HomeMy WebLinkAbout8.3 Prog Study Maint/EOC
C~lY CLERK
f~~e # D~[Q][Q]c~~
AGENDA STATEMENT
C~TV COUNC~l MEET~NG DATE JalrnualU-Y 15, 2008
SUBJECT
PresentatIOn of Programmmg Study for the ConstructIon of a
Mamtenance FacIlIty and Emergency OperatIOns Center
Report Prepared by Meilssa Morton, PuMe Warks D,
Mamtenance FacIlIty ProgrammIng Study
A TT ACHMENTS
RECOMMENDATiON
Receive the presentation and provIde comments as appropnate
FiNANCiAl. STATEMENT
The cost to purchase land and construct a Mamtenance FacilIty that
mcludes an Emergency Operations Center IS currently estImated to
be approxImately $16 5 Million Dollars The CIty currently does not
have adequate funds to acqUIre land and buIld thIS faCIlIty
][)ESCRD:PTION On August 15, 2006, the CIty CouncIl approved an agreement With
HardIson Komatsu Ivehch & Tucker (HKI&T) to complete the Mamtenance Yard Programmmg Study
(Study) The Study was to examme the personnel needs, functIOns and mfrastructure demands of a
mamtenance yard and office/storage faCIlIty, mcludmg proVIsIon for an Emergency OperatIons Center
(EOe) The chOIce to mclude an EOC m thIS future faCIlIty was based on the CIVIC Center not bemg
deemed an optImal locatIOn for an EOC due to Its proximity to both the 1~580 and 1-680 freeways In
additIOn, the Study was undertaken to allow some portIOn of the cost of the mamtenance yard to be
mcluded III the Public FdclhtIes Fee
In examining the potential needs of the City for a mamtenance yard, HKI&T compared the City to several
other comparable cities and operatIOns, takmg Into account that the CIty of DublmIs umque as operatIOns
do not mclude sewer or water maintenance, mamtenance IS conducted us10g contract personnel, and do
not mclude golf courses or aIrports However, for these seemmgly sIgmficant dIfferences, the sImIlantIes
WIth other mUnICipalItIes were greater Usmg establIshed, accepted mdustry standards, and m concert
WIth the current SIzes of offices and conference rooms 10 the CIVIC Center, the Study established the
operatIOnal needs for the faCIlity
-------------------------------------------------------------------------------------------~-----------------
COpy TO HKIT
Page 1 of2
liTEM NO.
~.3
G ICIPIMamtenance Faclhty Study\Agst Programmmg Study doc
v
The cost estImate meludes certalll mInImUm needs for gradmg and utlhtIes for a given Site, but wIthout a
specIfic slte yet desIgnated, these estImates are consIdered flUId \Vlule the long range plan for the facIlity
calls for more than five acres, for fundmg purposes, Staff has assumed the use of a five-acre site at $1 2
mIllion dollars per acre WhIle the report calls for a larger site by the year 2020, staff antIcIpates that the
SIte can be designed to accommodate bUlldout Without the addItIonal land area Consequently, the total
cost of the MaIntenance FacIlity, Includmg the EOC, IS $165 mIllIon dollars as Illustrated m the table
below
Work Com Oillellllt
SIte Work
o en S ace
AdrmmstratIon and Crew S ace
Sho S ace
Land Ac UlSItIon Cost
Total Cost
Detanns
Gradm , UtilItIes, Dramage
Landsca mg and Pavm
AdrmmstratIon Bmldm
Cost
$1 2 M er acre
$3,646,905
$684,125
$3,473,200
$2,694,240
$6,000,000
$16 5 MIllIon Dollars
Staffrecommends that the City Council receiVe the presentatIOn and provIde comments as appropnate
Page 2 of2
I~ CfCj
[O)[E5)~CGJ~ (c;~~lr[E~~A
CD~Y lQl~ [hnlbJ~Dn
1P1UI1bJ~nc WOlIr~S DelPallritmel/i)~ MBlDIli1~el/i)alIli1Ce Yallrdl
& lEmelrgelli1cy OlPelral~DOnS Cen~elr
1Dl1Ul1bJ~ ~ 1li1, Cal~ ~~OlrlnH aJ
November 2006
(Revised December 2007)
n
Prepared by
Parsons Bnnckerhoff
In Association with
HKI& T Architects
UeYv1i1=2 3 ,Jj5:Jo~ ~
M 1rTI M cr llilliJfIIE f\gTI'
I -
c:< ~ 9CJ
1 AfBllE Of' CON1ENTS
Chapter 1 General Considerations
Acknowledgments
Objective
Introducbon
Methodology
Project goals
Staffing
1 1
1 2
13
14
15
16
Chapter 2 Space Needs Program
Introduction
Administration Spaces
EOC
Crew Spaces
Shop Spaces
Outside Spaces
Vehicle Parking
Summary
21
22
22
22
23
23
24
24
Chapter 3 Functional Requirements
Admlnlstrabon Spaces
EOC
Crew Spaces
Shop Spaces
Outside Spaces
Vehicle Parking
31
320
325
328
341
351
Chapter 4 Site & BUilding Requirements
Codes and Standards
CIvil
Landscape
Architectural
Structural
Mechanical
Plumbing
Electncal
Security
Altematlve Fuellmpacls
Slgnage and Graphics
Waste Handling
FacIlity Maintenance
41
41
43
43
47
48
410
414
417
417
418
419
420
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Criteria
Page I
2> ~ CJ1
This page left Intentionally blank
4 at qq
CHAfl1r1E1R 1 GIE~IERAl C(Q)~S~DIEIRA l~(Q)NS
5 ~ CJCJ
GIENlElRAl CONS~IDIERA r~ONS
ACKNOWLEDGMENTS
The design team would like to thank the following City of Dublin staff members that completed the
questionnaires and participated In the mtervlews for their time and Input which made possible the
development of the data contamed herem
Cltv of Dublin
Melissa Morton Public Works Director
Ginger Russell Senior Admin Analyst
Lee Thompson Public Works Department
Mark Lander - City Engineer
Dean McDonald Maintenance Supenntendent
Ray Kuzban Senior CNII Engineer
Steve Yee Associate CIVil Engineer
Steve Pappa Information Systems Manager
Rose Macias ------Emergency Operations Center Consultant
Harry COl]asso -Street Maintenance Foreman
Tim Potts Park Maintenance Foreman
Gary Gabucan BUilding Maintenance Foreman
DeSlqn Team
HKI& T Architects
DenniS Okamura
Pnnclpal
Parsons Brlnckerhoff
Adam Manuel
PB Project Manager
Dublin Public Works Department Maintenance Yard
City of Dublm California
Design Crltena
Page 1 1
o c;f 91
GlElNllERAl COINIS~DlElRAr~OINlS
OBJECTIVE
The primary objective of the preliminary needs analysIs IS to arnve at an approximate area to
accommodate two basIc functions A City Mamtenance Yard and an Emergency Operations Center
(EOG) A LEED certificatIon of at least Sliver IS desired for the associated bUildings m the new City
Mamtenance Yard I EOC
CITY MAltllTENANCE YARD
The city currently contracts out most of ItS maintenance work and has only a small maintenance yard for
ItS use The needs analysIs proposes areas and facIlities to provide for a larger role of the City m ItS
maintenance tasks should the City desire to bnng those services m-house m the future Additionally If
new facIlities are constructed they could also be used by maintenance contractors
Space requirements for fueling and vehicle mamtenance are Identified In the Space Needs Program
(chapter 2) Other functions that are mcluded In the maintenance yard requirements are the traffic control
operations crew room space for 4 foremen space for up to four pubhc works mspectors and all
associated spaces for these operations
EMERGENCY OPERATIONS CENTER (EOC)
The current EOC for the City has been determmed to have Inadequate space for storage as well as
requlnng too much setup for EOC operation The needs analysIs proposes
Q The EOC will be setup for simple actlval10n m an emergency situation Data and commUnication
links and eqUipment (phones radio, etc ) will be In a fixed place (only minimal setup necessary)
Q Spatial conSideration will be made to address the needs of an operational EOC room and
separated room/area to communicate with the press and public
Q Parking outSide the EOC Will be prOVIded for approxImately 50 vehicles (40 staff and 10
additional for the public
Q There Will be a desIgnated space for at least two trailers With power and empty condUit for data
cables that run to the commUnication room of the EOC
Q Determine If It IS necessary to have a small tank of diesel for an emergency fuel supply for the
emergency generator In the next deSign phase
Q The degree of multiple use spaces for the maintenance yard and EOC Will be refined to meet the
construction budget requirements
DeSign Cntena
Page 1 2
Dubhn Public Works Department Maintenance Yard
City of Dublm California
11 Cf'7
GENERAL CONS~IDJIERA l~ONS
INTRODUCTION
The City of Dublin IS expenenClng significant population growth which will more than double ItS current size
from 39931 to 72 000 within the next twenty years Dublm will be relocating Its eXisting maintenance yard
FacIlity because It IS too small to meet the current demands of the City and It will need additional space to
meet the needs of Its projected 2020 bUlld-out ThiS document contains the criteria for design of the new City
maintenance yard I Emergency Operations Center and defines the necessary spaces and requirements for
operalional effiCienCies and provides the foundation for prellmmary desIgn The mformatlon gathered In the
design cntena IS orgamzed In the follOWing chapters
o Chapter 1 General Considerations Lists pertinent Information that Influences design
o Chapter 2 Space Needs Program Delineates the space requirements for offices maintenance bays &
shops support spaces parts storage vehicle/eqUipment storage and fuel & wash faCIlities
o Chapter 3 FunctIonal Requirements Presents the functional requirements for offices mamtenance
bays & shops support spaces parts storage vehicle/eqUipment storage and fuel & wash faohtles
o Chapter 4 Site & BUlldmg ReqUirements General design crltena relatmg to architecture structure
mechanical electrical CIVil and landscaping as well as security slgnage/graphlcs and waste handling
Issues
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Cnterla
Page 1 3
8; ~/Yj
GIENlElRAl CONS~DIEIRA r~ONS
METHODOLOGY
The first step m developing the design for the new City Mamtenance Yard / Emergency Operabons Center
IS to gain a thorough understanding of the operational characteristics and funclional needs of each
department to be located on the new site Methods used to gain this knowledge Included programming
questionnaires personal Interviews WIth City employees representing the groups that may be affected by this
project on site observations and review of eXlsbng documents relallve to thiS project The flow chart below
Illustrates the project approach being used to develop the new CIty Maintenance Yard { Emergency
Operations Center Note Only the first two tasks are tncluded In this project
.- ------------------~----~~- -~~~~~-~
,
,
I
I
: Programmmg
, Questionnaire
Design
Criteria
Site
AnalysIs
Conceptual
Design
Interviews
On-Site
ObservatIons
Data
Gathering
Design Criteria
Page 1 4
Dublm Public Works Department Mamtenance Yard
City of Dublin California
g1qq
GIENlElRAl CONS~IDIERA lnONS
PROJECT GOALS
The following project goals were developed with the Public Works staff dunng programming Interviews They
are listed In no particular order of pnonty
The facIlity should be built uSing the latest technological advancements and green bUilding
practices acqUlnng a LEED Silver rating or better
2 Provide a faCIlity to house the projected staff and maintenance operations for the City for the
foreseeable future assuming that the City will eventually assume In house maintenance of public
bUildings parks and roadways
3 Since thiS IS a dual use facIlity (maintenance plus EGG) we should determine ways that the
bUilding can serve both purposes with relatively little other than some obVIOUS storage &
commUnications equipment thai IS EGC only
4 Plan should be adaptive to phased module construction so that work can be accomplished In
phases as funding IS available plan needs to be within City s budget to facilitate
5 Provide flexibility to respond to future needs
6 Provide adequate vehicle and equipment storage
7 Provide adequate room for matenals and tools storage Including stockpiles of storm spill or
other emergency supplies
8 Provide adequate facility Infrastructure for operations and organizational flux and growth
9 Long term wear ability equipment and other features should be thought of first In terms of
reliability
1 0 Provide a decant station
11 Provide area for drop-off of household hazardous waste matenals
12 Provide for yard storage of traffic signals and street light poles
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Cntena
Page 1 5
I 0 ~ qc;
GENERAL CONS~DIERA l~ONS
STAFFING
Listed below are the current and projected (2020) staffing levels of each department to be accommodated
at the new City Maintenance Yard The Space Needs Program and Functional Requirements In the
following chapters are based on these staffing levels
Iposltlon ~Current ~ 2020)
Adm Inlstratlon
Senior CIvil Engineer 1 1
Associate CIvil Engineer 1 1
Engineering Tech II 1 1
Public Works Inspectors 4 2
Traffic Engineer 1 1
Slngal & Lighting T echs 2 4
Senior Admin Analyst 1 1
11 11
Maintenance
Maintenance Su perlntendent 1 1
Maintenance Supervisor 0 1
Maintenance Foremen 3 4
Irrigation Techs 6 7
Leadman 2 4
SWing Leadman 1 2
Weekend Leadman 1 2
14 21
Total SIte Staff 25 32
Design Criteria
Page 1 6
Dublin Public Works Department Maintenance Yard
City of Dubhn California
1/ '1'1'1
v
CCIHIAfJ1rIE~:2 S!P>ACCIE NIEIEDS IP~OGR.AM
bz ~ ~Cj
SPACE 1i\lIlElEIDS fJROGRAM
INTRODUCTION
The Space Needs Program presented In thiS secbon was developed based on detailed Interviews With City of
Dublin staff regarding the functional reqUirements and operating characteristics of the new City Mamtenance
Yard I Emergency Operations Center The program Includes the follOWing Information for each space
Space Name A description of the space
[E] = Enclosed [0] = Open office
[C] = Canopy covered [X] = Outdoor
[A] = Alcove
Space Standard The standard for each space based on the function equipment and furnishings to be
accommodated The standards are given In square feet Where the configuration of the space IS cntlcal
dimenSions are given for the space The size of the repair bays are commonly accepted Industry standards
Current Shows the reqUirements for today s operabon
2020 Shows what IS reqUired for the future
Qty Identifies the number of spaces to be accommodated Current represents area that should be prOVided
for today s operations and 2020 represents area reqUired to accommodate projected growth for the year
2020
Area Area In square feet for the proposed space Note that where a space standard IS given the area
equals the space standard times the quantity Current represents area that should be prOVided for today s
operations and 2020 represents area reqUIred for the year 2020
Reference Gives page number In Chapter 3 (Functional ReqUirements) that prOVides addlIJonallnformalJon
about space
Remarks Lists pertinent deSign Informallon
The space reqUirements shown for each function are net useable area A Circulation factor IS applied to
the total net usable area to arrive at a gross square footage requirement In addition to Circulation the
factor prOVides for spaces such as mechamcal and electrical chases structure Width of walls stairs and
elevators The Space Needs Program begms With a detailed program for each functional area followed
by an overall summary Note that the functional requirements for each space are delineated In Chapter 3
m the same order they appear m the Space Needs Program
Dublin Pubhc Works Department Mamtenance Yard
City of Dublin California
DeSign Criteria
Page 2 1
)3 ~ q<7
~lPACIE NIE[ElD~ lPROGRAM
Space Program
City of Dublin California
December 4 2007
SPACE NAME
SPACE
STANDARD
REMARKS
Adm I n1stratlo n Spaces 31
Lobbv 0 120 1 120 1 120 32 C ha I rs for 4-6 oeoola
Rece ptlon Counta r 0 60 1 60 1 60 32 Ad, to Clark
Clerk 0 64 1 64 1 64 33
Coov I Pnntar I Work Room E 144 1 144 1 144 34 Near EOC
File Area 0 120 1 120 1 120 35
Small Conference Room E 190 1 190 1 190 36 uo to 10 oeoole
Lame Co nfarence Room E 315 1 315 1 315 31 UP to 15 oeoole Access from Lobbv
Vend I no I Kitchen A 192 1 192 1 192 38 Near EOC With COOktOD I oven
Traffic Enq,neer E 144 1 144 1 144 39
M amte na nee S uoe nntandant E 192 1 192 1 192 310
Semor Admin Analvst E 125 1 125 1 125 311
Senlo r C 1\111 Enalneer E 144 1 144 1 144 312
M amtena nee S uoe (\fISO r E 125 1 125 1 125 312
Extra Office E 144 1 144 2 288 313
Assoc late ClvLI Eno I nee r E 144 1 144 1 144 313
Maintenance Foremen E 168 3 504 4 672 314 o ffiee sha red bv 2 peoole
Maintenance Workstation 0 64 5 320 6 384 315
Insoeetor WOr1<.statlon 0 64 4 256 2 128 316
Men s Restroom E 64 1 64 1 64 316
Women s Restroom E 64 1 84 1 64 317
Records Storaoa 0 320 1 320 1 320 317 Could be on Mezzanllle
Pia n Room I Re source Lib raN E 224 1 224 1 224 318 With SCanner Dlotter
Network I Tal~om Room E 200 1 200 1 200 319 With Seperate HVAC
Su biotal
Circulation I Walls I MEP
EOC 320
Additional Lobbv lor EOC 280 1 280 1 280 321
EOC OlrectorOffice E 144 1 144 1 144 321
E merQe ncv Ope ratio n Center E 800 1 800 1 800 322 UP to 40 Pea ole Adtace nt to Confare nCe Room s
EOC RACES Room E 192 1 192 1 192 323 Ra dlos ete 2 3 Deoole
EOC Supphes Storapa E 200 1 200 1 200 323 Emeroency Supplies elc
EOC Bunk Room E 144 2 288 2 288 324 Access to RR Showers Separate from E DC
S ubtota I
CircUlation I Walls I MEP
Totall
25701
25701
Crew SPaC" 325
Mud Room A 168 1 168 1 168 326
Men s RR Iloc kern I Showers E 896 1 896 1 896 326 For UP to 40 em P lovees 2 showe rs
Women s RR I Lac ke rs I Showers E 392 1 392 1 392 327 For uo to 10 emolovees 2 showers
Custodial Room E 120 1 120 1 120 321 Centrally located
S ubtota I
C're UletlO" I Walls I ME P
Totalj
(
DeSign Cntena
Page 2 2
Dublin Public Works Department Maintenance Yard
City of Dublin Califomla
/4 ~ CJCf
SPACE NEEDS PROGRAM
Space Program
City of Dublin California
December 4 2007
SPACE NAME
SPACE
