community Center space to serve the ultimate build-out of the City. The reconstruction of the Shannon Community Center is for 19,760 square feet, leaving a balance of 16,440 square feet for Emerald Glen Park. The goal of the Community Center is to provide a comprehensive multi-purpose center which responds to the recreational, cultural and social needs of all residents of Dublin. The Community Center may include the following program elements: Lobby/Reception/Office Area; Classrooms/Meeting Rooms; Community Hall/Assembly Facility; Caterer's Kitchen; and Preschool Room. Design and construction of the Community Center are beyond the time frame of this CIP. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 605,825 365,990 7,467,550 395,280 157,955 Project scheduled beyond CIP tirrye frame $ 8,992,600 $ 8,992,600 TOTAL PROJECT MANAGEMENT (FTE) $ 8,992,600 STAFF CONTRACT -45- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Schaefer Ranch Neighborhood Park ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for the design and construction of the neighborhood park in the Schaefer Ranch development in western Dublin. Miles 1 COMMENTS The proposed Schaefer Ranch project provides three contiguous parcels to be used for a neighborhood park. The parcels total 10.6 gross acres with 6.3 acres of flat usable park land. In Fiscal Year 2006-2007 the Conceptual Design for the park improvements was approved by the City Council. An Improvement Developer Agreement was also approved whereby the Developer is required to construct the park and dedicate the park improvements to the City upon completion. The park improvements must be completed prior to issuance of the 201st building permit. The Developer will receive credit for 6.3 acres of the park land and will be entitled to a credit for design and construction of the park improvements to be used against payment of the Community Parks, Improvements and Neighborhood Parks Improvements portions of the Public Facilities Fee for the development. It is anticipated that construction of the park by the developer will begin in Fiscal Year 2009-2010 and be complete in Fiscal Year 2010-2011. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals ** "It. Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous .. This project will be constructed by the Developer. TOTAL PROJECT STAFF MANAGEMENT (FTE) CONTRACT -46- 2006-2011. CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER ,Not Yet Assigned PROJECT DESCRIPTION Transit Cent~r Park ACTIVITY PARKS DESCRIPTION - LOCATION e This project provides for an 8.7 acre community park on the Transit Center property in eastern Dublin. MMe. , lA \ l' ...,......,. "'{ \. \ .",...,.-' C \ ,..-.~~ "\ \ COMMENTS This project provides for the acquisition, design and construction of a community park on the Transit Center property. The park will be designed in accordance with the Community Park Standards contained in the Parks and Recreation Master Plan. Depending upon the outcome of the Camp Parks land exchange process, it is possible that the location of this park could change in the future. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ 398,566 Other Contract Services Land! Right of Way 6,877,359 Improvements 3,507,375 Machinery! Equipment Miscellaneous 80,500 Insufficient funding within CIP time frame $ 10,863,800 TOTAL PROJECT MANAGEMENT (FTE) $ 10,863,800 STAFF CONTRACT $ 10,863,800 -47- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Wallis Ranch Neighborhood Parks ACTIVITY PARKS DESCRIPTION - LOCATION Q This project provides for the acquisition, design and construction of 7.9 acres of neighborhood parks in the Wallis Ranch development project. ................. J..-...........,. _........l .....--"'.... ~ \ '"( ...........,. i \.. ~.......-. C \ "{ ..........- .- -"'''''\ rJ MIes 1 COMMENTS The Wallis Ranch project provides two neighborhood parks totaling 7.9 +/- acres. The parks will be designed in accordance with the Neighborhood Park Standards contained in the Parks and Recreation Master Plan. These standards identify the following amenities: tot lot and apparatus play area; picnic tables and secluded space for informal family picnics; open space meadow for informal sports, games and passive activities; and sports facilities such as practice ball fields, tennis courts, volleyball courts and basketball courts. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 307,500 229,250 7,083,235 2,325,000 310 $7,590,005 $2,582,500 $10,172,505 227,520 TOTAL PROJECT MANAGEMENT (FTE) $ 10,172,505 STAFF CONTRACT $7,590,005 $2,582,500 $10,172,505 0.34 0.47 -48- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Dublin Historic Park Development ACTIVITY PARKS DESCRIPTION - LOCATION e UN.. 0.5 "" \ ~...- \.. \ .,--- \ \' '( ................. ...- This project provides for development of the Dublin Historic Park located at the corner of Dublin Boulevard and Donlon Way adjacent to the existing Dublin Heritage Center. COMMENTS The Dublin Historic Park Master Plan was adopted by the City Council in Fiscal Year 2006-2007. The Master Plan outlines the design concept for the former Dublin Square Shopping Center which was acquired by the City in Fiscal Year 2006-2007. The park will be developed in phases as funding becomes available. Design and Construction Documents for Phase I will be completed in Fiscal Year 2007-2008 with construction to follow in Fiscal Year 2008- 2009. Phase I includes the demolition of the existing Dublin Square Shopping Center (excluding the U.S. Bank Building). Additionally, the parking lot will be replaced with turf, landscaping, irrigation, a new parking lot and lighting. The estimated cost for Phase I is $2,238,600. The remaining four phases are outside' of the time frame of this Capital Improvement Program. Funding of this project would complete the following High Priority City Council Goal: 2007/2008 Goals 1. Upon acquisition of the Dublin Square Shopping Center, undertake development of the design and construction documents. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 1,203,695 906,005 001 $ 304,805 $1,933,795 $ 2,238,600 9,212,000 440,000 Insufficient Funding within CIP Time Frame 9,523,100 TOTAL PROJECT MANAGEMENT (FTE) $ 11,761,700 STAFF CONTRACT $ 304,805 $1,933,795 0.22 0.15 $11,761,700 -49- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 94520 PROJECT DESCRIPTION Tri-Valley Triangle Study ACTIVITY STREETS DESCRIPTION - LOCATION The purpose of the Tri-Valley Triangle Study is to develop a sequencing strategy for improvements identified in the Alameda Countywide Transportation Plan for the 1-580, 1-680, and Route 84 corridors. Since needed improvements for these corridors are underfunded, consensus on critical projects is essential. COMMENTS In partnership with the Alameda County Congestion Management Agency, Livermore, and Pleasanton, the City has contributed $60,500 to the completion of the Triangle Study. The study was completed in fiscal year 2006-2007. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services $ Land I Right of Way Improvements Machinery I Equipment Miscellaneous 001 $ 58,500 $ 2,000 $ 60,500 60,500 TOTAL $ 60,500 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 58,500 $ 2,000 $ 60,500 -50- PROJECT NUMBER 96001 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION Tri-Valley Transportation Development Fee Regional Transportation Projects ACTiVITY STREETS DESCRIPTION - LOCATION This project would contribute to the construction of the following Regional Transportation projects: 1) 1-580/1-680 Interchange Improvements (Complete) 2) Improvements - SR 84 between 1-580 and 1-680 3) 1-680 Auxiliary Lanes from Bollinger Canyon Road to Diablo Road 4) West Dublin/Pleasanton BART Station a.) $4 million TVTDF obligation - fulfilled using 80% funds b.) $2.5 million advance to BART - $1.25 million in FY 2005-2006 (using TIF Category 3 and 1-580/1-680 Reimbursement funds) and $1.25 million in FY 2008-2009 (using 20% TVTDF funds) 5) 1-580 HOV Lanes between Santa Rita Road and Greenville Road 6) 1-680 HOV Lanes between SR84 and Sunol Grade 7) Improvements to the 1-580/San Ramon Road Interchange (Dublin portion of project complete) 8) 1-680/Alcosta Blvd Interchange Improvements 9) Crow Canyon Road Safety Improvements west of Bollinger Canyon Road 10) Vasco Road Safety Improvement North of 1-580 11) Express Bus Service in the Tri-Valley Area COMMENTS The seven Tri-Valley jurisdictions (Dublin, Pleasanton, Livermore, Alameda County, San Ramon, Danville and Contra Costa County) are collecting Tri-Valley Transportation Development Fees (TVTDF) from developers as a mitigation for new developments in the Tri-Valley area. These fees are to be collected and used to construct projects on the above project list. The local match for the 1-580/1-680 Flyover Project, whichwas completed in June 2002, was funded first, and the remaining projects were prioritized based on the recently adopted Strategic Expenditure Plan 2004 Update through the development of a funding priority list. The TVTDF is projected to generate $93.9 million over the lifetime of the program, of which approximately $23.475 million is expected to be collected in Dublin. Approximately $7,165,077 has been disbursed to date by the City of Dublin. Each jurisdiction submits 80% of the fees collected to the Tri-Valley Transportation Council (TVTC) and retains 20% of the fees collected to fund top priority projects. Dublin designated the 1-580/San Ramon Road Interchange and the West Dublin BART Station as its two top priority projects for the 20% set-aside monies. The 1-580/San Ramon Road Interchange project on the Dublin side of 1-580 was completed in 2004, and the West Dublin BART Station is currently under construction. In 2003, the TVTC appropriated $800,000 in 80% TVTDF funds for the 1-580/San Ramon Road Interchange project, which was expended in conjunction with Dublin's 20% set-aside funds for construction of this project in 2004. Additionally, the City received $4,000,000 in Fiscal Year 2003-2004 from the 80% TVTDF for the West Dublin BART Station project, and passed these funds through to BART for use on this project. The City of Dublin advanced $1.25 million to the West Dublin BART Station project in FY 2005-2006 using TIF Category 3 and 1-580/1-680 Reimbursement funds. The City also plans to advance an additional $1.25 million to this project in FY 2008-2009 using 20% TVTDF funds. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection 300 Other Contract Services Land I Right of Way Improvements $ 15,059,923 Machinery I Equipment Miscellaneous 1,250,000 Insufficient funding within CIP time frame $ 1,250,000 $ 1,250,000 TOTAL $ 16,309,923 PROJECT I STAFF MANAGEMENT (HE) CONTRACT $ 1,250,000 $15,059,923 $16,309,923 -51- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96010 PROJECT DESCRIPTION Dublin Boulevard Improvements - Silvergate Drive to Hansen Drive ACTIVITY STREETS DESCRIPTION - LOCATION e COMMENTS This project will widen Dublin Boulevard between Silvergate Drive and Hansen Drive from two to four lanes and realign the Dublin Boulevard/Silvergate intersection into a standard 'T' intersection. This widening will take place on the south side of the street where there is sufficient right-of-way to make these improvements. In addition, the project will repair- the existing roadway section, which is creeping due to soil instability. A traffic signal will be installed at the intersection of Dublin Boulevard/Silvergate Drive. Mles 1 The addition of new residential projects and expansion of the Valley Christian Church/School require the widening of Dublin Boulevard from two to four lanes between Silvergate Drive and Hansen Drive. In 1992, an initial phase of the work realigned the Dublin Boulevard/Silvergate Drive intersection through restriping and pavement modifications. The developers of the Valley Christian Center, Hansen Hill, California Highland and Schaefer Ranch projects are obligated to share the costs of this project, based on their proportionate generation of traffic. To date, developer fees in the amount of approximately $720,000 have been expended to construct portions of the project, including the installation of a traffic signal at the intersection of Dublin Boulevard and Hansen Drive, the widening of Dublin Boulevard just west of Hansen Drive and the modification of a private driveway south of the intersection to align with Hansen Drive due to the signalization of the intersection. The final phase of the project will widen Dublin Boulevard to Silvergate Drive. For the purposes of this CIP, the estimated cost of this phase is approximately $2,966,449; however, Schaefer Ranch development will perform the actual construction of the final phase of the project as a condition of the project's Development Agreement. The unspent development fees that have been collected by the City will be contributed toward the project's construction. As of June 30, 2007, $46,050 remains in the fees collected to fund the final phase of this project. ESTIMATED COSTS Fund Prior Years 2006-2007 Design {Inspection $ 568,613 300 $ 719,976 Other Contract Services 168,102 Land { Right of Way Improvements 2,933,970 Machinery { Equipment Miscellaneous 15,740 TOTAL $ 3,686,425 $ 719,976 PROJECT STAFF MANAGEMENT (FTE) CONTRACT FINANCINGIYEARS SCHEDULE 2007-2008 2008-2009 2009-2010 2010-2011 Totals $ 2,966,449 $ 3,686,425 $ 2,966,449 0.45 0.37 $ 3,686,425 -52- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96011 PROJECT DESCRIPTION West Dublin BART Station Corridor Enhancement - Dublin Boulevard - Hansen Drive to Clark Avenue ACTIVITY STREETS DESCRIPTION - LOCATION e 1) Dublin Boulevard streetscape enhancement, including replacement of sidewalk tree grates and installation of identity markers, median and bridge railing treatment and city entrance sign 2) Improvements at the vicinity of Dublin Boulevard and Donlon Way including raised landscaped median, sidewalk bulbouts and angled parking 3) Widen sidewalks along Dublin Boulevard to 8 feet between the 1-680 freeway overpass and Village Parkway 4) Install and/orreplace bus shelters along Dublin Boulevard 5) Raise catch basin grates along Dublin Boulevard to improve rideability and bicycle safety This project consists of several improvements in the corridor of the West Dublin BART Station which is scheduled to start construction in 2006. The improvements will primarily be on Dublin Boulevard, the arterial directly serving the station. The main features of the project are: MYes 1 COMMENTS In 2005, the City applied for and was granted $1,257,000 of Housing Incentives Program (HIP) funds through the Metropolitan Transportation Commission (MTC),. in conjunction with the high density housing component of the Dublin Transit Center project. