HomeMy WebLinkAboutItem 4.04 AdvertiseContract 86-3CITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: February 24, 1986
SUBJECT:
Contract 86-3: Annual Sidewalk Program and
Arroyo Vista Sidewalk Connections
EXHIBITS ATTACHED:
1) Policy for Fiscal Year 1985-86, Sidewalk
Repair Program
2) Resolution for 1985-86 Sidewalk Repair
Program
3) Plans and Specifications to be available
at meeting
4) Location list f~r sidewalk repair
5) Housing Authority letter of 1/31/86
RECOMMENDATION:
1) Adopt policy resolution for Sidewalk
Repair Program
2) Authorize Staff to advertise for bids
3) Authorize budget adjustment to reflect
revised funding of Arroyo Vista sidewalk
connection project.
FINANCIAL STATEMENT:
Construction Design/Inspection Total
Annual Sidewalk
Repair
$ 20,500 $ 4,500 $ 25,000
Arroyo Vista 12,500
Sidewalk Connections
2,500 15,000
Total: 40,000
Although sufficient funds were budgeted, it was anticipated that
$13,000 of the sidewalk connection project would be financed with
Community Development Block Grant funds. These funds are no longer
available for the project. Therefore, the Pleasanton Housing
Authority has increased its contribution from $3,000 to $13,000, and
the City will need to finance the remaining $2,000 from the General
Fund.
DESCRIPTION:
Sidewalk Safety Repair Program: The annual sidewalk program has
funds scheduled for each year of the Five Year Capital Improvement
Program. For Fiscal Year 1985-86, $25,000 has been budgeted from the
General Fund. At its meeting of January 14, 1985, the City Council
adopted a policy for the repair of pedestrian hazards for the Fiscal
Year 1984-85. It is Staff's recommendation that this policy again be
adopted for Fiscal Year 1985-86.
Arroyo Vista Project: The sidewalks inside the Arroyo Vista
development were constructed prior to the design and construction of
the public sidewalks along the west side of Dougherty Road, and as
such, there is a grade difference between the two improvements. This
project would connect the sidewalks through ramps and stairs to allow
direct pedestrian access from within the project out to Dougherty
Road. This project would also allow four handicap improvements
within the project and add one parking space.
ITEM NO.~_~ COPIES TO:
POLICY FOR THE CITY OF DUBLIN
for Fiscal Year 1985-86
ANNUAL SIDEWALK REPAIR PROGRAM
It is the policy of the City of Dublin to cause repairs to be made to
certain public improvements for the safety of the general public under
the following guidelines.
Improvements Included:
Public improvements included under this program shall be limited to
those improvements which may constitute a potential tripping hazard to
pedestrian traffic such as curbs, gutters, driveways, and sidewalks.
Need:
Where these improvements have settled, heaved and/or cracked and offset
such as to represent a tripping hazard as identified by the City
Engineer, or his representative, these improvements shall be replaced.
Responsibility:
Where it is apparent that the damage to improvements has been caused by
natural causes such as tree roots or utility trench settlement, the
City of Dublin will pay for the cost of repair.
Where it is apparent that the property owner fronting the damaged
improvement has caused the damage, such as driving vehicles into a side
yard, the property owner shall be responsible for the repair. The City
Engineer shall establish a procedure whereby the property owner will be
notified of the needed repair, and if not done in a specified
reasonable time, he shall cause the repair to be made and the cost of
repair, together with reasonable administrative costs, shall become a
lien against the property.
Time Limit of Policy:
This policy shall be in effect for the Fiscal Year 1985-86 and
thereafter be reviewed for extension, modification, or replacement.
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
.............................................
ESTABLISHING A POLICY FOR THE REPAIR OF PUBLIC IMPROVEMENTS
DEEMED TO BE PEDESTRIAN HAZARDS
WHEREAS, public improvements such as curbs, gutters,
driveways, and sidewalks sometimes become damaged due to natural
and man-made causes; and
WHEREAS, these damaged improvements sometimes become
tripping hazards to pedestrian traffic; and
WHEREAS, it is in the best interest of safety to have
these hazards eliminated;
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Dublin to establish a policy of the City of Dublin
for Fiscal Year 1985-86 entitled "Annual Sidewalk Repair
Program."
PASSED, APPROVED, AND ADOPTED this 24th day of
February, 1986.