STANDARD
REMARKS
Shop Spaces 328
V ehle Ie I Eo ulDmen\ Storaoe 0 1 1500 1 2000 329
Ice I Water Station 0 100 1 100 1 100 329
Tool Cnb E 1 1000 1 1500 330 For use bV all Crews
Ja nrtor SUDO Iv Storaae E 1 1000 1 2000 331 Stareae al suoahes
S I!-Tn Slore ae E 1 1000 1 1500 331
Imoallon Storaoe I Shaa E 600 1 600 1 600 332
Sma II EqUl pmen! S hop I Storaoe E 600 1 600 1 600 334
F acil~les Ma I nt Shoo I Sto raoe E 600 1 600 1 600 336
SlOna Is Shoo -
S lona I Storaoe 0 200 1 200 1 200 338
S lona I Cabinet T estlna A 200 1 200 1 200 336
Slonal Bench Stock A 200 1 200 1 200 339
S Ion al Tool Cnb E 200 1 200 1 200 339 Could be enclosed bv caOI na
Networill Telecom Satell~e Room E 48 1 48 1 48 340 Sate IIJte Room Could be com b If desl n allows
S ubtota I
CIrCU laMn I Walls I ME P
Totall
86981
116981
Outside Spaces 341
Bulk Stareo s 342
Mulch C 10 x 20 200 1 200 1 200 342 510 vards
Baril C 10 x 20 200 1 200 1 200 342 5 10~rds
o raln Rock C 10 x 20 200 1 200 1 200 342 510vards
Sand C 10 X 20 200 1 200 1 200 342 5 10~rds
Too SOil C 10 X 20 200 1 200 1 200 342 510 vards
Green Wasta C 10 X 20 200 1 200 1 200 342
Cold Patch C 10 x 20 200 1 200 1 200 342
Sand Baa StoraQe C 10 x 20 200 1 200 1 200 342
Lumber Storace C 10 x 20 200 1 200 1 200 342
Cone I Bamcade Storaoe X 800 1 800 1 800 343
N ursery Storaoe X 343 With screened solar cover
Maintenance Yard Storaae X 1 1000 1 1000 343 Fenoe enclosed and hahted
De Cant Area X 1 5000 1 5000 344 ForVaclorlSweenlnnS
SlOnalI llohtlna Yard Storeoe X 1 7500 1 10000 344 Fence enclosed and hahted
Haza rd ou 5 Matena 15 Storaoe E 200 1 200 1 200 345 I n nre~nn bUlldm" for fuel ehs mica I s etc
Halllrdous Malenals Drop-Off X 2500 1 2500 1 2500 346 For Penoolc PubliC Dro.....Off
Dumosters X 400 1 400 2 800 346 30v.:.rd du rri ;,slar recessed
o uld oor Break Area X 400 1 400 1 400 347
Wash Bav C 20 x 50 1000 1 1000 1 1000 348
Wash EqUipment Room E 100 1 100 1 100 350
S ubtota I
Circulation I Walls
Totall
36 2251
413001
Dublm Public Works Department Maintenance Yard
City of Dublin California
DeSign Grttena
Page 2 3
SPJAClE NEEIDS PROGRAM
/5 ~ qCj
Space Program
City of Dublin California
December 4 2007
SPACE NAME
SPACE
STANDARD
REMARKS
Vehicle Parking 351
Aaency Vehicles 351
Lame Vehicles I Equipment X 12 x 40 480 1 480 2 960 351
Medium VehICles I Eourpmenl X 10 x 20 200 11 2200 17 3400 351
Small Veh,c1es I EoulOment X 10 x 10 100 2 200 3 300 351
Pool Cars X 10 x 10 100 2 200 3 300 351
Tern ooraN T ra lIers X 12 x 40 480 2 960 3 1440 351 Near Administration BUlldlnQ
DecommiSSioned Vehicle St X 10 x 20 200 4 800 6 1200 352
Personal Vehicles I 352
Employee Parkl no X 10 x 20 200 38 7600 63 12600 352
EOC Par1<,no X 10 x 20 200 40 8000 40 8000 352
Vlsrtor Par1<lno X 10 x 20 200 10 2000 10 2000 352
M otorl;\lCle Pa r1<.nq X 5 x 10 50 4 200 7 350 353
Subtotal
Circulation I Wails
Tolall
452BOI
SUMMARY
Build
I no Requ lremen ts
Administration Spaces 5636 5971
Eoe 2570 2570
Crew Soaces 2128 2128
Shop Spaces 8698 11698
DeSign Criteria
Page 2 4
Dublin Public Works Department Maintenance Yard
City of Dublin Califorma
(b r:{l1
CCHAl?rlE~:3 FUNCC1~(Q)NAlIRIEQU~lRlEMIENl51
/11 C1<1
1& 0;/'11
IFU NC1~ONAl RIEQU ~RIEMIEN1S
ADMINISTRATION SPACES
FUNCTIONAL RELATIONSHIPS
The relationships between the vanous functional areas Within this section are shown below The design
should accommodate these relationships m order to maximize operational efficiency This diagram IS not
meant to be a floor plan only a representational relationship diagram
Semor CIvil
Engineer
Assoc CIvil
Engmeer
Semor Admin
Analyst
Maintenance
Supenntenden
Maintenance
Foremen
Mamtenance
Supervisor
r-===
~
~
EmployeeNlsltor
Parkmg
Restrooms
r........=='iIr=====
I II
~ Recepllon I I Lobby
Counter I
I I
1I::;;d~_c=m~,JII:=I==:lIlC:::Ic::::::IIc:::::::III.JI
I = = = = =1 I .... .... F7l"e .... ....1
~ ~I A~a I
I Clerk ~ !. .... = = = =>
I ~ r R~o-;:ds= ~
I I Storage
"'__II;;;lII~~o=::::Ic::::::Ic:::::Ioc::::::lc::::::loJ
I c::::::I c::::::II c::::::I c::::::II c::::::I I c:::II -===II -. c::::= IC:II
~ I
I Mamtenance ~ I Inspector I
I Workstations I I Workstations I
I ~ I I
EOC-
Supplies
Storage
Extra
Offi ces
Traffic
Engineer
Plan Room I
Resource
Library
SHOP
SPACES
CREW
SPACES
...._-.a.......
Vehicle Parkmg
FUNCTIONAL AREA MODULES
Each functional area Within this section has been mdlvldually defined as a module Each module has
Information regarding the function of the space relationships to other areas cntlcal dimenSions (If any)
equipment/furnishings and finishes Technical conSiderations for ventilation mechanical plumbing and
electncal are also defined A detailed eqUIpment list for each space wIll be developed dUring design
Dublin Public Works Department Maintenance Yard
Clty of Dublin California
Design Cntena
Page 3 1
/4 ~ CJ 1
fUNcr~ONAl RIEQU~IRIEMIEN1S
Lobby / Waiting Area
(Administration Spaces)
Function
o FacIlity lobby
Relationship to Other Areas
o Adjacent to Reception
o Near VIsitor Parking
o Convenient access to/from Restrooms
Com ments/CharactenstlC$
o Furnlshmgs Reception furniture for 6 people display case City wall map and restncted access phone
o Utility requirements Grounded electncal convenience outlets telephone Intercom/pagmg system air
conditioned and heated
o Wmdow to outside
o Floor Finishes ResIlient tile or carpet
o Wall Finishes Painted gypsum board
o Ceiling FInishes Acoustical tile ceiling
o Llghtmg Parabolic fluorescent fixtures 50 fc
Reception Counter
(Administration Spaces)
Function
o Area for vISitor reception
Relationship to Other Areas
o Adjacent to LobbylWaltmg Area
o Near CopylWork Room and File Storage
o Convenient access to/from Restrooms
Comments/Charactenstlcs
o Furnishings Com puter workstation wI reception counter & chair 10 LF of shelving 4 file drawers
phone computer and pnnter
o Utility reqUirements Grounded electncal convenience outlets telephone Intercom/paging system
condUit for network computer system air conditioned and heated
o Floor Finishes Carpel
o Wall Finishes Modular partitions
o Ceiling Flnrshes Acoustlcalllle ceiling
o Llghtmg Parabolic fluorescent fixtures 50 fc
DeSign Cntena
Page 3 2
Dublin Public Works Department Maintenance Yard
City of Dublin California
~~i~
IFU NCr~ONAl RIEQU ~RlEMIENr~
Clerk
(AdminIstratIon Spaces)
Function
o Open office for the Administrative Clerk
Relationship 10 Other Areas
o Adjacent to Lobby/Waltlng Area
o Near Copy/Work Room and File Storage
o Convenient access to/from Restrooms
Comm ents/Charactenstlcs
o Furnishings Computer workstation & chair 10 LF of shelving 4 file drawers phone computer and
printer
o Utlllty reqUirements Grounded electrical convenience oullets telephone Intercorn/paglng system
conduit for network computer system air conditioned and heated
o Floor Finishes Carpet
o Wall Finishes Modular partitions
o Ceiling FInishes Acoustical tile ceiling
o Llghtmg Parabolic fluorescent fixtures 50 fc
Dublin Public Works Department Maintenance Yard
CIty of Dublin California
DeSign Cnterla
Page 3 3
!FLY INlC1r~ONAllRlE QlD ~ IRE M IE INl1rS
c;l/1 q:j
Copy I Pnnter I Work Room
(AdminIstratIOn Spaces)
12 -0
r f ~ BUIlt-in M,lIworl<
~ -~--
/
I
I
0
~ I
I CJ
I
L Copier Pnnter
Function
o Enclosed area for copier printer fax machme office supply storage and work surfaces
Relationship to Other Areas
o Adjacent to or near the Emergency Operations Center
o Centrally located within administrative office area
o Convenient access to/from Crew Areas
Comments/Character! StlCS
o Furnishings 24 LF of counter work surface lockable cabmetry central printer/copier fax machine
oversized copier and phone
o Utility Requirements Grounded electncal convemence oullets telephone Intercom/paging system
condUit for network computer system air conditioned and heated
o Floor FInishes ReSIlient f100nng
o Wall Finishes Painted gypsum board
o Ceiling FInishes Acoustical tile ceiling
o Llghtmg Parabolic fluorescent fixtures 70 fc
DeSIgn Criteria
Page 3 4
Dublin Public Works Department Mamtenance Yard
City of Dublin Cahforma
&0; ;f q1
IFlUNC1~ONAl RIEQlU~RIEMIENrS
File Area
(AdminIstratIon Spaces)
FunctIon
<) Open office area for actlve file storage
Relationship to Other Areas
<) Near Reception Administrative Offices and CopylWork Room
Comments/Characteristics
<) Furnishings Lateral file cabinets
<) Utility ReqUirements Grounded electrical convenience outlets air conditioned and heated
<) Floor Finishes Resilient flooring
<) Wall Finishes Painted gypsum board
<) Ceiling Finishes Acoustical tile ceiling
<) Lighting Parabolic fluorescent fixtures 20 fc
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Cntena
Page 3 5
~3~ 1'1
fUNCl~(Q)NAl RlEQlU~RIEMIENrS
Small Conference Room
(AdminIstratIon Spaces)
r
17 J
---
'i'
....
rJ 01 OJ CD ',,--
oIQQQJ~
Marker
Board
Function
o Enclosed area for frequent staff meetings and training sessions comfortably accommodating up to 10
people
Relationship to Other Areas
o Centrally located within administrative office area
o Convenient access to/from Crew Areas
Comments/Characten StlCS
o Furnishings Multl-configurable table & chairs for up to 10 people pull down projection screens marker
boards and phones
o Utility requirements Grounded electrical convenience outlets telephone mtercom/paglng system
teleVISion cable condUit for network computer system air conditioned and heated
o Floor Finishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acoustical tile ceiling
o lighting Parabolic fluorescent fixtures 50 fc and dimmable Incandescent down lights
o Acoustically separated from surrounding spaces
DesIgn Crltena
Page 3 6
Dublin Public Works Department Maintenance Yard
City of Dublin California
;14 ~ qq
FUNCC1~ONAlIRIEQUH~[EM[ENl5l
Large Conference Room
(AdminIstratIon Spaces)
22 -6 r
l'
--
~[5JrJrCJ)(EJr] ~
<? \0 0
;! to D
, OO~~
'- Marker
B"ard C ollferellce
Table
Function
" Enclosed area for EOC Media bnefings staff meetings & training sessions comfortably
accommodating up to 20 people
Relationship to Other Areas
" Centrally located within administrative office area
" Convenient access to/from lobby
Comments/Charactenstlcs
" Furnishings Multl-configurable table & chairs for up to 20 people pull-down projection screens marker
boards and phones
" Utility requirements Grounded electncal convenience outlets telephone, Intercom/paging system,
televIsion cable conduit for network computer system air conditioned and heated
o Floor FInishes Carpet
o Wall Finishes Painted gypsum board
o Cellmg Finishes Aooustlcal tile ceiling
o Llghtmg Parabolic fluorescent fixtures 50 fc and dimmable Incandescent or fluorescent down lights
o Acoustically separated from surrounding spaces
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSIgn Cntena
Page 3 7
IFUNC1~(QNAl RIEQU~RlEMIENrS
~6~qq
Vending I Kitchen
(AdministratIon Spaces)
f
16.0
Vending MachInes (2) I
R efig eralors (2)
D
CJ
~
~~~'~
~~I
)
<(
~
N
..
'---- Oou b Ie
Smk
Function
o Enclosed area for minor food preparation and space for vendor maintained vending machines
Relationship to Other Areas
o Convenient access to EOC and Crew room
o Centrally located within administrative spaces area
Comm ents/Charactenstlcs
o Furnishings Counter/cabinet With double sink/disposal, full-size refngerator reSidential oven residential
dishwasher 2 microwaves coffee maker and 2 vendor proVided vending machines
o Ulillty ReqUirements Grounded electrical convenience outlets Intercom/paging system air conditioned
and heated
o Floor Finishes ReSilient floonng
o Wall FInishes Painted gypsum board
o Ceiling FInishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 30 fc
DeSign Crltena
Page 3 8
Dublin Pubhc Works Department Maintenance Yard
CIty of Dublin California
db ~ '1q
IFlJJNC1~ONAl ~1EQU~RIEMIEN1S
Traffic Engineer
(Administration Spaces)
r
I " I
"- She Ivlng
12 -0
"-
~
Marko r Board -...,
,
"
q
~
o
(]]~D
~ Credenza
Desk
Function
" Enclosed pnvate office for the Traffic Engineer
Relationship to Other Areas
" Near Inspectors
Comm ents/Characten sbcs
" Furnishings Computer workstation wI chair credenza 2 Side chairs 4 traffic momtors 10 LF of
shelving 4 file drawers small conference table and chairs phone and computer
" Utility requirements Grounded electncal convenience outlets telephone Intercom/paging system
condUIt for network computer system air conditioned and heated
" Floor FInishes Carpet
" Wall FInishes Painted gypsum board
o Ceiling FInishes Acoustical trle ceIling
" Lighting Parabolic fluorescent fixtures 50 fc
Dubhn Public Works Department Maintenance Yard
City of Dublin Cahfornla
Design Cntena
Page 3 9
IFUNcr~ONAl R.IEQU~IRIEMlENrS
c21 ~ qq
Maintenance Superintendent
(Administration Spaces)
f
I
16~
,
',- Shelving
\
\
'~
q
~
0)
(rr
(~~/)
,'y) y
Confere no e
Table
ITJ~
/"'
J)
\
\
\
'-- Workstaflon
,- Marke, Board
Cred" nza
Function
o Enclosed private office for the Mamtenance Superintendent
Relationship to Other Areas
o Adjacent to Maintenance Supervisor
Comments/Characteristics
o Furnishings Desk chal r 2 side chaIrs credenza 10 LF of shelving 4 file drawers small conference
table and chairs marker board phone and computer
o Utility RequIrements Grounded eleclncal convenience outlets telephone intercom/paging system
conduit for network computer system air conditioned and heated
o Floor FInishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
Design Cnterla
Page 3 10
Dublin Public Works Department MaIntenance Yard
City of Dublin California
~ ~ tjq
IFlUJNCCr~ONAl RIEQlUJ~REM!ENrS
Semor AdminIstratIve Analyst
(AdmInistratIOn Spaces)
f
12,(>
~
9'
~
~
ID 0 1
4!0 DI
\
Crede nza
Desk
Function
o Enclosed pnvate office for the Senior Administrative Analyst
Relationship to Other Areas
o Adjacent to Clerk
Comments/Charactensllcs
o Furnishings Computer workstation wf chair 2 side chairs credenza 10 LF of shelving 4 file drawers
small conference table and chairs phone and computer
o Utility requirements Grounded electrical convenience outlets telephone Intercomfpaglng system
conduit for network computer system air condllloned and heated
o Floor Finishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acousllcalllle ceiling
o Lighting Paraboilc fluorescent fixtures 50 fc
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Cnterla
Page 3 11
FUNcr~ONAl RlEQU~RIEMlENrS
cJC? 1 qq
Senior Civil Engineer
(Administration Spaces)
See Traffic Engineer for Graphic
Funcllon
I) Enclosed pnvate office for the Senior Civil Engineer
RelatIonship to Other Areas
I) Adjacent to Associate CIvil Engineer
Comments/CharactenstlCS
I) Furnlshmgs Desk chaIr 2 sIde chairs credenza 10 LF of shelVing 4 file drawers small conference
table and chairs marker board phone and computer
I) Utility Requirements Grounded electrical convenience ou~ets telephone Intercom/pagmg system
condUlt for network computer system air conditioned and heated
I) Floor FInishes Carpet
I) Wall Fmlshes Painted gypsum board
I) Ceiling Finishes Acoustical tile ceiling
I) Lighting Parabolic fluorescent fixtures 50 fc
Mamtenance Supervisor
(Administration Spaces)
See Senior Administrative Analyst for Graphic
Function
I) Enclosed private office for the Mamtenance Supervisor
Relationship to Other Areas
I) Adjacent to Maintenance Superintendent
Comments/Characteristics
I) Furnishings Desk chair 2 side chairs credenza shelVing 4 file drawers marker board phone and
computer
I) Ullhty ReqUIrements Grounded electncal convenience outlets telephone Intercom/paging system
condUit for network computer system air conditioned and heated
I) Floor FInishes Carpet
I) Wall Finishes Painted gypsum board
I) Ceiling FInishes Acousllcallile ceiling
I) Lighting Parabolic fluorescent fixtures 50 fc
Design Criteria
Page 3 12
Dublin Public Works Department Maintenance Yard
City of Dublin California
3o~qq
IFlUlNC1~ONAlIRIEQlUl~RrEMrEN1S
Extra Office
(Admlnlstratton Spaces)
See Traffic Engineer for Graphic
Function
(> Enclosed pnvate office for future use
Relationship to Other Areas
(> Adjacent to other offices
Com m ents/Charactenstlcs
(> Furnishings Desk chair 2 side chairs credenza shelving 4 file drawers phone and computer
(> Utility Requirements Grounded electncal convenience outlets telephone intercom/paging system
conduit for network computer system air conditioned and heated
(> Floor Finishes Carpet
(> Wall Finishes Painted gypsum board
(> Ceiling Finishes Acoustical tile ceiling
(> Lighting Parabolic fluorescent fixtures 50 fc
Associate CIvil Engineer
(AdminIstratIon Spaces)
See Traffic Engineer for Graphic
Function
(> Enclosed pnvate office for the Associate CIvil Engineer
Relationship to Other Areas
(> Adjacent to Senior CIVil Engineer
Comments/Charactenstlcs
(> Furnishings Desk chair 2 side chairs credenza shelving 4 file drawers marker board phone and
computer
(> Utility requirements Grounded electncal convenience outlets telephone Intercom/paging system
condUit for network computer system air conditioned and heated
o Floor Finishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acoustical tile ceiling
(> Lighting Parabolic fluorescent fixtures 50 fc
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Crltena
Page 313
fFUINICr~OINlAl R.IEQU~RIEMlElNlrS
~, 1 q~
Mamtenance Foremen
(AdministratIOn Spaces)
1
140
1
r Shelving
"<---
1
I , I I I
/
~
\~V -'"
/ /,)
\( ,
/' ............(/ '->/ /' I ./'
^ "":' 00
'-/
.--- Workstation
q
!:!