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 201 0-2011 Totals Design I Inspection $ 97,524 206 $ 23,844 $ 34,150 $ 187,528 $ 245,522 Other Contract Services 215,000 210 40,000 165,000 1,052,000 1,257,000 Land I Right of Way Improvements 1,188,298 Machinery I Equipment Miscellaneous 1,700 TOTAL $ 1,502,522 $ 63,844 $ 199,150 $1,239,528 $ 1,502,522 PROJECT STAFF 0.20 0.27 0.32 MANAGEMENT (FTE) CONTRACT -53- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96012 PROJECT DESCRIPTION East Dublin BART Station Corridor Enhancement - Dublin Boulevard- Tassa'ara Road to Clark Avenue DESCRIPTION - LOCATION This project will improve a variety of transportation modes by improving pedestrian, transit and bicycle facilities leading to the East Dublin BART Station. The enhancements will primarily be on Dublin Boulevard, the arterial directly serving the station. The project includes the following: 1) Gateway feature and landscaping at the intersection of Dublin Boulevard and Dougherty Road 2) Dublin Boulevard streetscape enhancement including replacement of sidewalk tree grates and installation of identity markers, median and bridge railing treatment and City entrance signs 3) Installation and/or replacement of bus shelters along Dublin Boulevard 4) Widening of the Iron Horse-to-Tassajara Creek Bikeway to 12 feet along the north side of Dublin Boulevard COMMENTS ACTIVITY STREETS e MI.. 1 In 2005, the City applied for Housing Incentives Program (HIP) funds through the Metropolitan Transportation Commission (MTC), in conjunction with the high density housing component of the Dublin Transit Center project. With the City approval of high density housing next to the BART Station, MTC has granted $1,743,000 of HIP funds to the City. In addition, $300,000 of federal transportation earmark and $76,000 of federal Congestion Mitigation and Air Quality funds have been allocated for the project. FINANCINGNEARS SCHEDULE ESTlMA TED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 136,752 206 $ 24,962 $ 36,150 $ 363,216 $ 424,328 Other Contract Services 294,000 210 60,000 224,000 1,835,000 2,119,000 Land I Right of Way Improvements 2,108,876 Machinery I Equipment Miscellaneous 3,700 TOTAL $ 2,543,328 $ 84,962 $ 260,150 $ 2,198,216 $ 2,543,328 PROJECT STAFF 0.21 0.27 0.62 MANAGEMENT (HE) CONTRACT -54- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96022 PROJECT DESCRIPTION Dublin Boulevard Bridge Resurfacing at Alamo Canal ACTIVITY STREETS DESCRIPTION - LOCATION e This project will resurface the existing bridge deck on Dublin Boulevard across the Alamo Canal. M'" 1 COMMENTS California's Department of Transportation (Caltrans) is responsible to inspect all bridges in California. A recent Caltrans inspection report recommends that the Dublin Boulevard bridge deck at Alamo Canal be resurfaced with a protective chemical treatment. The older portion of the bridge is experiencing some deterioration. Despite the fact that the widened portion of the bridge, the entire bridge surface has to be coated for the treatment to be effective. ESTIMA TED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous . 6,704 206 $ 29,009 $ 29,009 22,205 100 TOTAL PROJECT MANAGEMENT (FTE) $ 29,009 STAFF CONTRACT $ 29,009 0.06 $ 29,009 -55- 2006.2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96082 PROJECT DESCRIPTION Underground Utilities - Dublin Boulevardl Dou herty Road Intersection and Vicinity ACTIVITY STREETS DESCRIPTION. LOCATION e This project would underground existing overhead utilities along Dougherty Road between Sierra Lane and Dublin Boulevard as well as a portion of Dublin Boulevard between Dublin Court and Dougherty Road and Scarlett Court from Dublin Boulevard to 560 feet south of Dublin Boulevard. ~ '" ). ~ .. .......' C-J ,._.. --------.----, 1-880 MH.. 1 COMMENTS The majority of funds expended under this project will be reimbursed with Public Utility Commission (PUC) Rule 20A funds collected by the City, except for improvement costs associated with Scarlett Court and traffic signal work. The Rule 20A PUC monies, reimbursements from other utilities, and developer contributions would pay the City's project costs. Staff costs associated with this project have been included in CIP #96852 - Dougherty Road - Houston Place to 1-580. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ 62,777 001 $ 423,207 $ 271,771 Other Contract Services Land! Right of Way Improvements 631,172 Machinery! Equipment Miscellaneous 1,029 $ 694,978 TOTAL PROJECT MANAGEMENT (FTE) $ 694,978 STAFF CONTRACT $ 423,207 $ 271,771 $ 694,978 -56- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96400 PROJECT DESCRIPTION Eastern Dublin Arterial Street and Freewa Improvements ACTIVITY STREETS DESCRIPTION . LOCATION This project establishes official Plan Lines for major arterials in eastern Dublin, and constructs improvements to those streets for the portion being funded by the Eastern Dublin Traffic Impact Fee (TIF). This project also includes engineering studies to update traffic impact fees as development occurs, repayment of loans from Pleasanton for the initial 2-lane construction of Dublin Blvd. and Freeway Interchange; and from Alameda County and BART for roadway access to the eastern Dublin BART station. Also included are obligations to Alameda County for a BART Parking Garage expansion. Miles 1 .......-: -..... I .....~. . -,-. / I .'" /' i I . I i . l___ 9 COMMENTS Required improvements are currently estimated at approximately $120 million. This includes improvements already completed by Developers as well as future work required. The amounts shown as "prior years" reflect the work done by the City to date on engineering and fee studies. Projected expenditures for Fiscal Years 2006-2007 through 2010-2011 include. improvements anticipated to be constructed by developers in return for Eastern Dublin TIF credits during each of these years; however, since these projects are not yet bonded, it is assumed for the purposes of this CIP that the City will pay for the work out of the Eastern Dublin TIFs. The insufficient funds estimate of approximately $38 million reflects projects forecasted to be constructed after the five-year time frame of the CIP. This project does not include Eastern Dublin TIF projects that have become individual Capital Projects identified elsewhere in this document. ...' ...' ....--j1:.-- '^ \ ,. ,......,. I """,,,- \. \ ......., / ~ ~ ...,~ C \ .....~ (/ .'" _______-:K.\ '-.\ Projects completed or guaranteed during Fiscal Year 2006-2007 included: partial payment to Pleasanton for the Dublin Blvd. Roadway Advance ($674,799); median work in Dublin Boulevard just east ofthe old Southern Pacific Right-of-Way; the extension of Dublin Boulevard to Fallon Road; completion of the westerly portion of the improvements on Fallon Road from 1- 580 to Bent Tree Drive, start of the Eastern Dublin BART Station Parking Structure, and completion of the Tassajara Road bridge at Shadowhill. Drive. Future projects include: 2007-2008: Installation of improvements on Tassajara Road along the Silvera Ranch and Fallon Crossings developments, between Silvera Ranch Drive and Moller Creek, installation of improvements on Fallon Road through the Silvera Ranch development from T assajara Road south to the Dublin Ranch boundary, completion of grading for the Fallon Road bridge crossing of Moller Creek; completion of Fallon Road improvements between Gleason Drive and Positano Parkway (Old Fallon Road) as part of the Fallon Village development, and completion of the Eastern Dublin BART Station Parking Structure. It is estimated that approximately $6.9 million ofthe Fiscal Year 2007-2008 budgeted expenditures for this project will be built by the development community. 2008-2009: Widening of Tassajara Road from Silvera Ranch Drive to North Dublin Ranch Drive from two to four lanes as part of the Wallis Ranch development; completion of Fallon Road improvements through Dublin Ranch between Signal Hili Drive and Silvera Ranch (providing a connection to Tassajara Road), and widening of Tassajara Road from Moller Creek to the Contra Costa County line as part of the Casmira Valley development. 