HomeMy WebLinkAboutReso 085-02 CCS I580Tassajr RESOLUTION NO. 85 - 02
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT WITH
CCS PLANNING & ENGINEERING, INC., FOR CONSULTING SERVICES
I-580/TASSAJARA ROAD INTERCHANGE IMPROVEMENTS DESIGN
WHEREAS, on November 2, 1999, the City Council of the City of Dublin approved an agreement
for consulting services with CCS Planning and Engineering, Inc., for the design of the 1-580/Tassajara
Road Interchange Improvements; and
WHEREAS, on May 1, 2001, the City Council of the City of Dublin approved Amendment No. 1
for additional design services; and
WHEREAS, Caltrans has reviewed the project plans and specifications prepared by CCS and,
based on Caltrans comments, CCS is required to perform additional design of the plans; and
WHEREAS, on November 6, 2001, the City Council approved the funding agreement with Koll
Dublin Corporate Center for the design and installation of landscaping along the Koll property abutting the
1-580 freeway; and
WHEREAS, in order to proceed with this landscaping work and other design changes required by
Caltrans, it is necessary to amend CCS's contract;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve Amendment No. 2 to the agreement with CCS Planning and Engineering, Inc., to include
additional services, as shown in "Exhibit A" attached hereto.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment.
PASSED, APPROVED AND ADOPTED this 18th day of June, 2002.
AYES: Councilmembers McCormick, Oravetz, Sbranti, Zika and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None ~¢///~- ~~M~/Mayor
/
K:/G/6-18-02/reso-ccs.doc (Item 4.18)
g:\engr\ccs\tassXreso_tass design amendment #2
EXltlBIT "A" OF RESOLUTION -02
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND CCS PLANNING AND ENGINEERING, INC..
FOR ENGINEERING SERVICES
WltEREAS, the City of. Dublin (hereinafter referred to as "CITY") and cCs Planning and
Engineering, Inc. (hereinafter.referred to as "CONSULTANT"), entered into an agreement on November
2, 1999 to design the 1-580/Tassajara Road Interchange Improvements; and
WItEREAS, the Scope of Work to be performed was mended on May 1, 2001 and is
proposed to be extended; and
WHEREAS, the not-to-exceed contract mount is proposed to be increased to cover the
cost of the additional Work;
NOW, TItEREFORE, the parties hereto agree as follows: '
Scope of Work
The Scope o'f Work shall be extended to include additional scope of work as described in
Consultant's letter dated March 11, 2002 for the 1-580/Tassajara Road Interchange Improvemenm Project
(attached).
Extension of Term
The total cost for time-and-materials work under this amendment shall not exceed an additional
$8!,366.
CITY OF DUBLIN
Mayor
ATTEST:
City Clerk
CCS PLANNING AND ENGINEERING, INC.
Thomas M. Wintch
Date: /~,~,~r ~go, Lo,, ~