"
Function
o Enclosed shared office for two Maintenance Foremen
Relationship to Other Areas
o Adjacent to Maintenance Supervisor
Comments/Charactenstlcs
o Furnishings (2) Computer wor1<.statlons wI chairs shelving 8 file drawers phones and computer
o Utility requirements Grounded electncal convenience outlets telephone Intercom/paglng system
condUit for networ1<. computer system air conditioned and heated
o Floor FInishes Carpet
o Wall FInishes Painted gypsurn board
o Ceiling Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
Design Cntena
Page 314
Dublin Public Works Department Mamtenance Yard
City of Dublin California
2P< ~ 91
fUNC1~(Q)NAl RrEQ\UJ~RrEMrEN"S
Mamtenance Workstation
(Administration Spaces)
",.
/" Y
.~~
o
"
Worhtat,on
Function
o Workstation area for the Maintenance Crew
Relationship to Other Areas
o Adjacent to Crew Room
Comments/Charactenstlcs
o Furnishings Computer workstations with chair 4 file drawers phone and computer
o Utility requirements Grounded electncal convenience outlets telephone intercom/paging system
conduit for network computer system air conditioned and heated
o Floor Finishes Carpet
o Wall FInishes Modular partJtlons
o Ceiling Finishes Acoustical tile ceiling
o Llghtmg Parabolic fluorescent fixtures 50 fc
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Criteria
Page 3 15
fUNC1~(QNAl RIE(QU~RIEMIENrS
33 ~qq
I nspector WorkstatIon
(AdmInistratIon Spaces)
See Maintenance Workstation for Graphic
Function
o Workstation area for the Inspectors
Relatlonshlp to Other Areas
o Adjacent to Traffic Engmeer
Com ments/Charactenstlcs
o Furnishings Computer workstation With chair 4 file drawers phone and computer
o Utility requirements Grounded electncal convenience outlets telephone Intercom/paging system
condUit for network computer system air condItioned and heated
o Floor Finishes Carpet
o Warl F,nishes Modular partitions
o Ceiling Finishes Acoustical tile ceiling
o lighting Parabolic fluorescent fixtures 50 fc
o PrOVide plan rack and draWing storage for each workstation
Men's Restroom
(AdminIstratIOn Spaces)
Function
o Restroom faCIlities for male administration staff / public
Relatlonshlp to Other Areas
o Convenient access to/from Administration areas
Comments/Charactenstlcs
o Furnishings PrOVide tOilets unnals wash Sinks paper towel dispensers and other fixtures as reqUired
by code
o Utility reqUirements Grounded electrical convenience outlets Intercom/paging system air conditioned
ventilated and heated
o Floor Finishes Ceramic tile
o Wall FInishes Ceramic tile on gypsum board and/or concrete block
o Ceiling Finishes Acoustical tile or plaster ceiling
o Lighting Parabolic fluorescent fixtures 30 fc
DeSIgn Cntena
Page 316
Dublin Public Works Department Maintenance Yard
City of Dublin California
3tf 0} q1
IF LD NCr~ONAl RIE QLD ~ RIE M E N1S
Women's Restroom
(AdmInistratIon Spaces)
Function
g Restroom facIlities for female administration staff / public
Relationship to Other Areas
g Convenient access to/from Administration areas
Comments/Charactenstlcs
(> Furnishings Provide tOilets wash Sinks paper towel dispensers and other fixtures as reqUl red by
code
g Utility requirements Grounded electrical convenience outlets Intercom/paging system air conditioned
venblated and heated
g Floor FInishes Ceramic tile
(> Wall Finishes CeramiC tile on gypsum board and/or concrete block
g Ceiling Finishes Acoustical tile or plaster ceiling
(> Lighting Parabolic fluorescent fixtures 30 fc
Records Storage
(Administration Spaces)
Function
(> Storage area for records file storage
Relationship to Other Areas
(> Could be located on mezzanine
Com ments/Charactensbcs
(> Furnishings ShelVing
(> Utility Requirements Grounded electrical convenience outlets
(> Floor Finishes Exposed structure
(> Wall Fmlshes Exposed structure
(> Ceiling Finishes Exposed structure
(> Lighting Parabolic fluorescent fixtures 20 fc
Dublin Public Works Department Mamtenance Yard
City of Dublm California
Design Cntena
Page 3 17
36~qq
f l)J NC1~O NAl IRE au ~ IRE M IE N1rS
Plan Room I Resource Library
(AdmInistration Spaces)
16 -0
f f
),-
- __ Bookshelves
Layout
Tabla
-
9 -
:!:
-
--........
\ I , I -
,
'-- Plottar I Scan ner
Function
o Enclosed area for plans and reference matenals
Relationship to Other Areas
o Adjacent to CopylWork Room
o Centrally located within administrative office area
o Convenient access to/from Crew Areas
Comments/CharactenstlCS
o Furnlshmgs Conference table w/6 chairs shelving plotter / scanner layout table and phone
o Utility Requirements Grounded electncal convenience outlets telephone Intercom/pagmg system
conduit for network computer system air conditioned and heated
o Floor Finishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
DeSign Cntena
Page 318
Dublin Public Works Department Mamtenance Yard
City of Dublin California
36 ;fq1
IFUNC1~ONAl RIEQU~RIEMIEN1S
Network I Telecomm Room
(AdminIstratIon Spaces)
WorkstatIon -
r
20.()
r ShelvIng
r
'><--
, ~
<~/
CJ
~
Netwo'" Racl<s
q
::!
CJ~---
S ecurlly E qu Ipm e nl
T "I"phone Eq ulpment
Function
o Enclosed separately secured area for network server and telephone system equipment
Relationship to Other Areas
o Centrally located to minimiZe wiring distances
Comments/CharactenstlCs
o Furnishings Workstation wI chair 20 LF of shelving 2 file drawers phone computer server equipment
telephone system equipment and equipment racks
o Utility Requirements Grounded electncal convenience outlets telephone Intercom/paging system
condUit for network computer system air condllJoned (separately controlled Unit) and heated
o Floor FInishes ResIlient f100nng
o Wall Finishes Painted gypsum board and/or concrete block
o Ceding Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
o Room must be secure (Including ceiling) from other areas and backed up with uninterrupted power
supply
o Computenzed building systems could also be located In thiS space
o Should be located on an outSide wall
Dublin Public Works Department Maintenance Yard
City of Dublin Cahforma
Design Cntena
Page 3 19
IFU NCCr~ ONAllR1E QU ~ RIEM IE NTS
S7~qq
EOC
FUNCTIONAL RELATIONSHIPS
The relationships between the vanous functional areas within this section are shown below The design
should accommodate these relationships In order to maXimize operational efficiency This diagram IS not
meant to be a floor plan only a representational relationship diagram
EmployeeNlsltor
Parking
EOC Director
Semor CIVil
Engineer
r................'iIj............=
~ ~ i
~ Reception ~ ~ Lobby
Counter n
I u ~
Assoc CIVil
Engineer
II:::::Ic::::::I<-=:::::::IIc::::::IIc::::::llJlC:::::Ic::::::II-==lIIlil;;;;;ilI_d
Maintenance
Foremen
I -- .... .... .... ....~ I"" .... FJe .... .... I
I I I Area I
I Clerk I b .... .... .... .... ....
I I r ....R;;;oTds.... ~
~ I Storage
-===lI~~iIl=iiIc:::::IIl~~==:II-==:Ic::::::llJI
~""""=""""I""""===
~ I
~ Maintenance ~ I Inspector I
~ Workstations ~ I Workstations I
I ~ I I
I!................. ....
EOC-
Supplies
Storage
Semor Admin
Analyst
Maintenance
Supenntenden
MaIntenance
SupervIsor
Extra
Offices
TraffiC
Engineer
Plan Room I
Resource
Library
SHOP
SPACES
CREW
SPACES
r............
I
I
- ~ ~"'-I
VehIcle Parking
FUNCTIONAL AREA MODULES
Each functional area WIthin thiS secuon has been Individually defined as a module Each module has
Informallon regarding the funcbon of the space relationships to other areas cnbcal dimenSions (If any)
equlpmenUfumrshlngs and finishes Technical conSiderations for venlllallon mechanical plumbing and
electncal are also defined A detailed equipment list for each space Will be developed dunng deSign
DeSign Cnlena
Page 3 20
Dublin Public Works Department Maintenance Yard
City of Dublin California
c3810Q
fUNCr~ONAl RlEQUHRlEMEN1S
Additional Lobby for EOC
(EOC)
Functton
o MedIa gathenng area
Relationship to Other Areas
o Part of FaCIlity Lobby
o Near VIsitor Parking
o Convenient access to/from Reslrooms
Commenls/Charactensllcs
o Furnishings Additional seating
o Utility reqUirements Grounded electrical convenience outlets telephone Intercom/paging system air
conditioned and heated
o Window to outside
o Floor Finishes ReSIlient tile or carpet
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
EOC Director
(EOC)
See Traffic Engmeer for GraphiC
Funcllon
o Enclosed pnvate office for the EGC Director
Relationship to Other Areas
o Adjacent to Emergency Operations Center
Comm ents/Charactenstlcs
o Furnishings Desk chair 2 side chairs credenza 10 LF of shelVing 4 file drawers small conference
table and chairs marker board phone and computer
o Utility ReqUirements Grounded electncal convenience outlets telephone Intercom/paging system
condUit for network computer system air conditioned and heated
o Floor FInishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling FInishes Acoustical tile ceiling
o Lighting ParaboliC fluorescent fixtures 50 fc
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Cnterla
Page 3 21
fUNcr~ONAl RIEQU~REMIENTS
JJq <:( qq
Emergency Operations Center (EOC)
~[ EJ:~~~EJ OIR~~~OR
. OFFICE
L:J (
~I
; >,-- ~/),
: ~:~~~Q VRACES
ROOM
c::J c:::J
r-I
'--
0 SUPPLIES
::! r Shelvmg ROOM
UnIts
I
i 24 -0 L 20 -0
"
44-0
(EOC)
~r'
~
o 0
~ ~
\
~l
J.
L
,
Function
<> Enclosed area for EGC personnel workstations conference! gathenng area to accommodate 30
people
Relationship to Other Areas
(> Centrally located
(> Adjacent to Conference Rooms
(> Adjacent to Vending / Kitchen
CommentsfCharactenstlcs
o Furnishings Multl-configurable table & chairs for up to 30 people 10 hardwlred workstations pull-down
projection screens marker boards and phones
<> Utility reqUirements Grounded electrical convenience outlets telephone Intercom/pagmg system
teleVISion cable condUit for network computer system redundant condUit to roof for satellite phone f
Internet air condllloned and heated
<> Floor Flntshes Carpet
(> Wall Fmlshes Pamted gypsum board acoustic wall panels
<> Ceiling Fmlshes Acoustical tile ceiling
<> Llghling ParabolIc fluorescent fixtures 50 fc and dimmable mcandescent down-lights
<> Acoustically separated from surrounding spaces
<> Charging station for radiOS
<> Should have separate access
DeSign Cntena
Page 3 22
Dublin Public Works Department Maintenance Yard
City of Dublm CalifornIa
40 1q~
f'UNCr~ONAl RlEQU~RlEMIENrS
EOC RACES Room
(cDC)
See Emergency Operations Center for graphic
Function
o Enclosed area for radiOs that may be used dunng emergency operations
Relationship to Other Areas
o Adjacent to EOC
CommentslCharactenstlcs
o Furmshlngs Shelving workstation
o Utility requirements Grounded electncal convenience outlets air conditioned and heated
o Floor Finishes Resilient f100nng
o Wall Finishes Painted gypsum board
o Ceiling FInishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
EOC - Supplies Room (EDC)
See Emergency Operations Center for graphic
Funcllon
o Enclosed secure storage for miscellaneous Items that may be used dunng emergency operations
Relationship to Other Areas
o Adjacent to EOC
Comments/Charactenstlcs
o Furnishings ShelVing bulk racks
o Utility reqUirements Grounded electncal convenience outlets air conditioned and heated
o Floor Finishes Resilient f100nng
o Wall Finishes Painted gypsum board
o Ceiling Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 20 fc
Dubhn Public Works Department Maintenance Yard
City of Dublin California
DeSign Crltena
Page 3 23
L1/~q1
fllJ NCr~ ONAllR1E QU ~ RIEM IE NfS
EOC Bunk Room
(EOC)
See Emergency Operations Center for graphic
Function
o Enclosed area for bunk beds that may be used dunng emergency operations
Relationship to Other Areas
o Adjacent to EOC room
Comments/Charactenstlcs
o Furnishings (4) Bunk beds desk and chair
o Utility requirements Grounded electncal convenience outlets air conditioned and heated
o Floor FInishes Carpet
o Wall Finishes Painted gypsum board
o Ceiling finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 30 fc
Design Cntena
Page 3 24
Dublin Public Works Department Maintenance Yard
City of Dublin California
/-;02 ~q1
f'U NCr~ONAl RIEQU ~RlEMENrS
CREW SPACES
FUNCTIONAL RELATIONSHIPS
The relattonshlps between the vanous functional areas within this section are shown below :f"he design
should accommodate these relationships In order to maximize operational efficiency This dtagram IS not
meant to be a floor plan only a representational relationship diagram
Vehicle
Parkmg
~
~ SHOP ADMI N ISTRA TION
. SPACES SPACES
Men's
Restroom I
Locker I
Showers
r===...."il
. Mud
I I Room B<:==<>
= = =.... _.II
I CREW SPACES
I
~ Women's
I Restroom I
I Locker I
I Showers
I
I Custodial
I Room
I
-=:::I -===:I ==:II ~
FUNCTIONAL AREA MODULES
Each functional area within thiS secuon has been individually defined as a module Each module has
Information regarding the funchon of the space relationships to other areas cnbcal dimensions (If any)
equipment/furnishings and finishes Technical conSiderations for venblabon mechanical plumbing and
electncal are also defined A detailed equipment list for each space will be developed dunng design
Dublin Public Works Department Maintenance Yard
CIty of Dublin California
Design Cntena
Page 3 25
q3~ q q
f'UNCr~ONAl RIEQU~RIEMIEIi\IITS
Mud Room
(Crew Spaces)
Function
o Alcove area for removal of muddy/gnmy apparel
Relationship to Other Areas
o Adjacent to Restroom / Lockers / Showers
Comments/Charactenstlcs
o Furnishings Benches and open lockers
o Utility Requirements Grounded electncal convenience outlets air conditioned and heated
o Floor Finishes Ceramic tile or sealed concrete
o Wall Finishes CeramiC tile on gypsum board and/or concrete block
o Ceiling Finishes Acoustical tile or plaster ceiling
o Lighting Parabolic fluorescent fixtures 50 fc
o Locker tops to be sloped to prevent clutter
Men's Restroom / Lockers { Shower
(Crew Spaces)
Function
o Restroom locker and shower facIlities for male crew members
Relationship to Other Areas
o Adjacent to Mud Room
o Convenient access to/from crew shops
Comments/Charaetenstlcs
o Furnishings Provide tOilets unnals wash sinks 2 Individual shower stalls w/ changing area 40 full-
length lockers paper towel dispensers and other fixtures as required by code
o Utility requirements Grounded electrical convenience outlets Intercom/paging system air conditioned
ventilated and heated
o Floor Finishes CeramiC tile
o Wall Finishes Ceramic tile on gypsum board and/or concrete block
o Ceiling Finishes Acoustical tile or plaster ceiling
o Lighting Parabolic fluorescent fixtures 30 fc
o Locker lops to be sloped to prevent clutter
DeSign Criteria
Page 3 26
Dublin Public Works Department Maintenance Yard
City of Dublin California
1ft{ ~ q1
f'UNCr~ONAlIRIEQU~RIEMIENrS
Women's Restroom I Lockers I Shower
(Crew Spaces)
Function
o Restroom locker and shower facIlities for female crew members
Relationship to Other Areas
o Adjacent to Mud Room
o Convenient access to/from crew shops
Comments/Charactenstlcs
o Furnishings Provide tOilets wash sinks 2 Individual shower stalls w/ charging area 10 full length
lockers paper towel dispensers and olher fixtures as required by code
o Utility requirements Grounded electncal convenience outlets intercom/paging system air conditioned
ventilated and heated
o Floor FInishes Ceramic tile
o Wall FInishes Ceramic tile on gypsum board and/or concrete block
o Ceiling Finishes Acoustical tile or plaster ceiling
o Lighting Parabolic fluorescent fixtures 30 fc
o Locker tops to be sloped 10 prevent clutter
Custodial Room
(Crew Spaces)
Function
o Enclosed area for storage of Janltonal supplies and cleaning equipment
Relationship to Other Areas
o Adjacent to Restrooms
Com mentslCharactenstlcs
o Furnishings 'Shelving Unit and floor sink
o UtilIty Requirements Grounded electncal convenience outlets ventilated and heated
o Floor Finishes Ceramic tile or sealed concrete
o Wall Finishes Ceramic tile on gypsum board and/or concrete block
o Ceiling FInishes Acoustical tile ceiling where appropnate
o Lighting Parabolic fluorescent fixtures 30 fc
o May need a second room depending on deSign
Dublin Public Works Department Maintenance Yard
CIty of Dublin California
DeSign Criteria
Page 3 27
4S~ qq
f'UNCr~ONAl RlEQU~RIEMIENrS
SHOP SPACES
FUNCTIONAL RELATIONSHIPS
The relationships between the vanous functional areas within this section are shown below The design
should accommodate these relationships In order to maximize operational efficiency This diagram IS not
meant to be a floor plan only a representational relal10nshlp diagram
ADMINISTRATION CREW
SPACES SPACES
r...o=...o....'i1 Network I Tool r =v;h I cle = 'iI
Jamtor Supply I Ice I Water I Telecom Crib ~ Equipment I
Storage ~ Station I Room (For All Crews) ~ Storage ~
t =...o=1...o=J t ==l...o=J
Circulation
Tool Signal Shop
Crib :::=c> r SIg;.al ~
Irrigation Small FaCIlities Sign
I Cabinet Storage I EqUIpment Maintenance Storage
...o"""".... = A Shop Shop I Shop I
Signal :::=c> r Be';ch .,. Storage Storage
Storage ~ Stock I
_ -=:I ~ -= Ai
~
~
VEHICLE ACCESS
FUNCTIONAL AREA MODULES
Each functional area Within thiS seclion has been Individually defined as a module Each module has
information regarding the function of the space relatlonshlps to other areas cnbcal dimenSions (If any)
