HomeMy WebLinkAbout4.6 Accept Work 88-4 GITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: October 24, 1988 SUBJECT: Acceptance of Work - Contract No. 88-4 Annual Street Overlay and Repair; Dougherty Road Bike Path EXHIBITS ATTACHED: 1) Memorandum from Public Works Inspector dated 10/3/88 2) Chan§e Orders RECOMMENDATION: · 2) Approve Change Orders 1 and 2 Accept improvements under Contract 88-4. Authorize final progress payment and retention in the amount of $96,336.97 to Les McDonald Construction. Authorize additional appropriation in the amount of $154,146.99 from General Fund and Gas Tax reserves to cover those project costs which carried over into Fiscal Year 1988-89. FINANCIAL STATEMENT: See Below DESCRIPTION: In April, 1988, the City Council awarded Contract 88-4 to Les McDonald Construction Company. This contract combined the Annual Street Overlay and Repair Program and the Dougherty Road Bike Path. The street repair which was undertaken as part of this contract included those streets which are overlaid and slurry sealed. In the development of the Fiscal Year 1988-89 Annual Budget, Staff anticipated that the work included in this contract would be completed prior to the end of Fiscal Year 1987-88, and therefore, no funds were budgeted in Fiscal Year 1988-89 to complete the project. As indicated in the memorandum from the Public Works Inspector to the City Manager dated October 3, 1988 (see attached), numerous problems were encountered during the course of construction which caused the project to overlap into Fiscal Year 1988-89. These problems also necessitated two change orders (see attached) totaling $20,477.87 and $33,256.10 respectively. These change orders involved additional street repair associated with more extensive street failures than anticipated on Bedford Way, Canterbury Lane, and Brighton Drive. These streets had serious subgrade problems which had last been skin-patched and slurry sealed before incorporation. The Public Works Director authorized additional repair in these areas in the field. In addition to time required to complete this additional work, the contractor took more time than was allowed under the contract and the change orders and was, therefore, assessed liquidated damages totaling $4,500. Despite the problems encountered with this contract, the actual project costs were well under the total budget established for these projects in Fiscal Year 1987-88 as shown below. TOTAL PROJECT COST ITEM 1987-88 APPROVED CHANGE TOTAL PROJECT BUDGET CONTRACT ORDERS ACTUAL COST IMPROVEMENTS Street Overlay & Repair: Annual Overlay Street Repair Striping Subtotal: $170,000.00 250,000.00 5,000.00 $425,000.00 $107,496.60 $ (8,864.60) $ 98,632.00 193,308.00 63,343.57 256,651.57 8~335.90 <745.50) 7,590.40 $309,140.50 $53,733.47 $362,873.97 Bike Path: TOTAL IMPROVEMENTS $60,000.00 $485,000.00 $60,289.00 0.00 60,289.00 $369,429.50 $53,733.47 $423,162.97 Less Liquidated Damages (4,500.00) TOTAL NET CONTRACT COST $418,662.97 ENGINEERING/INSPECTION Street Overlay & Repair Bike Path $34,000.00 15,000.00 $29,809.34 12~234.09 TOTAL ENGINEERING/INSP. $49,000.00 $42,043.43 TOTAL PROJECT COST: $534,000.00 $460,706.40 The costs incurred during Fiscal Years 1987-88 and 1988-89 are illustrated below: ACTUAL COSTS ACTUAL COSTS TOTAL ITEM 1987-88 1988-89 ACTUAL COSTS Street Overlay and Repair: Annual Overlay $ 83,025.90 Street Repair 181,663.20 Striping 3,852.90 Engineering/Inspection 26,241.22 Subtotal: $294,783.22 $ 15,606.10 70,488.37 3,737.50 31568.12 $ 93,400.09 $ 98,632.00 252,151.57 7,590.40 29,809.34 $388,183.31 Bike Path: Improvements $ 0.00 Engineering/Inspection 11~776.19 Subtotal: $ 11,776.19 $~60,289.00 457.90 $ 60,746.90 $ 60,289.00 121234.09 $72,523.09 TOTAL