2009-2010: Completion of improvements On Gleason Drive, Central Parkway, and Dublin Boulevard from Tassajara Road to Brannigan Drive in conjunction with development of the DiManto property. 2010-2011: Construction of Park and Ride Lot with Dublin Boulevard, west side of Fallon Road off of 1-580. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Design /Inspection $ 202,160 300 $ 45,091,029 $ 8,820,889 $ 7,536,428 $ 7,166,019 $ 11,598,499 $ 878,680 $ Other Contract Services 590,434 Land I Right of Way Improvements Machinery I Equipment Miscellaneous Totals 81,091,544 109,139,672 $ 45,091,029 $ 8,820,889 $ 7,536,428 $ 7,166,019 $ 11,598,499 $ 0.06 0.07 0.04 0.04 38,364,338 878,680 $ 119,455,882 0.04 TOTAL PROJECT MANAGEMENT FTE 9,523,616 $ 119,455,882 STAFF CONTRACT Insufficient funding within CIP time frame -57- PROJECT NUMBER 96430 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION 1-580 & Fallon Road Freeway Interchange Improvements - Phase I ACTIVITY STREETS DESCRIPTION - LOCA liON Phase I of this project would improve the 1-580/Fallon Road freeway interchange to accommodate future traffic in the next 10 to 15 years, including traffic generated by several recently approved developments in eastern Dublin. Phase I consists of thefollowing: 1) Widen existing Fallon Road overcrossing to provide two lanes in each direction 2) Widen eastbound 1-580 offramp to provide a second left-turn lane at the ramp end at the EI Charro Road intersection and install a traffic signal at EI Charro Road 3) Construct a southbound to eastbound 1-580 two- lane loop onramp (one mixed-flow lane with an HOV bypass) e "" \ "'1."""""'.1 \. \ ...-~' . "'I" ......., / I Mi:'" C \ ....-.'1' /' I .,......j..... \" ! ........ ) ''-, \. I .......... / '",,_ i ........ ./ '. . ....~ J/ l______. ~\J t 4) Widen northbound Fallon Road north of the 1-580 over-crossing for additional capacity at ramp intersection 5) Widen westbound 1-580 offramp to four lanes (two left- and two right-turn lanes) at the Fallon Road intersection 6) Widen Fallon Road southbound and north of 1-580 approaching the intersection with the westbound ramps 7) Widen westbound 1-580 onramp and install Fallon Road traffic signal 8) Adding one westbound 1-580 auxiliary lane 1,300' in advance of the interchange COMMENTS New traffic from eastern Dublin development and from adjacent communities will require a new bridge and ramp modifications at Fallon Road over 1-580 to maintain the level of service within the range established by the City's General Plan. The Eastern Dublin Traffic Impact Fee (TIF) is expected to fund Dublin's portion of this project. The developer of Dublin Ranch has deposited monies for preparation of the State-required Project Study Report, Project Report and Project Design, and has agreed to fund the Phase I construction. Pleasanton requested that Dublin amend the Project Report to include additional improvements associated with proposed developments in Pleasanton. This work includes a northbound Fallon Road to westbound 1-580 loop to accommodate traffic from the proposed Staples Ranch development in Pleasanton. A funding agreement between the two cities has been approved for the design and construction of the northbound to westbound loop, and the cost of this improvement is being reimbursed by Pleasanton. DSRSD has also requested the installation of a 20" potable waterline within Caltrans right-of-way as part of the project, and has agreed to pay for its design and construction. The ultimate phase will be required once the area becomes fully developed. It is anticipated that Pleasanton and Livermore will contribute their fair share of the cost of this ultimate project. ESTIMATED COSTS Fund Prior Years Design !Inspection Other Contract Services Land! Right of Way Improvements Machinery! Equipment Miscellaneous TOTAL PROJECT MANAGEMENT (FTE) $ 335,990 3,977,967 341,272 11,900,000 $ 001 300 425,623 2,346,064 7,039 $ 16,562,268 STAFF CONTRACT $ 2,771,687 $ FINANCINGNEARS SCHEDULE 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 $ 813,703 105,634 12,871,244 Totals $ 1,239,326 15,322,942 105,634 $ 13,684,947 0.40 0.54 0.07 6.90 $ 16,562,268 -58- . 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 96452 Downtown Traffic Signal STREETS Equipment Replacement DESCRIPTION - LOCATION e This project is designed to acquire advanced traffic signal controllers, central modems, controller modems, and other related equipment over a five-year period ending June 3D, 2007. This project will improve the interconnection of traffic signals within Downtown Dublin and integrate these signals into the 1-580 Smart Corridor system. MUea 1 COMMENTS This project is needed to establish central communications with traffic signals in Downtown Dublin and facilitate signal coordination to improve traffic flow. By 2003, some of the City's legacy signal controllers were 10 to 15 years old and were technically outdated. The installation of state-of-the-art traffic signal controllers and communications equipment on this project has helped to expand the 1-580 Smart Corridor system by allowing downtown traffic signals to be added onto the system. The 1-580 Smart Corridor project was designed to allow the City to monitor traffic flows on major streets from a central location, detect traffic incidents, and manage the timings of traffic signals based on an automated time-of-day schedule. The system also serves as an important tool to diagnose reported problems at signalized intersections from the Civic Center and possibly identify the nature of the problem before directing signal maintenance staff to travel to the site for troubleshooting purposes. This CIP project has ~nabled the City to accomplish the tasks listed below. The project will be completed by the end of FY 2006-2007 and no additional replacements of traffic signal equipment are needed in downtown Dublin. Fiscal Year 2003-2004: Upgraded traffic signal controllers at six intersections on Dublin Boulevard and integrated these signals into the 1-580 Smart Corridor system. Fiscal Year 2004-2005: Coordinated the signals on Dublin Boulevard between Village Parkway and Regional Street for the morning commute period. Fiscal Year 2005-2006: Upgraded traffic signal controllers at ten intersections on Amador Valley Boulevard and on San Ramon Road, and integrated these signals into the 1-580 Smart Corridor system. Fiscal Year 2006-2007: Upgraded traffic signal controllers at four intersections on Village Parkway and integrated these signals into the 1-580 Smart Corridor system. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection .$ 15,665 001 $ 105,943 $ 24,057 $ 130,000 Other Contract Services Land! Right of Way Improvements 114,335 Machinery! Equipment Miscellaneous TOTAL $ 130,000 $ 105,943 $ 24,057 $ 130,000 PROJECT I STAFF 0.02 MANAGEMENT (FTE) CONTRACT -59- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96480 PROJECT DESCRIPTION Downtown Dublin Roadway Improvements ACTIVITY STREETS DESCRIPTION - LOCATION Q 1) St. Patrick Way Extension 2) Golden Gate Drive Widening 3) Dublin Boulevard/Golden Gate Drive Intersection Improvements 4) Dublin Boulevard/Amador Plaza Road Intersection Improvements 5) Dublin Boulevard/Dougherty Road Intersection Improvements (includes widening of Dublin Boulevard between Dougherty Road & Sierra Court) 6) San Ramon Road/Dublin Boulevard Intersection Improvements ,J The City Council established a Traffic Impact Fee (TIF) for future developments within the downtown area of Dublin. The Downtown TIF program identifies six roadway improvement projects as listed below. These improvements will be required to mitigate future traffic impacts generated by new development in Downtown Dublin. Mles 1 The total cost for these improvements was estimated to be $8.711,298 in 2004 when the TIF program was adopted, including the cost of developing and updating the program. COMMENTS Separate CIP projects have been set up for improvements 1, 4 and 5 listed above. As a result, expenditures using funds collected from the Downtown TIF or other sources associated with these improvements are not reflected in the schedule below to avoid double-counting of expenditures. The estimated cost for the remaining three improvements is $5,569,915 in today's dollars. The City has accumulated fees and traffic mitigation contributions from a number of development projects, which will be used to fund the above roadway improvements. Through the end of Fiscal Year 2006-2007, total funds available for these improvements are estimated at $550,162. Depending on project priorities and circulation needs to support development in downtown Dublin, these funds could potentially be used to fund improvements 2, 3 and 6, which are the only improvements included in the expenditure schedule below. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 20.0.6-20.0.7 20.0.7-20.0.8 20.0.8-20.0.9 20.0.9-20.10. 20.10.-20.11 Totals Design I Inspection $ 22,650. Other Contract Services 8,883 Land I Right of Way Improvements 5,569,915 Machinery I Equipment Miscellaneous 2,564 30.0. $ 30.,0.65 $ 1,992 $ 2,0.40. $ 34,0.97 Insufficient Funding within CIP Time Frame TOTAL PROJECT MANAGEMENT (FTE) $ 5,60.4,0.12 STAFF CONTRACT $ 30.,0.65 $ 1,992 $ 0..0.2 2,0.40. 0..0.2 5,569,915 $ 5,60.4,0.12 -60- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96580 PROJECT DESCRIPTION Annual Street Overlay Program ACTIVITY STREETS DESCRIPTION - LOCATION This project provides for the placement of a 1-1/2 inch asphalt overlay on streets that are presently in a deteriorated condition at various locations. COMMENTS As streets begin showing structural failures, it is important to reinforce these streets with pavement repairs and overlay to reduce the need for more costly pavement reconstruction in the future. The City's Pavement Management Program has provided the City with funding guidelines and priorities for maintaining the City streets. The scope of work in this annual program includes removing and replacing failed pavement, placing 1-1/2 inches of asphalt concrete overlay, and restriping the street. This program is primarily funded by Alameda County Transportation Improvement Authority (ACTIA) Measure B funds (Fund 217) and Gas Tax (Fund 206) as well as Alameda County Congestion Management Agency (CMA) TIP funds (Fund 228) in Fiscal Year 2007-2008 and Fiscal Year 2008-2009 for improvements on arterial/collector streets. Proposition 42 funds (Fund 240) is also available for this program in FY 2007-2008. This program will protect the substantial investment the City has in its street system. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ 222,622 206 Annual $ 10,096 $ 240,000 $ 240,000 $ 490,096 Other Contract Services 43,868 217 Annual $ 404,970 $ 151,220 $ 408,400 382,400 385,400 1,732,390 Land! Right of Way 228 Annual 289,000 217,000 506,000 Improvements 2,915,627 240 182,292 274,239 456,531 Machinery! Equipment Miscellaneous 2,900 TOTAL $ 3,185,017 $ 597,358 $ 714,459 $ 625,400 $ 622,400 $ 625,400 $ 3,185,017 PROJECT I STAFF 0.30 0.30 0.29 0.29 0.29 MANAGEMENT (FTE) CONTRACT -61- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 96585 Annual Slurry Seal Program STREETS DESCRIPTION - LOCATION This program would slurry seal existing street surfaces as a preventive maintenance technique used to prolong the life of asphalt concrete pavement. COMMENTS As streets begin showing some wear and stress cracking, it is important to seal the cracks to keep water from getting into the roadway subgrade, and to prolong the life of the asphalt concrete pavement. Slurry seal consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The City's Pavement Management Program provides the funding guidelines and the priorities for properly maintaining the City streets. This program will protect the substantial investment the City has in its street system. It is anticipated that the Civic Center and Library parking lots will be resurfaced in FY 2007-2008 as part of this program. It is proposed to complete specifications and bid process late in Fiscal Year 2006-2007 and start improvements early the following fiscal year. By doing so, it will minimize impacts to school traffic and maximize weather conditions to apply a slurry seal treatment. FINANCINGIYEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 174,031 206 Annual $ 19,080 $ 619,300 $ 619,400 $ 619,400 $ 619,400 $ 2,496,580 Other Contract Services 001 $ 33,000 $ 33,000 Land I Right of Way Improvements 2,353,549 Machinery I Equipment Miscellaneous 2,000 TOTAL $ 2,529,580 $ 19,080 $ 652,300 $ 619,400 $ 619,400 $ 619,400 $ 2,529,580 PROJECT I STAFF 0.10 0.25 0.24 0.24 0.24 MANAGEMENT (FTE) CONTRACT -62- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96773 PROJECT DESCRIPTION Alamo Canal Trail Under 1-580 ACTIVITY STREETS DESCRIPTION - LOCATION e The City of Dublin is working jointly with the East Bay Regional Park District, the City of Pleasanton, Caltrans and Zone 7 in constructing a trail underneath 1..;580 that will connect the Alamo Canal Trail north of the freeway (adjacent to the City Library) with the Pleasanton trail south of the freeway to transform it to a regional trail. An engineering feasibility study was conducted in FY 06-07 which concluded that a trail underneath the freeway is feasible. MI.. 1 COMMENTS Based on the results of the feasibility study, the City joined together with the East Bay Regional Park District and Pleasanton and applied for Alameda County Transportation Improvement Authority (ACTIA) funds to design the project. ACTIA has approved $235,000 for the design phase which, is anticipated to cost $330,000. To match the ACTIA funds, Dublin and Pleasanton have agreed to contribute $50,000 each, and an additional $6,630 in Staff support. While funding for the construction of the project is currently unavailable, completion of the design will allow this project to compete favorably for grant funds. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design {Inspection $ Other Contract Services Land I Right of Way Improvements Machinery { Equipment Miscellaneous 13,143 72,366 227 $ 4,113 $ 24,766 $ 56,630 $ 85,509 TOTAL PROJECT MANAGEMENT (FTE) $ 85,509 STAFF CONTRACT $ 4,113 $ 24,766 $ 0.02 56,630 0.05 $ 85,509 -63- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY 96775 Citywide Bicycle I Pedestrian Plan STREETS DESCRIPTION - LOCATION This project provides for the development of a City-wide Bicycle I Pedestrian Plan that would evaluate existing bicycle conditions and incorporate an integrated plan including access to parks and open space areas. The Master Plan is scheduled for completion in June 2007 and will be used to prioritize future bicycle projects. COMMENTS The City applied for Transportation Development Act Article 3 funding in the amount of $45,144 that would partially fund the development of the Plan. Supplementary funds from the Measure B Bicycle Program would be used to fully fund the project. This project was completed in FY 2006-2007. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 20,275 211 $ 45,144 $ 45,144 Other Contract Services 60,144 227 14,313 21,162 35,475 land I Right of Way Improvements Machinery I Equipment Miscellaneous 200 TOTAL $ 80,619 $ 59,457 $ 21,162 $ 80,619 PROJECT I STAFF 0.06 MANAGEMENT (FTE) CONTRACT -64- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96776 PROJECT DESCRIPTION Crossridge Road Trail Connection 1m rovements ACTIVITY STREETS DESCRIPTION - LOCATION This project will construct a pedestrian gate and asphalt paving at the terminus of Crossridge Road to provide a connection between the Alamo Creek Trail in the City of Dublin and the Bent Creek Open Space Trail/Emergency Vehicle Access to the north in the City of San Ramon. COMMENTS e M'" 0.5 The City of Dublin is working jointly with the City of San Ramon to construct the project; the costs to build it will be equally shared by the two cities. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 4,050 001 13,950 5,896 560 TOTAL PROJECT MANAGEMENT (FTE) $ 24,456 STAFF CONTRACT $ 24,456 $ 24,456 $ 24,456 0.D3 $ 24,456 -65- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96840 PROJECT DESCRIPTION Scarlett Drive Iron Horse Trail Extension ACTIVITY STREETS DESCRIPTION - LOCATION e This project would provide an extension of Scarlett Drive and relocate and enhance a portion of the Iron Horse Trail. The roadway element is a connection between Dougherty Road and Dublin Boulevard (within the former Southern Pacific Railroad Right-of-Way). MHos 1 ~ \ l' ............ \. \ .".,.--.'- "'( 'I _- C \ _...-~ COMMENTS The extension of Scarlett Drive, which is included in the Dublin General Plan, will relieve traffic congestion at the Dougherty RoadlDublin Boulevard intersection, especially for BART Station-bound traffic. The project costs will need to be funded by developer contributions, County-Wide half-cent transportation sales tax, Eastern Dublin Traffic Impact Fees (Category 2), and Contra Costa County contributions. This project is included in the voter-approved Alameda County Transportation Expenditure Plan funded by the half-cent sales tax. The sales tax funding programmed for this project is presently $6.144 million, and is subject to approval by the Alameda County Transportation Improvement Autho~ity (ACTIA). A portion of Scarlett Drive from Dougherty Road to Houston Place was constructed by a private developer as part of the Scarlett Place housing development, located next to Scarlett Drive. The value of the dedicated street right-of-way and street improvements was estimated at $2,386,360. The total cost of the project has been reduced by this amount to reflect this improvement. A future development that could impact this project is the City General Plan Amendment being proposed by the Federal Government at Camp Parks. This development would be located on the southern part of the Camp Parks property generally bounded by Dublin Boulevard, Dougherty Road, Arnold Road, and 5th Street. Any proposed streets within this area could impact the extension of Scarlett Drive. Project development, including preliminary engineering and environmental work, was performed in Fiscal Years 2005- 2006 and 2006-2007, using traffic mitigation fees specifically collected for this project. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 796,145 811,846 5,170,000 4,148,076 300 $ 134,436 $ 100,295 234,731 TOTAL PROJECT MANAGEMENT (FTE) 25,453 $ 10,951,520 STAFF CONTRACT Insufficient Funding within CIP Time Frame $ 134,436 $ 100,295 0.13 10,716,789 $ 10,951,520 -66- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96850 PROJECT DESCRIPTION Dougherty Road Improvements - North of Amador Valley Boulevard to North of Houston Place ACTIVITY STREETS DESCRIPTION - LOCATION fa This project consists of two phases. The first phase widened the travel lanes by removing existing dirt medians on Dougherty Road and replacing them with new pavement. This completed the ultimate pavement improvements for southbound traffic for this segment of Dougherty Road. A second phase of this project will widen Dougherty Road from four to six lanes and will include landscaped medians from Amador Valley Boulevard to north of Houston Place. Mias' 1 COMMENTS The first phase of this project allowed the two southbound lanes to move away from the westerly curb, thus improving intersection sight distance and providing an area along the curb for bus stops, emergency parking and on-street bicyclists. The City received an Intermodal Surface Transportation Efficiency Act (ISTEA) Grant to fund the bulk of this project. The City also overlaid this segment of Dougherty Road, including a portion of Dougherty Road north of Amador Valley Boulevard. The second phase of this project is anticipated to be funded by Traffic Impact Fees, including contributions from the Dougherty Valley (Contra Costa County) projects and eastern Dublin. To date, approximately $174,085 of project mitigation contributions have been collected and are available for this project. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 TOTAL PROJECT MANAGEMENT (FTE) $ 4,346,695 STAFF CONTRACT $ 570,269 2010-2011 Totals $ 139,186 285,044 62,269 69,340 14,430 3,776,426 $ 4,346,695 Design I Inspection $ 462,375 Other Contract Services 152,741 Land I Right of Way Improvements 3,574,937 Machinery I Equipment Miscellaneous 156,642 206 $ 139,186 210 285,044 217 62,269 220 69,340 300 14,430 Insufficient funding within CIP time frame -67- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96852 PROJECT DESCRIPTION Dougherty Road Improvements - Houston Place to 1-580 ACTIVITY STREETS DESCRIPTION - LOCATION This project provides for acquisition of right-of-way and widening of Dougherty Road between 1-580 and Houston Place, and required improvements at the intersection of Dublin Boulevard and Dougherty Road. To accommodate the necessary left-turn, right-turn and through lanes, the following improvements are proposed: e 1) Widen northbound Dougherty Road between 1- 580 and Dublin Boulevard 2) Widen southbound Dougherty Road between the 1-580 westbound onramp and Dublin Boulevard 3) Widen southbound Dougherty Road between Dublin Boulevard and Sierra Lane 4) Widen westbound Dublin Boulevard between Dougherty Road and approximately 500 feet east of Dougherty Road 5) Widen westbound Dublin Boulevard between Dublin Court and Dougherty Road 6) Widen eastbound Dublin Boulevard between Dublin Court and Dougherty Road MIlea 1 COMMENTS Traffic studies have indicated the need to widen Dougherty Road and Dublin Boulevard to improve the level of service at the intersection of the two roadways, which is necessary to accommodate the growth in the Dublin General Plan and the Transit Village at the eastern Dublin BART Station. The project cost is proposed to be funded by developer dedications/contributions, Traffic Impact Fees (TIF), and/or outside grants. The Downtown TIF program is intended to cover 16% of the total project cost when sufficient funds are collected from this program. Preliminary engineering and environmental work for this capital project were completed in Fiscal Year 2003-2004. Design and right-of-way acquisition started in Fiscal Year 2004-2005, with design completed in Fiscal Year 2006-2007. Construction is scheduled to start Summer 2007 and completed by Summer 2008. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous $ 1,049.280 1,452.322 9,582,402 4.870,216 300 $ 4.771,909 $ 3,040,749 $ 9,146,050 $ 16,958,708 4,488 TOTAL PROJECT MANAGEMENT (FTE) $ 16,958,708 STAFF CONTRACT $4,771,909 '$ 3,040,749 $ 9,146,050 0.94 0.41 0.04 $ 16,958,708 -68- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96870 PROJECT DESCRIPTION Saint Patrick Way - Regional Street to Golden Gate Drive ACTIVITY STREETS DESCRIPTION - LOCATION e This project will construct a 2-lane roadway between Golden Gate Drive and Regional Street, south of and parallel to Dublin Boulevard. MHea 1 COMMENTS The need for a connector road for three long commercial cul-de-sacs was first identified in the City's original Downtown Study. This need is becoming more apparent as this portion of the Central Business District develops further and the proposed BART parking lot is constructed along Golden Gate Drive. The section of Saint Patrick Way between Amador Plaza Road and Golden Gate Drive was constructed by the Alameda County Transportation Authority (ACTA) as part of the 1-580/1-680 Interchange Improvements. It is anticipated that the City's project, between Golden Gate Drive and Regional Street, will be funded through private contributions in the form of the Downtown Traffic Fee, BART mitigation funds, and developer-built mitigation improvements. For the purpose of this Capital Project, the cost estimate is based only on the portion of Saint Patrick Way that is anticipated to be built using City funds, which is physically the easterly one-third of the roadway segment between Golden Gate Drive and Regional Street. It is anticipated that the City of Dublin will acquire this right-of-way in Fiscal Year 2007-2008, and the developer of the residential property fronting the BART property (Windstar) will construct the improvements in Fiscal Year 2007-2008 or 2008-2009. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 16,869 300 $ 60,000 395,343 6,942 $ 11,000 $ 454,337 $ 472,279 67 TOTAL PROJECT MANAGEMENT (FTE) $ 472,279 STAFF CONTRACT $ 6,942 $ 11,000 $ 0.03 454,337 0.05 $ 472,279 -69- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96920 PROJECT DESCRIPTION Dublin Boulevard Improvements - Village Parkway to Sierra Court ACTIVITY STREETS DESCRIPTION - LOCATION e This project widened and overlayed Dublin Boulevard from Village Parkway to Sierra Court including the Dublin Boulevard bridge over Alamo Canal. The project increased the capacity of this segment of Dublin Boulevard from 4 lanes to 6 lanes plus bike lanes. It also included the improvement of Alamo Canal under the Dublin Boulevard bridge to protect the bridge piers and it restored the failed segment of Alamo Canal bike trail underneath the bridge. MH.. 1 )J / COMMENTS Traffic model studies indicated the need for Dublin Boulevard to become six lanes wide to avoid heavy congestion at intersections in the future. The City received $3,080,268 under the State Transportation Improvement Program (STIP) and $400,000 of CMA Transportation Improvement Program (TIP) funds for this project. In addition, the City utilized $1,604,667 in Developer Fees. Also included in the project is a recycled waterline and other appurtenances requested by Dublin San Ramon Services District (DSRSD) to be included in the project. The City will be reimbursed by DSRSD for all of this additional work. The overhead utilities along the roadway were undergrounded under CIP Project # 96080 and included in the construction contract to facilitate construction. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design / Inspection $ 705,446 Other Contract Services 1,150,543 001 $ 142,845 $ 142,845 Land / Right of Way 513,687 206 421,635 421,635 Improvements 3,803,056 219 3,080,268 3,080,268 Machinery / Equipment 228 400,000 400,000 Miscellaneous 10,110 300 1,580,327 $ 557,767 2,138,094 TOTAL $ 6,182,842 $ 5,625,075 $ 557,767 $ 6,182,842 PROJECT STAFF 0.07 MANAGEMENT (FTE) CONTRACT -70- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER 96930 PROJECT DESCRIPTION Dublin Boulevard Improvements - Sierra Court to Dublin Court ACTIVITY STREETS DESCRIPTION - LOCATION e This project will widen Dublin Boulevard from Sierra Court to Dublin Court and underground existing overhead utilities. This project will increase the roadway capacity from four to six lanes. M'" 1 COMMENTS This is the third phase of the Dublin Boulevard widening. The widening of this segment of Dublin Boulevard will complete the improvements on Dublin Boulevard from San Ramon Road to Dougherty Road. Recent traffic studies have shown that six lanes of traffic will be needed as Dublin continues to expand to the east. It is anticipated that this project will be funded through Traffic Impact Fees (TIF) and outside grants. Through the end of Fiscal Year 2006-2007, approximately $621,782 of project mitigation contributions have been collected and are available for for this project. In addition, the project may be funded from Category 2 Eastern Dublin TIF fees. It is proposed to proceed with preliminary engineering and environmental work in Fiscal Year 2010-2011. Insufficient funding is available within the CIP time frame to address: design; land acquisition; and construction. Existing overhead utilities will also need to be relocated along Dublin Boulevard prior to the road improvements. It is anticipated that insufficient Public Utility Commission Rule 20A funds will be available in the next five years to reimburse the City for these improvements. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund PriorYears 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ Other Contract Services Land! Right of Way Improvements Machinery! Equipment Miscellaneous 263,114 173,481 566,511 1,818,424 300 $ 123,066 $ 123,066 TOTAL PROJECT MANAGEMENT (FTE) 59,651 $ 2,881,181 STAFF CONTRACT Insufficient Funding within CIP Time Frame 2.758,115 $ 123,066 $ 2,881,181 0.18 -71- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY Not Yet Assigned Bike Lane - Amador Valley Boulevard STREETS Stagecoach Road to Dougherty Road DESCRIPTION - LOCATION e This project would construct a Class 2 .bicycle lane along the north side of Amador Valley Boulevard between Stagecoach Road and Dougherty Road to allow for the exclusive use of bicycles and pedestrians. Miles 1 COMMENTS This Bike Lane Project on Amador Valley Boulevard will connect the Iron Horse Trail, the Alamo Creek Bike Path, and the Dougherty Road Bike Path. As of the end of Fiscal Year 2006-2007, developer fees in the amount of approximately $64,981 have been collected for this project. The balance of the project is proposed for funding from future Measure B Bike/Pedestrian Funds. FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 81,947 227 $ 230,718 $ 230,718 Other Contract Services 8,272 300 64,981 64,981 land I Right of Way Improvements 203,893 Machinery I Equipment Miscellaneous 1,587 TOTAL $ 295,699 $ 295,699 $ 295,699 PROJECT - I STAFF 0.27 MANAGEMENT (FTE) CONTRACT -72- 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER Not Yet Assigned PROJECT DESCRIPTION Dougherty Road Improvements - Amador Valley Boulevard North to City Limits ACTIVITY STREETS DESCRIPTION - LOCATION This project consists of constructing the ultimate northbound lanes from Amador Valley Boulevard north to the Dublin City Limits. This would make . Dougherty Road a six-lane facility. COMMENTS e '^ \ l' ."""_......- \.. \ .,.... C ' ~ :.~.-. ~." rJ ~ \) M". 1 The present configuration of the road is four lanes; however, the easterly lane is in the future median. This project will widen Dougherty Road to a six-lane divided roadway with landscaped medians within the limits of the project. The need for this project is being driven by development in the Dougherty Valley. It is anticipated that developers' Traffic Impact Fees, including Contra Costa County's Dougherty Valley fees, will fund the project. In Fiscal Year 2002-2003, Dougherty Valley impact fees funded the traffic signal at the intersection of Dougherty Road and Willow Creek Drive. Through the end of Fiscal Year 2006-2007, the Traffic Impact Fees collected specifically for this project is approximately $389,653. ESTIMATED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design !Inspection $ 443,257 Other Contract Services 168,060 Land! Right of Way Improvements 3,476,651 Machinery! Equipment Miscellaneous 122,521 Insufficient funding within CIP time frame TOTAL PROJECT MANAGEMENT (FTE) $ 4,210,489 STAFF CONTRACT $ 4,210,489 $ 4,210,489 -73- . 