eqUIpment/furnishings and finishes Technical conSiderations for venti lab on mechanical plumbing and
electncal are also defined A detailed equlpmenllist for each space Will be developed dunng design
Design Crltena
Page 3 28
Dublin Public Works Department Maintenance Yard
City of Dublin California
Lt6 1- qq
rFUNC1~ONAl R[E(Q2U~IR[EMIENrS
Vehicle I Equipment Storage
(Shop Spaces)
Function
o Storage for vehicles and equipment
Relabonshlp to Other Areas
o Near maintenance bay
Comments/Characteristics
o Furnlshmgs None
o Utility requirements Grounded electncal convenience outlets, ventilated and heated
o Floor FInishes SOIl grease and water resistant concrete with clear epoxy sealer Provide slip
resistant finish
o Wall Finishes SOil and grease resistant Epoxy pamted to 8 feet AFF
o Ceiling FInishes Painted exposed structure
o Llghllng Metal halide or fluorescent 30 fc
o Provide guardrails along walls or hard surface wainscot to protect walls from vehicles
Ice I Water Station
(Shop Spaces)
Function
o Alcove area for water cooler preparation
Relationship to Other Areas
o Convenient access to/from Shop Spaces
Comments/Characteristics
o Furnishings Ice machine and water dispenser
o Utility Requirements Grounded electncal convenience outlets ventilated and heated
o Floor FInishes SOil grease and water resistant concrete With clear epoxy sealer PrOVide slip
resistant finish
o Wall Finishes SOil and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Fmlshes Painted exposed structure
o Llghtmg Parabolic fluorescent fixtures 50 fc
Dubhn Public Works Department Maintenance Yard
City of Dublin California
DeSign Crltena
Page 3 29
1/1 ~ qq
FU NC1~ONAl fRIE au ~ fRlE M rE N1S
Tool Cnb
(Shop Spaces)
Function
o Secured enclosed area for storage of hand tools and eqUipment for use by all crews
RelationshIp to Other Areas
o Adjacent to Vehicle/Equipment storage
Comments/Characteristics
o Furnlshmgs Shelving and storage cabinets
o Utility requirements Grounded electncal convenience outlets ventilated and heated
o Floor FInishes 5011 grease and water resistant concrete With clear epoxy sealer Provide slip
resistant finish
o Wall Finishes 5011 and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Finishes Painted exposed structure
o Lighting Metal halide or fluorescent fixtures 20 Fc
Design Criteria
Page 3 30
Dublin Public Works Department MaIntenance Yard
City of Dublin California
I1g 1 q~
fU ~cr~O~Al RIEQU ~REM[EN1S
Jamtor Supply Storage
(Shop Spaces)
Function
o Enclosed area for storage of Janltonal supplies and cleaning equipment
RelationshIp to Other Areas
o Convenient access for Crew
Comments/Characteristics
o Furnishings Shelving umts pallet racks
o Utility ReqUirements Grounded electncal convenience outlets ventilated and heated
o Floor Finishes SOIl grease and water resistant concrete with clear epoxy sealer Provide slip
reslstant finish
o Wall Finishes SOil and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Finishes Painted exposed structure
o Lighting Metal halide or fluorescent fixtures 20 fc
Sign Storage
(Shop Spaces)
Function
o Enclosed storage area for street and traffic signs
Relationship to Other Areas
o Convenient access to/from Shop Spaces
Comments/Charactenstlcs
o Furnishings Sign racks
o Utility requirements Grounded electncal convenience outlets ventilated and heated
o Floor FInishes SOil grease and water resistant concrete wIth clear epoxy sealer Provide slip
resistant finish
o Wall Finishes SOil and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Finishes Painted exposed structure
o Lighting Metal halide or fluorescent 20 fc
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Cntena
Page 3 31
41 '1 qq
FUNcr~<ONAl RIEQU~RIEMIENrS
Irrigation Storage I Shop
(Shop Spaces)
l'
30 -o~
v- Shelving
Bulk Racks
r
dJ
3J
o
Flammable
Malerlal s
Cabmet
~ Workbench
/ wllh Vise
Buffer I Grinder
[QJ ~
~ Onlj Press
[0
___ Storage
Cabmet
<>
<>
..
H and Wash!
Eye Wash
StatIon
L^J
~~ J\,-
Function
o DeSignated space for the fabrication and storage of Irrrgatlon components
Relationship to Other Areas
., Convenient access to/from Shop Spaces
EqUipment/Furnishings
., Severe use workbench w/ vise drill press buffer I grinder eyewash flammable materials cabinet 3 x3
stainless steel sink drawer units bulk racks shelving units and storage cabinets
Comments
., Forklift accessible
., Exterior access
DeSign Crltena
Page 3 32
Dublm Public Works Department Maintenance Yard
City of Dublin California
5D~q~
fUNClnONAl RlEQUHRIEMIENlS
TECHNICAL CONSIDERATIONS
Architectural
o Finishes
o Floor SOIl grease and water resistant concrete with Integral non-metallic hardener and clear epoxy
sealer Provide slip resistant finish
Walls 501\ and grease resIstant Epoxy pamted to 8 foot above finished floor minimum
Ceiling Painted exposed structure
o Doors
Personnel doors to meet applicable codes and eXiting requirements
Structural
o Control Jomts In floor slab at adequate spacing
o Structure as needed to support equipment
Mechanical
o General ventilatIOn as reqUired by codes
o As required by equipment
Plumbing
o 12 wide trench drain Just Inside overhead door With removable gratmg to all/water separator
o 3/4 water hose bib With standard faucet at 4 0 AFF
o Compressed air line With cut-off valve filter regulator With gauge lubncator and qUick disconnects on
walls at 4 -0 AFF Provide disconnects at locabOns to be determined dunng detailed design
o As required by equipment
Electncal
o Llghllng
Metal halide or fluorescent 70 fc
o Power
General purpose duplex receptacles 120V AC 20A GFI protected on walls at 3 -6 AFF
As required by equipment
o Communications
Paglng/lntercom system speakers phone
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Cntana
Page 3 33
51 ~ qq
JFUNC1~(QNAl RIEQU~RIEMlEN1S
Small Equipment Shop I Storage
(ShOp Spaces)
I
30-ll
Flarnrnab 10
M aterl als
Cab, net
Buffer!
Grinder
g
\-0"11
Press
~ ~ __Storage
Cab Inel
DworkbenOh
bJ
wIth Vise
o
:;:
Pam
u/~ ",,",". ""'
Hand wash
Sink
Workbenoh
w,th V,se
x
Eyewash! Safety
Shower
~ Shelving
"
c=c=t=J
\
>-
Function
o Enclosed secure area for maintenance and storage of small equipment such as lawn mowers chain
saws etc
Relationship to Other Areas
o Convenient access to/from Shop Spaces
Equipment/Furnishings
o Severe use workbench with vise buffer/grinder parts cleaning tank dnll press flammable matenals
cabinet shelVing hand wash station eyewash/safety shower and shop storage cabinets
Comments
o Forklift access
DeSign Cnterla
Page 3 34
Dublin Public Works Department Maintenance Yard
City of Dublin California
002 ~ 1q
JFU N<Cl~OINlAl RIE QU ~ RIE M IE !NIlS
TECHNICAL CONSIDERATIONS
Architectural
o Finishes
Floor Soil grease and water resistant concrete with Integral non-metallic hardener and clear epoxy
sealer Provide slip resistant finish
Walls SOil and grease resistant Epoxy painted to 8 feet AFF
Ceiling Painted exposed structure
o Doors
Personnel doors to meet applicable codes and eXIting requirements
Structural
o Control JOints In fioor slab at adequate spacing
o Structure as needed to support equipment
Mechanical
o Ventilation as required by codes to prevent accumulation of explosive mixtures
o As required by equipment
Plumbing
o 3/4 water hose bib with standard faucet at4 -0 AFF
o Compressed air line with cut-off valve filler regulator with gauge lubncator cleanout valve and qUick
disconnects on walls at 4 0 AFF Provide disconnects at locations to be determined dunng detailed
deSign
o As required by equipment
Electncal
o Lighting
Metal halide or fluorescent 70 fc
o Power
Welding outlet centrally located 208 V AC 1 ph 50A and 480 V AC 3 ph 30A at 3 -6 AFF
General purpose duplex receptacles 120 VAC 20A GFI protected on walls at 3 6 AFF
As required by equipment
o Communications
- Intercom/paging system speakers
Dublin Pubhc Works Department Maintenance Yard
City of Dublin California
DeSign Cnterla
Page 3 35
153 ~ Cjq
fUNC1~CONAl RIEQU~RIEMIENrS
Facilities Mamtenance Shop I Storage
(Shop Spaces)
~
/ Hand wash!
Eye wash
StatIon
o
o
'"
~ Soldering
U ~ Slallon
bworkbench ~ Flammable
wllh V I sa Mal<lri als
Cabonel
o I
9
;!:
r- Bulk Racks
/
"
j
30...
j
Function
o Enclosed shop for facIlity maintenance crew
o Storage for working stock
Relationship to Other Areas
o Convenient access to / from Shop Spaces
Cntlcal Dimensions
o 14 0 verbcal clearance
EqUipment/Furnishings
o Severe use workbench With vise soldering station buffer/gnnder dnll press hydraulic press pipe
bender/threader bulk racks flammable materials cabinet
Comments
o Forklift accessible
o Extenor access for vehicles
DeSign Crltena
Page 3 36
Dublin Public Works Department Maintenance Yard
City of Dublin California
5t{ ~q~
IFU ~cr~ O~Al RolE au ~ !REM IE ~rs
TECHNICAL CONSIDERATIONS
Architectural
o Finishes
Floor SOil grease and water resistant concrete with Integral non metallic hardener and clear epoxy
sealer Provide slip resistant finish
Walls SOil and grease resistant Epoxy painted to 8 feet AFF
Ceiling Painted exposed structure
o Doors
Personnel doors to meet applicable codes and eXiting requirements
Extenor overhead door 14 x 14 motor operated with Intenor push button controls and lockout on
extenor
o Sollards on extenor at Jambs of overhead door (2 per door)
Structural
o Control JOints In floor slab at adequate spacing
Mechanical
o General ventilation as reqUired by codes
o As reqUired by eqUipment
Plumbing
o Com pressed air lines with cut-off valve fi Iter regulator with gauge lubncator and qUick disconnects on
walls at 4 -0 above finished floor and at locations over worktables to be determined dunng detailed
deSign
o 3/4' water hose bib with standard faucet at 4 0 AFF
o As reqUired by eqUipment
Electrical
o Llghllng
Metal halide or fluorescent 70 fc
o Power
General purpose duplex receptacles 120V AC 20A GFI protected on walls at 3 6 AFF
As reqUired by equipment
o Commumcatlons
Paglnglintercom system speakers
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Crltena
Page 3 37
550,( qq
f'UNCr~ONAl RIEQU~RIEMIENrS
Signal Storage
(Shop Spaces)
Function
o Designated space for the secure storage of traffic signals and street lights
Relationship to Other Areas
o Adjacent to Signal Shop
Comments/Characteristics
o Furmshlngs Shelving Units and bulk storage units
o Utility requirements Grounded electncal convenience outlets venblated and heated
o Floor Finishes 5011 grease and water resistant concrete with Integral non-metallic hardener and clear
epoxy sealer Provide slip resistant finish
o Wall Finishes SOil and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Finishes Painted exposed structure
o Lighting Metal halide or fluorescent 30 fc
Signal Cabinet Testing
(ShOp Spaces)
Function
o Alcove area for Signal cabinet testing
Relationship to Other Areas
o Adjacent to Signal Shop
Comments/Charactenstlcs
o Furnishings None
o Utility requirements Grounded electrical convenience outlets ventilated and heated
o Floor Finishes SOil grease and water resistant concrete With clear epoxy sealer ProVide slip
resistant fimsh
o Wall Finishes 5011 and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Finishes Painted exposed structure
o Lighting Metal halide or fluorescent 30 fc
DeSign Cnterla
Page 3 38
Dublin Public Works Department Maintenance Yard
City of Dublin California
6G1t}q
flU NC1~ONAl RIEQU ~RIEMIEN1S
Signal Bench Stock
(Shop Spaces)
See Signal Shop for graphic
Funcllon
Q Designated space for signals bench stock storage
Relatlonshlp to Other Areas
Q Adjacent to Signal Shop
Comments/Characteristics
Q Furnishings Bins shelvmg
Q Utility requirements Grounded electncal convenience outlets ventilated and healed
Q Floor Finishes SOIl grease and water resistant concrete with clear epoxy sealer Provide slip
resistant finish
Q Wall Finishes 5011 and grease resistant Epoxy painted to 8 feet AFF
Q Ceiling Finishes PaInted exposed structure
Q Llghtmg Metal halide or fluorescent 30 fc
Signal Tool Cnb
(Shop Spaces)
See Signal Shop for graphic
Function
o Designated space for the secure storage of handheld equipment and specialty tools for the signal shop
Relationship to Other Areas
Q Adjacent to Signal Shop
Comments/Characteristics
o Furnishings Shelving Units and storage cabmets
Q Utlllty requirements Grounded electrical convenience outlets ventilated and heated
o Floor FInishes 5011 grease and water resistant concrete with clear epoxy sealer Provide slip
resistant finish
Q Wall Finishes SOil and grease resistant Epoxy painted to 8 feet AFF
Q Ceiling Finishes Painted exposed structure
o Lighting Metal halide or fluorescent 30 fc
Dublin Public Works Departrnent Maintenance Yard
City of Dublin California
Design Cnterla
Page 3 39
67 c;y qq
IFUNcr~ONAl RlEQU~RIEM1ENrS
Network I Telecom & Satellite Room
(ShOp Spaces)
Functlon
Q Enclosed separately secured area for computer and telephone sWitching equipment
Relationship to Other Areas
Q Centrally located to minimize wlnng distances
Comments/Charactenstlcs
Q Furnishings None
Q Utility Requirements Grounded electncal convenlence outlets telephone intercom/paging system
condUIt for network computer system air conditioned and heated
Q Floor FInishes ReSIlient f100nng
Q Wall Finishes Painted gypsum board and/or concrete block
Q Ceding Finishes Acoustical tile ceiling
o Lighting Parabolic fluorescent fixtures 20 fc
DeSign Crltena
Page 3 40
Dublin Public Works Department Maintenance Yard
City of Dublin California
5810q
IFU NCr~(Q) NAlRIE QU ~ RIEM IE NIS
OUTSIDE SPACES
FUNCTIONAL RELATIONSHIPS
The relationships between the vanous functional areas within this section are shown below The design
should accommodate these relationships In order to maximize operational efficiency This diagram IS not
meant to be a floor plan only a representational relauonshlp diagram
r====
ADMINISTRATION
SPACES
CREW <l==C> SHOP
SPACES SPACES
-===:I -==:II == Ii;;;;;;I -==iI.c;;;;;liIll;;;;;llIll;;;l;iil~_~~IIl:=i:lI~ .c::=I _ __
OUTSIDE
SPACES
FUNCTIONAL AREA MODULES
Each functional area within this section has been Individually defined as a module Each module has
Information regarding the functJon of the space relationships to other areas cntlcal dimensions (If any)
eqUlpment/fumlshlngs and finishes Technical considerations for venblatJon mechanical plumbing and
electncal are also defined A detailed eqUipment list for each space will be developed dunng design
Dublin Public Works Department Maintenance Yard
City of Dublin California
DesIgn Cntena
Page 341
511 qq
lFUNC1~ONAl RIEQU~RlEMIENTS
Bulk Storage
(OutsIde Spaces)
SEE PROGRAM FOR SIZE ANO MATERIAL STORAGE
Open Matenal /'
Storage Area I \,
Covered Malerlali\
Slorage Area / ''\
I
'\ --$-
\1
I
114 per foot
Slope (Typ l
I
\
\
"
"
'-- Con C rele
Base
60.{l (Mln I
Vehk;le Maneuvering
Area
1
L________
""
""'-- Can opr Cover
(19.{1 Verneal Clearance)
Function
o Covered storage of various bulk materials
Relatlonshlp to Other Areas
o Efficiently located within Site traffic flow
Cnhcal Dimensions
o See Space Needs Program for matenals stored and Individual storage bay sizes
Comments
o Storage bunkers to be open faced with adequate vehicle turning area (BO 0 ) In front
DeSign Cnterla
Page 3 42
Dublin Public Works Department Maintenance Yard
City of Dublin California
(po 1qq
IFlUJNCr~ONAl RrEQU~IRIEMIENrS
Cone I Barricade Storage
(OutsIde Spaces)
Functron
" Designated covered area for the storage of traffic barricades Signs and cones
Relationship to Other Areas
" Near Equipment Parking
Com ments/Characterlstlcs
" Furnishings None
" Utility requirements None
" Floor Finishes Concrete
" Wall Finishes Concrete
" Ceiling FInishes Painted exposed structure
" Lighting Site lighting
Nursery Storage
(OutsIde Spaces)
Function
" Designated shade covered area for the storage/stagmg of vanous trees shrubs and other planted
vegetalion
Relationship to Other Areas
" Easy vehicle access
Com m ents/Cha ractenstlcs
Q Furnishings None
" Utility requirements None
" Froor Finishes Concrete
" Wall Finishes None
" Ceiling Finishes None
" Lighting Site IIghtmg
Maintenance Yard Storage
(OutsIde Spaces)
Function
Q Designated outdoor area for meter boxes hydrants pipe covers culverts eqUipment accessones and
other miscellaneous materials
Comments
Q Fence enclosed and security lighted
Dublin Public Works Department Maintenance Yard
City of Dublin California
DesIgn Criteria
Page 3 43
(, f ;f qq
lFUNcr~ONAl RIEQU~RIEMIENrS
Decant Station
(OutsIde Spaces)
Function
o Designated outdoor area for drying and staging Vactor I Sweeper debris
Relationship to Other Areas
o Easy vehicle access
Comments/Characten stics
o Furnishings None
o Utility reqUirements None
o Floor Finishes Concrete
o Wall Finishes None
o Ceiling Finishes None
Q Lighting Site lighting
Signal 1 Lighting Yard Storage
(OutsIde Spaces)
Function
o Designated outdoor area for signal cabinets streetlight poles mast arms and other miscellaneous
materials
Relationship to Other Areas
o Easy vehicle access
Comments/Cha ractenstlcs
o Furnishings None
Q Utility requirements None
Q Floor FInishes Concrete
o Wall FInishes None
o Ceiling Finishes None
o lighting Site lighting
Design Cntena
Page 3 44
Dublin Public Works Department Maintenance Yard
City of Dublin California
bo< 1 q~
fUNC1~ONAl RfEQU~RIEMIEN1S
Hazardous Materials Storage
(Outside Spaces)
"""""."
