HomeMy WebLinkAbout4.6 Advertise ForBids 88-6 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: May 9, 1988 SUBJECT: Contract 88-6 Traffic Signals at Amador Plaza Road/Amador Valley Blvd. and Village Parkway/Lewis Avenue Intersections; Dual Left Turn Modification for Eastbound Dublin Blvd. at Village Parkway EXHIBITS ATTACHED: Plans and Specifications will be available at the }l~ty Council meeting. RECOMMENDATION: ~/~;'Authorize Staff to advertise for bids. FINANCIAL STATEMENT: Budgeted costs are as follows: Design/Inspection Improvements Right-of-Way Two-Signal Project Dublin Blvd/VPW* Total $ 73,000 $ 5,000 $ 78,000 349,500 20,000 369,500 500 500 $423,000 $ 25,000 $ 448,000 Deszgn budgeted for 1987-88; construction for 1988-89. Estimated costs are as follows: R/W Description & Negotiation 1,000 Design/Inspection $ 68,500 Improvements 400,000 Right-of-Way 500 $470,000 DESCRIPTION: This project provides for the installation of traffic signals at the intersections of Amador Plaza Road/Amador Valley Blvd. and Village Parkway/Lewis Avenue. The project will also complete the landscaping of Amador Valley Blvd. from Amador Plaza Road to Village Parkway and will complete the signal interconnect link from Dublin Boulevard north on Village Parkway and the west on Amador Valley Blvd. to San Ramon Road. In addition, the second left turn lane from eastbound Dublin Boulevard to northbound Village Parkway has been added to this project in order to obtain the best possible construction cost. This modification was requested by the City Council and will significantly improve the level of service at the Dublin Blvd./Village Parkway intersection. This project is included in the 1987-88 and 1988-89 Fiscal Years' Capital Improvement Program budgets. Both intersections receiving new signals have met the warrants for the installation of traffic signals. Because of the new signal at Amador Valley Blvd. and Amador Plaza Road, the left turn storage bay from westbound to southbound must be extended. This will affect the church driveway on the north side of the street by moving the opening to the east, making a "U" turn necessary rather than a direct turn-in. CITY OF DUBLIN DEPARTMENT OF PUBLIC WORKS NOTICE TO BIDDERS Notice is hereby given that sealed bids, subject to the conditions named herein and in the Specifications therefo~ for TRAFFIC SIGNALIZATION OF VILLAGE PARKWAY AT LEWIS AVEN~E AND AMADOR YAiJ~EY BLVD. AT A~DOR PLAZA ROAD, LANDSCAPING AND IRRIGATION OF AMADOR VALLEY BLVD. AND TRAFFIC SIGNAL MODIFICATION OF DUBLIN BLVD. AT VILLAGE PARKWAY, CONTRACT 88-6 addressed to the City of Dublin will be received at the office of the City Engineer, 6500 Dublin Boulevard Suite D, Dublin, California 94568 up to 2:00 p.m. Monday, June 13, 1988 at which time they will be publicly opened and read. A Bid Deposit equal to at least 10~ of the total amount of the bid shall be placed in an envelope attached to the outside of the sealed proposal. The Bid Deposit shall be in one of the following forms: cash~ cashier's check or certified check payable to the City, or bidder's bond in favor of the City executed by an authorized surety company. Faithful Performance or Labor and Materials bonds as set forth in the Standard Specifications will be required from the successful bidders. The right is reserved, as the interest of the City may require, to reject any or all bids, to waive any informality in bids, and to accept or reject any items of the bid. The Council has ascertained the general prevailing rate of wages applicable to the work to be done. A tabulation of the various classifications of workers to be employed and the prevailing rate of wages applicable thereto is on file in the City Clerk's office and is available for inspection. Plans and Contract Documents may be secured at the office of the City Engineer, 6500 Dublin Boulevard Suite D, Dublin, California 94568, at the following non-refundable costs: Plans and Contract Documents $20.00 per set. If mailing is desired, an additional non-refundable cost of $5.00 per set will be required. For further ~nformation, telephone 415/829-4927. oESCRIPTION OF WORK: Amador Valley Blvd. between Amador Plaza Road and Village Parkway to be landscaped. Signals are to be constructed at the intersections of Amador Valley Blvd. and Amador Plaza Road and the intersection of Village Parkway and Lewis Avenue, signal modification at Dublin Blvd./Village Parkway. The work to be