COSTS: $306,559.41 $154,146.99 $460,706.40 The City Engineer has inspected the work performed on the project and determined that it is complete and in accordance with the plans and specifications. CITY OF DUBLIN MEMORANDUM Date: October 3, 1988 To: City Manager From: Public Works Inspector Subject: Attached Change Orders for Contract 88-4 The annual street overlay project includes digging out and repairing the failed areas in both the streets to be overlaid with asphalt concrete and those which receive a slurry seal coat. Identification of failed areas is often made difficult by previous attempts to cover the failures with slurry seals or asphalt skin patches, a commoh practice of Alameda County maintenance. During the recent overlay project, it became evident, as the marked out areas were exposed, that the failures were more extensive than originally surveyed. The streets which required almost total rehabilitation were Canterbury, Bedford, and Brighton. Brighton Drive also collmpsed in five locations in the parking lanes during the paving operation. The cost to repair these areas required an additional $33,295.10. This amount covers extended bid item amounts to make the extra repairs. Bid item quantities also had to be adjusted because Regional Street was pulled off the overlay at the last minute due to a time conflict for the installation of E1 Pollo Asado's gas line. The overlay was extended on Tamarack to Elgin Lane, thereby changing quantities in striping and monuments in particular. An extra cost was also incurred when the grinder hit a buried monument on Brighton Drive and had to be repaired. DS/gr Project CIPl: -' oject Finance Control ~gineer Contract I PERCEHT COMPLETED: COUXCIL APPROVED COHT2ACTOR: ~PROVEO ~UOGET AXOUXT COORDIL ;?PROVED COR/RJ¢! RRO~RI: C~REE ORDER C~;R~E ORO£R Annual Street Overlay/Repair and Dougherty Road Bike Path 9629 88-4 100 ! Les McDonald Construction S 531,500.00 IDI~E! 7 $/- RDR~ER ! +1- $ lOX;ER ~ $/- S R~RDER 10 H- S 33,256.1o ~ 36 %_ .4_2_9_._5..o_ _ S 423:162.97 P'RO~REiii 2;YXEXT$ X.t~£: 2~YlE~T JUICER I s 254,87~.oo l s__._67,455.oo I $ $ $ 11 S. 12 S .......... Ill $_ 15 ~. S. 32__2.: 3__2.6..:.0.0_.__ x 96,336.97 RECOIlE~ATIOX: APPROVED APPROVED DENIED · APPROVEU DENiEB LST City llyor Supervising City Department Head . · ~' 0 Box 4076,.H~yvard_.C_A 94540 ~cDo~ld Consc=UctlOo~ r, 3) Belay and down ~ime during pavini opera~ion caused by subgr&d¢ failure on Additional trucking ~o ~ump si~e ~ . Repair of damage to AC grinder caused by hi~i.~ $ ~29,~4 buried survey monument Repair ~o fa~lcd area~ on Brighton and Regional a£~er comple~ion of overlay materials) $ 11~174.93 CHANGES IN FIELD MF. ASU~,~;D QUANTITIES FROM BID ITEM AMOUNTS 1) Plane AO pavement FI~I,.II 17 068 2) I~s~all overlay .52 364,525 SF - ~ -~,,~22 3) p~vement fabric ~)'(-' BID 24,597 SY ~, ~,~ &) Adjust monuments BID 11 E~ 12 0 70.00 ~ID · FISLD 201 El ($ 437.84) ($~,42~.~6) $ 840.00 ($ ~ ~ ': CHANOB. ORDER NO, ! CON?rD', ~"~ 6) c~ltr~n~ De~il 23 FIELD 100 L2 350 o 1.6o ~ ~ ('S 56o.oo) 2-v~y rc~ec~ore BID 3O BA ~I?X,D 0 ~A 30--'-~A 2-~¥ reflectors (blue) 9ID lB EA FIELD 11 ~A $.do ~ ($ 15o.oo) Single yello~ broken DID 7730 ~r FInD 7091'LT s ~0.oo ,,//Io ($ ' 7o.oo) , ,.... ,. .... . ..... :., ." ~.. .. ',','!' ,,,,~ .... .. : , ...... ' , SEP Z3 '88 24:16 LES MCDOM,qLD CONETR~.~][)I ' H.bZb - ~L ~0.~ . . ,.. ~,~ CHANGE ORDBR ~0. 1CONT'D. yellow Sinile white BID FIELD 580 LF ~ ~ .2~ ~,~ 12) Double yellow BID 820 fIELD II14 /c 14) Yellow line BID i233 LF ($ ]9~.oo) ',- _/ 1.30 ($ 1~5.oo) ',D $ 981.50 ~ANG£ O~DE~ NO. 1 CONT~D. 15) FIELD ~ 260'~00 ($3,120.00) ~ ~.0o $38,427.00 16) Pavement failure 3" ~ID 70,800 -'38,4~7 0 1.lo $ 7,559.20 Pavement ~ailur~ 4" BID 101,',680 SF FIELD