OpwMl F-..1Il &114
Function
" Pre-engineered secure area for the storage of hazardous matenals
Relationship to Other Areas
" Convenient access to all areas
Comments/Charactenstlcs I
" Furnishings Shelving for 1 gallon 5 gallon and 30 gallon containerS
" Utility ReqUirements Power as required by manufacturer
" Floor FInishes ACid resistant grating
" Wall Finishes Chemical resistant coating
" Ceiling FInishes Chemical resistant coating
" Lighting Metal halide orfJuorescent per manufacturer
" Containment sump With removable grating
" PrOVide for eaSily cleaning under grating
" PrOVide concrete slab on which to set pre engineered portable structure
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Cntena
Page 3 45
f'UNCCr~ONAlIRIEQU~RIEMIENrS
(,31 ~q
Hazardous Materials Drop-off
(OutsIde Spaces)
Function
o Designated outdoor area for receiving pen odic public drop-off of hazardous household matenals
Relationship to Other Areas
o Convenient Access to Hazardous matenals storage
Dumpsters
(OutsIde Spaces)
Function
o Designated area for stagmg of dumpsters
Relationship to Other Areas
o Located to optimize vehicle and pedestnan traffic flows
Comments/Cha ractenstlcs
o FUrnishings 30 CY roll-off dumpster
o Utility requirements Intercom/paging system speakers
o Floor Fmlshes Concrete
o Wall Finishes None
o Cellmg Finishes None
o Lighting Watertight metal halide 20 fc
Design Criteria
Page 3 46
Dublin Public Works Department Maintenance Yard
City of Dublin California
6tf 1qq
IFU~Cr~ONAl RIEQU~IRIEMIE~lS>
Outdoor Break Area
(Outside Spaces)
Function
o Exterior patio area for employee breaks and relaxation
Relationship to Other Areas
o Near Vending/Kitchen
CommentsfCharacten sucs
o Furnishings Patio furniture
o Utility requirements Outdoor electncal convenience outlets and Intercom/paging system speakers
o Floor Finishes Slip resistant concrete or tile
o Wall Finishes None
o Ceiling Finishes None
o Lighting Palla type lighting
o Area should be nicely landscaped
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Criteria
Page 3 47
b51 qq
IFLDNC1r~ONAl RIEQU~IRIEMlENrS
Wash Bay (OutsIde Spaces)
10 -0
,( f ~ HIgh Pressure
~c, -j~' ......'
High Pressure.-......... ,...
Nonie Reel ""
-i 0- - - - - - - - - - - - - - - - - - - ~'Mi ~
~ i [I = Ill~r- i ..~.
I I~
I I Canopy
~~-~-----------------------~
'---- High Pressure
Nonie Reel
"
50-0
j<
FUNCTIONAL CHARACTERISTICS
Function
o Canopy covered area for the manual cleaning of vehicle exteriors
Relationship to Other Areas
o Convenient access to/from vehicle parking
a EfficlenUy located within site traffic flow
Cntlcal Dimensions
a 16 0 vertical clearance
o 20 0 wide by 50 -0 long
Eq ulpmentlFurnlshlngs
a High pressure/hot water washer outlets air outlets hose bib
Comments
o Dnve through configuration
Design Cntena
Page 3 48
Dubhn Public Works Department Maintenance Yard
City of Dublin California
ac ~q1
IFU NCr~ ONAl R1E QU ~ RIEM IE NIlS
TECHNICAL CONSIDERATIONS
Architectural
o FInishes
Floor 5011 grease and water resistant concrete with Integral non metallic hardener and clear epoxy
sealer Provide slip resistant finish
Walls 5011 and grease resistant Epoxy painted to full height
Celllng Painted exposed structure
o Doors
None
Structural
o Control JOints In floor slab at adequate spacing
o Structure as needed to support equipment
Mechanical
o General ventilation as required by codes
o As required by eqUipment
Plumbing
o Two foot wide and two foot deep drain at mid bay (With removable cover) to sediment and 011 Interceptor
o 3/4 water hose bib with standard faucet at 4 0 AFF
o Compressed air II ne with cut-off valve filter regulator with gauge lubncator c1eanout valve and qUick
disconnects on walls at 4 -0 AFF ProVide disconnects at locations to be determined dunng detailed
deSign
o As required by eqUipment
Electrical
o Llghllng
WatertIght metal halide located between wall and centerline of lane 70 fc
o Power
Waterproof duplex receptacles 120V AC 20A GFI protected on walls at 3 6 AFF
- As required by equipment
o Communications
Waterught paglnglintercom system speakers
Dublm Public Works Department Maintenance Yard
City of Dublin California
DeSign Cntena
Page 3 49
611 qq
IFU NC1~OlNlAl fRlE QU ~ RIE M IE lNllS
Wash EquIpment Room
(Outside Spaces)
See Wash Bay for Graphic
Function
o Covered area for vehicle washer and water reclaim equipment
Relationship to Other Areas
o Adjacent to Truck Wash
Comments/Characteristics
o Furnlshmgs Washer support and water reclaim equipment
o Utility reqUlremenls As required by eqUlpment
o Floor Finishes 5011 grease and water resistant concrete With clear epoxy sealer
o Wall Finishes 5011 and grease resistant Epoxy painted to 8 feet AFF
o Ceiling Fmlshes Painted exposed structure
o Lighting Watertight metal halide 30 fc
DesIgn Crltena
Page 3 50
Dublin Public Works Department Maintenance Yard
CIty of Dublin Callforma
6~ 1 11
FlUJ Nccr~ ONAl RlE QlUJ ~ REM [E NlS
VEHICLE PARKING
FUNCTIONAL RELATIONSHIPS
The relationships between the various functional areas wIthin this section are shown below The design
should accommodate these relationships In order to maximize operational efficiency This diagram IS not
meant to be a floor plan only a representational relatlonshrp diagram
Agency Vehicle I Equipment Parking
(VehIcle Parkmg)
Function
o Designated outdoor parking area for vehicle and equipment parking
Relationship to Other Areas
o Near functronal area responsible for vehicles
o Located to optimize vehicle and pedestrian traffic flows
Com ments/Characterlstlcs
o Furnishings None
o Utility requirements Intercom/paging system speakers
o Floor Finishes Concrete
o Wall Finishes None
o Ceiling Finishes None
o Lighting Security type lighting typical for parking areas
o See Space Needs Program for size and quantllJes
Temporary Trailers
(VehIcle Parkmg)
Function
o Designated outdoor area for the setup and operation of temporary trailers
Relationship to Other Areas
o Near administratIOn bUilding
Comm ents/Characten StlCS
o Furnishings None
o Utility requirements Intercom/paging system speakers connected via condUit raceway to EOC
o Floor Finishes Concrete
o Wall Finishes None
o Ceiling Finishes None
o Lighting Secunty type lighting typical for parking areas
Dublin Public Works Department Maintenance Yard
City of Dublin Calrfornla
Design Criteria
Page 351
~q 1C)Q
flU INIcr~<o INIAL RIE QlU ~ RIE M IE INIIS
Decommissioned Vehicle Storage
(VehIcle Parkmg)
Function
o Designated outdoor storage area for Decommissioned vehicles
Relationship to Other Areas
o located to optimize vehicle and pedestnan traffic flows
Com m ents/Characterlstlcs
o Furnishings None
o Utility requirements Inlercom/paglng system speakers
o Floor Finishes Concrete or asphalt
o Wall Finishes None
o Ceiling Finishes None
o lighting Secunty type lighting tYPical for parking areas
o See Space Needs Program for size and quantll1es
Personal Vehicle Parking
(Vehicle Parkmg)
Function
o DeSignated area for employee / VIsitor vehicle parking
Relationship to Other Areas
o located to optimize vehicle and pedestnan traffic flows
o Near lobby
Comments/Charactenstlcs
o Furnishings None
o Utility reqUirements Inlercom/paglng system
o Floor Finishes Concrete or asphalt
o Wall Finishes None
o Ceiling Finishes None
o lighting Security type lighting tYPical for parkmg areas
o Meet ADA and local requirements for accessible parkmg spaces
DeSIgn Cnterla
Page 3 52
Dublin Public Works Department Maintenance Yard
City of Dublin California
70 1qq
fl~ NCl"~(QJ NAl IRIE QU ~ RIE M IE Nl"S
Motorcycle Parkmg
(VehIcle Parkmg)
Functlon
o Designated area for motorcycle vehicle parkmg
Relationship to Other Areas
o Near Lobby/Reception
Comments/Characteristics
o Furnishings None
o Utility requirements Intercom/paging system
o Floor FInishes Concrete
o Wall Finishes None
o Ceiling Fmlshes None
o Llghtlng Secunty type lighting tYPical for parkmg areas
Dublin Public Works Department Mamtenance Yard
City of Dublin California
Design Cntena
Page 3 53
~I ~~~
L-.- __~~~
CHAf'lIER ~ S~llE AND BU~lD~N<G RIEQU~RIEM1EN1S
lel1'q~
SrnE AND BU~lD~N<G IRIEQU~RIEMlEN"S
CODES AND STANDARDS
o Site and BUilding reqUirements shall Incorporate sustamable cnterla that will faCIlitate LEED Silver
Certification for the Project
o All design elements shall be based on the requirements of local state and nalional codes and
7standards Due to the unique functions assocIated With thiS type of faCility a code review shall be
performed durmg detailed design to Incorporate all codes and standards related to the faCility
o The code review shall mclude listing and diSCUSSion of zoning requirements storm water retention
fire prevention methods occupancy separatIOns area classifications
CIVIL
The followmg Issues shall be addressed by the CIVil discipline These Issues are not meant to represent
the full extent of CIVil mvolvement but Instead are meant to convey baSIC functional requirements In an
effort to faCIlitate coordination dunng detailed deSign
Survey
o A survey of the selected site Will be developed by the Owner shOWing all pertinent eXisting
boundanes property lines above and below ground utilities easements and topography
o Utility easements Will be Identified
SOils Earth Relocation, and Other ConSiderations
o A geotechnical investIgation shall be developed by the Owner With detailed Information regarding
surface and subsurface SOil conditions
o Recommendations from the geotechnical Investigation shall be utilized In site development deSign
Streets
o Proposed access streets and any Improvements required for eXisting streets shall be deSigned to
conform to applicable standards and codes and shall be approved by the responsible authOrity
o A traffic study If necessary Will be performed by the Owner
Parking Lots
o Driveways Into site must be suffiCient to accommodate heavy loads and frequent traffic
o Concrete shall be provided for all driveways and support vehicle parking areas
o Asphalt paving With concrete curbs IS suffiCient for extenor employee/VIsItor parking areas
o Concrete wheel stops and/or curbs shall be furnished In automobile parking lots only where reqUired
for phYSical protection of bUlldmgs landscapmg fencmg and as needed for storm drainage
o A concrete apron shall be provided for access to all bays fueling lanes and vehicle washers
Concrete bypass lanes shall also be provided around these faCIlities where practical
Dublm Public Works Department Mamtenance Yard
City of Dublin California
DeSign Crltena
Page 4 1
S~1"1E AND BU~lD~NG RIEQU~IRIEMIEN1"S
151 01'
o All slopes shall be perpendicular to vehicle parking where practical
o Vehicle parking areas shall Include pavement markings Signs Sidewalks and hghtlng as reqUired for
safe and efficient operations
o Pavement markings shall be paint stnplng with no projections so that the surface can be easily swept
and cleaned
o Landscaping In parking areas shall be provided as required by the local JUrisdictions
Site Dramage
o New pavement grades shall be established with an attempt to malntatn a minimal grade of 1 00%
(asphalt) and an absolute mtnlmum grade of 1 % (concrete) Maximum pavement grades shall be
limited to 6% If greater slopes are required care must be taken to ensure that vehicles will not
bottom out
Q Adequate quantities and sizes of catch basins and drams shall be provided to keep paved areas free
of standmg water dUring normal rainfall
Q Site drainage shall Include oIl/water separation and retention/detention as required by state and local
codes prior to discharge mto storm sewer sanllary sewer or natural outlet location
o Building foundation elevations shall be Integrated to the site drainage to avoid the need for stairways
at personnel entrances and excessive grades at vehicle entrances
o Drainage shall always be directed away from bUildings and facIlities
Q Drainage design shall address wetlands protection avoidance and/or mitigation
Site Utlhtles
Q Electncal telephone water natural gas sanitary sewer and storm drainage/retention availability
capacity and charactenstlcs shall be determmed dunng detail design
Q All utility services shall conform to local codes and requirements
Q All utility services to bUildings shall be underground Service to the site may be overhead
Q The specification should stipulate that the contractor IS to pay for any connection fees
o Fiber OptiC service to the site IS required
DesIgn Cnterla
Page 4 2
Dublin Public Works Department Maintenance Yard
City of Dublin California
"" 1- tt ~
S~llE AND IBU~lD~NG IRIEQU~RIEMIEN1S
LANDSCAPE
The following Issues will be addressed by the landscape architect These Issues are not meant to
represent the full extent of the landscape architects Involvement but Instead are meant to convey baSIC
fundamental requirements In an effort to facilitate coordination durmg detailed design
Vegetation
o Vegetation shall be determined by the Dublin Parks Department
o Vegetation which IS compatible and mdlgenous to the surrounding area IS preferred
o Vegetation decorative fencing and berms shall be used to screen parking areas and maintenance
areas from the public view as applicable and as required by zonmg ordinance
o A small lawn area would be appropriate near the main or VIsitors entry to the facIlity
o Vegetation shall be placed to avoid conflict with vIsibility needs for vehicle circulation Ingress and
egress
o Consideration shall be given 10 penmeter vegetation selection and placement to avoId Its use as a
screen for Criminal or undesirable social activities
o Consideration will be given to the size of fully mature plantlngs with respect to site IIghtmg and
parkmg lot safety concerns
Irrigation
o An automated Irrigation system shall be provided m all new landscaped areas near bUildings
ARCHITECTURAL
The following Issues shall be addressed by the Project Architect These Issues are not meant to
represent the full extent of the Architect's Involvement but mstead are meant to convey basIc fundamental
reqUirements In an effort to facIlitate coordmatlon dUring detailed design
General ConSiderations
o The overall architecture of the facIlity and ItS aesthetics shall create the feeling of Unity and proper
relationship of all components
o The facIlity shall be Oriented to take advantage of cross and/or stack ventilation If practical
o Natural light shall be utilized wherever possible Vertical Orientation (windows) shall be used Instead
of hOrizontal orientation (skylights) to aVOid problems with leaking
o ThiS will be a no smoking facIlity however separate designated smokmg areas shall be provided
o Windows should be operable (unless above reach) where appropnate
o The entire facIlity must meet ADA accessibility requirements
Dubhn Public Works Department Mamtenance Yard
City of Dublin California
Design Criteria
Page 4 3
srnE AND IBU~l[))~NG ~IEQU~[RIEMIENlS
'1() <;fqq
Design DimenSions and Clearances
The design of the facIlity must allow safe and efficient movement of personnel equipment agency
vehicles and delivery vehicles In order to prOVide proper clearances the following minimum
unobstructed clearances will be maintained
o Hallways Doorways Interior Grade Changes and Restrooms ADA standards
o Ceiling Clearances (minimums)
Offices areas 8'-6'
Parts rooms 14 -0
Shops 14'-0"
Repair bays 19 -0
Support vehicle wash pads and fueling lanes 16-0
o Door Openings (width by height)
Parts rooms 12 x12
Shops 1 0'x1 0' (for forklift access)
Repair bays 14'x14
Vehicle wash areas variable
o Circulation (width)
Pedestrian cOrridors 6 -0
Forklift alsl es 10 0'
o Work Area
Engl ne end of vehicle 10 -0
Opposite end of vehicle 5 0
o Bay/Shop Width and Depth (width x depth)
Minor Maintenance Bay 20 xSO (25 wide when adjacent to a wall)
Carpentry Shop 30 x40
Mechanical Shop 20 x30
o Parking Space Dimensions (width x length)
Large vehicles / eqUipment 12 x40
Medium vehicles (including employee/vIsitor) 10 x20
Small vehicles/eqUipment 8 x10
Motorcycle 5 x1 0
o Turning and Circulation Requirements (900 turn)
Extra large and large support vehicles 50
Medium vehicles (supporUemployee/vlsltor) 25'
Forklifts 1 0
Design Criteria
Page 4 4
Dublin Public Works Department Maintenance Yard
City of Dublin California
1~ }1q
