Loading...
HomeMy WebLinkAbout4.06 ApproveChangeOrder87-6 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: February 8, 1988 SUBJECT: Kolb Park Improvements Contract 87-6 Proposed Change Order EXHIBITS ATTACHED: None ~pprove Change Order for resurfacing of the two tennis RECOMMENDATION: courts at Kolb Park FINANCIAL STATEMENT: Additional cost to project of $17,666 DESCRIPTION: The Kolb Park project was designed to add a surface color coat to fill in minor imperfections and provide a new playing surface. After the project was awarded, the surface was cleaned of debris and found to have structural damage in the form of cracks from roots from the trees lining the courts. It is proposed to repair this problem by adding a pavement reinforcing fabric and an asphalt overlay, much the same as a street repair. This process will require the bottom rail of the fence surrounding the courts to be removed, the fence lifted around the bottom, and the overlay put on. The rail would then be replaced and the fence fabric cut to fit and reattached. Tree roots will be cut at the outside of the courts to minimize a recurrence of the problem. Both the landscape architect, Singer and Hodges, and City Engineering Staff concur on the need for this additional work. The additional cost is $17,666. Valley Crest Landscape