AYES:
NOES:
ABSENT:
Mayor
ATTEST:
City Clerk
DATE:
19 86 SIDEWALK REPAIR PROGRAM
SQUARE SAW C&G R-SHIELD
ADDRESS WIDTH LENGTH FEET LENGTH LENGTH LENGTH
7571 Amador Valley B1
Apt. 7 4 8 32 4
Apt. 9 4 12 48 -· 4
7108 Village Pkwy. 4 18 64 22
6891 Village Pkwy. 4 12 48 20
N. E. return @ Lewis · 4 12.5 50 12.5
ZONE ' I
DATE: Februasy 3, 1986
19 86 SIDEWALK REPAIR PROGRAM
SQUARE SAW C&G R-SHIELD
ADDRESS 'WIDTH LENGTH FEET LENGTH LENGTH LENGTH
7416 Amarillo 4 18 32 4 0
Amarillo/Estrella ' '
N. W. Return 6.5 14 91 14
~on Amarillo)
1667 Ladera 4 24 96 8 10
7761 Castillian 4 8 32 8
4 4 16 11 4
7777 Castillian 4 8 32 0 8
7273 Hansen 4 10 40 0 10
7281 Hansen 4 12 48 0 0 10
7289 Hansen 4 12 48 4 0 10
7379 Hansen 4 6 24 0 0 0
7793 Pepper tree 4 14 56 8 10
7967 Pepper tree 4 22 88 4
7982 Peppertree 4 6 24 4
ZONE II
DATE: February 5, 1986
1986 SIDEWALK REPAIR PROGRAM
SQUARE SAW C&G R-SHIELD
ADDRESS 'WIDTH LENGTH FEET LENGTH LENGTH LENGTH
7721 Donahue 4 53 212 6 0 0
7809 Donahue 4 8 32 4 0 0
8010 Holanda 4 4 16 10 13 0
8022 Holanda 4 4 16 4
8023 Holanda 4 16 64 4 0 0
8034 Holanda 4 12 48
8035 Holanda 4 20 80 20
4 28 112
8011 Holanda 4 12 48
(on Vomac) 4 20 80 10
7867 Ironwood 4 7 28 4 0 0
7859 Ironwood 6 27 162 0 15 0
7530 Ironwood 4 22 88 8 0 10
7643 Ironwood 4 18 72 0 0 10
7726 Sunwood 4 4 16 4 0 0
7726 Sunwood ' 4 5 20 0 0 0
zoNE III
DATE: February 5, 1986
1986 SIDEWALK REPAIR PROGRAM
SQUARE SAW C&G R-SHIELD
ADDRESS 'WIDTH LENGTH FEET LENGTH LENGTH LENGTH
8455 Beverly Lane 4 14 56 4 0 10
8497 Beverly Lane 4 14 56 ''8 0 10
8496 Davona Drive 4 '22 88 0 0 0
8287 Davona Drive 4 14 56 8
8295 Davona Drive 4 24 96
8798 Edenberry 4 15 60 0 0 10
8682 Wicklow 4 8 32
8556 Wickl°w 4 30 120
. DATE: February 5, 1986
ZONE IV
19 86 SIDEWALK REPAIR PROGRAM
SQUARE SAW C&G R-SHIELD
ADDRESS 'WIDTH LENGTH FEET LENGTH LENGTH LENGTH
6990 Brighton 4 2 8 7 2
6947 Brighton 4 4 16 14 4
7182 Burton .6 12 72 18
7733 Callan (on Burnh~J0 4 20 80 20
7240 Dover Lane 4 18 72 18
7640 Frederiksen 4 12 48 1.5 12 10
7612 Prederiksen 4 8 32 7 8 10
7633 Frederiksen 4 8 32 5.5 8 10
7675 Frederiksen 4 8 32 5.5 8 10
6680 Spruce Lane 4 4 16
HOUSING
AUTHORITY
of the City of '
PLEASANTON
MICHAEL PARSONS
Executive Director
January 31, 1986
Mr. Richard C. Ambrose, City Manager
P. O. Box 2340
Dublin, CA 94568
Re: City of Dublin Site Work at Arroyo Vista Development
Dear Mr. Ambrose:
The Pleasanton Housing Authority has been advised by HUD Regional
Office that HUD Central Office is "pushing" to close out entirely
all existing development~projects; Arroyo Vista is one of many such
projects. HUD emphasizes'that the work must be done and funds ex-
pended by June, 1986.
Steps, rails, .handicapped cut-outs and concrete connectors between
the Arroyo Vista site and Dougherty Road sidewalks still remain to'
be completed. HUD has already determined the Pleasanton Housing
Authority has $13,000 which we can contribute to this work.
For some time now the City of Dublin has plan~ed to do the above
listed work as part of its over-all HCD program. The City of Dublin
was to be the "lead agency" in this matter. For its portion, the
Housing Authority was to simply contribute $13,000 to the City of
Dublin when all work was completed.
The Pleasanton Housing Authority is dependent on the City of Dublin
to complete this work by the summer '86 deadline. Otherwise HUD
will rescind or take back the $13,000 that the Housing Authority
now has in the bank waiting to be used as its contribution. If
these funds are returned to HUD, the Pleasanton Housing Authority
will not have any other funds available to assist the City of Dublin
in these needed projects.
Therefore, when will the City of Dublin start and what is the date
of completion of this HCD work at Arroyo Vista?
Please advise the Pleasanton Housing Authority in Writing, as we
have all along been quite willing to work with the City of Dublin
to complete this matter; this will allow us the keep HUD appraised
of matters.
MY-~ h'a el Parsons'
Executive Director
· MP:hfd '
cc: PHA Board of Commissioners
-.