S~llE ANID BlU~llD~NG RIEQlU~[REMIEN1S
Matenals
The facIlity design shall utilize matenals that not only are aesthetically pleasing but are also durable and
cost effective The matenals shall also be appropnate for the functional area In which they are used
Some of the areas In which careful selection of matenals IS very Important due to the specialized
functions are
o Vehlcle wash area
o Vehicle fueling lane
o Compressor rooms
If a composite wall system IS used CMU or other hard surface shall be used at least up to eight feet
above finished floor Mechanical fasteners which are exposed to the weather or a wet environment shall
be stainless steel
Floors
o Floors In maintenance bay and shops shall be flat with no slope to the drains
o Floors In wash areas and parking areas shall slope to the trench drains
FInishes
Room finishes are an Important element In the design of this type facIlity The wrong finish can be
dangerous and also very costly to replace The following are specialized finishes Inherent with
maintenance functions
o Epoxy painted CMU walls In shops and maintenance bay
o Epoxy painted CMU walls or glazed block with epoxy grout In vehicle wash areas
o 5011 and grease resistant walls
o Painted exposed ceiling structure
o 5011 grease and water resistant concrete with an Integral non metallic hardener light reflective
colonng and sealer
Doors
o All door types and matenals shall be standardized throughout the facIlity except In spaces which have
hostile corrosive environments such as wash areas and chemical storage
o Exterior overhead garage doors shall be Insulated high 11ft aluminum frame type with full view glass
panels
o Extenor overhead garage doors shall be motor operated (where possible) with Intenor push-button
controls Door controls shall allow for only full up or down (not partially closed) Doors shall open
completely Automatic door opening loops shall be embedded In the pavement Immediately outside
of each overhead door
o Door thresholds shall be aVOided In maintenance and shop areas unless necessary If thresholds are
reqUired they will be of Industnal grade In maintenance and shop areas
Dublin Public Works Department Maintenance Yard
City of Dublin Califorma
DesIgn Cntena
Page 4 5
"11 100
s~rlE A~D BU~lD~~G RlEQU~RlEMIENrS
o Doors and doorways shall meet applicable accessibility reqUIrements
o Overhead doors shall have clutches In the operator The chain drive operator shall be on one end of
the spnng counter balanced shaft
o All shop doors entering onto corndors shall have automatic fire closures
o All overhead doors shall have a manual overnde
o Door frames shall be all welded Knockdown type frames are nol acceptable
o Extenor overhead doors must resist corrOSion from sail
o Door hardware should be standardized DeSign team to coordinate With Park Superintendent and
Supervisor
Bollards
o Protective bollards shall be prOVided al all overhead doors and where protection of personnel
slructures and equipment are deemed necessary
o Steel curb faces and corner edges shall be prOVided at all raised concrete Islands associated With
protecting the bUilding or equipment
Housekeeping Pads
o Housekeepmg pads and Isolation pads shall be proVided for appropriate electrical mechanical and
plumbing equipment Other housekeeping pads may be functionally necessary for some shop
equipment
o Housekeeping pad and Isolation pad deSign shall be coordinated With the structural engineer to
ensure pad strength and uniformity throughout the faCIlity
o Exposed housekeeping pad surfaces shall drain away from the equipment supported on them
o Housekeeping pad surface finishes shall be conSistent With room floor finishes except for light
reflectIVe surfacing
DeSign Criteria
Page 4 6
Dublin Public Works Department Maintenance Yard
City of Dublm California
'18c:{qq
S~llE AND BU~llQ)~NG IRIEQU~RlEMIENrS
STRUCTURAL
The following Issues shall be addressed by the structural engineer These Issues are not meant to
represent the full extent of structural Involvement but Instead are meant to convey basIc fundamental
requirements in an effort to facilitate coordination during detailed design
Foundations
o Foundation design shall be based on the recommendal1on of the geotechnical investigation reports
o Control JOints In floor slab shall be provided at adequate spacing
Floor Load Ratings
o Floor loads shall be determined by occupancy per applicable codes and standards
o Where practical floor loads shall be consIstent for all occupancies on a glVen floor
Structural Steel
o Structural members shall be provided With corrosion protective coatings based on the functions of
spaces In which they are exposed
o Exposed JOiStS and other structural members shall be provided With ample future loading capacity for
miscellaneous supported loads
Piping Trenches
o Piping trenches shall be coordinated With structures architectural elements mechanical and utilities
and fixed equipment
o Piping trenches shall be covered With steel plate or grating conSistent With the floor loading and
finishes speCified for the space served
o Steel angles or nosing shall be Imbedded In the trench mouth to support the trench covers and to
prevent trench wall spalllng
o Trench walls and floor finishes shall be epoxy coated to prevent excurSions of the piping fluids (see
Plumbing) Into or through the concrete
o Trench bottoms shall slope to drainage pOints
Cranes
o Crane InstallatJOn design shall be based on the cranes speCified The final crane details and
installation reqUirements may vary based on the approved crane manufacturer
Dublin Public Works Department Maintenance Yard
CIty of Dublin California
Design Cntena
Page 4 7
"111qq
s~rlE AND BU~lD~NG RIEQU~RIEMIENrS
MECHANICAL
The following Issues shall be addressed by the mechanical engmeer These Issues are not meant to
represent the full extent of mechanical involvement but Instead are meant to convey basIc functional
requirements In an effort to facilitate coordination dunng detailed design
Heating, VentilatIon and Air Condltlomng
o All enclosed occupied bUilding areas shall be provided with heating and ventilation In accordance
with code requirements
o All office areas will be provided with air conditioning to 78 degrees Fahrenheit 50% relative humidity
o Air conditioning in areas with communication equipment and computers require 70 degrees
Fahrenheit 50% :t 50;,,, relative humidity year round
o Positive pressure relative to maintenance areas must be maintained In all offices and break room to
preclude migration of fumes Into these areas
o Restroom areas shall be negative pressure draWing air from adjacent spaces for additional
ventilation
o Maintenance areas shall be positively venlilated and spot cooled and heated with particular attention
to the effects of air movement on the perception of comfort
o Provide for smoke and heat venling of repair areas Make use of smoke curtain boards as reqUired
o Repair inspection and body repair areas shall be ventilated by at-floor exhaust and basement/pit
exhaust systems conforming to the ventilation requirements of NFPA 513 and NFPA 888 These
systems Will remove vapors which are heaVier than air
o Smoke and CO2 detectors shall be provided
o Mechanical systems must be zoned so that adjustments can be made In response to varying
demand and activity
o Uliltzatlon of a waste 011 burning heating system will be evaluated dunng detailed deSign This type of
system may be considered for the Enclosed/Unheated Vehicle Storage area
Exhaust Ventilation
o Exhaust ventilation where reqUired shall be provided In accordance With all applicable codes
o An overhead vehicle exhaust reel system shall be provided for the maintenance bay Reels shall be
located at the appropnate end of the bay
Energy Conservation and Management
o Mechanical and electrical deSign efforts shall coordinate to evaluate the cost effectiveness of the
follOWing
USing high effiCiency motors
Duty cycling of HVAC systems (rotating off penods)
DeSign Cnterla
Page 4 8
Dublin Pubhc Works Department Maintenance Yard
City of Dublin California
g (Q ~q 4
s~r1E AND Bl\Jn..D~NG R.rEQl\J~RlEMlENr5
Demand load shedding controllers for non-essentlal HVAC motors
Reduced voltage or current limiting starting for large motors
Power factor correction for large motors
Heat recovery Units
HIgh efficiency cooling Units
Use of automatlc dampers and variable frequency motor controllers to allow a central fan to
efficiently collect exhaust from only the exhaust hose reels In use even though several reels are
ganged together via common ductwork to the central fan
Soft start capability for larger motors (40 h P or greater)
o Consideration shall be given to over sIzing long pipe and duct runs where reasonable paybacks can
be achieved through reduced brake horsepower requirements and reduced electrical consumption
o Passive solar solutions (onentatlon natural lighting cross and/or stack ventilation) shall be
evaluated
o A centralized Energy Management System (EMS) shall be evaluated based on the followIng cntena
among others
Ability to conform to peak load crltena for energy cost savings
Automated equipment maintenance scheduling resulting In lower anticipated equipment life cycle
costs
Benefits of mOnitoring equipment performance to be within acceptable limits
Utlllty usage patterns
Temperature setbacks corresponding to occupancy and utilization patterns
Uniform and limited control of temperature settings
Filter pertormance monitoring and replacement pattern data accumulaliOn
Ability to monllor and record Indoor and outdoor conditions affecting HVAC systems as well as
alarms failures and abnormal operating conditions
Ability to automatically control selected equipment such as chillers air handlers pumps fans
bOilers heaters valves and automated dampers as well as lighting In selected areas
Ability to pertorm energy accounting by displaYing and recording electrical and natural gas flows
o PassIve energy consumption reduction strategies such as Increased Insulation and Isolation of
temperature controlled and ambient spaces and Increased eqUIpment capacities to reduce duty
cycles shall be utilized to the best advantage of the faCIlity
Pollution Control
o Mechanical systems designs shall Insure that airborne and waterborne contaminant emiSSions Will
meet all applicable codes and regulations
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Cntena
Page 4 9
a'c;r01
s~rlE AND BU~lD~NG RIEQU~REMIEN1S
o The percentage of air re circulated and outside air provided to the occupied spaces of the facility
shall take ASHRAE recommendations Into account to avoid Sick bUilding syndrome and other
undesirable effects associated With stagnant air
o Exhaust air discharge and outside air Intake locations shall lake Into consideration building shape
prevailing Winds and outdoor contaminants
MechamcallEqUlpment Rooms
o The mechanical discipline shall provide gUidance to the Architect concerning the size and [ocatlon of
mechanical and equipment rooms and utility chases
o Mechanical room SIZing shall take exchanger tube and air filter removal as well as other common
maintenance activity clearance requirements Into account as well as space and clearance required
by OSHA ASHRAE and bUilding codes and the recommendations of the design basIs equipment
manufacturer shall also be taken Into account
PLUMBING
The follOWing Issues shall be addressed by the plumbing engineer These Issues are not meant to
represent the full extent of plumbing Involvement but Instead are meant to convey basIc functional
reqUirements In an effort to faCilitate coordination during detailed design
Plumbing and Plpmg Systems
o The follOWing piping systems may be Incorporated Within bUildings as applicable
Domestic Hot and Cold Water (HW and CW)
Fire Protection Water
Sanitary Waste and Vent
Industrial Waste Water
Roof Drainage
Storm Drainage
Compressed Air (CA)
Diesel Fuel (OF)
Unleaded Gasoline (UG)
Fuel Gas/Low Pressure Natural Gas
Vehicle Wash Water
o PIPing which contains SOil contaminating flUIds shall not be directly bUrled In earth
o Piping which IS reqUIred to communicate With services across floors and vehicle traffic areas shall be
routed In trenches as desCribed In the structural section
Design Criteria
Page 410
Dublin Public Works Department Maintenance Yard
City of Dublin California
g~ 1 q1
S~TE AND IBU~lD~NG fRlEQUHRIEMIENlS
o All piping shall be readily accessible and available for visual mspectlon
o The plumbmg disCipline shall provide the structural disCipline with trench width and turnmg area
reqUIrements With attentIOn given to wrench clearances between fittings and pipes where appropriate
or necessary for safe mamtenance practices
o The preferred methods for supportmg pipes shall be detailed along With their arrangement and
routmg
o Plpmg supports shall allow for the possible modest addition of future services and plpmg
o Each plumbed system shall have shut off valves overhead
o All piping sizes shall be based on maximum expected flows With an appropnate fouling allowance
o A set of pipe specifications shall be developed such that at least one specification eXists for each flUid
service With design pressures and temperatures exceeding the expected operatmg pressure and
temperature extremes of the system m question NOTE Each flUid service does not require ItS own
pipe specifications The pipe specification shall detail the matenal design conditions sUitable valves
and fittings m the appropriate size ranges minimum pipe wall thickness and required msulatlon If
any
o Pipe Insulation IS required for domestic hot water
o Industnal waste water must go to an all/water separator
o Where required by code plpmg shall have secondary containment With leak detection
Plumbmg Fixtures
o All plumbing fixtures where applicable shall be of a water savmg design
o Water closets shall be wall hung Siphon Jet flush action flush valve type
o Unnals In maintenance areas shall be wall mounted Siphon jet flush action durable low
mamtenance type
o Hand washmg stations shall be provided In shop areas Consider use of touchless faucet activation
device
o Showers for men and women shall be IndiVidual type
o Eyewash and safety showers shall be located m hazardous areas and provided With tempered water
o Paper towel dispensers (not hand dryers) shall be provided In restroom faCIlities
o All dramage plpmg shall have adequate slope toward the colleclJon pomts
o Trap primers shall be used as required by local codes and should be Installed on lines With a low
expected frequency of operallon
o Water hammer arrestors shall be properly applied to the system
o Use of Instant on eleclnc water heaters shall be considered for restroom facilities Without showers
o Flush valve handles on handicapped closets to be located on Wide Side of stall
o Extenor hose bibs Will be key-type and of the' freezeless 1 vanety
Dublin Public Works Department Maintenance Yard
City of Dublin California
Design Crrtena
Page 4 11
g3 'f q q
Si~rlE AND BU~lD~NG RIEQU~RIEMENrS
o The effects of cold weather on standing water In piping and fixtures will be conSidered particularly for
eyewash and safety shower applications
o The design will stnve to passIVely eliminate the need for external powered freeze protection but
where required heat tracing will be of the self limiting electncal type
o Consideration will be given for uSing hydrant boxes With hot water and yard hydrants
o Use of touchless fixtures (water closets urinals and hand washing faucets) should be considered
An alternative consideration would be a timed shut off system
Drains
o All floor/area drain piping shall be Sized based on the maximum expected flow loading With a
generous allowance for fouling due to gravity flow velOCities
o Drain grates and frames shall be cast Iron
o Drains In lubricant containment area shall be Ihe type which are manually operated and shall
normally be closed except dUring wash down
o Trench drains Will be proVided at maintenance bay and pool shop overhead door eXits Twelve Inch
Wide trench drains Will be used whenever possible Grates and frames must support vehicle traffic
o Drains from maintenance and lubricant containment areas shall pass through adequately Sized
