HomeMy WebLinkAboutReso 128-07 Engineers Rpt AD 83-1
RESOLUTION NO. 128 - 07
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*************
APPROVING ENGINEER'S REPORT, CONFIRMING DIAGRAM
AND ASSESSMENT, AND ORDERING LEVY OF ASSESSMENT
CITY OF DUBLIN STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT 83-1
WHEREAS, by its Resolution No. 5-07, a Resolution Directing Preparation of Annual Report for
City of Dublin Street Lighting Maintenance Assessment District No. 83-1 (the "District"), this Council
designated the Public Works Director as Engineer of Work and ordered said Engineer to make and file a
report in writing in accordance with and pursuant to the Landscaping and Lighting Act of 1972; and
WHEREAS, said report was made and filed with the City Clerk and duly considered by this
Council and found to be sufficient in every particular, whereupon it was determined that said report
should stand as Engineer's Report for all subsequent proceedings under and pursuant to the aforesaid
Resolution and that July 17,2007, at 7:00 p.m. in the Council Chambers, Dublin Civic Center, 100 Civic
Plaza, Dublin, California, was appointed as the time and place for a hearing by the Council on the
question of the levy of the proposed assessment, notice of which hearing was published and posted in
accordance with the Landscaping and Lighting Act of 1972; and
WHEREAS, at the appointed time and place, said hearing was held, and all persons interested
desiring to be heard were given an opportunity to be heard, and all matters pertaining to said levy were
heard and considered by this Council, and this Council thereby acquired jurisdiction to order said levy and
confirmation of diagram and assessment prepared by and made a part of the report of said engineer to pay
the cost and expenses thereof;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby approve that:
(a) The property owners owning more than fifty percent of the area of assessable land within
the District had not, at the conclusion of said hearing, filed written protests against the said
proposed levy, or against the Engineer's Estimate of costs and expenses, or against the
maps and description, or against the diagram or the assessment to pay for the costs and
expenses thereof;
(b) The public interest, convenience, and necessity require that said levy be made;
(c) The District benefited by said improvements and to be assessed to pay the costs and
expenses thereof, and the exterior boundaries thereof are as shown by a map thereof filed
in the office of the City Clerk, which map is made a part hereof by reference thereto.
PASSED, APPROVED AND ADOPTED this 17th day of July, 2007, by the following vote:
AYES: Councilmembers Hildenbrand, Oravetz, Sbranti, Scholz and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
G:CC-MTGS/7-17-0 so 12883-1 (Item 6.1)
G:\ASSESSMENT DISTRICT&83-1 City Wide SL\FY07-08\Public Hearing\Resolevy-831.doc
2