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY Not Yet Assigned Dublin Boulevard - STREETS Right Turn at Village Parkway DESCRIPTION - LOCATION e This project will construct an eastbound right-turn lane on Dublin Boulevard at Village Parkway. MMe. 1 '^ \ \ .--.,...- ~ \.....~...._..._4ll" C \ "t .....---- COMMENTS The 1-580/1-680 Direct Connector Project identified the need to construct an eastbound right-turn lane on Dublin Boulevard at Village Parkway. This project will accommodate additional traffic from downtown Dublin attracted to the new 1-680 northbound on-ramp at Village Parkway and will improve the level of service at the intersection of Dublin Boulevard and Village Parkway. This project will be funded from available Traffic Impact Fees (Eastern Dublin TIF Category 3). ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ Other Contract Services Land I Right of Way Improvements Machinery I Equipment Miscellaneous 72,232 300 12,491 149,663 458,507 $ 206,933 $ 487,748 $ 694,681 1,788 TOTAL PROJECT MANAGEMENT (FTE) $ 694,681 STAFF CONTRACT $ 206,933 $ 487,748 0.10 0.10 $ 694,681 -74- L 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY New Citywide Signal Communications Upgrade STREETS - DESCRIPTION - LOCATION e This project will replace traffic signal controllers at several intersections located to the east of Dougherty Road in Dublin with state-of-the-art controllers, as part of integrating Dublin's signals into the 1-580 Smart Corridor system. Once integrated into the system, Staff will be able to monitor and update timing and coordination plans at these intersections from the City's traffic operations center. This project will also integrate an existing network of signal interconnect cable into the 1-580 Smart Corridor system so that central communications with traffic signals can be established on a Citywide basis. Miles 0.5 "'- , 9 ~~ 11)c,?, }I; ~<1;~~ ~ I Gfq yJ[{ ~(L -.\ ~{ L~.---L J~~ t1 ~~ jF~ ?:~.I~ ~ -(.)-~ I m'IJ.) -~ ~ ~ - ~' ~~~\fl( " '-- I --, ...- ,----......-- .,,#' 1-680 COMMENTS This project is needed to coordinate traffic signals and improve traffic flow on a Citywide basis. It is proposed to be implemented over a five-year period using the General Fund. Every effort will be made to obtain grant funding if possible. The following intersections will be upgraded as part of this project: 1. Dublin Boulevard/Hibernia Drive 2. Dublin Boulevard/Myrtle Drive 3. Dublin Boulevard/John Monego Court 4. Dublin Boulevard/Glynnis Rose Driv~ 5. Hacienda Drive/Summerglen Drive FINANCINGNEARS SCHEDULE ESTIMATED COSTS Fund Prior Years 2006-2007 2007 -2008 2008-2009 2009-2010 2010-2011 Totals Design / Inspection $ 27,540 001 $ 17,580 $ 17,775 $ 17,900 $ 18,275 $ 71,530 Other Contract Services Land / Right of Way Improvements 62,390 Machinery / Equipment Miscellaneous Insufficient Funding within CIP Time Frame 18,400 TOTAL $ 89,930 $ 17,580 $ 17,775 $ 17,900 $ 18,275 $ 89,930 PROJECT I STAFF 0.02 0.02 0.02 0.02 MANAGEMENT (FTE) CONTRACT -75- ~ , 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Citywide Street Storm Drain Condition Assessment ACTIVITY STREETS DESCRIPTION - LOCATION This project will clean and assess the condition of the storm drain system within the City limits. COMMENTS Several older sections of the storm drain system are known to have problems and should be repaired. However, there is no existing survey for the condition of approximately 547,100 linear feet of storm drain pipes found within the City. The City's storm drain system is currently valued at approximately $82 million. In order to avoid costly repairs or replacement, the assessment of the storm drain pipes is recommended. The project will begin in FY 2007-2008 and extend into FY 2011-2012 as a 5-year program. The project will start with the older sections of Dublin and move toward east Dublin in subsequent years. Included in the project is a clean out of the storm drain system, a video recording of the existing pipe condition, and an assessment and report of the storm drain system. The assessment will generate a report that may propose local repairs to the storm drain system. Any proposed repairs will create a new CIP for approval. This Capital Project would accomplish the following High Priority City Council Goal: 2007 -2008 GOAL Conduct assessment of the storm drain system and develop an appropriate replacement schedule. ESTIMA TED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design I Inspection $ 43,680 001 Other Contract Services 371,760 Land I Right of Way Improvements Machinery I Equipment Miscellaneous 800 $ 104,060 $ 104,060 $ 104,060 $ 104,060 $ 416,240 TOTAL $ 416,240 PROJECT I STAFF MANAGEMENT (FTE) CONTRACT $ 104,060 $ 104,060 $ 104,060 $ 104,060 $ 416,240 0.10 0.09 0.09 0.09 0.03 0.06 0.06 0.06 -76- . 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION Dublin Boulevard/Amador Plaza Road Intersection Improvements ACTIVITY STREETS DESCRIPTION - LOCATION Over the past few years, the intersection of Dublin Boulevard and Amador Plaza Road has experienced a siginificant increase in congestion due to traffic generated by the 1-680 hook ramps and the development of commercial businesses near the intersection. This project will perform a detailed engineering study to determine the precise plan of the proposed improvements and to identify the right of way needed to improve said intersection. The improvements will include addition of left turn and right turn lanes to facilitate traffic movement through the intersection. COMMENTS e \"\ ....."..-- \ "^ .."".-- "" \.. ........ \ "'{ --........ Miles 0.5 The intersection improvement project is included in the Downtown Traffic Impact Fee Program list of improvement projects. In FY2007-2008 it is proposed that the preliminary engineering work be undertaken. ESTIMATED COSTS FINANCINGNEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Totals Design {Inspection $ 11,050 Other Contract Services 83,000 Land { Right of Way Improvements 1,087,650 Machinery { Equipment Miscellaneous 300 300 94,350 94,350 Insufficient Funding within CIP Time Frame TOTAL $ 1,182,000 PROJECT STAFF MANAGEMENT (FTE) CONTRACT 1,087,650 $ 94,350 0.09 $ 1,182,000 -77- ... 2006-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER New PROJECT DESCRIPTION San Ramon Road Trail Improvements ACTIVITY STREETS DESCRIPTION - LOCATION This project. will design and construct trail improvements to repair the trail adjacent to San Ramon Road from Alcosta Boulevard to approximately 710 feet south. Improvements will include placing tree root barriers, removing and replacing the asphalt concrete trail, and relamping the trail lighting to create greater comfort and safety for those who utilize the trail. COMMENTS e Miles 0.5 The existing trail has many areas where tree roots have heaved the trail paving to such an extent that staff have received several comments that the trail is difficult to traverse. This project would include investigation of existing conditions, environmental review and design in FY 2007-2008 and completion of the improvements in FY 2008-2009. ESTIMA TED COSTS FINANCINGIYEARS SCHEDULE Fund Prior Years 2006-2007 2007-2008 2008-2009 2009.2010 2010-2011 Totals Design {Inspection $ 25,000 001 Other Contract Services Land { Right of Way Improvements 120,000 Machinery { Equipment Miscellaneous TOTAL PROJECT MANAGEMENT (FTE) $ 145,000 STAFF CONTRACT $ 25,000 $ 120,000 $ 145,000 $ $ 145,000 25,000 $ 120,000 -78-