Oil/water separators
o Wash bay may reqUire special drams traps and sumps These components shall be Identified and
coordinated dunng detailed design
o Drams shall be located away from maintenance actlvllles where pOSSible so as not to Impede
movement of 1001 boxes and portable eqUipment
o Vehicle wash water must connecllo an Oil/water separator
o All trench drains must connect to an Oil/water separator
Compressed Air System
o Compressed air shall be prOVided to all maintenance work areas and to other designated locations
o Compressed air drops shall consist of the followmg components ball cut off valve filter regulator
With gauge lubncator 1/4 mch qUick disconnect and a 6 Inch drip leg With ball valve
o Compressed air shall be SUitable In quality quantity and pressure for tool operation Including
pneumatic engine starters and lire pressunzatlon Simultaneous use of tools may occur In particular
areas
o Instrument and/or breathable air shall be proVided for eqUipment as applicable
o The compressed air system shall have appropnately Sized air receivers located In the compressor
room The receivers shall have automatic drams
DeSign Cntena
Page 412
Dublin Public Works Department Maintenance Yard
City of Dublin Callforma
!!/f ~ qq
s~rlE AND BU~lD~NG RlEQU~RIEMIENrS
o All branch lines for the compressed air header shall eXit from the top of the header except drip legs
to condensate dram traps shall exll from the bottom
<) All lines mcludlng main header shall be sloped to dram to drip legs with condensate drain traps
<) Designer shall evaluate cost reliability and benefits of regenerative refrigerated and combination
refrigerated and deliquescent air dryers to obtain compressed air with a sUitable pressure dew pOint
to prevent condensation under winter ambient design conditions
o A pressure sWitch shall be mounted In the mam air header and shall activate an audible and visual
alarm when the SWitch detects pressure at or below 90 PSI
<) QUick connect fittmgs for different services such as lubricated air palnUblast air and breathing air
shall be color coded and be non-mterchangeable
<) A separator and filter shall be mounted between the air receiver and the air dryer
o The air dryer as well as the upstream separator and filter shall be designed to handle the maximum
surge flow from the receiver or the compressor rated flow whichever IS greater
<) All receivers shall be equipped with automatic condensate drain traps which shall discharge to the
mdustrlal waste system
<) All valves m the compressed air system shall be of the ball-type
Liquid Bulk Storage/Distribution
<) The most economical method of purchasmg and stOring liqUid consumables IS In bulk Waste liquids
can also be handled m bulk The follOWing storage capacities are to be provided at the new facility
Diesel Fuel 5 000 gallon aboveground tank
Unleaded Gasoline 5000 gallon aboveground tank
<) Fuel tanks and fuel delivery piping Will be equipped with leak detection and alarm and automatic
gauging devices Alarm location shall be Idenlified dUring detail design
<) Bulk liquid fuels Will be transferred by m-tank electnc pumps
<) Vapor recovery for gasoline Will be balance or vacuum assisted depending on the distance from the
fuel dispensing pomt
o Tank Will be separately vented at a safe distance from grade and from site faCilities and equipment
<) Above ground fuel tanks must meet federal state and local regulations
<) All tanks contamlng environmentally hazardous matenals shall be of the double wall type thus
providing secondary containment In the event of mner wall failure A leak detector shall be located In
the annulus between the mner and outer shells
o All storage tanks shall be equipped With relief valves or devices to protect from over or under
pressure conditions
Fuel Management System
Dublin Public Works Department Mamtenance Yard
City of Dublin Califorma
DesIgn Criteria
Page 413
cSt) ~ q4
s~rlE AND BlIJ~lD~NG RIEQU~IREMIENrS
o A fuel management system will be provided at the fueling area to monitor use of diesel fuel and
unleaded gasoline
o The fuel management system at all locations will be Integrated Into a centrally monitored network
system
o Final installatIOn details may vary based on the approved fuel management system manufacturer
o The diesel fuel directed to the emergency generator will be monitored by the fuel management
system
o Fuel management system periormance dUring fire alarm situations shall be addressed
o ProvIsions for premature vehicle pull out will be Included In the deSign
Fire Protection System
o Fire protection systems such as automatic fire sprinklers standpipes fire hose cabinets and fire
extingUishers shall be deSigned as required for maximum safety In accordance with the requirements
of all applicable codes and the local Fire Department for each hazard occupancy
o Fire hydrants and pump connection locallons shall be coordinated with the local Fire Marshall or
other appropriate local authOrity for the type and class of fire fighting equipment serving the site
o BUilding fire alarm shall shut down process flUid flow to building
o The fire alarm system shall have the option for testing IndiVidual alarm function
o Emergency push button fuel supply shut off shall be prOVided near the fuel lanes
ELECTRICAL
The follOWing Issues shall be addressed by the electrical engineer These Issues are not meant to
represent the full extent of electrical Involvement but Instead are meant to convey baSIC functional
reqUirements In an effort to faCIlitate coordination dunng detailed deSign
Power
o The Site electriC service voltage shall be coordinated With the power utility dUring detailed deSign The
electrical engineer shall prOVide the architect With direction concerning the form space reqUirements
and site Impacts of the transformer and service entrance
o In most cases motors larger than 1/2 HP shall be supplied 480 volt 3 phase 208 volt 3-phase If 480
vollls not available
o Dedicated CirCUits and condUit connections shaH be prOVided throughout the faCIlity for computer
terminals
o A dedicated circuit 120 volt convenience receptacle shall be prOVided at each telephone terminal
backboard
o Spare capacity (25%) shall be prOVided at all panel boards and SWitchboards
DeSign Crltena
Page 414
Dublin Public Works Department Maintenance Yard
City of Dublin California
8& % q1
s~rlE AINJD IBU~l[))~NG RIEQU~RIEMIENrS
o Surge suppression equipment shall be provided either at the panel boards from which Isolated
ground receptacle CirCUits originate or Individually at the appropnate outlet
o A 90 minute battery backup system shall be proVided for the following Items
Radio and dispatch system
Fire alarm and other fire protection and security systems
EXit lights
o Computers shall be connected to battery powered UPS packages with surge protection
o All electrical equipment shall be sUitable for the area claSSification of the area for which It IS designed
to be mstalled
o All wall outlets and disconnects shall be labeled With panel location
o The transformer and service entrance equipment shall be protected by removable traffic bollards
o The mam distribution system voltage shall be 480/277 volts 3 phase 4 wire grounded neutral With a
four wire fault system that meets or exceeds the National Electrical Code reqUirements
o Distribution of branch CIrCUIts and feeders shall take the application of emergency power and zone
electrical shut-down requirements mto account
Emergency Generator
o An emergency generator shall be Sized dUring detailed design The generator shall be connected to
the main distribution system In such a manner as to promote maximum fleXibility for utiliZing
emergency power
o The emergency generator location shall be determined dUring faCIlity layout finallzallon It shall be
close to the electncal service eqUipment Will require an outlet for hot exhaust gasses and Will require
ample mtake and ventilation air
o Due to the nOise and heat from the engine the generator shall be Isolated from faCIlity occupants
o The follOWing Items shall be connected to the emergency generator
Lighting heating and ventilation for all offices shOps kitchenette restrooms and fuel Island
Llghtmg and heat for the emergency operational areas
Ventllatlon/exhaust In the maintenance bay
Fuel pump
One air compressor for the maintenance bay
RadiO communication equipment
Fire alarm and fire protection
Gate to the yard
EXit lights
o An automatIc transfer sWitch shall transfer the load from utility power to the engme generator after the
engme gets up to speed and the generator up to frequency
Dublin Public Works Department Maintenance Yard
City of Dublin California
DeSign Cnterla
Page 415
srnE AND IBU~lD~N<G RIEQU~RIEMIENrS
g11q~
General lighting Types and lighting levels
o Site IIghtmg shall be high pressure sodium In exterior parking areas
o Site Ilghtmg shall be photocell controlled
o Light poles In the vehicle parking area shall be limited to the perimeter If pOSSible
o Site Ilghtmg shall comply with any local light pollution regulations
o Office lighting levels shall be equal to those suggested by the Illuminating Engmeers Society (IS)
Handbook
o Office areas shall use daylight fluorescent lamps with energy efficient ballast and reflectors
o Maintenance bay and some shop areas shall use metal halide or fluorescent type lighting Each area
shall be mdlvldually SWitched
o Lighting shall be SUitable for the area classification where they are designed to be Installed Areas
such as the vehicle wash area and others will bear special conSideration
o Damp or wet location fixtures shall be labeled and used In appropriate locations
o Interior lighting shall be controlled locally but may be Integrated to the Energy Management System
In cases of single shift occupancies
o Extra lighting must be prOVided In all areas (exterior and Interior) with vehicle movement at night
o Areas where teleVISion CCTV or personnel mterface monitors (computer screens) are used shall
have non-glare lighting treatments
Fire Alarm and Detection
o Fire alarm and fire/smoke detection devices shall be prOVided to momtor all areas m the facility
o Fire alarm pull boxes shall be prOVided at eXits
o ActivatIon of any detector or pullbox shall result In an audible/Visual alarm throughout the facIlity
Interact with the mechanical systems Interact with the fire protection/suppression system (ref
plumbing) and transmit an alarm Signal via telephone line to a centrally located monitor and to the
local fire department mOnitoring station
o The fire alarm control panel shall prOVide Visual and audible annunciation for each initiating zone
o The fire alarm control panel shall be located m a conspICUOUS place
TelephonefData Communications and RadiO
o A system of empty conduits outlet boxes and terminal backboard shall be prOVided In each bUilding
of the facIlity
o Conduits shall Include pulling ropes
o Computer network wlnng schemes shall be coordinated with the City of Dublin
o Most telephones shall have long distance restrictions on outgoing lines
DeSign Criteria
Page 416
Dublin Public Works Department Maintenance Yard
City of Dublin California
&81 cr1
S~llE AND IBU~l[)~NG IRIEQU~RIEMIEN1S
PaglnglPubhc Address System
o A paging/public address system shall provide service to all offices shops bays and outdoor work
areas
o System speakers shall be of a type sUitable for areas of high ambient nOise
o The control eqUipment shall be complete with provISions to permit mterfacmg with telephone system
to allow orlgmatlon of paging from telephone Instruments by dialing an assigned number
o The volume level of Individual speakers shall be adjustable without sacnficlng system performance
o Remote phone handsets shall be provided In shop and vehicle parking areas
SECURITY
FenCing
o The entire yard area must be secured (with fence and/or bUildings) Consideration shall be given to
one Inch wire mesh With no barbed wire versus two Inch wire mesh With barbed wire
o Fenced areas Will need control gates at access/egress POints Gates may be accessed by key card
or electronically The specific method of access shall be determmed dunng detailed deSign
LIghting
o Security site lighting shall be provided m employee and vehicle parking areas and around bUildings
o Security lighting shall not adversely Impact surrounding property
Other Security ConSlderatlons
o An electrOniC security system shall be provided for the entire facility The system specifications must
be coordinated With the City of Dublin dunng detailed deSign
ALTERNATIVE FUEL IMPACTS
Should there ever be a reqUirement to convert these faCilities to the servmg of natural gas powered
vehicles the follOWing consideratIOns Will greatly reduce the reqUired capital expenditures
o Note that future addition of a cellmg air sweep may reqUire freeze protection of mdoor fire
suppression system piping since heatmg of sweep air may not be cost effective
o Tie Ins to the fire suppression system header shall be prOVided for future fire mOnitor connections In
the bulk storage area for alternative fuels
o Spot heating In the maintenance bay which In the future may see the presence of LNG/CNG shall
be prOVided by unit heaters fed by hot water or steam Electnc or gas fired Unit heaters shall be
aVOided or located outSide of the maintenance space
Dublin Public Works Department Mamtenance Yard
City of Dublm California
DeSign Cntena
Page 4 17
W1 ~ qq
s~rlE AND BU~lD~NG IRIEQU~IRIEMIENrS
o ProvIsions In the Architectural and Structural design of maintenance bUildings shall be made to allow
for the future Installation of a ceiling air sweep exhaust system as well as an LNG/CNG tank vent
exhaust system In the event that the facility beginS servicing LNG/CNG powered vehicles This
Includes providing ample unobstructed wall space near the ceiling for the cut out of wall penetrations
for the Installation of supply and exhaust fans ThIs also Includes providing ceiling space for the tank
ventexhaustducDNork
o The Energy Management System shall be capable of incorporating the Inputs and outputs of future
LNG/CNG related systems such as ceiling sweep ventilatIon fans LNG/CNG tank vent fans and
related eqUipment
o Ceilings must be deSigned to be free of areas where a lighter than air gas might pocket
o A slope In the ceiling shall be provided with the high pOint terminating In a wall that might easily be
penetrated with louvers or forced ventilation eqUipment
o Fire Detection and Alarm systems shall be specified so that they can be expanded for the possible
addition of gas detection zones
o DeSign for a 25% Increase In the number of motor feeder circuits
o Open flame heaters or other high temperature systems shall be avoided In the repair bays
o Allocate space for fuel storage or compression on the site keeping In mind the relationship beDNeen
the dispenSing the properties adjacent to the facilities and the forecast number of vehicles to be
fueled
SIGNAGE AND GRAPHICS
Proper Slgnage and graphics throughout the facility are Important Because of complex Industnal work
flow safety regulations mixing of vehicle and pedestnan traffic employee performance codes and the
reqUirements of the Amencans with Disabilities Act high quality graphics that promote a positIVe
orgafllzatlonallmage are Important Not only Will well deSigned graphics add to the aesthetics of the
facIlity they Will also assist employees In performing their assigned tasks more efficiently and safely
Specific slgnage and graphics requirements Including safety dlrechonal Informallonal traffic signs and
pavement markings Will be developed during detailed deSign
o All exposed pipes conduits and major lines In the maintenance areas shall be color coded for easy
Identification Color coding shall be by full painting If possible but at least color banded
DeSign Cnterla
Page 418
Dublin Public Works Department MaIntenance Yard
City of Dublin California
00 '3f qq
s~rlE AND IBU~lD~NG RIEQU~RIEMIENll'S
WASTE HANDLING
o Appropriate space for storage and handling of waste must be provided Inadequate storage space
can result In an unsightly mess that IS difficult to control There are four types of materials for which
