Loading...
HomeMy WebLinkAboutItem 3.4 AccptImprvDghrtyRd84-1AGENDA STATEMENT SUBJECT: CITY COUNCIL MEETING DATE: August 13, 1984 Contract 84-1 - Dougherty Road Improvements (Phase I) EXHIBITS ATTACHED: RECOMMENDATION~ None l) 2) Accept improvements under Contract 84-1 Authorize final payment to P & F Construction Inc. in the amount of $7,315.87 FINANCIAL STATEMENT: Total project budget (including Engineering & Inspection) $91,000.00. Total project cost (including Engineering & Inspection) $88,158.76. DESCRIPTION: In February 1984, the City Council awarded Contract 84-1 to P & F Construction Inc., for Dougherty Road Improvements. The major items of work in Phase I were the construction of sidewalk, curb and gutter along the frontage of Arroyo Vista from the Southern Pacific Railroad right-of-way on the south to the northern property limit of the subdivision near Ventura Drive. During the constructScn phase, the City Engineer authorized lowering 6 catch basins to avoid a future utility conflict and the removal of concrete buried within the project area. Phase II of the Dougherty Road Improvements will be the installation of a storm drain along the same frontage (1984-85). On February 27, 1984, the City Council awarded the contract to P & F Construction in the amount of $44,598.50. On March 12, 1984, the City Council authorized additional curb, gutter and sidewalk to be installed because of the availability of additional Community Development Block Grant funds. This additional work was performed by P & F Construction at the same unit price included in the bid. A breakdown of costs versus budget and funding of this project is shown below. BUDGET ACTUAL Construction Engineering/Inspection Total $80,000.00 15,000.00 $95,000.00 $73,158.76 15,000.00 $88,158.76 REVENUE (PHASE I and II) Block Grant Funds Jobs Bill General Fund Total Phase I Costs Remaining Phase II Funds $113,490.00 6,150.00 35,360.00 $155,000.00 88,158.76 $ 66,841.24 The Contractor has completed the improvements in accordance with the approved plans, specifications and modifications. ITEM NO. ~-V COPIES TO: