Loading...
HomeMy WebLinkAbout4.04 Annual Overlay Accpt Work CITY CLERK File # D~~-[~]~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 4,2007 SUBJECT: Acceptance of Work - Contract No. 07-06 2006-2007 Annual Street Overlay Program Report Prepared by: Melissa Morton, Public Works Dir~ None ATTACHMENTS: RECOMMENDATION: ~. Accept improvements under Contract No. 07-06,2006-2007 Annual .~ ' ~ Street Overlay Program, and release retention after 35 days if there are no subcontractor claims ,.~---~. FINANCIAL STATEMENT: 2006-2007 Annual Street Overlay: FY 2006-2007 Budget Est. Actual $ 528,969 $ 498,559 $ 82,000 $ 87.539 TOTAL: $ 610,969 $ 586,098 Improvements - Overlay: Improvements - Slurry Seal: The estimated actual of $586,098 is within the total improvements budget of $610,969. Pavement failure repair and crack sealing on proposed slurry seal streets have been included with the Overlay Program as a cost savings measure. The Annual Street Overlay Program is funded by Traffic Congestion Relief Program (TCRP), Gas Tax and Measure B Local Streets & Roads funds. The pavement failure repairs for slurry seal streets are funded by Gas Tax. DESCRIPTION: On May 15, 2007, the City Council awarded Contract No. 07-06, 2006-2007 Annual Street Overlay Program, to EI Camino Paving, Inc. COpy TO: EI Camino Paving, Incorporated ITEM NO. 1.1 Page 1 of2 G:\CIP\Overlay\2006-2007\AS acceptance. doc Thw Annual Street Overla~ •oject consisted of removing and re~, ,ing failed asphalt concrete (AC) pavement to a minimum depth of 3 inches on residential streets and 6 inches on collector/arterial streets, resurfaced the street with a minimum 1-1/2-inch overlay of AC, and re-striped pavement markings. Major cracks were also sealed prior to resurfacing in order to prevent the cracks from reflecting through the new AC overlay. The 2006-2007 Annual Street Overlay Program repaired and overlaid the following streets: STREET LIMITS Re ional Street Amador Valle Boulevard to south end Sta ecoach Road Pearl Place Tur uoise Street to Amador Valle Boulevard Tur uoise Street to east end On x Place Tur uoise Street to east end Woodren Court Dublin Greene Drive to north end Dublin Greene Drive Woodren Court to Silver ate Drive St. Ra mond Court Dublin Greene Court to east end Donlon Wa Dublin Boulevard to north end Casa Linda Court Pe ertree Road to west end Glen Oaks Wa Beverl Lane to Bandon Drive Edenber Street Ashford Wa to Bluebell Wa Edenber Place Bluebell Wa to south end Ardmore Place Wicklow Lane to north end Wicklow Court Wicklow Lane to south end Lon ford Wa Ashford Wa to Carlow Wa Tassa'ara Road Shadow Hill Drive to North Dublin Ranch Drive In addition, pavement failure repair and crack sealing for slurry seal streets have been included with the Overlay Program as a cost savings measure to coordinate similar work. Staff has inspected the work and recommends that the City Council accept the improvements under Contract No. 07-06, 2006-2007 Annual Street Overlay Program, and release retention after 35 days if there are no subcontractor claims. Page 2 of 2