storage must be provided
Waste This consists of the faCIlity s trash and waste products which cannot be recycled
Provide a screened area for dumpsters
Scrap Ferrous and non-ferrous scrap metals Contract scrap dealer may provide containers for
collection and removal but adequate space and vehicle circulation must be considered when
locatmg scrap areas
Recyclable Bins may be provided for recycling steel brass copper glass aluminum paper
and other selected matenals ProvIsions for these shall be Included In the facility design
Hazardous Matenals Many Items are now considered hazardous materials and must be dealt
with In special ways Some of these Items are tires battenes paint solvents and contaminated
011 filters Containers for hazardous matenals may be prOVIded for storage and collection but
adequate space and vehicle Circulation must be conSidered when locating these containers
Dublin Public Works Department Mamtenance Yard
City of Dublin California
DeSign Cntena
Page 419
s~rlE AND BU~llD~NG IRIEQU~IRIEMIEN1S
CJ/r{ q1
FACILITY MAINTENANCE
o FacIlities are mamtalned by the City of Dublin
o Space for storage of matenals and equipment and for a crew work area must be provided at the
facIlity
o Storage space for Janitorial supplies and equipment must be provided In each area
o A floor sink with hot and cold water IS reqUired In custodial room
Design Cntena
Page 4 20
Dublin Public Works Department Maintenance Yard
City of Dublin California
B Hodgson Construction Cost Consultant
710 Trancas Street Apt 227
Napa CA 94558
Phone ((707) 255 7371
q~ ~qq
SUMMARir
-
SITE WORK $3,646,905
OPEN SPACE $684,125
ADMINISTRATION AND CREW $3,473,200
SHOP SPACE $2,694,240
1 PROJECT TOTAL 1 $10,498,4711
Unit costs on the estimate are current Escalation factors have not been addressed
The Unit Costs reflect the Increases expenenced thiS past 12 months specifically
wages workmen s compensation copper products steel and other metals and all
petroleum based products e 9 asphalt and plastiCS
10/17/2007
DubllnPWCorpYdOct1707 xis
Page 1 of 8
B Hodgson Construction Cost Consultant
710 Trancas Street Apt 227
Napa CA 94558
Phone ((707) 2557371
E1~MA~0q
PROJECT IMAINTENANCE YARD DATE 10/17/07
DUBLIN PUBLIC WORKS DEPARTMENT I Est No 50278
DUBLIN CALIFORNIA I Job No None
f-- SITE IMPROVEMENTS EST TYPE Concept
AREA 220 308
liTEM II""~ IIYUAl'lllllf UNIT l;U~1 IT
1 A2 CLEAR AND GRUBB
2110105 A2 Clear and Qrub plants trees and miscellaneous 5 1 Ac 576000 29132
22000 A4 EARTHWORK
2200302 A4 Site cut & fill earth 50M 250M 26 437 Cv 600 158 622
2221102 A4 Eng Fill Imported 10 mile 31724 Cv 2160 685 246
2222102 A4 Ha ul matenal 10 cytruck 5 mile round trip 26437 Cy 954 252209
2500 A5 PAVING AND SURFACING
2500103 A5 AC 3 on 8 base [Truck & Ramp} 76 852 S 660 507 223
2525415 A5 Vertical curb 6 x24~ straight curb 3570 L 1926 68 758
2526011 A5 Parkmq Bumper block 3 Precast 88 Ea 54 00 4752
2530102 A5 Traffic sign 1 8 x24~ steel reflectonzed 6 Ea 270 00 1620
25607301 A5 StrlPInQ 4 Wide 2 cts 1836 L 120 2203
1 A6 SITE UTiliTIES
2611105 A6 Storm & Sewer Pipe PVC SDR 35 allowance ave 3150 L 54 00 170100
2630505 A6 Water Pipe PVC Munl Wtr C900 Class 150 ave 1250 L 54 00 67 500
2630606 A6 Fire Water Pipe DIP 350 PSI Class 50 ave 1500 L 6000 90 000
2630811 A6 Gas Pipe Black Stl Sch 40 ave allow 1500 L 4200 63 000
2670312 A6 ElectriC Telephone & Signal dlstnbullon allow 1190 L 5040 59 976
2670804 A6 8 x 10 Transformer Pad 2 Ea 1500 00 3000
2800 A8 MISC SITE IMPROVEMENTS
2830105 A8 Fence C/L 8 high galv steel 2440 L 3000 73 200
2830303 AS Sldq qate up to 45 lonq (pair) 2 Opq 6600 00 13200
29000 A9 LANDSCAPING
290001 A9 LandscaplnQ & Irrigation allow 10200 S 360 36 720
TOTAL ESTIMATED PROBABLE DIRECT CONSTRUCTION COST I $10 381 $2 286 461
I 1 GENERAL CONDITIONS @ 15%1 1 II II $342,9691
I 1 CONTINGENCY & ESCALATION @ 30%1 1 II I $685 938
I I I I II I $3 315368
I I OVERHEAD AND PROFIT 10%/ II I $331 537
I I I II $3646905
10/17/2007
DubllnPWCorpYdOct1707 xis
Page 2 of 8
B Hodgson Construction Cost Consultant
710 Trancas Street Api 227
Napa CA 94558
Phone ((707) 255-7371
Es~t~ q1
PROJECT MAINTENANCE YARD Date I 10f17/07
DUBLIN PUBLIC WORKS DEPARTMENT Est No 5027B
DUBLIN, CALIFORNIA Job No None
- OPEN SPACE EST TYPE Concept
I AREA 36225
ITEM I DESCRIPTION QUANTITY UNITI COST I AMOUNT
I I I I I
1 A BULK STORAGE
3050203 A Conc Wall 8 relnf 1 face IncldQ ftQS 2700 Sf 2600 70 200
3050704 A SOG 5 4 rock memb #4 @ 18 OCEW 2700 Sf 545 14715
13121101 A Pre.enQ metal covenng 20 eave helQht 2700 Sf 1500 40 500
16000107 A Total Elect Warehouse 2700 Sf 408 11 016
136431
1 C MAINTENANCE YARD STORAGE
2500102 C AC 2 on 6 base 1000 S 450 4500
2680704 C llQht 175W Merc Vapor 1 0 pole 6 Ea 1 800 00 10 800
2830105 C Fence C/l 8 high galv steel 140 l 17 50 2450
2830506 C Gates 20 Wide 8 hlah dbl SWlna 2 Ooa 2 850 00 5700
23 450
1 0 DECANT AREA
2520101 0 4 concpvq 5000 Sf 400 20 000
2680704 D llqht. 175W Merc VaDor. 1 0 Dole 10 Ea 1 800 00 18 000
38 000
1 E SIGNAULlGHTING YARD STORAGE
25201 01 E 4 concpvg 7500 Sf 400 30 000
2680704 E L1aht 175W Merc Vaoor 1000le 12 Ea 1 800 00 21 600
51 600
1 F HAZ MAT STORAGE
13121301 F Modular FMS Bldq Fdtn & Shell 200 Sf 195 00 39 000
13121302 F Electnc power and liQhtlnQ 1 Ea 630 96 631
13121303 F Fire SuppressIon System 200 Sf 10 00 2000
9920102 F1 Pamt Chemical Resltant Coating 520 Sf 400 2080
2520102 F2 6" Pavlnq concrete Matenals Drop off area 2500 Sf 550 13 750
2520101 F3 4 conc ova Dumoster staalna area 800 Sf 400 3.200
60 661
1 G OUTDOOR BREAK AREA
2520101 G 4 concpvg 400 Sf 400 1600
2680902 G 200W Incand flush mt landscape 110 8 Ea 425 00 3400
2900211 G landscaping Allowance 320 S 300 960
4210605010 G Precasl conc oallo blocks 2 Ihlck natural 400 S 390 1,560
7520
1 H FUELING POSITION & TANK FARM
2520102 H 6 Pavlnq conc remf sloned to drain on 6 rock 288 S 550 1584
2540101 H Pipe Bollards 6 pipe conc filled IncldQ ftg 16 Ea 16500 2640
2650602 H Trench Dram 1 6 x 1 6 x 3 thk wi grate 0 l 8100 0
11140151 H Gasoline Pump dual hose 1 Ea 712000 7120
10/17/2007
DublinPWCorpYdOct1707 xis
Page 3 of 8
B Hodgson Construction Cost Consultant
710 Trancas Street Apt 227
Napa CA 94558
Phone ((707) 255 7371
c18 o-i qq
ESTIMtYfE
PROJECT MAINTENANCE YARD Date 10/17f07
DUBLIN PUBLIC WORKS DEPARTMENT Est No 50278
DUBLIN, CALIFORNIA Job No None
- OPEN SPACE I EST TYPE Conceot
I AREA 36225
ITEM I I DESCRIPTION IIQUANTITY IIUNITII COST I AMOUNT
I I I
111401512 H Air and water service post tyoe allow 0 Ea 4 800 00 0
111401513 H Canopy Structure allow 0 Sf 2200 0
1650865 H 250W Metal Halide ExplOSion proof fixtures 0 Ea 371500 0
1114021012 H1 Fuel Storace Tank 1500 callon above around 1 Ea 5 200 00 5200
16730001 H1 PaOlna horns/soeakers Incldc cable & hook uo 1 Ea 1 173 84 1 174
17 718
1 J WASH BAY
2520102 J 6 PavmQ conc relnf sloped to drain on 6 rock 1000 S 550 5500
2650102 J Floor Om 2 x 2 x 2 Hvv Duty Grate 2 Ea 1 050 00 2100
09910101460J Paint 2 epoxy floor finish 1000 S 400 4000
111401513 J Canooy Structure allow 1000 S 2200 22 000
111401515 J HIQh Pressure Nozzle Reels allow 2 Ea 2 130 00 4260
1650865 J 250W Metal Halide Exnloslon oroof fixtures 2 Ea 371500 7430
45 290
1 K WASH EQUIPMENT ROOM
3050704 K SOG 5 4 rock memb #4 @ 18 OCEW 100 S 545 545
5100102 K Roof Structure Steel beams & metal Deck 100 S 3750 3750
3050203 K1 Conc Wall 8 relnf 1 face Incldg flgs 360 S 2600 9360
8101001 K1 Pair HM Door and Frame mcldo oamt 1 Ea 700 00 700
87023 K1 Door Hardware Pair Ext Storaoe 1 Ea 1 279 90 1280
09910101460K Paint 2 epoxy floor finish 100 S 400 400
99101015 K1 Pamtepoxvl ntenorfin Ish 420 S 500 2100
104001101 K1 SIQnaQe allow per door 2 Ea 7500 150
11140 K1 Vehicle Washer and water reclaim eqUipment 1 24 000 00 24 000
16001001 K1 SWltchaearallow 100 Ea 1 00 100
16010508 K1 Feeder CondUit and Wire allow 150 U 1000 1500
16230211 K1 SWitch 20 amp 1 Ea 105 00 105
16231013 K1 Receot 20 amo GFI weatheroroof 4 Ea 136 00 544
1650865 K1 250W Metal Halide Exoloslon oroof fixtures 1 Ea 371500 3715
48 249
TOTAl PROBABLE DIRECT CONSTRUCTION COST 1184 $428919
GENERAL CON DlTIONS @ 15% 178 $64 338
CONTINGENCY & ESCALATION@30% 355 $128676
1717 $621 932
OVERHEAD AND PROFIT tID 10% 1 72 $62 193
TOTAL ESTIMATED CONSTRUCTION COST 1889 $684 125
10/17/2007
Dublin PWCorp Y dOct1707 xis
Page 4 of 8
B Hodgson Construction Cost Consultant
710 Trancas Street Apt 227
Napa CA 94558
Phone ((707) 255-7371
E~~/M~ tJt1
MAINTENANCE YARD DATE 10/17/07
DUBLIN PUBLIC WORKS DEPARTMENT DUBLIN Est No 502781
CALIFORNIA Job No None
- ADMINISTRATION AND CREW
EST TYPE Concept
AREA 10 334
ITEM I DESCRIPTION QUANTITY I UNITI COST AMOUNT
I I I I I
EXCAVATION FOR BUILDINGS
Excavate project area dispose 1240 Cy 1260 15625
Eng Fill Imported spread m layers 1488 Cy 17 40 25 893
FOUNDA nONS
!FtgS continUous and spread 1 story 207 Cy 762 00 157490
SLAB ON GRADE
lSOG 5 4 rock memb #4 @ 18 OCEW 10 334 Sf 654- 67 584
STRUCTURE
Columns TS 30x30 bays 18 Ton 780000 141 059
Roof Structure Trus JSIs wi plywood 10334 Sf 1020 105 407
ENCLOSURE VERTICAL
* Exterior Studwalls * (65X181 )=492 Lf Ave Ht14
Ext Studwall 6 18ga @ 16 oc 5994 Sf 582 34 883
Bat! msul 6 R 19 wall fOil backed 1 Side 5994 Sf 132 7912
Int surf ext walls gyp bd pamt rubber base 5994 Sf 264 15823
Stucco 3/4 3 cis skip trowel finish 666 Sy 9994 66 554
Alum Storefront and Windows allowance 2397 Sf 7200 172619
EXT DOORS FRAMES AND HARDWARE
Doors Frames and Hardware allow 6 Ea 1440 00 8640
ENCLOSURE HORIZONTAL
FIG Insul 9 1/2 R30 ceiling attic orfloor 10334 Sf 180 18601
Roofing 5 ply JM 5GNC 20 yr mln surf system mcldg ngld msul Sf 62 004
10334 600
SUPPORT ITEMS
Exp Jomt covers celllwall assbly w/2 sp bronze 64 Lf 9317 5963
Flashmg and Sheet metal allowance 1476 Lf 804 11 867
Roof hatch alummum 2 6 x 4 6 2 Ea 155281 3106
JOint sealanls allowance 10 334 Sf 072 7440
INTERIOR CONSTRUCTION
FLOOR FINISH
Base Rubber 4 lopsel 2273 Lf 270 5138
ReSilient Floonng 1532 Sf 350 5515
Carpet acrylic 28 oz heavy 802 Sy 4200 33 703
Ceramic Tile FlOOring 1580 Sf 1800 28 440
WALL FINISH Sf
Mtl stud 20 ga 6 16 oc 12401 Sf 330 40 923
Drywall 5/8 X walls mU studs or fumng 24802 Sf 132 32 738
Pamt Intenor drywall 3 cis 24802 Sf 180 44 643
CeramlcTlle Wall 2072 Sf 1800 37 296
CEILING FINISH Sf
IT Bar Clg 2 x 4 Ultrallne senes 10334 Sf 158 16369
I Lay In Pnl 2 x 4 ALLOWANCE 10334 Sf 270 27 902
CASEWORK & MILLWORK
Cabmets and tops allowance 162 Lf 330 00 53 460
Reception Counler allowance 1 Ea 900 00 900
ShelVing 12 14 deep var hts 208 Lf 300 00 62 400
10/17/2007
DublmPWCorpYdOct1707 xis
Page 5 of a
B HOdgson Construction Cost Consultant
710 Trancas Street Apt 227
Napa CA 94558
Phone ((707) 2557371
Es2r~q~
I MAINTENANCE YARD DATE 10/17107
DUBLIN PUBLIC WORKS DEPARTMENT DUBLIN Est No 5027B1
CALIFORNIA Job No None
-
ADMINISTRATION AND CREW EST TYPE Concept
AREA 10 334
ITEM I DESCRIPTION QUANTITY II UNIT COST AMOUNT
I I I
DOORS FRAMES AND HARDWARE
Door and Frame Allowance Incldo Damt 41 Ea 540 00 22321
Pair Door & Frame Allow Incldo Damt 2 Ea 840 00 1680
Door Hdwe Assmbly Office/AdmlnlstratJon 33 Ea 780 00 25740
Door Hdwe Assmbly Pair Office/AdmmlstratJon 2 Ea 3780 00 7560
Door Hdwe Assmblv Storaoe 4 Ea 480 00 1920
Door Hdwe Assmblv Bath 4 Ea 780 00 3120
SPECIALTIES
Slanaae allow per door 43 Ea 9000 3870
Pull Down Projection Screen 3 Ea 540 00 1620
Markerboards 8 x4 tYPical 14 Ea 900 00 12600
Shelves metal 5 36 x24 x84 8 Ea 47400 3792
Foldmo PartltJons motor allow 40 Lf 21000 8400
Lockers 64 Ea 300 00 19200
Bath Accessones 12 Ea 18000 2160
EQUIPMENT
Food Service EqUipment 192 Sf 1800 3456
FURNISHINGS Sf
Modular Units 3574 Sf 3000 107 220
PLUMBING AND FIRE PROTECTION Sf
I Fire Protection allow 10334 Sf 420 43 403
Plumblna Fixtures mcldQ roouQh m 34 Ea 300000 102000
HVAC Sf
EaulPment mcldg controls 10334 Sf 180 18601
Ductwork Incldg dampers and InsulatJon 14468 Lb 1200 173 611
Diffuser Register and gnlle allowance 159 Ea 150 00 23 848
ELECTRICAL Sf
SWITCHGEAR 10 334 Sf 120 12401
FEEDER CONDUIT AND WIRE' 11057 Lf 1200 132 689
· WIRING DEVICES
Receptacle Duplex 91 Ea 1632 14841
SWitch SmQle Pole 43 Ea 126 5418
Fluor 2x4 2L Recessd Parabolic aluminum louver 129 Ea 360 46 503
Recessed down lights allow 32 Ea 540 17 280
S IGNALANDCOM M U N ICA TIONS 10334 Sf 420 43 403
I
y~ I TOTAl PROBABLE DIRECT CONSTRUCTION COSTI $21072 $2177 555
GENERAL CONDITIONS@ 15%1 $31 61 $326633
I CONTINGENCY & ESCALATION @30%1 $63 22 $653 266
1 $30554 $3157455
OVERHEAD AND PROFIT @ 10% $30 55 $315745
1 TOTAL ESTIMATED CONSTRUCTION COST $336 09 $3 473 200
10/17/2007
DubhnPWCorpYdOct1707 xis
Page 6 of 8
B Hodgson Construction Cost Consultant
E~~M~:~
I
I MAINTENANCE YARD DATE 10117107
DUBLIN PUBLIC WORKS DEPARTMENT Est No 502784
DUBLIN CALIFORNIA I Job No None
SHOP SPACE I EST TYPE Concept
AREA 9658
DESCRIPTION QUANTIn UNIT COST AMOUNl
EXCAVATION FOR BUILDINGS
Excavate prOject area dispose 1 159 Cy 1260 14603
Eng Fill Imported spread In layers 1391 Cy 17 40 24199
FOUNDATIONS
Ftgs conbnuous and spread 1 story 193 Cy 762 00 147 188
SLAB ON GRADE
SOG 5 4 rock memo #4 @ 18 OCEW 9658 Sf 654 63 163
STRUCTURE
Columns TS 30x30oays 17 Ton 780000 131 832
Roof Structure Trus JSts wi plywood 9658 Sf 1020 98512
ENCLOSURE VERTICAL
Extenor Studwalls (150x1 12)=524 Lf Ave Ht 14
Ext Studwall 6 18ga @ 16 oc 5602 Sf 582 32 602
Bait msul 6 R 19 wall fall backed 1 Side 5602 Sf 132 7394
Int surf ext walls gyp bd pamt rubber base 5602 Sf 264 14788
Stucco 3/4 3 cis skip trowel finish 622 Sy 9994 62201
Alum Storefront and wmdows allowance 1467 Sf 72 00 1 05 624
EXT DOORS FRAMES AND HARDWARE
Doors Frames and Hardware allow 16 Ea 1440 00 23 040
ENCLOSURE HORIZONTAL
FIG Insul 9 112 R30 ceiling attic or floor 16908 Sf 180 30 434
Roofing 5 ply JM 5GNC 20 yr mln surf system mcldg ngld 57 948
msul 9658 Sf 600
SUPPORT ITEMS
Exp Jomt covers celllwall assbly w/2 sp bronze 40 Lf 9317 3727
Flashing and Sheet metal allowance 960 Lf 804 7718
Roof hatch alummum 2 6 x 4 6 1 Ea 1552 81 1553
Jomt sealants allowance 9658 Sf 072 6954
INTERIOR CONSTRUCTION
FLOOR FINISH
IClear epoxy Fmlsh 9658 Sf 900 86 922
WALL FINISH Sf
Mil stud 20 ga 6 16 oc 11590 Sf 330 38 246
Drywall 518 X walls mtl studs or furnng 23179 Sf 132 30 597
Pamt mtenor drywall 3 cis Sf 180
Paint mterlor epoxy finish 23179 Sf 600 139 075
CEILING FINISH Sf
Paint structure finish allow 9658 Sf 270 26 077
DOORS FRAMES AND HARDWARE
Door and Frame Allowance mcldg pamt 10 Ea 540 00 5400
Pair Door & Frame Allow mcldg pamt 3 Ea 840 00 2520
20 x14 Sect metal orade overhead door wi hOist 4 Ea 7200 00 28 800
1 0 x1 0 Sect metal overhead door wi hOist 1 Ea 222000 2220
Door Hdwe Assmblv Office/AdmlnlstratJon 3 Ea 78000 2340
Door Hdwe Assmblv Pair OfficelAdmmlstratlon 3 Ea 3780 00 11340
Door Hdwe Assmblv Storaoe 3 Ea 480 00 1440
10/17/2007
DublinPWCorpYdOct1707 xis
Page 7 of 8
B Hodgson Construction Cost Consultant
~;I:tJ1
I
IMAINTENANCE YARD DATE 10/17/07
DUBLIN PUBLIC WORKS DEPARTMENT I Est No 502784
DUBLIN CALIFORNIA I Job No None
SHOP SPACE I EST TYPE Concept
AREA 9658
DESCRIPTION QUANTln UNIT COST AMOUNT
Door Hdwe Assmblv Entrv 2 Ea 1980 00 3960
Door Hdwe Assmbly Pair Storage 4 Ea 1536 00 6144
SPECIALTIES
ISlgnage allow per door 29 Ea 9000 2610
IShelves metalS 36 x24 x84 30 Ea 47400 14220
EQUIPMENT
IShop EqUipment allowance 9658 S 990 95 614
PLUMBING AND FIRE PROTECTION S
Fire Protecbon allow 9658 S 420 40 564
Plumblnq Fixtures mcldq roouqh In 13 Ea 3000 00 39 000
HVAC S
EqUipment mcldg controls 9658 S 180 17 384
Ductwork IncldQ dampers and InsulatIOn 4926 Lb 1200 59 107
Diffuser Reqlster and qnlle allowance 43 Ea 15000 6439
ELECTRICAL S
'SWITCHGEAR' 9658 S 120 11590
FEEDER CONDUIT AND WIRE 5312 L 1200 63 743
~ WIRING DEVICES'
Receptacle Duplex 48 Ea 19584 9400
SWitch Single Pole 29 Ea 151 2 4385
Fluor 2x4 2L Recessd ParaboliC aluminum louver 110 Ea 432 47520
Recessed down Ilqhls allow 16 Ea 648 10368
'SIGNALANDCOMMUNICA TIONS' 9658 Sf 504 48 676
TOTAL ESTIMATED PROBABLE DIRECT CONSTRUCTION COST $17490 $1 689 179
GENE RAL CONDITIONS @ 15%1 $26 23 $253 377
I CONTINGENCY & ESCALATION@ 30%1 $52 47 $506 754
I $253 60 $2 449 309
I OVERHEAD AND PROFIT @ 10% $25 36 $244 931
I TOTAL ESTIMATED CONSTRUCTION COST $278 96 $2 694 240
10117/2007
DubllnPWCorpYdOct1707 xis