done includes but is not limited to the furnishing of all labor and materials for the performance of the following tasks: installation of full pavement section~ including base, binder, AC pavement, and fog seal) installation of curb, gutter, sidewalks, and the installation of landscaping, irrigation system, street lighting, signalization, signing, and other roadway items. ENGINEER'S ITEMIZATION OF WORK: The quantities tabulated below are estimates. Payment quantities shall be based on the quantities of the Bid Schedule presented in the proposal section of the special provisions. ITEM ITEM UNIT OF ESTIMAIED NO. DESCRIPTION MEASURE QUANTITY 1 MOBILIZATION LS 1 2 TRAFFIC CONTROL LS 1 3 CLEARING & GRUBBING LS 1 4 CURB & GUTTER REMOVAL LF 48 5 DRIVEWAY, SIDEWALK & HGP RAMP REMOVAL SF 976 6 ISLAND REMOVAL SF 2,725 7 PAVEMENT REMOVAL SF 7,072 8 A C SAWCUT LF 867 9 P C C SAWCUT LF 125 10 FULL PAVEMENT SECTION SF 7,072 11 FOG SEAL SF 12,000 12 PLANING 6~ WIDE KEY CUT LF 222 13 A C OVERLAY SF 3,15~ 14 P C C CURB LF 652 15 P C C CURB & GUTTER SF 16 16 P C C SIDEWALK SF 261 17 P C C HANDICAP RAMP EA 18 P C C DRIVEWAY SF 403 'q RELOCATE ROADWAY SIGN EA 2 3 ROADWAY SIGN EA 7 21 VILLAGE PARKWAY & LEWIS AVE. SIGNAL EA 1 22 AMADOR YALLEY/AMADOR PLAZA SIGNAL EA 1 23 PAINTING, STRIPING, PAVEMENT MARKERS LS ! 24 INTERCONNECT WIRES LF 5,520 25 INTERCONNECT CONDUIT & WIRES LF 170 26 INTERCONNECT PULL BOX EA 27 SIGNING & STRIPING ~ DUBLIN BLVD/ VILLAGE PARKWAY LS 1 2S DUBLIN BLVD./VILLAGE PKWY. SIGNAL MODIFICATION LS ! 29 15 GAL. TREE EA 19 30 $ GAL. SHRUB EA 27 31 GROUND COVER SF 560 32 TOPSOIL CY 32 33 MULCH SY 95 3~ PREPARE PLANT BED SF 855 35 IRRIGATION LS 36 INTERLOCKING PAVERS SF 7,000 37 PRESSURE TREATED DF LF 25~ 38 90-DAY MAINTENANCE PERIOD LS 1 39 CONST. STAKING LS 1 Where work includes excavation of any trench or trenches or open excavations five feet or more in depth, the bid shall contain adequate sheeting, shoring, and bracing or equivalent method, for the protection of life or limb, which shall conform to applicable safety orders, Pursuant to Section 5590 of the Government Code, securities in an amount equivalent to any contract retention shall be permitted by the City. Attention is directed to Section 2 of the Standard Specifications (General Provisions) for detailed instructions regarding bidding. The City Engineer has prepared an Engineer's Estimate of the work to be done. Such estimate is available for public inspection. The Contract to be entered into with the City contemplates completion of the work within 80 working days from the date of Notice to Proceed by the City. Each bid must be submitted on the prescribed form and accompanied by Certification by Bidder regarding Equal Employment Opportunity. The Bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under his contract: (a) Must be acceptable to the City~ and (b) Must submit Certification by Proposed Subcontractor regarding Equal Employment Opportunity. Approval of the proposed subcontract award cannot be given by the Owner unless and until the proposed subcontractor has submitted the Certification and/or other evidence showing that it has fully complied with any report requirements to which it is or was subject. (c) Although the Bidder is not required to attach such Certifications by proposed subcontractors to his bid, the Bidder is here advised of this requirement so that appropriate action can be taken to prevent subsequent delay in subcontract awards. The Bidder is responsible for verifying to his own satisfaction the existing conditions prior to submitting his bid. The City will not pay additional monies or relieve any Bidder from any obligations due to discrepancies between any drawing depicting conditions as existing and existing site conditions. A bidders~ meeting will be held at the City Engineer~s Office, 6500 Dublin Blvd., Suite D, Dublin~ California, on June 6, 19887 at the hour of 1:30 p.m. At that time, a representative of the City will be available to answer Bidders' questions. Bidders will be offered the opportunity to inspect the site of the work. Dated: May 10, 1988 Richard C. City Clerk PLEASE NOTE: BECAUSE OF THE NUMBER OF PLANHOLDERS ANTICIPATED ON THIS PROJECT, THE CITY WILL NOT READ PLANHOLDERS LISTS OVER THE PHONE. LISTS WILL BE MAILED PERIODICALLY TO ALL PLANHOLDERS. ANY OTHER PARTIES WISHING TO OBTAIN PLANHOLDERS LISTS ~Y REQUEST TO BE ON THE MAILING LIST OR MAY PICK UP THE LIST AT THE CITY OFFICES.