HomeMy WebLinkAbout4.04 AuthExtraWork 86-2 CITY OF DUBLIN 86-2 AGENDA STATEMENT City Council Meeting Date: March 23, 1987 SUBJECT: Amador Valley Blvd. Rehabilitation Project Authorization for Extra Work EXHIBITS ATTACHED: RECOMMENDATION~ 1) Improvement Design 2) Budget Change Form Authorize additional appropriation from General Fund Street Improvement Reserve; authorize Staff to contract for extra work. FINANCIA~ STATEMENT: Estimated cost of improvements: $17,500 Design and inspection: 3,000 20,500 DESCRIPTION: At the time that the Amador Valley Blvd. Rehabilitation project was designed, bid, and awarded, the Southern Pacific railroad tracks were not scheduled to be removed for quite some time; consequently, the design of the project allowed for the tracks to remain in place, with reconstruction of this area to be accomplished at a later date. Southern Pacific has, however, begun removal of the tracks and ties from their right-of-way in Dublin ahead of schedule, and it is possible to accomplish reconstruction in this area at a savings to the City if it is done by the contractor presently on the site. This work includes removal of curb returns on each side of the track, construction of new curb, gutter, and sidewalk, embankment behind the sidewalk, and the installation of a leveling course of asphalt concrete to insure proper drainage. The existing opening'in the median would be closed with new curb and paver stones. Staff has received a cost figure for the improvements from Oliver De Silva on the basis that the work would be included in the current project in the form of a change order. This cost, $17,500, has been reviewed by Staff and found to be equitable. The estimated cost of doing this work as a separate job at a later date is $25,000. If the work is to be done as part of the current contract, it must be done very soon, as the overlay portion of the job is scheduled to be done in approximately two weeks. Staff recommends that the extra work be authorized at this time in order to accomplish a cost savings and in order to preserve the continuity of the project. SANTINA & THOMPSON CONSULTI, ~u CIVIL ENGINEERS, INC. 1040 OAK GROVE ROAD JOB NO. ~ ~ O~)~"~ 'SliT. CONCORD, CA 94518 PROJECT ~4. (415) 827-3200 CABLE: SANTHOMINC TELEX 338563 DATE . BY 1300 SO. BEACON ST., SUITE 116'- SAN PEDRO, CA 90731 (213) 832-8371 OF .... 310 ..... SAN flNA & THOMPSON CONSULT""~ CIVIL ENGINEERS, INC. 1040 OAK ~ROVE ROAD CONCORD, CA 94518 (415) 827-3200 CABLE: SANTHOMINC TELEX 338563 1300 SO. BEACON ST., SUITE 116. SAN PEDRO, CA 90731 (213) 832-~k371 JOB NO. ~ 0 CkS'~, SHT. PROJECT A,~/, "J~- DATE ~,~1o--~'7 6Y_.~)_.E OF ...... 34'1 34(,, ..... ' ..... S4~/ .a 4 co. 7Z ~ ,'-JI J / $ c.~c~': S,~JTINA & THOMPSON 'Tz.. ,g~ BEGIN CONSULTING CIVIL ENGINEERS, INC. 1040 OAK GROVE ROAD CONCO"~ CA 94518 (415) 827-o./00 CABLE: SANTHOMINC TELEX 338563 1300 SO. BEACON ST., SUITE 116 SAN PEDRO, CA 90731 (213) 832-8371 'l JOB NO. F JECT DATE SHT. OF BY Il 7£ '; 2. B NE'G/A: C ~ C- 72.+ 80 ~MD C,d~4 [ll It1 [11 |IT ~ SA. ,IA ,~. THOMPSON CONSULTING CIVIL ENGINEERS, INC. 1040 OAK ~"OVE ROAD CONCORD, CA 94518 (415) 827-3200 CABLE: SANTHOMINC TELEX 338563 1300 SO. BEACON ST., SUITE 116 SAN PEDRO, CA 90731 (213) 832-8371 JOP~3. SHT. OF PROJECT DATE BY. .?z*oo CItY OF DUBLIN B,UDGE.T CHANGE FORM FROM TO APPROPRIATION ACCOUNT AMOUNT ACCOUNT AMOUNT '~TRANSFER ~MENDMENT 1-1 416 20,500 3-56 20,500 JUSTIFICATION PURSUANT TO COUNCIL APPROVAL ON 3/23/87, AN ~DDITIONAL APPROPRIATION IS MADE FROM THE GENERAL FUND STREET IMPROVEMENT RESERVES TO THE CAPITAL IMPROVEMENT PROJECT - AMADOR VALLEY BLVD. REHABILITATION ITEMITIZED COST CITY MANAGER CIT--Y CO,.,NCIL APPROVAL APPROVAL CAPITAL IMPROVEMENT PROJECT AVB REHAB, LANDSCAPING TOTAL DATE DATE 20,500.00 20,500.00